CN212133244U CN202020556858.7U CN202020556858U CN212133244U CN 212133244 U CN212133244 U CN 212133244U CN 202020556858 U CN202020556858 U CN 202020556858U CN 212133244 U CN212133244 U CN 212133244U
Authority
CN
China
Prior art keywords
wall
vertical wall
bolt hole
bolt
slag notch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020556858.7U
Other languages
Chinese (zh)
Inventor
孙广颖
赵瑞林
王怀绪
祁洪军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Gute Furnace Engineering Co ltd
Original Assignee
Tianjin Gute Furnace Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Gute Furnace Engineering Co ltd filed Critical Tianjin Gute Furnace Engineering Co ltd
Priority to CN202020556858.7U priority Critical patent/CN212133244U/en
Application granted granted Critical
Publication of CN212133244U publication Critical patent/CN212133244U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

The utility model discloses a fast-mounting type baking oven machine for a slag hole of a gasification furnace, which comprises a first vertical wall, a second vertical wall and a top wall, wherein heating bodies are fixed on the first vertical wall, the number of the first vertical wall is two, and each first vertical wall is provided with a first bolt hole, a second bolt hole, a first chute and a first fixing groove; the first bolt hole is connected with a top wall through a first bolt, and a third bolt hole is formed in the top wall; the second bolt holes are connected with a second vertical wall through second bolts, the number of the second vertical wall is two, and each second vertical wall is provided with a fourth bolt hole; the first sliding groove is connected with a first short wall through a first sliding block, a first fixed block is arranged on the first short wall, and the first fixed block is placed in a first fixed groove; the bottom of the first vertical wall is connected with wheels. The utility model discloses baker machine, the installation is simple swift, and it is nimble convenient to use, and it is fast to generate heat, and the heat loss is few.

Description

Rapid mounting type furnace drier for slag hole of gasification furnace
Technical Field
The utility model belongs to the technical field of thermal equipment, concretely relates to slag notch quick installation formula baker under gasifier.
Background
After the construction of the plastic material is accomplished in the ramming of slag notch under the gasifier, need use the baker machine to dry, the stainless steel shell that current baker machine generally adopted, generally assemble the crooked piece of subassembly again through welded fastening in the shell subassembly installation, assemble the stove courage after the welding finishes, because the fixed stove courage of reassembling after finishing of box, the degree of difficulty of stove courage equipment has been increased, the technical staff who also needs the specialty of welding simultaneously, whole process is complicated time-consuming, be unfavorable for high-efficient production requirement, how to provide a quick installation formula baker of slag notch under the gasifier, make the baker machine installation simple swift, be the direction of technical staff's effort in the field.
SUMMERY OF THE UTILITY MODEL
The utility model provides a gasifier slag notch quick installation formula baker to solve the problem that proposes in the above-mentioned background art, the utility model provides a gasifier slag notch quick installation formula baker is down, after the construction of the plastic material is accomplished to the slag notch is rammed under the gasifier, installation that can be simple swift is in order to carry out drying process.
In order to achieve the above object, the utility model provides a following technical scheme: a fast-mounting type furnace baking machine for a slag hole of a gasification furnace comprises a first vertical wall, a second vertical wall and a top wall, wherein heating bodies are fixed on the first vertical wall, the second vertical wall and the top wall; the bottom of each first vertical wall is connected with a wheel support through a wheel base, and the wheel supports are connected with wheels; the first vertical walls are provided with first bolt holes, second bolt holes, first sliding grooves and first fixing grooves; the first bolt hole is connected with a top wall through a first bolt, a third bolt hole is formed in the top wall, and the third bolt hole and the first bolt hole are the same in aperture; the second bolt holes are connected with a second vertical wall through second bolts, the number of the second vertical wall is two, each second vertical wall is provided with a fourth bolt hole, and the diameters of the fourth bolt holes and the second bolt holes are the same; the first chute is connected with a first short wall through a first sliding block, a first fixed block is arranged on the first short wall, and the first fixed block is placed in a first fixed groove.
Adopt above-mentioned technical scheme, can carry out the equipment of baker before the slag notch under the gasifier of needs drying, earlier through first bolt with the headwall with first upright wall connection fixed, rethread second bolt with first upright wall and second upright wall connection fixed, finally by 2 first upright walls, 2 second upright wall and headwall constitution stoving space, arrange the slag notch under the gasifier in the stoving space and carry out drying process. The bolt connection between the first vertical wall and the top wall and between the first vertical wall and the second vertical wall enables the drying oven to be installed simply and quickly, the wheels are arranged to facilitate the movable installation of the first vertical wall and the drying oven machine, the first short wall is arranged to facilitate the sealing of the gap between the first vertical wall and the ground caused by the wheels, and the heat loss is reduced. In addition, the setting of first slider, first spout, first fixed block and first fixed slot makes first quarter wall swing joint on first founding the wall, when the baker needs to keep warm, takes out first fixed block on the first quarter wall from the first fixed slot on the first founding the wall, and first quarter wall slides through first slider and falls to ground for first founding the wall and ground clearance is sealed, in order to reduce the heat loss. When the oven dryer is not used or is moved, the first fixing block on the first short wall is placed in the first fixing groove, namely, the first short wall is lifted and suspended and fixed on the first vertical wall. The size of the furnace baking machine can be flexibly set according to the size of the slag discharging opening of the gasification furnace.
Furthermore, the bottom of each second vertical wall is connected with a wheel support through a wheel base, and the wheel supports are connected with wheels; the second vertical wall is provided with a second sliding groove, the second sliding groove is connected with a second short wall through a second sliding block, and the second short wall is placed in a second fixing groove through a second fixing block. The wheels are arranged to facilitate the moving and installation of the second vertical wall and the oven dryer, and the arrangement of the second short wall facilitates the sealing of the gap between the second vertical wall and the ground caused by the wheels, so that the heat loss is reduced.
Furthermore, one end of the first sliding block and one end of the second sliding block are arc-shaped. The setting of slider arc end is firstly less with spout contact friction when being convenient for the slider to slide, and secondly the arc end can support in the spout internal rotation when being convenient for the stub wall to take out.
Further, the first fixed block and the second fixed block are solid structures. The first fixing groove and the second fixing groove are of a structure with a large inside and a small outside. The solid structure of fixed block is convenient for increase the gravity of quarter wall, and the quarter wall of being convenient for relies on gravity to fix on founding the wall. When the inside of fixed slot is greatly convenient for the short wall to take out, the slider arc end supports when the spout internal rotation fixed slot is inside gives the great activity space of fixed block, and the outside fixed block of being convenient for is fixed in the fixed slot for a short time.
Furthermore, the first vertical wall, the second vertical wall, the top wall, the first short wall and the second short wall are all made of heat-insulating materials. The heat preservation material can be selected from heat preservation cotton and the like.
Furthermore, the first vertical wall and the second vertical wall are respectively provided with a first sealing gasket. The arrangement of the first sealing gasket is convenient for sealing between the first vertical wall and the top wall and between the second vertical wall and the top wall, and heat loss is reduced.
Further, a second sealing gasket is arranged on the first vertical wall. The second sealing gasket is convenient for sealing between the first vertical wall and the second vertical wall, and reduces heat loss.
Further, the first bolt and the second bolt are connected with the first vertical wall through bolt gaskets. The arrangement of the bolt gasket facilitates bolt fastening, and further facilitates sealing between walls.
Further, the heating body is a heating sheet or a heating disc. The heating sheet or the heating plate has high heating efficiency and simple installation and use.
Further, the wheel base is a 360-degree rotating base. The 360-degree rotary base is convenient for the flexible movement of the oven dryer.
The utility model discloses following beneficial effect has:
1. the utility model relates to a slag notch quick installation formula baker machine under gasifier founds wall and top wall through 2 first vertical walls of bolt equipment fixing, 2 second and constitutes the baker machine, and just founds the wall bottom installation wheel for the installation is rapid, and the laborsaving construction convenient operation of trouble-saving is swift.
2. The utility model relates to a slag notch quick installation formula baker machine under gasifier sets up sealed pad and mobilizable quarter wall on founding the wall, makes compact structure between wall and the wall sealed through sealed the pad during installation, makes to found wall and ground clearance sealed through putting down movable quarter wall during the heat preservation, reduces the baker heat loss.
3. The utility model relates to a slag notch quick installation formula baker machine under gasifier sets up slider, spout, fixed block and fixed slot and makes the quarter butt with found wall swing joint together, and quarter butt accessible fixed block, the direct unsettled fixing of fixed slot are on founding the wall, also can directly fall on ground through the slider spout, the nimble use of the baker of being convenient for.
Drawings
FIG. 1 is a schematic structural view (front side cut away) of an embodiment 1 of a rapid-installation type furnace dryer for a slag hole of a gasification furnace of the present invention;
FIG. 2 is an enlarged view of FIG. 1 at A;
FIG. 3 is a side view of the first vertical wall of FIG. 1;
FIG. 4 is a side view of the second vertical wall of FIG. 1;
FIG. 5 is a schematic view of the assembled neutral wall of FIG. 1 in exploded assembly (top cut away);
FIG. 6 is a front view of the top wall of FIG. 1;
FIG. 7 is a side view of the top wall of FIG. 1;
FIG. 8 is a schematic view showing the disassembly and assembly of the vertical wall (top cut away) in example 2 of a rapid slag hole installation type roaster for a gasification furnace according to the present invention;
fig. 9 is a side view of the second stud wall of fig. 8.
Number in the figure: 1. a top wall; 2. a first vertical wall; 3. a first bolt; 4. a second bolt; 5. a first chute; 6. a first fixing groove; 7. a first short wall; 8. a first fixed block; 9. a wheel; 10. a wheel support; 11. a wheel base; 12. a heating element; 13. a first gasket; 14. a second bolt hole; 15. a second gasket; 16. a second vertical wall; 17. a second fixing groove; 18. a second short wall; 19. a second chute; 20. a fourth bolt hole; 21. a bolt washer; 22. a third bolt hole; 23. a first bolt hole; 24. a second slider; 25. a second fixed block; 26. a first slider.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings and examples.
Example 1
As shown in fig. 1-7, a fast-mounting type furnace baking machine for a slag hole of a gasification furnace comprises a first vertical wall 2, a second vertical wall 16 and a top wall 1 which are made of heat preservation cotton, wherein heating elements 12 are fixed on the first vertical wall, the second vertical wall and the top wall, and the heating elements 12 are common heating sheets or heating discs in the market. Specifically, as shown in fig. 1, 2, 3, and 5, the first vertical wall 2 has two pieces, each piece has a bottom connected to a wheel support 10 through a wheel base 11 capable of rotating 360 degrees, and the wheel support 10 is connected to a wheel 9; first upright wall 2 all is equipped with first bolt hole 23, second bolt hole 14, first spout 5 and first fixed slot 6, and first spout 5 connects first quarter butt 7 through first slider 26, and first slider 26 one end is the arc, and first quarter butt 7 accessible solid construction's first fixed block 8 is placed in first fixed slot 6, is equipped with first sealed 13 and the sealed 15 of second of filling up on the first upright wall 2.
As shown in fig. 1, 6 and 7, the top wall 1 is provided with a third bolt hole 22, the diameter of which is the same as the first bolt hole 23 of the first vertical wall 2, and the first bolt 3 sequentially passes through the bolt gasket 21, the first bolt hole 23 and the third bolt hole 22, so that the top wall 1 and the first vertical wall 2 are fixedly connected.
As shown in fig. 1, 4 and 5, the second vertical wall 16 is two-piece, the bottom of each piece is connected with a wheel support 10 through a wheel base 11 capable of rotating 360 degrees, and the wheel support 10 is connected with a wheel 9. In addition, each second vertical wall 16 is provided with a second sliding groove 19, a second fixing groove 17 and a fourth bolt hole 20, and is provided with a first sealing gasket 13. The second sliding groove 19 is connected with the second short wall 18 through a second sliding block 24, one end of the second sliding block 24 is arc-shaped, and the second short wall 18 can be placed in the second fixing groove 17 through a second fixing block 25 of a solid structure. The diameter of the fourth bolt hole 20 is the same as the diameter of the second bolt hole 14 of the first standing wall 2. The second bolt 4 passes through the bolt gasket 21, the second bolt hole 14, the second sealing gasket 15 and the fourth bolt hole 20 in sequence, so that the second vertical wall 16 and the first vertical wall 2 are fixedly connected.
The bolt holes are formed in the bolt holes, so that the first vertical wall 2 is connected with the top wall 1 through bolts, the first vertical wall 2 is connected with the second vertical wall 16 through bolts, the installation is simple and fast, the wheels 9 are convenient to move and install the vertical wall and the baking oven, the short wall is convenient to seal the gap between the vertical wall and the ground due to the wheels 9, and the heat loss is reduced. The oven dryer is simple and rapid to install, flexible and convenient to use, rapid in heating and low in heat loss.
Example 2
As shown in fig. 8 and 9, a fast-mounting type furnace baking machine for a slag hole of a gasification furnace comprises a first vertical wall 2, a second vertical wall 16 and a top wall 1 which are made of heat preservation cotton, wherein heating elements 12 are fixed on the first vertical wall, the second vertical wall and the top wall, and the heating elements 12 are common heating sheets or heating discs in the market. Wherein, the second is found the wall 16 and is two, and every piece all is equipped with only first sealed 13 and fourth bolt hole 20, and first is found wall 2 and top wall 1 and is set up the same embodiment 1.
The working principle, in a first step, is to assemble the top wall 1 and the first standing wall 2. The top wall 1 is placed on the first sealing gaskets 13 of the two first vertical walls 2, and the first bolt 3 sequentially penetrates through the bolt gasket 21, the first bolt hole 23 of the first vertical wall 2 and the third bolt hole 22 of the top wall 1, so that the top wall 1 and the first vertical wall 2 are fixedly connected. In a second step, the second erected wall 16 and the first erected wall 2 are assembled. And (3) abutting the second vertical wall 16 against the second sealing gasket 15 on the first vertical wall 2, abutting the first sealing gasket 13 on the upper part of the second vertical wall 16 against the top wall 1, and sequentially penetrating the second bolt 4 through the bolt gasket 21, the second bolt hole 14 of the first vertical wall 2, the second sealing gasket 15 and the fourth bolt hole 20 of the second vertical wall 16 so as to connect and fix the second vertical wall 16 and the first vertical wall 2. After one of the second vertical walls 16 and the first vertical wall 2 are assembled, the lower slag hole of the gasification furnace is arranged in a space formed by three vertical walls and a top wall, then the other second vertical wall 16 is assembled, and finally the lower slag hole of the gasification furnace is arranged in a space formed by four vertical walls and a top wall 1. And thirdly, putting down the short wall to seal the gap between the vertical wall and the ground. During the first two steps of assembly, the fixed block on the short wall is placed in the fixed slot of the vertical wall, that is, the short wall is fixed on the vertical wall and suspended on the ground, so that firstly, the arc-shaped end of the first sliding block 26 of the first short wall 7 is abutted against the first sliding groove 5 to rotate, meanwhile, the first fixed block 8 on the first short wall 7 is pulled out from the first fixed slot 6, then the first sliding block 26 is slid to the bottom in the first sliding groove 5, meanwhile, the first short wall 7 reaches the ground to seal the gap between the vertical wall and the ground, and the second short wall 18 is treated in the same way. And finally, switching on a power supply to enable the heating sheet or the heating disc to start working and dry the slag discharging opening of the gasification furnace.
It should be finally noted that the above embodiments are only used for illustrating the technical solutions of the embodiments of the present invention and not for limiting the same, and although the embodiments of the present invention are described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the embodiments of the present invention can still be modified or replaced with equivalents, and these modifications or equivalent replacements cannot make the modified technical solutions depart from the scope of the technical solutions of the embodiments of the present invention.

Claims (10)

1. A fast-mounting type furnace drier for a slag hole of a gasification furnace comprises a first vertical wall (2), a second vertical wall (16) and a top wall (1), and is characterized in that,
the first vertical wall (2), the second vertical wall (16) and the top wall (1) are all fixed with heating elements (12);
the first vertical wall (2) is divided into two pieces, the bottom of each piece is connected with a wheel support (10) through a wheel base (11), and the wheel supports (10) are connected with wheels (9);
the first vertical walls (2) are respectively provided with a first bolt hole (23), a second bolt hole (14), a first sliding groove (5) and a first fixing groove (6);
the first bolt hole (23) is connected with the top wall (1) through a first bolt (3), a third bolt hole (22) is formed in the top wall (1), and the third bolt hole (22) is the same as the first bolt hole (23) in aperture;
the second bolt hole (14) is connected with a second vertical wall (16) through a second bolt (4), the second vertical wall (16) is divided into two pieces, each piece is provided with a fourth bolt hole (20), and the fourth bolt holes (20) and the second bolt holes (14) have the same aperture;
first spout (5) are connected first quarter wall (7) through first slider (26), be equipped with first fixed block (8) on first quarter wall (7), first fixed block (8) are placed in first fixed slot (6).
2. The gasifier slag notch quick installation type baking oven machine according to claim 1, characterized in that the bottom of the second vertical wall (16) is connected with a wheel bracket (10) through a wheel base (11), and the wheel bracket (10) is connected with wheels (9);
the second vertical wall (16) is provided with a second sliding groove (19), the second sliding groove (19) is connected with a second short wall (18) through a second sliding block (24), and the second short wall (18) is placed in a second fixing groove (17) through a second fixing block (25).
3. The gasifier slag notch quick installation type furnace drier of claim 2, characterized in that one end of the first sliding block (26) and one end of the second sliding block (24) are arc-shaped.
4. The gasifier slag notch quick installation type furnace drier of claim 2, characterized in that the first fixing block (8) and the second fixing block (25) are solid structures.
5. The gasifier slag notch quick installation formula baker machine of claim 2, characterized in that, first standing wall (2), second standing wall (16), top wall (1), first quarter wall (7) and second quarter wall (18) are the heat preservation material.
6. The gasifier slag notch quick installation type baking oven machine according to claim 1, characterized in that the first vertical wall (2) and the second vertical wall (16) are respectively provided with a first sealing gasket (13).
7. The gasifier slag notch quick installation type baker machine according to claim 1, characterized in that the first vertical wall (2) is provided with a second sealing gasket (15).
8. The gasifier slag notch quick installation type baker machine according to claim 1, characterized in that the heating body (12) is a heating sheet.
9. The gasifier slag notch quick installation type furnace drier of claim 1, characterized in that the heating body (12) is a heating plate.
10. The gasifier slag notch quick installation type furnace drier of claim 1, characterized in that the wheel base (11) is a 360-degree rotating base.
CN202020556858.7U 2020-04-15 2020-04-15 Rapid mounting type furnace drier for slag hole of gasification furnace Expired - Fee Related CN212133244U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020556858.7U CN212133244U (en) 2020-04-15 2020-04-15 Rapid mounting type furnace drier for slag hole of gasification furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020556858.7U CN212133244U (en) 2020-04-15 2020-04-15 Rapid mounting type furnace drier for slag hole of gasification furnace

Publications (1)

Publication Number Publication Date
CN212133244U true CN212133244U (en) 2020-12-11

Family

ID=73689071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020556858.7U Expired - Fee Related CN212133244U (en) 2020-04-15 2020-04-15 Rapid mounting type furnace drier for slag hole of gasification furnace

Country Status (1)

Country Link
CN (1) CN212133244U (en)

Similar Documents

Publication Publication Date Title
CN212133244U (en) Rapid mounting type furnace drier for slag hole of gasification furnace
CN212457834U (en) Novel prickly ash is dried device
CN201184591Y (en) High-efficiency energy-saving wood ash combustor
CN201409823Y (en) Sealed steaming and frying cylinder pan
CN207402101U (en) Corner fittings production ladle dryer
CN211921437U (en) Full-automatic coke feeder of disc valve type intelligent gas furnace
CN213661987U (en) Far infrared auxiliary heater is used in production of high molecular weight dispersant
CN206803187U (en) A kind of lower upset slag formula pyrolysis oven bottom of row
CN205012202U (en) Pitch regeneration drying roller
CN201425309Y (en) Dry-type multilayer disc slag cooler
CN219841050U (en) Double-valve plate high-temperature material discharging and air locking device
CN217636550U (en) Drying device for agricultural production
CN219756404U (en) Boiler slag cleaning device
CN218269968U (en) Fodder drying cabinet convenient to collect
CN106288822A (en) The tower pellet circular cooler of wind
CN220206170U (en) Energy-conserving roaster of heat accumulation formula vacuum chamber
CN206846824U (en) A kind of efficient burning gas-cooker support frame using alcohol radical fuel oil
CN218914979U (en) Combustion vessel for tea detection
CN218046960U (en) Device for preventing bag pasting of ignition furnace
CN219479856U (en) Steaming, baking and drying cylinder frame
CN212590053U (en) Novel rice is dried device
CN216694235U (en) Fertilizer drying device
CN217979611U (en) Indirect heat transfer energy-saving high-efficiency rotary cylinder dryer
CN115317637B (en) Effective disinfection equipment for biomass energy steam boxes
CN208786019U (en) Round energy storage bed separate type sieve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201211