CN212153405U - Embedded prestressing force batter pile in tip - Google Patents

Embedded prestressing force batter pile in tip Download PDF

Info

Publication number
CN212153405U
CN212153405U CN202020637054.XU CN202020637054U CN212153405U CN 212153405 U CN212153405 U CN 212153405U CN 202020637054 U CN202020637054 U CN 202020637054U CN 212153405 U CN212153405 U CN 212153405U
Authority
CN
China
Prior art keywords
pile
pulling device
inclined pile
loading device
pulling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020637054.XU
Other languages
Chinese (zh)
Inventor
魏建华
尹骥
俞海洲
马宗玉
海明雷
李想
卫佳琦
徐司慧
王勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Survey Design And Research Institute Group Co ltd
Original Assignee
SGIDI Engineering Consulting Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SGIDI Engineering Consulting Group Co Ltd filed Critical SGIDI Engineering Consulting Group Co Ltd
Priority to CN202020637054.XU priority Critical patent/CN212153405U/en
Application granted granted Critical
Publication of CN212153405U publication Critical patent/CN212153405U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to an end embedded prestressed inclined pile, which is driven into the soil before excavation; the anti-pulling device is movably connected with the inclined pile in the axial direction; the loading device takes the anti-pulling device as an acting point and applies axial prestress to the inclined pile; the anti-pulling device is pre-buried and fixed in the enclosing purlin, and a loading device is installed at the part of the upper end of the anti-pulling device, which extends out of the enclosing purlin; the anti-pulling device and the loading device are locked and fixed by adopting a detachable positioning device. The utility model can apply prestress before excavation, and quickly exert bearing capacity of the inclined pile; the force transmission equipment can provide reverse thrust to the inclined pile support to enable the inclined pile to deform in advance, so that the bearing capacity of the inclined pile is exerted quickly, the deformation of the foundation pit is controlled, and the surrounding environment is protected; after the structure maintenance is finished, the anti-pulling device and the prestress stressing device above the enclosing purlin can be disassembled and recovered; the inclined pile prestress applying device is positioned outside the ring beam, has a wide application range and can extend to the ground so as to avoid the influence of underground water due to the falling bottom of the ring beam.

Description

Embedded prestressing force batter pile in tip
Technical Field
The utility model relates to a bracing device for in foundation ditch particularly, is an embedded prestressing force batter pile of tip, belongs to foundation ditch engineering technical field.
Background
The slant slip casting steel pipe props as foundation ditch engineering temporary support structure, has not only increased the interior operating space of hole, has also reduced the supporting system cost, has good application and spreading value. However, in the actual implementation process, only after the top of the oblique grouting steel pipe is deformed to a certain extent, a reliable bearing capacity can be provided, and the deformation of the foundation pit and the protection of the surrounding environment are not facilitated.
The Chinese patent document with the publication number of CN103276739A, 9 and 4 in 2013, discloses a foundation pit supporting structure with an inclined pile and a prestressed enclosing purlin, and discloses a concept that a loading device is arranged at the bottom of an inclined steel support so as to actively apply prestress, but the loading device is arranged on a bottom plate and can be implemented only after earth is completely excavated, and the loading device is difficult to recover; and because loading device sets up on the bottom plate, loading device is far away from hole limit control system, and the connecting wire of loading device and hole limit control system influences hole limit earthwork excavation and underground major structure construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an embedded prestressing force batter pile of tip and construction method thereof compares in existing slant slip casting steel pipe support, the utility model discloses can apply the batter pile prestressing force before the earthwork excavation fast, make the batter pile get into the stress state in advance to reach quick performance batter pile bearing capacity, reduce the purpose that the foundation ditch warp and effectively protect all ring edge borders, the device is exerted to batter pile prestressing force in addition is located the ring roof beam outside, it is big to have application scope, thereby the extensible avoids because the ring roof beam falls the end and suffers groundwater influence, exerts advantages such as prestressing force device recoverable.
The utility model adopts the following technical proposal:
an end embedded prestressed inclined pile comprises an inclined pile, a surrounding purlin, an anti-pulling device and a loading device; the inclined piles are driven into the soil before excavation; the anti-pulling device is movably connected with the inclined pile in the axial direction; the loading device takes the anti-pulling device as an acting point and applies axial prestress to the inclined pile; the anti-pulling device is pre-buried and fixed in the enclosing purlin, and the loading device is installed at the part of the upper end of the anti-pulling device, which extends out of the enclosing purlin; the anti-pulling device and the loading device are locked and fixed by adopting a detachable positioning device.
Preferably, the anti-pulling device 4 is cylindrical and is sleeved outside the inclined pile 10, and the loading device 1 is fixedly connected with the upper end of the anti-pulling device 4 through a flange.
Preferably, the anti-pulling device 4 is cylindrical and is sleeved outside the inclined pile 10, and the loading device 1 is arranged inside the anti-pulling device 4; the side walls of the loading device 1 and the anti-pulling device 4 are provided with a plurality of corresponding positioning holes, and the loading device and the anti-pulling device are fixedly positioned through a plurality of bolts.
Preferably, an end sealing plate is fixedly installed at the upper end of the batter pile 10, and the loading device 1 applies force to the end sealing plate.
Preferably, the inclined pile is one or more of a steel pipe, profile steel, combined steel, a prefabricated pipe pile, a square pile and a steel and concrete combined type long and thin axial stress rod piece.
Preferably, one end of the inclined pile extends out of the surrounding purlin, and the other end of the inclined pile is embedded into pit bottom soil; the inclined pile is provided with a limiting device for fixing and positioning the anti-pulling device 4.
Preferably, the purlin is a retaining pile end anchoring and force transmission component made of one or more of steel concrete, section steel and combined section steel.
Furthermore, the anti-pulling device is of a cylindrical structure and sleeved on the inclined pile; one end of the anti-pulling device is embedded and fixed in the enclosing purlin, and the other end of the anti-pulling device is exposed out of the enclosing purlin; the anti-pulling device is embedded and fixed on the surrounding purlin section and is provided with an anti-sliding device 7; and the upper part of the anti-pulling device is provided with an opening for placing the loading device.
Furthermore, a reserved groove is formed in the side edge of the anti-pulling device, and the locking device 2 is placed in the reserved groove opening; the locking device is used for connecting the loading device and the inclined pile, the used material is profile steel, the locking mode is one of welding, bolts and rivets, and the locking device can be unlocked and prestress can be applied for multiple times.
Preferably, the loading device applies axial force to the batter pile through expansion and contraction; the loading device is aligned with the anti-pulling device by adopting a positioning device; the loading device is connected with the anti-pulling device through a bolt or welded; the loading device adopts a jack.
The construction method of the end embedded prestressed inclined pile comprises the following steps:
s1, constructing the inclined piles; s2, sleeving the anti-pulling device into the inclined pile, and fixing the bottom end of the anti-pulling device to a limit point; s3, constructing a ring beam; s4, maintaining; installing a loading device; and S5, applying prestress, and reading the displacement and the axial force of the steel pipe.
Preferably, step S1 further includes constructing a fender post; in step S2, the anti-pulling device completes the processing of the loading port and the anti-sliding device; further comprising the steps of: s6, locking through a locking device to finish prestress application; s7, when the prestress loss or the displacement is too large, unlocking and applying prestress for many times; s8, recovering the anti-pulling device and the loading device after the support is detached.
The beneficial effects of the utility model reside in that:
1) and a prestress device is applied before excavation, so that the bearing capacity of the inclined pile is quickly exerted. The prestressed force applying device is additionally arranged on the existing inclined pile support, and the force transmission equipment can provide reverse thrust to the inclined pile support to enable the inclined pile to deform in advance, so that the bearing capacity of the inclined pile is exerted quickly, the deformation of a foundation pit is controlled, and the surrounding environment is protected.
2) The prestress force application device can be recovered. After the structure maintenance is finished, the anti-pulling device above the enclosing purlin and the prestress stressing device can be disassembled, and the prestress device can be recovered.
3) The inclined pile prestress applying device is positioned outside the ring beam, has a wide application range and can extend to the ground so as to avoid the influence of underground water due to the falling bottom of the ring beam.
Drawings
Fig. 1 is a side view of an end embedded prestressed batter pile in the first embodiment.
Fig. 2 is a partially enlarged view of fig. 1.
Fig. 3 is a side view of the embedded prestressed batter pile of the second embodiment.
Fig. 4 is a partially enlarged view of fig. 3.
FIG. 5 is a schematic view of the construction of fender posts and diagonal bracing steel pipes in the first step of the first embodiment.
Fig. 6 is a schematic diagram of welding the head plate after filling stones in the diagonal bracing steel tube and grouting in the second step in the first embodiment.
FIG. 7 is a schematic view showing the first embodiment, in which the outer tube is inserted and the bottom end is fixed to the limit point, in the third step.
Fig. 8a is a schematic diagram of the fourth step of pouring the enclosure beam (purlin) in the first embodiment.
Fig. 8b is a cross-sectional view in the top direction of fig. 8 a.
Fig. 9a is a schematic diagram of the loading device and bolt hole positions in the fifth step of the first embodiment.
Fig. 9b is a cross-sectional view in the top direction of fig. 9 a.
Fig. 10a is a schematic view of the loading device and the outer sleeve fixed by the bolt in the sixth step of the first embodiment.
Fig. 10b is a cross-sectional view in the top direction of fig. 10a.
Fig. 11a is a schematic diagram of the seventh step of the first embodiment, in which the jack is pressurized, the prestress is applied, and the displacement and the axial force of the steel pipe are read.
Fig. 11b is a cross-sectional view in the top direction of fig. 11 a.
Fig. 12a is a schematic view of the eighth step of the first embodiment, which is to weld the locking device through the pre-groove to lock the front-prop grouting steel pipe and the outer sleeve.
Fig. 12b is a cross-sectional view in the top direction of fig. 12 a.
FIG. 13 is a schematic view of the construction of a fender pile and a diagonal steel pipe in the second embodiment.
Fig. 14 is a schematic diagram of welding the head plate after filling stones in the diagonal bracing steel tube, grouting and finishing in the second step of the second embodiment.
FIG. 15 is a schematic view showing the step three of the second embodiment in which the outer tube is inserted and the bottom end is fixed to the limit point.
Fig. 16a is a schematic view of the pouring of the enclosure beam (purlin) in the fourth step in the second embodiment.
Fig. 16b is a cross-sectional view in the top direction of fig. 16 a.
Fig. 17a is a schematic illustration of the loading device, step five, with bolt hole positions aligned therewith, according to a second embodiment.
Fig. 17b is a cross-sectional view in the top direction of fig. 17 a.
FIG. 18a is a schematic view of the second embodiment, step six, in which the loading device is fixed to the outer sleeve by the bolt and the jack can be loaded to apply the axial force.
Fig. 18b is a cross-sectional view in the top direction of fig. 18 a.
In the figure, 1, a loading device, 2, a locking device, 3, a fender post, 4, an anti-pulling device, 5a, a positioning device (embodiment one), 5b, a positioning device (embodiment two), 6, a preformed groove, 7, an anti-sliding device, 8, an enclosing purlin, 9, a limiting device, 10, an inclined pile, 11, a head plate, 12, an anti-shearing device, 10a, a front support steel pipe, 4a, an anti-pulling outer sleeve and 4b, the preformed groove are arranged.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and specific embodiments.
The first embodiment is as follows:
referring to fig. 1-2, an end-embedded prestressed inclined pile comprises an inclined pile, a surrounding purlin, an anti-pulling device and a loading device; the inclined piles are driven into the soil before excavation; the anti-pulling device is movably connected with the inclined pile in the axial direction; the loading device takes the anti-pulling device as an acting point and applies axial prestress to the inclined pile; the anti-pulling device is pre-buried and fixed in the enclosing purlin, and the loading device is installed at the part of the upper end of the anti-pulling device, which extends out of the enclosing purlin; the anti-pulling device and the loading device are locked and fixed by adopting a detachable positioning device.
In this embodiment, the anti-pulling device 4 is cylindrical and sleeved outside the batter pile 10, and the loading device 1 is arranged inside the anti-pulling device 4; the side walls of the loading device 1 and the anti-pulling device 4 are provided with a plurality of corresponding positioning holes, and the loading device and the anti-pulling device are fixedly positioned through a plurality of bolts, as shown in fig. 1 and 2.
In this embodiment, an end plate 11 is fixedly installed at the upper end of the batter pile 10, and the loading device 1 applies force to the end plate, as shown in fig. 1 and 2.
The inclined pile is one or more of steel pipes, section steel, combined steel, prefabricated pipe piles, square piles, steel and concrete combined type long and thin axial stress rod pieces and the like. Specifically, in this embodiment, the oblique piles are made of grouting steel pipes.
In this embodiment, referring to fig. 1-2, the batter pile extends out of the purlin at one end and is embedded in the pit bottom soil at the other end; the batter pile is provided with a limiting device 9 for fixing and positioning the anti-pulling device 4.
In this embodiment, the purlin is a retaining pile end anchoring and force transmission member, and the material is one of reinforced concrete, section steel, combined section steel and the like.
In this embodiment, the anti-pulling device 4 is a cylindrical structure, and is sleeved on the inclined pile; one end of the anti-pulling device is embedded and fixed in the enclosing purlin, and the other end of the anti-pulling device is exposed out of the enclosing purlin; the anti-pulling device is embedded and fixed on the surrounding purlin section and is provided with an anti-sliding device 7; the upper part of the anti-pulling device 4 is provided with an opening for placing the loading device 1. As shown in fig. 1 and 2.
In this embodiment, the anti-pulling device 4 has a pre-groove on its side, and the pre-groove is inserted into the locking device 2 (not shown in detail in the drawings, but understood by those skilled in the art); the locking device 2 is used for connecting the loading device 1 and the inclined pile 10, the used material is section steel, the locking mode is one of welding, bolts and rivets, and the locking device can be unlocked and prestress can be applied for multiple times.
In this embodiment, the loading device 1 applies axial force to the batter pile by telescoping; the loading device 1 is aligned with a reserved hole in the anti-pulling device 4 by adopting a positioning device 5 a; the loading device 1 is connected with the anti-pulling device through a bolt or welded; the loading device 1 adopts a jack.
The construction method of the end embedded prestressed inclined pile, as shown in fig. 5-12 b, comprises the following steps:
s1, constructing inclined piles and fender piles, as shown in figure 5;
s2, after the anti-pulling device finishes the processing of the loading port and the anti-sliding device, sleeving the inclined pile, and fixing the bottom end of the anti-pulling device to a limit point, as shown in figures 6 and 7;
s3, constructing a ring beam, as shown in FIGS. 8a and 8 b;
s4, maintaining to meet the design requirement; installing a loading device; as shown in fig. 9a, 9 b;
and S5, applying prestress, and reading the displacement and the axial force of the steel pipe. As shown in fig. 11a, 11 b.
S6, locking through a locking device to finish prestress application; as shown in fig. 12a, 12 b.
S7, when the prestress loss or the displacement is too large, unlocking and applying prestress for many times;
s8, recovering the anti-pulling device and the loading device after the support is detached.
Example two:
referring to fig. 3 to 4, the present embodiment is different from the first embodiment in that: the positioning device 5b is different from the first embodiment in that the positioning device is a flange, the loading device 1 is fixedly connected with the upper end of the anti-pulling device 4 through the flange, the loading device and the anti-pulling device can be fixed in the same way, and the anti-pulling device can provide a force application point for the loading device in the same way.
The construction method in this embodiment, as shown in fig. 13 to 18b, includes the following steps:
s1, constructing fender piles and inclined piles; as shown in fig. 13-14;
s2, sleeving the inclined pile after the machining of the connecting device (a loading port and a transverse anti-sliding device) is finished, and fixing the bottom end of the connecting device to a limit point; as shown in fig. 15;
s3, constructing a ring beam, as shown in FIGS. 16a and 16 b;
s4, after the maintenance meets the design requirement, installing a loading device; as shown in fig. 17a, 17 b;
s5, applying prestress, and reading the displacement and the axial force of the steel pipe; as shown in fig. 18a, 18 b;
s6, locking through a locking device to finish prestress application; this step is not necessary;
s7, when the prestress loss or displacement is too large, the locking can be released, and prestress is applied for many times; this step is not necessary;
s8, recovering the connecting device and the loading device after the support is detached.
The distance that the anti-pulling device stretches out of the enclosing purlin can be shortened through the scheme of the second embodiment, when the requirement on the space above the enclosing purlin is high, the scheme of the second embodiment is suitable, and the cost is reduced.
Compare in existing slant steel pipe envelope, the utility model discloses the accessible is applyed the thrust in the pile bolck and is applyed prestressing force to the batter pile, makes the batter pile get into the stress state in advance to reach the purpose of quick performance batter pile bearing capacity, effectively protect all ring edge borders.
The above two embodiments are the preferred embodiments of the present invention, and those skilled in the art can make various changes or improvements on the above embodiments without departing from the general concept of the present invention, and these changes or improvements should fall within the protection scope of the present invention.

Claims (10)

1. The utility model provides an embedded prestressing force batter pile in tip which characterized in that:
comprises an inclined pile (10), a surrounding purlin (8), an anti-pulling device (4) and a loading device (1);
the batter pile (10) is driven into the soil before excavation;
the anti-pulling device (4) is movably connected with the inclined pile (10) in the axial direction;
the loading device (1) takes the anti-pulling device (4) as an acting point to apply axial prestress to the inclined pile (10);
the anti-pulling device (4) is pre-buried and fixed in the enclosing purlin (8), and the loading device (1) is installed on the part of the upper end of the anti-pulling device, which extends out of the enclosing purlin (8);
the anti-pulling device (4) and the loading device (1) are locked and fixed by a detachable positioning device.
2. The end embedded prestressed batter pile of claim 1, wherein: the uplift device (4) is cylindrical and is sleeved outside the inclined pile (10), and the loading device (1) is fixedly connected with the upper end of the uplift device (4) through a flange.
3. The end embedded prestressed batter pile of claim 1, wherein: the uplift device (4) is cylindrical and is sleeved outside the inclined pile (10), and the loading device (1) is arranged inside the uplift device (4); the side walls of the loading device (1) and the anti-pulling device (4) are provided with a plurality of corresponding positioning holes, and the loading device and the anti-pulling device are fastened and positioned through a plurality of bolts.
4. The end embedded prestressed batter pile of claim 1, wherein: an end sealing plate is fixedly arranged at the upper end of the inclined pile (10), and a loading device (1) applies acting force to the end sealing plate.
5. The end embedded prestressed batter pile of claim 1, wherein: the inclined pile is one or more of steel pipes, section steel, combined steel, prefabricated pipe piles, square piles and steel and concrete combined type long and thin axial stress rod pieces.
6. The end embedded prestressed batter pile of claim 1, wherein: one end of the inclined pile extends out of the surrounding purlin, and the other end of the inclined pile is embedded into pit bottom soil; the inclined pile is provided with a limiting device for fixing and positioning the anti-pulling device (4).
7. The end embedded prestressed batter pile of claim 1, wherein: the purlin is a retaining pile end anchoring and force transferring component made of one or more of steel concrete, section steel and combined section steel.
8. The end embedded prestressed batter pile of claim 3, wherein: the anti-pulling device is of a cylindrical structure and sleeved on the inclined pile; one end of the anti-pulling device is embedded and fixed in the enclosing purlin, and the other end of the anti-pulling device is exposed out of the enclosing purlin; the anti-pulling device is embedded and fixed on the surrounding purlin section and is provided with an anti-sliding device (7); and the upper part of the anti-pulling device is provided with an opening for placing the loading device.
9. The end embedded prestressed batter pile of claim 8, wherein: a reserved groove is formed in the side edge of the anti-pulling device, and a locking device (2) is placed in the reserved groove opening; the locking device is used for connecting the loading device and the inclined pile, the used material is profile steel, the locking mode is one of welding, bolts and rivets, and the locking device can be unlocked and prestress can be applied for multiple times.
10. The end embedded prestressed batter pile of claim 1, wherein: the loading device applies axial force to the inclined pile through expansion and contraction; the loading device is aligned with the anti-pulling device by adopting a positioning device; the loading device is connected with the anti-pulling device through a bolt or welded; the loading device adopts a jack.
CN202020637054.XU 2020-04-24 2020-04-24 Embedded prestressing force batter pile in tip Active CN212153405U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020637054.XU CN212153405U (en) 2020-04-24 2020-04-24 Embedded prestressing force batter pile in tip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020637054.XU CN212153405U (en) 2020-04-24 2020-04-24 Embedded prestressing force batter pile in tip

Publications (1)

Publication Number Publication Date
CN212153405U true CN212153405U (en) 2020-12-15

Family

ID=73723548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020637054.XU Active CN212153405U (en) 2020-04-24 2020-04-24 Embedded prestressing force batter pile in tip

Country Status (1)

Country Link
CN (1) CN212153405U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364481A (en) * 2020-04-24 2020-07-03 上海勘察设计研究院(集团)有限公司 End embedded type prestressed inclined pile and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111364481A (en) * 2020-04-24 2020-07-03 上海勘察设计研究院(集团)有限公司 End embedded type prestressed inclined pile and construction method thereof

Similar Documents

Publication Publication Date Title
US6012874A (en) Micropile casing and method
US10738436B1 (en) Tubular foundation for onshore wind turbine generators
CN210315186U (en) Light arch bridge foundation structure
CN111119199A (en) A-shaped double-row pile foundation pit supporting structure and construction method thereof
CN111364481A (en) End embedded type prestressed inclined pile and construction method thereof
CN212153405U (en) Embedded prestressing force batter pile in tip
CN104264683A (en) Concave ultra-deep foundation pit zoned supporting method for three-side surrounded cultural protection building
CN212294677U (en) End type prestressed inclined pile
Lu et al. Overview of typical excavation failures in China
CN212153407U (en) Prestressed inclined pile support
KR101406259B1 (en) Load transfer method of underpinning construction method in the final stage
JP3831737B2 (en) Steel tower basic structure
CN112832252B (en) Deep foundation pit supporting construction method with large height difference of two sides
CN215105392U (en) Retractable prefabricated retaining wall supporting structure for manual hole digging pile
CN214942693U (en) Underpinning support system for storey-adding reconstruction of existing building basement
CN114892672A (en) Foundation pit support construction process method
CN111364480A (en) Prestressed inclined pile support and construction method thereof
CN113653064A (en) Front-support rear-pull type foundation pit enclosure system and construction method thereof
US20200208612A1 (en) Bionic Root Foundation for Onshore Wind Turbine Generators
CN112943256A (en) Construction method of prefabricated pipe-jacking working well
CN216405469U (en) U type tunnel and utility tunnel sharing structure
CN110700274A (en) Mechanically-connected assembled stand column and stand column pile
CN218373894U (en) Prestressed inclined throwing support
CN111321741A (en) End type prestressed inclined pile and construction method thereof
CN114876494B (en) Shallow-buried tunnel ground beam tie bar combined sinking inhibition device and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 38, Shuifeng Road, Yangpu District, Shanghai 202150

Patentee after: Shanghai Survey, Design and Research Institute (Group) Co.,Ltd.

Address before: No. 38, Shuifeng Road, Yangpu District, Shanghai 202150

Patentee before: SGIDI ENGINEERING CONSULTING (Group) Co.,Ltd.