CN212138544U - Column and pier greening and climbing device - Google Patents

Column and pier greening and climbing device Download PDF

Info

Publication number
CN212138544U
CN212138544U CN202020753842.5U CN202020753842U CN212138544U CN 212138544 U CN212138544 U CN 212138544U CN 202020753842 U CN202020753842 U CN 202020753842U CN 212138544 U CN212138544 U CN 212138544U
Authority
CN
China
Prior art keywords
baffle
bottom plate
pier
climbing device
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020753842.5U
Other languages
Chinese (zh)
Inventor
高倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020753842.5U priority Critical patent/CN212138544U/en
Application granted granted Critical
Publication of CN212138544U publication Critical patent/CN212138544U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The utility model discloses a post, mound afforestation climbing device, comprising a base plate, the bottom plate facial make-up is equipped with first baffle, the shelf board has been installed to one side of first baffle, the second baffle has been installed to one side of shelf board, lay the perforation on the second baffle, the reinforcing bar net has been installed to the lower surface of bottom plate, the clamp splice has been installed to the bilateral symmetry of bottom plate, be equipped with the screw hole on the clamp splice, threaded hole alternates there is the bolt, the bolt has the nut to back one end threaded connection who goes out the screw hole, in the implementation, tightly laminate the bottom plate at the surface of pier, reuse the inflation screw and wear out the perforation, beat into in advance on the pier and beat the fixed orifices, make the bottom plate fix around the pier, first baffle, in the check that shelf board and second baffle constitute, can place soil, the layering again, divide the planting plant of variety, the afforestation effect.

Description

Column and pier greening and climbing device
Technical Field
The utility model belongs to the technical field of the public road bridge roof beam afforestation, concretely relates to post, mound afforestation climb and attach device.
Background
The viaduct is mainly constructed for solving the problem of traffic jam, the viaduct is generally established at the intersection, traffic flows in different directions can be mutually alternated and spanned on roads with different heights without mutual interference, the accidents of head-on phase control can be avoided, the piers are used for supporting the bridge, a plurality of piers are delicate, and the reinforced cement material is used for reducing the quantity of gas generated by the piers, so that the pier greening in the building greening is generated.
The bridge pier greening not only beautifies urban traffic roads, but also plants can absorb harmful gases such as automobile exhaust and the like, but has the following defects: during the greening construction of the existing bridge pier, climbing plants are planted at the bottom of the bridge pier mostly, and the bridge pier is automatically climbed by the plants for greening, so that the problem of poor greening effect exists.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a post, mound afforestation climb and attach device to solve the not good enough problem of the existence afforestation effect among the prior art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a post, mound afforestation climbing device, includes the bottom plate, the bottom plate facial make-up is equipped with first baffle, the shelf board has been installed to one side of first baffle, the second baffle has been installed to one side of shelf board, the reinforcing bar net has been installed to the lower surface of bottom plate, the clamp splice has been installed to the bilateral symmetry of bottom plate, be equipped with the screw hole on the clamp splice, the bolt has been alternate in the screw hole, the one end threaded connection that the screw hole was unscrewed to the bolt has the nut.
Preferably, the second baffle is provided with through holes.
Preferably, the bottom plate is of an arc-shaped plate structure, and the first baffle and the second baffle are of arc-shaped plate structures.
Preferably, the shelf plate is of a square plate structure.
Preferably, the clamping block is of a cuboid structure.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model provides a post, mound afforestation climb and attach device, during the implementation, tightly laminate the bottom plate at the surface of pier, reuse the inflation screw and wear out the perforation, squeeze into and beat in advance on the pier in the fixed orifices, make the bottom plate fix around the pier, in the check that first baffle, shelf and second baffle constitute, can place soil, layering, the planting plant of branch variety have strengthened the afforestation effect.
The utility model provides a post, mound afforestation climb and attach device, reinforcing bar net provide the support of climbing for the plant, are favorable to the plant to climb the stability of attaching.
Drawings
Fig. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view in partial cutaway of FIG. 1;
fig. 3 is a top view partially cut-away schematic view of the present invention;
fig. 4 is an enlarged schematic view of a portion of fig. 2.
In the figure: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, perforated plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, 2, 3 and 4, a column and pier greening climbing device includes a bottom plate 1, the bottom plate 1 is of an arc-shaped plate structure made of a stainless steel plate, a first baffle 2 is welded on the bottom plate 1, an object placing plate 3 is welded on one side of the first baffle 2, the object placing plate 3 is of a square plate structure, a second baffle 4 is welded on one side of the object placing plate 3, the first baffle 2 and the second baffle are of arc-shaped plate structures, a through hole 10 is distributed on the second baffle 4, a steel mesh 5 is welded on the lower surface of the bottom plate 1, clamping blocks 6 are welded on two ends of the bottom plate 1, the clamping blocks 6 are of a cuboid structure, a threaded hole 7 is formed in each clamping block 6, a bolt 8 is inserted into each threaded hole 7, and a nut 9 is connected to one end of each bolt 8, which is screwed out of the threaded hole 7.
During implementation, the inner rings of the two bottom plates 1 are opposite and are respectively placed on two sides of a pier, clamping blocks at two ends of the two bottom plates 1 are attached and connected, the bolts 8 are screwed into the threaded holes 7, one sections screwed out of the threaded holes 7 are locked by the nuts 9, the bottom plates 1 are tightly attached to the outer surface of the pier, the expansion screws penetrate through the through holes 10 and are driven into the pier to be fixed in the fixing holes in advance, the bottom plates 1 are fixed around the pier, soil can be placed in lattices formed by the first baffle plate 2, the object placing plates 3 and the second baffle plate 4, planting plants can be layered and classified, the greening effect is better and more attractive, the reinforcing mesh 5 provides a support for the plants to climb, and the plants are beneficial to climbing.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a post, mound afforestation climbing device, includes bottom plate (1), its characterized in that: the improved structure is characterized in that a first baffle (2) is arranged on the base plate (1), a storage plate (3) is arranged on one side of the first baffle (2), a second baffle (4) is arranged on one side of the storage plate (3), a reinforcing mesh (5) is arranged on the lower surface of the base plate (1), clamping blocks (6) are symmetrically arranged on two sides of the base plate (1), threaded holes (7) are formed in the clamping blocks (6), bolts (8) are inserted in the threaded holes (7), and nuts (9) are connected to one ends of the bolts (8) which are screwed out of the threaded holes (7) in a threaded mode.
2. The column and pier greening and climbing device as recited in claim 1, wherein: the second baffle (4) is provided with a through hole (10).
3. The column and pier greening and climbing device as recited in claim 1, wherein: the bottom plate (1) is of an arc-shaped plate structure, and the first baffle (2) and the second baffle are of arc-shaped plate structures.
4. The column and pier greening and climbing device as recited in claim 1, wherein: the shelf (3) is of a square plate structure.
5. The column and pier greening and climbing device as recited in claim 1, wherein: the clamping block (6) is of a cuboid structure.
CN202020753842.5U 2020-05-09 2020-05-09 Column and pier greening and climbing device Expired - Fee Related CN212138544U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020753842.5U CN212138544U (en) 2020-05-09 2020-05-09 Column and pier greening and climbing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020753842.5U CN212138544U (en) 2020-05-09 2020-05-09 Column and pier greening and climbing device

Publications (1)

Publication Number Publication Date
CN212138544U true CN212138544U (en) 2020-12-15

Family

ID=73709506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020753842.5U Expired - Fee Related CN212138544U (en) 2020-05-09 2020-05-09 Column and pier greening and climbing device

Country Status (1)

Country Link
CN (1) CN212138544U (en)

Similar Documents

Publication Publication Date Title
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN102966052A (en) Protective method and structure for preventing rockfall dangers at high and steep slope of mountain road
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN202208904U (en) Semi-mobile combined flood-control dam
CN212138544U (en) Column and pier greening and climbing device
CN212612522U (en) Truss string concrete combined supporting system
CN106504674A (en) Billboard
CN213773098U (en) Novel municipal afforestation frame
CN116024860A (en) Tensile water permeability concrete pavement structure for repairing
CN216713950U (en) Steel construction assembled supports bed-jig
CN213978546U (en) Assembled bridge abutment structure and assembled bridge abutment using same
CN206144237U (en) Prefabricated assembled large -scale steel structure rectangle storehouse and rectangle crowd storehouse
CN211446616U (en) Deepwater river pier construction operation platform
CN112696009A (en) Supporting joist platform of dish knot formula support suitable for building engineering
CN106436574A (en) Buckle hanging method of bridge
JP3174304U (en) Steel retaining fence
CN220848580U (en) Foldable operation platform
CN215329111U (en) Lightweight concrete roadbed
CN215926949U (en) Steel leaning tower force rod type support structure system
CN217129040U (en) Assembling type safety passage protection shed
CN214531415U (en) Hollow steel grid beam floor system
CN220747845U (en) Assembled tent cable structure
CN214402248U (en) Detachable sound insulation screen installation system
CN214695417U (en) Flood control fence capable of preventing sand bags from being washed away
CN219691058U (en) Scaffold convenient to build

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201215