High-strength belt carrier roller hanging device for underground excavation Download PDFInfo
- Publication number
- CN212150435U CN212150435U CN202020664029.0U CN202020664029U CN212150435U CN 212150435 U CN212150435 U CN 212150435U CN 202020664029 U CN202020664029 U CN 202020664029U CN 212150435 U CN212150435 U CN 212150435U
- Authority
- CN
- China
- Prior art keywords
- rod
- force application
- limiting
- carrier roller
- hanging device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model belongs to the technical field of belt feeder bearing roller dress is hung. A hoisting device for a high-strength belt carrier roller in underground mining comprises a force application rod, a hoisting chain and a support frame, wherein the hoisting chain is arranged at the first end part of the force application rod, and the lower end of the hoisting chain is provided with a hook; the support frame is arranged on the force application rod at the rear side of the lifting chain. The support frame comprises a U-shaped frame body and a limiting part, and the middle part of the frame body is connected with the force application rod; the limiting parts are arc-shaped, and the two limiting parts are respectively arranged on the two support arms of the frame body. This application overall structure reasonable in design, portable instrument, design benefit, the dead weight is light, hangs the convenience, and labour saving and time saving can accomplish alone, better solution the bearing roller hang the problem of difficulty.
Description
Technical Field
The utility model belongs to the technical field of belt feeder bearing roller dress is hung, concretely relates to dig high strength belt bearing roller cable suspension device in pit.
Background
Along with the continuous increase of the mining depth, the influence on installing the belt conveyor is increasingly large, a plurality of machine paths are very fast in drum change, the space is narrow and small, the maintenance is difficult, the requirement on the performance of equipment is also increasingly high, the service cycle of the existing small carrier roller is short, a bearing and a sheath are easy to damage, the carrier roller is difficult to replace, the problems are repeatedly rectified and changed, the manpower and financial resources are wasted, and the problem needs to be solved immediately under the current situation.
With the gradual deterioration of the operation situation, the economic benefit is poor, the wage income is seriously reduced, the situations that the working enthusiasm of workers is poor, the workers do not want to work and the like occur, the potential hazard is caused to the safety management, and the working enthusiasm of the workers are greatly influenced. The phenomenon that the workers do not work out, the phenomena of getting together and dealing with the workers are more and more serious, the number of underground belts is large, the number of devices is large, the hidden dangers are large, the current basic-level team personnel are seriously insufficient, the workers cannot take care of the workers, and the fact that the workers face the workers is achieved if the problems are overcome.
The bearing roller is as belt conveyor's main bearing part, because the belt dead weight rises with tight the reason, the installation environment in addition, the operating space is limited, there is the difficult problem of change, along with the perfect and improvement of colliery rubber belt conveyor equipment, the strengthening of conveyer frame widens, the bearing roller becomes heavy, the bearing roller drops the degree of difficulty of dress string bearing roller also along with increasing, the worker of patrolling and examining before generally uses tools such as board pincers and screwdriver when dress string bearing roller, crow bar belt limit pipe needs the cooperation more than two people even, because bearing roller self weight and belt resistance, still have the coal on the skin when having emergency, it is very difficult to dress string, sometimes ordinary tool atress will the slippage greatly, and the dynamics is not enough, cause many times to adorn and hang the failure, the instrument slippage causes personnel injured.
Disclosure of Invention
The utility model discloses the purpose is to the problem that above-mentioned exists with not enough, provides a dig belt bearing roller cable suspension device that excels in pit, its overall structure reasonable in design, portable instrument, design benefit, the dead weight is light, hangs the convenience, labour saving and time saving can accomplish alone, the better problem of the difficulty is hung to the bearing roller of having solved.
In order to realize the purpose, the adopted technical scheme is as follows:
a kind of DH mining high-strength belt idler cable suspension device, including:
a force application rod;
the suspension chain is arranged at the first end part of the force application rod, and a hook is arranged at the lower end of the suspension chain; and
and the support frame is arranged on the force application rod at the rear side of the lifting chain.
According to the utility model discloses dig high strength belt bearing roller cable suspension device in pit, preferably, the support frame includes:
the middle part of the frame body is connected with the force application rod; and
the limiting part is arc-shaped, and the two limiting parts are respectively arranged on the two support arms of the frame body.
According to the utility model discloses dig high strength belt bearing roller cable suspension device in pit, preferably, spacing portion includes:
the arc-shaped rod body is of a hollow structure;
a first limit rod;
the first limiting rod and the second limiting rod are matched and slidably arranged at two ends of the arc-shaped rod body; and
the spring is arranged in the arc-shaped rod body and drives the first limiting rod and the second limiting rod to extend outwards.
According to the utility model discloses dig high strength belt bearing roller cable suspension device in pit, preferably, still be provided with the drive on the arc body of rod the first logical groove and the handle of first gag lever post and second gag lever post, the handle passes through first logical groove is connected with the gag lever post that corresponds.
According to the utility model discloses dig high strength belt bearing roller cable suspension device in pit, preferably, two arms of support body all include first sleeve pipe and second sleeve pipe, first sleeve pipe and second sleeve pipe slip cap are established together, just are in be provided with corresponding regulation hole between first sleeve pipe and the second sleeve pipe, the matching is provided with positioning pin axle in the regulation hole.
According to the utility model discloses dig high strength belt bearing roller cable suspension device in the pit, preferably, the second end cover of application of force pole is equipped with the telescopic link.
According to the utility model discloses dig high strength belt bearing roller cable suspension device in pit, preferably, the cross-section of application of force pole is polygonized structure, the hole of telescopic link with the application of force pole matches, the outer wall cross-section of telescopic link is circular.
According to the utility model discloses dig high strength belt bearing roller cable suspension device in pit, preferably, it leads to the groove to be provided with the second on the telescopic link, the second leads to and is provided with elastic pressing plate on the groove, elastic pressing plate's lower part be provided with slipmat or the antiskid tooth that application of force pole corresponds.
According to the utility model discloses dig high strength belt bearing roller cable suspension device in pit, preferably, be provided with the tongs cover on the telescopic link, elastic pressing plate and one of them the tongs cover corresponds the setting.
By adopting the technical scheme, the beneficial effects are as follows:
this application overall structure reasonable in design, its structural design through to application of force pole and support frame can improve the stability of structure on the one hand, and on the other hand conveniently carries out structural adjustment, and accommodation is wide, can satisfy different space demands, reduces intensity of labour, improves work efficiency.
This application conveniently carries, and is small, and operation convenient and fast can alone accomplish, and labour saving and time saving, greatly reduced borehole operation's intensity of labour, security when having improved the operation, facilitate promotion and application.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings of the embodiments of the present invention will be briefly described below. The drawings are intended to depict only some embodiments of the invention, and not all embodiments of the invention are limited thereto.
Fig. 1 is according to the utility model discloses dig high-strength belt bearing roller cable suspension device in pit's structure schematic diagram.
Fig. 2 is according to the utility model discloses dig high strength belt bearing roller cable suspension device in pit overlook the schematic structure drawing.
Fig. 3 is a schematic structural diagram of a support frame according to an embodiment of the present invention.
Fig. 4 is a schematic view of a connection structure of the force application rod and the telescopic rod according to the embodiment of the present invention.
Number in the figure:
100 is a force application rod, 101 is a telescopic rod, 102 is an elastic pressure plate, 103 is a glove, 104 is an anti-skid pad;
200 is a sling chain, 201 is a hook;
310 is a frame body, 311 is a first sleeve, 312 is a second sleeve, 313 is a positioning pin, 320 is a limiting part, 321 is an arc rod body, 322 is a first limiting rod, 323 is a second limiting rod, 324 is a spring, 325 is a handle.
Detailed Description
The embodiments of the present invention will be described more fully hereinafter with reference to the accompanying drawings, in which embodiments of the invention are shown. Unless defined otherwise, technical or scientific terms used herein shall have the ordinary meaning as understood by those of ordinary skill in the art.
In the description of the present invention, it is to be understood that the terms "first," "second," and the like are used for describing various elements of the present invention, and do not denote any order, quantity, or importance, but rather are used to distinguish one element from another.
It should be noted that when an element is referred to as being "connected," "coupled," or "connected" to another element, it can be directly connected, coupled, or connected, but it is understood that intervening elements may be present therebetween; i.e., positional relationships encompassing both direct and indirect connections.
It should be noted that the use of the terms "a" or "an" and the like do not necessarily denote a limitation of quantity. The word "comprising" or "comprises", and the like, means that the element or item listed before the word covers the element or item listed after the word and its equivalents, but does not exclude other elements or items.
It should be noted that terms indicating orientation or positional relationship such as "upper", "lower", "left", "right", and the like, are used only for indicating relative positional relationship, which is for convenience of describing the present invention, and not that the indicated device or element must have a specific orientation, be constructed and operated in a specific orientation; when the absolute position of the object to be described is changed, the relative positional relationship may also be changed accordingly.
Referring to fig. 1-4, the application discloses a suspension device for a high-strength belt carrier roller for underground mining, which comprises a force application rod 100, a suspension chain 200 and a support frame, wherein the suspension chain 200 is arranged at a first end part of the force application rod 100, and a hook 201 is arranged at the lower end of the suspension chain 200; the support frame is provided on the force application rod at the rear side of the hoist chain 200.
The support frame comprises a U-shaped frame body 310 and a limiting part 320, and the middle part of the frame body 310 is connected with the force application rod 100; the limiting portion 320 is arc-shaped, and the two limiting portions 320 are respectively disposed on the two support arms of the frame body. Support the location through spacing portion to as the strong point, be connected with the bearing roller by the couple, and carry out the application of force through the application of force pole, thereby realize the dress of bearing roller and hang the operation, whole operation in-process is quick, convenient operation, construction strength are low.
In order to further improve the structural stability of the device, the limiting portion in this embodiment includes an arc-shaped rod 321, a first limiting rod 322, a second limiting rod 323, and a spring 324, where the arc-shaped rod 321 is a hollow structure; the first limiting rod 322 and the second limiting rod 323 are matched and slidably arranged at two ends of the arc-shaped rod body; the spring 324 is disposed in the arc rod 321, and the spring 324 drives the first limiting rod 322 and the second limiting rod 323 to extend outward. The design of above-mentioned structure can make the carriage just play certain centre gripping effect when supporting, when applying the effort, can keep the spacing effect of certain centre gripping, avoids spacing portion slippage, and the security among the whole operation process obtains effectual improvement.
In order to facilitate installation, the first through groove and the handle 325 which drive the first limiting rod 322 and the second limiting rod 323 are further arranged on the arc-shaped rod body 321 in the embodiment, the handle 325 is connected with the corresponding limiting rod through the first through groove, and the first limiting rod and the second limiting rod can be opened and closed through the handle, so that preliminary alignment support is facilitated.
Further, the structure can be further refined, specifically: the two arms of the frame body 310 all include a first sleeve 311 and a second sleeve 312, the first sleeve 311 and the second sleeve 312 are slidably sleeved together, a corresponding adjusting hole is formed between the first sleeve 311 and the second sleeve 312, a positioning pin shaft 313 is arranged in the adjusting hole in a matched mode, the height of the support frame can be adjusted through the design of the telescopic structure, and therefore different working condition requirements are met.
Because the operation space is limited in the pit, at the in-process of carrying the instrument, if the size is too big, it is comparatively inconvenient, but the application of force pole adopts lever principle, and the length of application of force pole is longer, and corresponding power can be less, therefore the second tip cover of application of force pole 100 in this embodiment is equipped with telescopic link 101, and the cross-section of application of force pole 100 is polygonized structure, and the hole and the application of force pole of telescopic link 101 match, and the outer wall cross-section of flexible 101 pole is circular. A second through groove is formed in the telescopic rod 101, an elastic pressing plate 102 is arranged on the second through groove, and a non-slip mat 104 or non-slip teeth corresponding to the force application rod are arranged on the lower portion of the elastic pressing plate. The telescopic rod is provided with a grab sleeve 103, and the elastic pressing plate 102 is arranged corresponding to one grab sleeve 103. In the operation process, after the pull through the telescopic link is adjusted to certain length, one of them grab gloves is held to the left hand, also grips simultaneously to the elastic pressure plate and pushes down, and the slipmat contacts with the application of force pole this moment, avoids sliding relatively between telescopic link 101 and the application of force pole 100, plays stable effect, and another grab glove is grabbed to the right hand, pushes down, accomplishes the dress of bearing roller and hangs work.
While the above description has described in detail the preferred embodiments for carrying out the invention, it should be understood that these embodiments are presented by way of example only, and are not intended to limit the scope, applicability, or configuration of the invention in any way. The scope of the invention is defined by the appended claims and equivalents thereof. Many modifications may be made to the foregoing embodiments by those skilled in the art in light of the teachings of the present disclosure, and such modifications are intended to be within the scope of the present disclosure.
Claims (9)
1. The utility model provides a dig belt bearing roller cable suspension device that excels in pit which characterized in that includes:
a force application rod;
the suspension chain is arranged at the first end part of the force application rod, and a hook is arranged at the lower end of the suspension chain; and
and the support frame is arranged on the force application rod at the rear side of the lifting chain.
2. The hanging device for the underground mining high-strength belt carrier roller according to claim 1, wherein the support frame comprises:
the middle part of the frame body is connected with the force application rod; and
the limiting part is arc-shaped, and the two limiting parts are respectively arranged on the two support arms of the frame body.
3. The hanging device for the underground mining high-strength belt carrier roller according to claim 2, wherein the limiting part comprises:
the arc-shaped rod body is of a hollow structure;
a first limit rod;
the first limiting rod and the second limiting rod are matched and slidably arranged at two ends of the arc-shaped rod body; and
the spring is arranged in the arc-shaped rod body and drives the first limiting rod and the second limiting rod to extend outwards.
4. The hanging device for the underground mining high-strength belt carrier roller according to claim 3, wherein a first through groove and a handle for driving the first limiting rod and the second limiting rod are further arranged on the arc-shaped rod body, and the handle is connected with the corresponding limiting rods through the first through groove.
5. The hanging device for the underground mining high-strength belt carrier roller according to any one of claims 2 to 4, wherein the two support arms of the frame body respectively comprise a first sleeve and a second sleeve, the first sleeve and the second sleeve are slidably sleeved together, a corresponding adjusting hole is formed between the first sleeve and the second sleeve, and a positioning pin shaft is arranged in the adjusting hole in a matched manner.
6. The hanging device for the underground mining high-strength belt carrier roller according to claim 1, wherein a telescopic rod is sleeved at the second end of the force application rod.
7. The hanging device for the underground mining high-strength belt carrier roller according to claim 6, wherein the cross section of the force application rod is of a polygonal structure, an inner hole of the telescopic rod is matched with the force application rod, and the cross section of the outer wall of the telescopic rod is circular.
8. The hanging device for the underground mining high-strength belt carrier roller according to claim 6 or 7, wherein a second through groove is formed in the telescopic rod, an elastic pressing plate is arranged on the second through groove, and a non-slip pad or non-slip teeth corresponding to the force application rod are arranged on the lower portion of the elastic pressing plate.
9. The hanging device for the underground mining high-strength belt carrier roller according to claim 8, wherein the telescopic rod is provided with a gripping sleeve, and the elastic pressing plate is arranged corresponding to one of the gripping sleeves.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020664029.0U CN212150435U (en) | 2020-04-27 | 2020-04-27 | High-strength belt carrier roller hanging device for underground excavation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020664029.0U CN212150435U (en) | 2020-04-27 | 2020-04-27 | High-strength belt carrier roller hanging device for underground excavation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212150435U true CN212150435U (en) | 2020-12-15 |
Family
ID=73720641
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020664029.0U Expired - Fee Related CN212150435U (en) | 2020-04-27 | 2020-04-27 | High-strength belt carrier roller hanging device for underground excavation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212150435U (en) |
-
2020
- 2020-04-27 CN CN202020664029.0U patent/CN212150435U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107492837B (en) | Power-assisted follow-up pulley | |
CN103170963B (en) | Dual-arm robot | |
CN204230769U (en) | Climb type steel cable ladder | |
CN104326390A (en) | Traction device of working tool at high place of power transmission tower | |
CN212150435U (en) | High-strength belt carrier roller hanging device for underground excavation | |
CN108046125A (en) | The lifting conveyer of part is safeguarded for air return lane fully-mechanized mining equipment | |
CN104410009A (en) | Climbing type steel wire rope ladder | |
CN204237495U (en) | Transmission tower high-rise working instrument draw gear | |
CN203476246U (en) | Sucker rod lifting system device | |
CN210829099U (en) | Two-layer platform arranged in sinking type installation mode of power-assisted winch | |
CN202284116U (en) | Lifting appliance special for large equipment | |
CN211813067U (en) | Novel CTD crane | |
CN210655793U (en) | Double-machine lifting sling | |
CN205422583U (en) | Lifting hook, hang assembly and hang hoisting accessory | |
CN207330217U (en) | A kind of Cam clamping type hanging device | |
CN221170352U (en) | Hand pulling block hook convenient to pick and hang | |
CN219860076U (en) | Dedicated triangle hoist of driving | |
CN206362321U (en) | A kind of servicing unit of tunnel monitoring measurement steel ruler convergence gauge | |
CN216190643U (en) | Device for hanging hoist at high place conveniently | |
CN217024354U (en) | Automobile wheel hub equips with transport tongs | |
CN213923728U (en) | Safe hoisting traction tool for hoisting | |
CN214754796U (en) | Power distribution cabinet convenient to hoist | |
CN213743294U (en) | A device that moves about for vertical scroll core drill lifting system | |
CN214828357U (en) | Hanging mechanism of electric tightening machine | |
CN217947419U (en) | Pneumatic cantilever crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201215 Termination date: 20210427 |
|
CF01 | Termination of patent right due to non-payment of annual fee |