CN212146397U - Scriber for building construction - Google Patents

Scriber for building construction Download PDF

Info

Publication number
CN212146397U
CN212146397U CN202020820459.7U CN202020820459U CN212146397U CN 212146397 U CN212146397 U CN 212146397U CN 202020820459 U CN202020820459 U CN 202020820459U CN 212146397 U CN212146397 U CN 212146397U
Authority
CN
China
Prior art keywords
support
roller
wheel
fixedly connected
blanking pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020820459.7U
Other languages
Chinese (zh)
Inventor
李秋芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Juyong Decoration Design Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020820459.7U priority Critical patent/CN212146397U/en
Application granted granted Critical
Publication of CN212146397U publication Critical patent/CN212146397U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Soil Working Implements (AREA)

Abstract

The utility model discloses a scriber for building construction, which relates to the field of building scribing equipment and adopts the technical proposal that the scriber comprises a first roller, a belt and a first bracket, wherein the front surface of the first roller is fixedly connected with a roller which runs through the first roller and extends to the outside of the first roller, the utility model is provided with a material shifting wheel, when temporary scribing is needed, a baffle plate is drawn out, a bolt is inserted into the inner wall of a second through hole, at the moment, the second roller is contacted with the ground, a second rotating wheel is not contacted with the ground, lime powder is poured into the material feeding barrel, the lime powder falls into a groove of the material shifting wheel through the material feeding barrel, along with the rotation of the material shifting wheel, the lime powder falls to the ground through a discharge pipe, simultaneously, personnel push the first roller to move through the second bracket, so that the first belt wheel drives the second belt wheel to rotate, and further the material shifting wheel to rotate at a constant speed, the temporary line drawing can be conveniently and quickly completed.

Description

Scriber for building construction
Technical Field
The utility model relates to a building setting-out equipment field, the more specifically setting-out ware that its construction used that says so.
Background
At present, building construction refers to production activities in the engineering construction implementation stage, is a construction process of various buildings, and can also be a process of changing various lines on a design drawing into a real object in a specified place. The construction method comprises foundation engineering construction, main structure construction, roof engineering construction, decoration engineering construction and the like, and a large amount of line drawing work is needed in building construction work, so that the construction accuracy is ensured.
Through the retrieval, chinese patent discloses a setting-out device for construction (publication number is CN208231778U), and this patent technique is favorable to wall eminence setting-out, the ground setting-out of being convenient for simultaneously, and the function is various, and novel structure, the setting-out is accurate, and convenient to use, the usable value is high, conveniently controls setting-out length, but the job site often uses lime powder temporary setting-out, and the device can not satisfy this demand, consequently, technical staff in the field provides a setting-out device for construction to solve the problem that proposes among the above-mentioned background art.
SUMMERY OF THE UTILITY MODEL
For solving the problem that provides among the above-mentioned background art, the utility model aims to provide a scriber that construction used, its advantage lies in can using lime powder to carry out interim setting-out, also can use the typewriter ribbon to carry out the setting-out, satisfies the different scenes of using.
In order to achieve the above object, the utility model provides a following technical scheme: a scriber for building construction comprises a first roller, a belt and a first support, wherein the front of the first roller is fixedly connected with a roller, the roller penetrates through the first roller and extends to the outside of the first roller, the back of the roller is fixedly connected with a first belt pulley, the roller is rotatably connected with the first support, the top of the first support is fixedly connected with a blanking pipe, the inner wall of the blanking pipe is rotatably connected with a material stirring wheel, the back of the material stirring wheel penetrates through the blanking pipe and is fixedly connected with a second belt pulley, the first belt pulley and the second belt pulley are connected through belt transmission, the top of the blanking pipe is communicated with a material inlet barrel, the bottom of the blanking pipe is communicated with a discharge pipe, the bottom of the first support is hinged with support legs positioned on the left side of the blanking pipe, and the bottom of the first support is provided with two support wheel devices, the supporting wheel device runs through the first support and extends to the outside of first support, the right side of first support is rotated and is connected with quantity and is two first rotation wheel, the bottom fixedly connected with quantity of first support is two connecting rods, the bottom of connecting rod is rotated and is connected with the second and rotates the wheel, two first rotation wheel and two the second has rotated the winding between the wheel and has been had the typewriter ribbon, the right side fixedly connected with storage device at first support top, the left side fixedly connected with second support at first support top.
As a further aspect of the present invention: the supporting wheel device comprises a supporting rod, the supporting rod penetrates through the first support and extends to the outside of the first support, the bottom of the supporting rod is rotatably connected with a second roller, a first through hole located below the first support is formed in the right side of the supporting rod, a second through hole located above the first support is formed in the right side of the supporting rod, and a bolt is inserted into the inner wall of the second through hole.
As a further aspect of the present invention: storage device includes the round bar, the bottom of round bar and the top fixed connection of first support, the surface cover of round bar is equipped with quantity and is three storage box.
As a further aspect of the present invention: the left side fixedly connected with spring of supporting legs, the top of spring is articulated with the bottom of first support, the bottom fixedly connected with of first support is located the joint seat on supporting legs right side.
As a further aspect of the present invention: the surface of the kick-out wheel is provided with evenly distributed grooves.
As a further aspect of the present invention: the right side of the blanking pipe is spliced with a blocking plate, and the left side of the blocking plate penetrates through the blanking pipe and is attached to the inner wall of the blanking pipe.
Compared with the prior art, the beneficial effects of the utility model are that:
1. through the arrangement of the material stirring wheel, when temporary line drawing is needed, the blocking plate is pulled out, the bolt is inserted into the inner wall of the second through hole, the second roller is in contact with the ground, the second rotating wheel is not in contact with the ground, lime powder is poured into the material feeding barrel, the lime powder falls into the groove of the material stirring wheel through the material feeding barrel, the lime powder falls onto the ground through the discharge pipe along with the rotation of the material stirring wheel, meanwhile, a person pushes the first roller to move through the second support, so that the first belt wheel drives the second belt wheel to rotate, the material stirring wheel rotates at a constant speed, and the temporary line drawing is conveniently and quickly completed;
2. by arranging the first rotating wheel, when a color ribbon is needed to draw lines, the blocking plate is firstly inserted into the blanking pipe until the left side of the blocking plate is attached to the inner wall of the blanking pipe; the bolt inserts the inner wall of first through-hole, and the second gyro wheel does not contact with ground this moment, and the second rotates wheel and ground contact, utilizes first rotation wheel and second to rotate the wheel, and along with the rotation of first gyro wheel, the typewriter ribbon of wraparound carries out the setting-out to ground between two first rotation wheels, convenient to use, and the switching process is simple easily operated.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the connection between the first pulley and the conveyor belt according to the present invention;
FIG. 3 is an enlarged view of a portion of FIG. 1;
FIG. 4 is an enlarged view of a portion of the present invention at B in FIG. 1;
fig. 5 is a partial enlarged view of the point C in fig. 1 according to the present invention.
In the figure: 1. a first roller; 2. a drum; 3. a first pulley; 4. a belt; 5. a second pulley; 6. a material poking wheel; 7. a first bracket; 8. a support wheel arrangement; 801. a second through hole; 802. a bolt; 803. a first through hole; 804. a support bar; 805. a second roller; 9. a connecting rod; 10. a first rotating wheel; 11. a charging barrel; 12. a discharging pipe; 13. a discharge pipe; 14. a second rotating wheel; 15. a color band; 16. a second bracket; 17. a barrier plate; 18. supporting legs; 19. a spring; 20. a clamping seat; 21. a storage device; 2101. a storage box; 2102. a round bar.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 to 5, in an embodiment of the present invention, a scriber for building construction includes a first roller 1, a belt 4 and a first support 7, a roller 2 is fixedly connected to a front surface of the first roller 1, the roller 2 penetrates the first roller 1 and extends to an outside of the first roller 1, a first belt pulley 3 is fixedly connected to a back surface of the roller 2, the roller 2 and the first support 7 are rotatably connected, a blanking pipe 12 is fixedly connected to a top portion of the first support 7, a material stirring wheel 6 is rotatably connected to an inner wall of the blanking pipe 12, a second belt pulley 5 is fixedly connected to a back surface of the material stirring wheel 6 and penetrates the blanking pipe 12, the first belt pulley 3 and the second belt pulley 5 are in transmission connection through the belt 4, a material inlet barrel 11 is communicated to a top portion of the blanking pipe 12, a material outlet pipe 13 is communicated to a bottom portion of the blanking pipe 12, a supporting foot 18 located at a left side of the blanking pipe 12 is hinged to a bottom, the bottom of first support 7 is provided with quantity and is two supporting wheel device 8, supporting wheel device 8 runs through first support 7 and extends to the outside of first support 7, the right side of first support 7 is rotated and is connected with quantity and is two first rotation wheel 10, the bottom fixedly connected with quantity of first support 7 is two connecting rod 9, the bottom of connecting rod 9 is rotated and is connected with second rotation wheel 14, it has typewriter ribbon 15 to wind between two first rotation wheels 10 and two second rotation wheels 14, the right side fixedly connected with storage device 21 at first support 7 top, the left side fixedly connected with second support 16 at first support 7 top.
In fig. 5, the supporting wheel device 8 includes a supporting rod 804, the supporting rod 804 penetrates through the first support 7 and extends to the outside of the first support 7, a second roller 805 is rotatably connected to the bottom of the supporting rod 804, a first through hole 803 located below the first support 7 is formed in the right side of the supporting rod 804, a second through hole 801 located above the first support 7 is formed in the right side of the supporting rod 804, a bolt 802 is inserted into the inner wall of the second through hole 801, when temporary line drawing is needed, the blocking plate 17 is drawn out, the bolt 802 is inserted into the inner wall of the second through hole 801, at this time, the second roller 805 is in contact with the ground, and the second rotating wheel 14 is not in contact with the ground; when the color tape 15 needs to be used for drawing a line, firstly, the blocking plate 17 is inserted into the blanking pipe 12 until the left side of the blocking plate 17 is attached to the inner wall of the blanking pipe 12; the bolt 802 is inserted into the inner wall of the first through hole 803, at this time, the second roller 805 does not contact with the ground, and the second rotating wheel 14 contacts with the ground, so that the adjustment and switching of the two line drawing modes are realized.
In fig. 1, the storage device 21 includes a round bar 2102, the bottom of the round bar 2102 is fixedly connected with the top of the first bracket 7, and the surface of the round bar 2102 is sleeved with three storage boxes 2101, so as to facilitate drawing lines by using the color ribbon 15 for a long time.
In fig. 4, a spring 19 is fixedly connected to the left side of the supporting foot 18, the top of the spring 19 is hinged to the bottom of the first bracket 7, and a clamping seat 20 is fixedly connected to the bottom of the first bracket 7 and located on the right side of the supporting foot 18, so that when the device is temporarily stopped, the device is stably placed on the ground by using the supporting foot 18.
In fig. 3, the surface of the kick-out wheel 6 is provided with uniformly distributed grooves, which is beneficial to the continuous falling of lime powder and realizes the line drawing process of the lime powder.
In fig. 3, a blocking plate 17 is inserted into the right side of the feeding pipe 12, the left side of the blocking plate 17 penetrates through the feeding pipe 12 and is attached to the inner wall of the feeding pipe 12, and the blocking plate 17 is used for controlling the lime powder to fall.
The utility model discloses a theory of operation is: when the temporary line drawing device is used, when temporary line drawing is needed, the blocking plate 17 is pulled out, the bolt 802 is inserted into the inner wall of the second through hole 801, the second roller 805 is in contact with the ground, the second rotating wheel 14 is not in contact with the ground, lime powder is poured into the material feeding barrel 11, the lime powder falls into the groove of the material stirring wheel 6 through the material feeding barrel 11, the lime powder falls to the ground through the discharge pipe 13 along with the rotation of the material stirring wheel 6, meanwhile, a person pushes the first roller 1 to move through the second support 16, so that the first belt pulley 3 drives the second belt pulley 5 to rotate, the material stirring wheel 6 rotates at a constant speed, the temporary line drawing is conveniently and quickly completed, the uniformly distributed grooves are formed in the surface of the material stirring wheel 6, the lime powder can continuously fall, and the line drawing process of the lime powder is realized; when the color tape 15 needs to be used for drawing a line, firstly, the blocking plate 17 is inserted into the blanking pipe 12 until the left side of the blocking plate 17 is attached to the inner wall of the blanking pipe 12; the bolt 802 is inserted into the inner wall of the first through hole 803, at the moment, the second roller 805 is not in contact with the ground, the second rotating wheel 14 is in contact with the ground, the first rotating wheel 10 and the second rotating wheel 14 are utilized, along with the rotation of the first roller 1, the color ribbon 15 in a winding connection between the two first rotating wheels 10 draws lines on the ground, the use is convenient, the switching process is simple and easy to operate, the surface of the round rod 2102 is sleeved with three storage boxes 2101, the long-time use of the color ribbon 15 is facilitated, in addition, when the device is temporarily stopped, the device is stably placed on the ground by utilizing the supporting legs 18.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a scriber that construction used, includes first gyro wheel (1), belt (4) and first support (7), its characterized in that: the front surface of the first roller (1) is fixedly connected with a roller (2), the roller (2) penetrates through the first roller (1) and extends to the outside of the first roller (1), the back surface of the roller (2) is fixedly connected with a first belt pulley (3), the roller (2) is rotatably connected with a first support (7), the top of the first support (7) is fixedly connected with a blanking pipe (12), the inner wall of the blanking pipe (12) is rotatably connected with a material stirring wheel (6), the back surface of the material stirring wheel (6) penetrates through the blanking pipe (12) and is fixedly connected with a second belt pulley (5), the first belt pulley (3) is in transmission connection with the second belt pulley (5) through a belt (4), the top of the blanking pipe (12) is communicated with a material inlet barrel (11), the bottom of the blanking pipe (12) is communicated with a discharge pipe (13), and the bottom of the first support (7) is hinged with a support leg (18) positioned on the left side of the blanking pipe (12), the bottom of first support (7) is provided with quantity and is two supporting wheel device (8), supporting wheel device (8) run through first support (7) and extend to the outside of first support (7), the right side of first support (7) is rotated and is connected with quantity and is first rotation wheel (10) two, the bottom fixedly connected with quantity of first support (7) is connecting rod (9) two, the bottom of connecting rod (9) is rotated and is connected with the second and rotates wheel (14), two first rotation wheel (10) and two the second has rotated around having typewriter ribbon (15) between wheel (14), the right side fixedly connected with storage device (21) at first support (7) top, the left side fixedly connected with second support (16) at first support (7) top.
2. The line drawing device for building construction according to claim 1, wherein the supporting wheel device (8) comprises a supporting rod (804), the supporting rod (804) penetrates through the first support (7) and extends to the outside of the first support (7), a second roller (805) is rotatably connected to the bottom of the supporting rod (804), a first through hole (803) located below the first support (7) is formed in the right side of the supporting rod (804), a second through hole (801) located above the first support (7) is formed in the right side of the supporting rod (804), and a bolt (802) is inserted into the inner wall of the second through hole (801).
3. A line striper in construction according to claim 2, wherein the storage means (21) comprises a circular rod (2102), the base of the rod (2102) is fixedly attached to the top of the first support (7), and the surface of the rod (2102) is provided with three storage boxes (2101).
4. The line drawing device for building construction according to claim 1, wherein a spring (19) is fixedly connected to the left side of the supporting foot (18), the top of the spring (19) is hinged to the bottom of the first support (7), and a clamping seat (20) located on the right side of the supporting foot (18) is fixedly connected to the bottom of the first support (7).
5. The line drawing device for building construction according to claim 1, wherein the surface of the material stirring wheel (6) is provided with uniformly distributed grooves.
6. The line drawing device for building construction according to claim 1, wherein a blocking plate (17) is inserted into the right side of the blanking pipe (12), and the left side of the blocking plate (17) penetrates through the blanking pipe (12) and is attached to the inner wall of the blanking pipe (12).
CN202020820459.7U 2020-05-15 2020-05-15 Scriber for building construction Active CN212146397U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020820459.7U CN212146397U (en) 2020-05-15 2020-05-15 Scriber for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020820459.7U CN212146397U (en) 2020-05-15 2020-05-15 Scriber for building construction

Publications (1)

Publication Number Publication Date
CN212146397U true CN212146397U (en) 2020-12-15

Family

ID=73706524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020820459.7U Active CN212146397U (en) 2020-05-15 2020-05-15 Scriber for building construction

Country Status (1)

Country Link
CN (1) CN212146397U (en)

Similar Documents

Publication Publication Date Title
CN203701536U (en) Building construction wall painting and leveling device
CN207947579U (en) A kind of tunnel cable holder
CN112900811A (en) Floor tile laying device for building construction
CN212146397U (en) Scriber for building construction
CN207277774U (en) Portable ceramic tile machinery apparatus of plastering
CN111677302A (en) Wall building auxiliary tool
CN219243107U (en) Site surveying instrument for construction engineering cost
CN218216379U (en) Cable laying auxiliary device for electromechanical equipment installation
CN116573484A (en) Power cable transmission line pipeline laying device
CN206859602U (en) Clean power integration device and ceramic tile apparatus of plastering
CN110206326B (en) Floor brick tiling is with handling device
CN213461027U (en) Simple cable trench support structure
CN213537073U (en) Channel is hoist device for lining board
CN216422979U (en) Automatic cladding cement mortar equipment of light material piece
CN210366370U (en) Cable coiling device for electric power engineering construction
CN210779902U (en) Line hanging bracket for construction site
CN221856088U (en) Support frame of plaster
CN101845816B (en) Adjustable support for spraying of building foundation pits and side slopes
CN207001867U (en) A kind of quick devices for taking-up of site construction cable
CN209082942U (en) A kind of engineering construction scaffold
CN218234278U (en) Adjustable telescopic building construction platform
CN220447913U (en) View stone material transportation and strorage device
CN220645102U (en) Device for building outer elevation construction
CN221439746U (en) Carrying device for landscaping engineering
CN214364839U (en) Building engineering construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240122

Address after: Room 103, No. 207 Huancheng South Road, Jingchuan Town, Jing County, Xuancheng City, Anhui Province, 242500

Patentee after: Yu Haiyan

Country or region after: China

Patentee after: Wang Xiangbing

Address before: No. 808, No. 600, Yanling Road, Tianhe District, Guangzhou, Guangdong 510650

Patentee before: Li Qiufang

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240328

Address after: 200000 Hongkou District, Shanghai Guangji road 173, 10 level 1001 room (centralized registration)

Patentee after: Shanghai Juyong Decoration Design Engineering Co.,Ltd.

Country or region after: China

Address before: Room 103, No. 207 Huancheng South Road, Jingchuan Town, Jing County, Xuancheng City, Anhui Province, 242500

Patentee before: Yu Haiyan

Country or region before: China

Patentee before: Wang Xiangbing