CN212133319U - Mixing bunker center steam stand fixed knot constructs - Google Patents
Mixing bunker center steam stand fixed knot constructs Download PDFInfo
- Publication number
- CN212133319U CN212133319U CN202020978766.8U CN202020978766U CN212133319U CN 212133319 U CN212133319 U CN 212133319U CN 202020978766 U CN202020978766 U CN 202020978766U CN 212133319 U CN212133319 U CN 212133319U
- Authority
- CN
- China
- Prior art keywords
- steam
- central
- stand column
- central steam
- mixing bunker
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Manufacture And Refinement Of Metals (AREA)
Abstract
The utility model relates to a central steam stand column fixing structure of a mixing bunker, which comprises a cross beam, a central steam stand column and a steam source inlet pipeline, wherein the central steam stand column is connected and fixed with the cross beam in a plug-in manner, and the upper opening of the side wall of the central steam stand column is detachably and fixedly connected with the steam source inlet pipeline; this fixed knot structure has effectively reduced because of the probability that central steam stand drops and leads to the production to be interrupted, the mediation and the change of the pipeline of being convenient for simultaneously.
Description
Technical Field
The utility model belongs to the technical field of steel smelting equipment technique and specifically relates to a mixing bunker central steam stand fixed knot constructs.
Background
In a sintering workshop of an iron mill, the steam preheating device of the mixing bin of the sintering machine can effectively improve the temperature of mixed materials, improve the yield of sintered ores and reduce the consumption of solid fuels. At present, because the steam preheating central stand column adopts a fixed structure in welded connection, the welding point is extremely easy to corrode and wear, so that the central stand column falls off, the cloth cylinder is blocked to interrupt production, the treatment at each time takes about 3 hours on average, and in order to solve the problem, the structural strength of the central steam stand column needs to be optimized and designed, so that the smooth production can be ensured.
Disclosure of Invention
The utility model aims at providing a mixing bunker center steam stand fixed knot constructs to above-mentioned condition, this fixed knot construct has effectively reduced because of the probability that center steam stand drops and leads to the production to be interrupted, the mediation and the change of the pipeline of being convenient for simultaneously.
The utility model has the following concrete scheme: mixing bunker center steam stand fixed knot constructs, including crossbeam, center steam stand and steam source inlet pipeline, center steam stand with adopt bayonet connection fixed mode between the crossbeam, the lateral wall upper shed of center steam stand and with steam source inlet pipeline detachable fixed connection.
Further, in the utility model discloses in bayonet junction department between central steam stand and the crossbeam adopts the helicitic texture to carry out fixed connection, and this helicitic texture is including the concave station of seting up on the crossbeam, establish the external screw thread on perforating hole, fastening nut and the central steam stand outer wall of concave station bottom, and central steam stand passes external screw thread and fastening nut threaded connection on the perforating hole and, and fastening nut blocks on the up end of the perforating hole of concave station bottom.
Further, the utility model discloses well opening on the central steam stand lateral wall with detachable connects the adoption between the steam source inlet pipeline that one section transition hose of screwed pipe joint cooperation connects, and wherein the opening part of screwed pipe joint welding on the central steam stand lateral wall, the both ends of transition hose are passed through the thread bush and are connected with steam source inlet pipeline and screwed pipe joint respectively.
Furthermore, in the present invention, the transition hose is a metal hose.
The utility model cancels the flange connection mode of the original central steam upright, adopts the integral central steam upright, adopts the plug-in connection and fixation mode between the upright and the cross beam, and adopts the fastening nut mode to fix the top end of the upright on the cross beam; change former steam source entry into crossbeam lower part pipeline admission by crossbeam center admission to adopt metal collapsible tube to connect the leading-in central steam stand of steam, the mediation and the change of the pipeline of being convenient for, through adopting the utility model discloses a fixed knot constructs, has effectively reduced because of the probability of the production interrupt that central steam stand drops and leads to.
Drawings
FIG. 1 is a schematic view of a steam column fixing structure in the center of a conventional mixing bunker;
fig. 2 is a schematic structural diagram of the present invention;
fig. 3 is a schematic diagram of the connection of the plug-in connection point between the central steam column and the cross beam of the present invention.
In the figure: the steam source comprises a steam source inlet pipeline, a beam, a flange, a welding point, a central steam upright post, a metal hose, a threaded pipe joint, a through hole, a fastening nut, a concave table and an external thread, wherein the steam source inlet pipeline comprises 2 parts, the beam comprises 3 parts, the flange comprises 4 parts, the welding point comprises 5 parts, the central steam upright post comprises 6 parts, the threaded pipe joint comprises 7 parts, a through hole comprises 8 parts.
Detailed Description
Referring to fig. 1-3, the utility model relates to a mixing bunker center steam stand fixed knot constructs, including crossbeam 2, center steam stand 5 and steam source inlet pipeline 1, center steam stand with adopt bayonet connection fixed mode between the crossbeam, center steam stand's lateral wall upper shed and with steam source inlet pipeline detachable fixed connection.
Furthermore, in this embodiment, the insertion-type connection point between the central steam column and the cross beam is fixedly connected by a threaded structure, the threaded structure includes a concave platform 10 formed on the cross beam, a through hole 8 formed at the bottom of the concave platform, a fastening nut 9, and an external thread 11 on the outer wall of the central steam column, the central steam column passes through the through hole and the external thread thereon is in threaded connection with the fastening nut, and the fastening nut is clamped on the upper end surface of the through hole at the bottom of the concave platform.
Furthermore, the detachable connection between the opening on the central steam stand lateral wall and the steam source inlet pipeline in this embodiment adopts threaded pipe joint 7 to cooperate with one section of transition hose to connect, wherein threaded pipe joint welds the opening part on the central steam stand lateral wall, and the both ends of transition hose are connected with steam source inlet pipeline and threaded pipe joint respectively through the thread bush.
Further, in this embodiment, the transition hose is a metal hose 6.
Traditional mixing bunker center steam stand is fixed with center steam stand and relevant flange welded connection, sets up the steam source entry in the inside of crossbeam simultaneously, and in case the welding point corroded back center steam stand will drop like this and lead to relevant production to appear interrupting.
The original welding structure is changed into threaded connection, and the central steam stand column and the cross beam are fixed in an insertion mode, so that the structural strength of a connecting point and a fixing point is guaranteed.
The utility model cancels the flange connection mode of the original central steam upright, adopts the integral central steam upright, adopts the plug-in connection and fixation mode between the upright and the cross beam, and adopts the fastening nut mode to fix the top end of the upright on the cross beam; change former steam source entry into crossbeam lower part pipeline admission by crossbeam center admission to adopt metal collapsible tube to connect the leading-in central steam stand of steam, the mediation and the change of the pipeline of being convenient for, through adopting the utility model discloses a fixed knot constructs, has effectively reduced because of the probability of the production interrupt that central steam stand drops and leads to.
In specific implementation process, the utility model discloses effectively reduced because of central steam stand drops the probability that leads to the production to be interrupted, can avoid consequently the problem to lead to the production interruption time about 48 hours each year, according to 350 tons productivity calculations per hour, can avoid the loss of about 48x370=17760 (ton) agglomerate each year.
Claims (4)
1. Mixing bunker center steam stand fixed knot constructs, including crossbeam, center steam stand and steam source inlet pipeline, its characterized in that: the central steam upright post and the cross beam are connected and fixed in an inserting mode, and the side wall of the central steam upright post is provided with an opening and is detachably and fixedly connected with the steam source inlet pipeline.
2. The mixing bunker center steam column fixing structure of claim 1, wherein: the central steam stand column is fixedly connected with the inserted connecting point between the central steam stand column and the cross beam by adopting a threaded structure, the threaded structure comprises a concave platform arranged on the cross beam, a through hole arranged at the bottom of the concave platform, a fastening nut and an external thread arranged on the outer wall of the central steam stand column, the central steam stand column penetrates through the through hole and the external thread on the central steam stand column is in threaded connection with the fastening nut, and the fastening nut is clamped on the upper end face of the through hole at the bottom of the concave platform.
3. The mixing bunker center steam column fixing structure of claim 1, wherein: the opening on the side wall of the central steam stand column and the steam source inlet pipeline are detachably connected by adopting a threaded pipe joint matched with one section of transition hose for connection, wherein the threaded pipe joint is welded at the opening on the side wall of the central steam stand column, and two ends of the transition hose are respectively connected with the steam source inlet pipeline and the threaded pipe joint through threaded sleeves.
4. The mixing bunker center steam column fixing structure of claim 3, wherein: the transition hose is a metal hose.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020978766.8U CN212133319U (en) | 2020-06-02 | 2020-06-02 | Mixing bunker center steam stand fixed knot constructs |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020978766.8U CN212133319U (en) | 2020-06-02 | 2020-06-02 | Mixing bunker center steam stand fixed knot constructs |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212133319U true CN212133319U (en) | 2020-12-11 |
Family
ID=73670511
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020978766.8U Active CN212133319U (en) | 2020-06-02 | 2020-06-02 | Mixing bunker center steam stand fixed knot constructs |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212133319U (en) |
-
2020
- 2020-06-02 CN CN202020978766.8U patent/CN212133319U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205393883U (en) | H shaped steel equipment fixture | |
CN212133319U (en) | Mixing bunker center steam stand fixed knot constructs | |
CN101692565B (en) | Joint drainage board type strain clamp | |
CN101042251A (en) | Method for making arrangement type rustless steel water separator | |
CN201660884U (en) | Mechanical connection structure for uplift pile foundation | |
CN201354262Y (en) | Belt conveyer feeding pipe | |
CN209338904U (en) | A kind of highly concentrated deslagging device of paper production slurry | |
CN209990022U (en) | Construction steel bar connecting piece | |
CN208928296U (en) | A kind of feeding system for ball mill | |
CN209349496U (en) | A kind of activity detachable chute | |
CN210394422U (en) | Ferronickel refining device | |
CN213914859U (en) | High-strength outer screen assembly matched with dehydrator for use | |
CN206105025U (en) | Bilateral scissors screw -down device and pull rod thereof | |
CN201161253Y (en) | Technique head of cold drawing steel tube | |
CN210703031U (en) | Water cooling tile nozzle of high-power argon arc welding gun | |
CN201898309U (en) | Drainage rod type strain clamp | |
CN212671161U (en) | Aluminum alloy upright rod butt joint piece | |
CN205294464U (en) | Copper line cooling conveyor | |
CN2784423Y (en) | Crystallizer for electroslag refusion | |
CN217709627U (en) | Crude lead refining device and aeration device for crude lead refining | |
CN215560406U (en) | Efficient tapping machine adapter sleeve device | |
CN213652558U (en) | Novel air supply branch pipe | |
CN216408125U (en) | Multifunctional quick adapter | |
CN207187258U (en) | A kind of grain slag filter inlet passage | |
CN201538789U (en) | Novel steelmaking wire-feeding conveying device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |