CN212162462U - Floor-following mounting device for temporary floor power utilization for construction site - Google Patents
Floor-following mounting device for temporary floor power utilization for construction site Download PDFInfo
- Publication number
- CN212162462U CN212162462U CN202021210859.2U CN202021210859U CN212162462U CN 212162462 U CN212162462 U CN 212162462U CN 202021210859 U CN202021210859 U CN 202021210859U CN 212162462 U CN212162462 U CN 212162462U
- Authority
- CN
- China
- Prior art keywords
- threading pipe
- floor
- power supply
- electric box
- wall body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
The utility model relates to a floor-following installation device for temporary electricity utilization of floors in building sites, which comprises an electric box, a first threading pipe, a second threading pipe, a first flame-retardant corrugated hose, a second flame-retardant corrugated hose and a power supply cable of the electric box, wherein the first threading pipe and the second threading pipe are pre-embedded on a wall body, outlet cavities are formed in the wall body corresponding to the outlet positions of the first threading pipe and the second threading pipe, and the outlet cavities are communicated with the first threading pipe and the second threading pipe; the utility model discloses a fire-retardant bellows of electric box, including the electric box, the electric box is installed on the wall body and is located the chamber top of being qualified for the next round of competitions, the power supply cable of electric box passes first threading pipe and stretches out the chamber outer junction electric box of being qualified for the next round of competitions, the power supply cable of electric box passes second threading pipe and stretches out the chamber outer junction electric box of being qualified for the next round of competitions, the fire-retardant bellows cover of second is put on exposing the power supply. One section electric wire cable between first threading pipe and second threading pipe and electronic box exposes then uses first fire-retardant corrugated hose, carries out insulation protection, improves the security greatly.
Description
Technical Field
The utility model relates to a building field, in particular to along with layer installation device of interim power consumption of floor for building site.
Background
The existing floor temporary electricity utilization can be used for temporary electricity utilization on floors during main structure construction in the building construction process and also used for floor electricity utilization in other construction stages, a power source of the temporary electricity utilization is from a construction site power distribution room, the temporary electricity utilization is installed along with the floor, convenience, safety and economy in the construction process are improved, and the practicability in the user construction process is achieved.
The layer-following installation temporary power utilization is connected with a construction power utilization power supply, the layer-following installation temporary power utilization box is connected with the power supply, then the power supply of the layer-following installation temporary power utilization box and the power supply of the layer-following installation power utilization box are connected in the using process by using a cable, the height of the layer is gradually increased along with the cable between the layer-following installation temporary power utilization box and the power supply, the vertical and horizontal cables of the electric box and the cable are exposed outside in the using process and are difficult to perfect in insulation measures with building structures, various unsafe factors existing in the construction process easily damage the layer-following installation box and the cable, the electric box and the cable cause a building problem, when electric leakage occurs due to human factors or other reasons, the power supply is generally turned off, the layer-following installation temporary power utilization box is generally installed on an operation layer, and the cable is obviously laid.
The temporary electricity utilization is installed along with the layer installation device and is generally installed in stairwell, cable lay and be difficult for receiving destruction position such as in the major structure, and under the general condition, the temporary electricity utilization case cable along with the layer installation is laid along with the mode that the major structure construction carried out pre-buried threading pipe.
However, because the temporary power box installed along with the floor is generally installed on the operation floor and limited by the ground of the operation floor, in addition, cables are exposed, if the problems that the cables are damaged due to human factors or other reasons, the power box is damaged, insulation measures are not effectively insulated and the like exist, the problems of tripping, electric leakage and the like easily exist, potential safety hazards exist, and then, the temporary power box installed along with the floor is provided with the anti-smashing shed and the cables are provided with the sleeves, but the temporary power box is heavy and inconvenient to use after being provided with the anti-smashing shed, and the cables are still easy to damage to different degrees due to external factors in the process of increasing the floor and using after being provided with the sleeves.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a will be along with electronic box of the interim power consumption of layer installation fix on the wall to laying of cable changes the stealthy applying into by the bright applying, avoids because of the bright applying problem artificial or other reasons cause the interim power consumption of floor along with layer installation device of destruction to the cable.
The purpose of the utility model is realized like this:
a floor-following installation device for temporary electricity utilization of floors for construction sites comprises an electric box, a first threading pipe, a second threading pipe, a first flame-retardant corrugated hose, a second flame-retardant corrugated hose and a power supply cable of the electric box, wherein the first threading pipe and the second threading pipe are pre-embedded in a wall body, outlet cavities are formed in the wall body corresponding to the outlet positions of the first threading pipe and the second threading pipe, and the outlet cavities are communicated with the first threading pipe and the second threading pipe;
the utility model discloses a fire-retardant cable of electronic box, including the wall body, the electrical cabinet is installed on the wall body and is located the chamber top of being qualified for the next round of competitions, the power supply cable of electrical cabinet passes first threading pipe and stretches out the chamber outer junction electrical cabinet of being qualified for the next round of competitions, first fire-retardant bellows cover is put on exposing the power supply cable of the electrical cabinet of being qualified for the next round of competitions outside the chamber, the power supply cable of electrical cabinet passes second threading pipe and stretches out the chamber outer junction electrical cabinet of being qualified for the next round of competitions, the fire-.
Because the power supply cable is pre-buried in the wall body, the user can be according to the pre-buried position of the position rational selection of electronic box installation, also can set up pre-buried threading pipe in the unified position of every floor, very big maneuverability that facilitates the user to use, convenience and security, and because install at interim electronic box use the inflation screw on the wall body in the floor fixed can, the user need not to set up the canopy of preventing pounding of keeping off the rain after can accomplishing interim electronic box installation, the cable of being connected between electronic box and power is laid through pre-buried threading pipe, not only use easy operation, insulation protection is reliable, and can also reduce the maintenance cost, and it exposes then uses first fire-retardant corrugated hose to have one section electric wire cable between first threading pipe and second threading pipe and electronic box, insulation protection, the security improves greatly.
The purpose of the utility model can also adopt the following technical measures to solve:
as a more specific scheme, a foam plate is embedded in the position of the wire outlet cavity.
More specifically, the foam board is a polystyrene foam board.
More specifically, the foam board has a length of 200mm, a width of 150mm and a thickness of 100mm
The utility model has the advantages as follows:
the utility model discloses, because the power supply cable is pre-buried in the wall body, the user can be according to the pre-buried position of the position rational selection of electronic box installation, also can set up pre-buried threading pipe in the unified position of every floor, maneuverability that very big convenience of customers used, convenience and security, and because install at interim electronic box use the inflation screw on the wall body of floor in fixed can, the user need not to set up the rain-sheltering after can accomplishing with interim electronic box installation and prevents pounding the canopy, the cable of being connected between electronic box and power is laid through pre-buried threading pipe, not only use easy operation, insulation protection is reliable, and can also reduce the maintenance cost, and it then uses first fire-retardant corrugated hose to have one section electric wire cable to expose between first threading pipe and second threading pipe and electronic box, insulation protection, the security improves greatly.
Drawings
Fig. 1 is the utility model discloses the temporary power consumption of floor is along with the schematic diagram of layer installation device for building site.
Fig. 2 is the utility model discloses building site uses the front view along with layer installation device of the interim power consumption of floor.
Fig. 3 is the utility model discloses the left side view along with layer installation device of interim power consumption of floor for the building site.
Detailed Description
The invention will be further described with reference to the following drawings and examples:
an embodiment, as shown in fig. 1 to 3, is a floor-following installation device for temporary electricity utilization of floors in a building site, including power supply cables (not shown in the figure) of an electric box 1, a first threading pipe 2, a second threading pipe 3, a first flame-retardant corrugated hose 4, a second flame-retardant corrugated hose 5 and the electric box 1, the first threading pipe 2 and the second threading pipe 3 are pre-embedded on a wall body, an outlet cavity 6 is opened at an outlet position of the wall body corresponding to the first threading pipe 2 and the second threading pipe 3, a foam board is pre-embedded at the outlet cavity 6 position, the foam board is a polystyrene foam board, the length of the foam board is 200mm, the width of the foam board is 150mm, the thickness of the foam board is 100mm, and the outlet cavity 6 is communicated with the first threading pipe 2 and the second threading pipe 3.
The utility model discloses a cable box, including electrical cabinet 1, first threading pipe 2, first flame retardant corrugated pipe cover, second threading pipe 3, electrical cabinet 1, first flame retardant corrugated pipe cover is put on exposing the power supply cable of the electrical cabinet 1 outside the chamber 6 of being qualified for the next round of competitions, electrical cabinet 1 installs on the wall body and is located the chamber 6 top of being qualified for the next round of competitions, the power supply cable of electrical cabinet 1 passes first threading pipe 2 and stretches out the chamber 6 outer joint electrical cabinet 1 of being qualified for the next round of competitions, the second flame retardant corrugated pipe cover is put on exposing the power supply cable of the electrical cabinet 1 outside the chamber 6 of being qualified.
Because the power supply cable is pre-buried in the wall body, the user can rationally select pre-buried position according to the position of electronic box 1 installation, also can set up pre-buried threading pipe in the unified position of every floor, very big maneuverability that facilitates the user to use, convenience and security, and because install at interim electronic box 1 use the inflation screw on the wall body of floor in fixed can, the user need not to set up after can installing interim electronic box 1 and accomplish to keep off the rain and prevent pounding the canopy, the cable of being connected between electronic box 1 and the power is laid through pre-buried threading pipe, not only use easy operation, insulation protection is reliable, and can reduce the maintenance cost, and it then uses first fire-retardant corrugated hose 4 to have one section electric wire cable to expose between first threading pipe 2 and second threading pipe 3 and electronic box 1, insulation protection, the security improves greatly.
Claims (4)
1. The utility model provides a building site is with installation device along with layer of interim power consumption of floor which characterized in that: the cable comprises an electric box, a first threading pipe, a second threading pipe, a first flame-retardant corrugated hose, a second flame-retardant corrugated hose and a power supply cable of the electric box, wherein the first threading pipe and the second threading pipe are pre-embedded on a wall body, outlet cavities are formed in the wall body corresponding to the outlet positions of the first threading pipe and the second threading pipe, and the outlet cavities are communicated with the first threading pipe and the second threading pipe;
the utility model discloses a fire-retardant cable of electronic box, including the wall body, the electrical cabinet is installed on the wall body and is located the chamber top of being qualified for the next round of competitions, the power supply cable of electrical cabinet passes first threading pipe and stretches out the chamber outer junction electrical cabinet of being qualified for the next round of competitions, first fire-retardant bellows cover is put on exposing the power supply cable of the electrical cabinet of being qualified for the next round of competitions outside the chamber, the power supply cable of electrical cabinet passes second threading pipe and stretches out the chamber outer junction electrical cabinet of being qualified for the next round of competitions, the fire-.
2. The floor-following installation device for temporary floor electricity utilization for a construction site according to claim 1, characterized in that: and a foam plate is embedded in the position of the wire outlet cavity.
3. The floor-following installation device for temporary floor electricity utilization for a construction site according to claim 2, characterized in that: the foam board is a polystyrene foam board.
4. The floor-following installation device for temporary floor electricity utilization for a construction site according to claim 2, characterized in that: the foam board has a length of 200mm, a width of 150mm and a thickness of 100 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021210859.2U CN212162462U (en) | 2020-06-24 | 2020-06-24 | Floor-following mounting device for temporary floor power utilization for construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021210859.2U CN212162462U (en) | 2020-06-24 | 2020-06-24 | Floor-following mounting device for temporary floor power utilization for construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212162462U true CN212162462U (en) | 2020-12-15 |
Family
ID=73700611
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021210859.2U Active CN212162462U (en) | 2020-06-24 | 2020-06-24 | Floor-following mounting device for temporary floor power utilization for construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212162462U (en) |
-
2020
- 2020-06-24 CN CN202021210859.2U patent/CN212162462U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110469048B (en) | Wiring method for assembled wall | |
CN206340934U (en) | A kind of residential electricity cabling laying structure | |
CN206360298U (en) | Architecture indoor cable system | |
US3879641A (en) | Utility meter pedestal-foundation mounting | |
CN103414130A (en) | Slot and layout structure of slots | |
CN101831932B (en) | Dredger electric installation construction technology | |
KR101022752B1 (en) | Box for electric wire protective of apartment house | |
CN212162462U (en) | Floor-following mounting device for temporary floor power utilization for construction site | |
KR101266228B1 (en) | The outlet box with earthing structure | |
KR20170133975A (en) | Non bolt joint connector apparatus for sleeve of standing cable tray | |
CN203481732U (en) | Slot and layout structure thereof | |
CN106655033B (en) | Wisdom assembles baseboard and its assembly method | |
CN214754204U (en) | Socket type grounding device | |
CN216215122U (en) | Pre-buried fixing device of electrical installation engineering electronic box | |
CN210857599U (en) | Pipeline separation waterproof heat preservation integration wall body and building that constitutes thereof | |
KR100379752B1 (en) | Method of distributing wires for a building | |
CN111900679B (en) | Anti-falling device for fireproof mud | |
CN218182076U (en) | Novel panel wiring bottom box | |
CN106558842A (en) | A kind of 630KVA power transformation boxes and installation foundation | |
CN206364463U (en) | Baseboard corner wire structures | |
CN215631014U (en) | Wall block with slotted hole | |
KR200492152Y1 (en) | Fixing system for outlet box on building wall | |
CN108331292A (en) | Inside plant assembly system and laying method | |
CN210890366U (en) | Pipe groove structure for prefabricated water and electricity pipeline | |
RU2681150C1 (en) | Lifting distribution system with lifting panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |