CN212129223U - Pin-connected panel piping lane - Google Patents
Pin-connected panel piping lane Download PDFInfo
- Publication number
- CN212129223U CN212129223U CN202020427195.9U CN202020427195U CN212129223U CN 212129223 U CN212129223 U CN 212129223U CN 202020427195 U CN202020427195 U CN 202020427195U CN 212129223 U CN212129223 U CN 212129223U
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- piping lane
- sawtooth
- pin
- connected panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses an assembled pipe gallery, which comprises an upper pipe gallery and a lower pipe gallery, wherein the section of the upper pipe gallery is in an arch shape with a semicircular groove in the middle of the bottom, the section of the lower pipe gallery is in a semicircular shape with an upward opening, two sides of the semicircular upper end of the lower pipe gallery are provided with bosses extending outwards horizontally, the bosses are provided with sawtooth-shaped positioning blocks protruding upwards, two ends of the arch bottom of the upper pipe gallery are provided with sawtooth-shaped positioning grooves sunken upwards, the sawtooth-shaped positioning blocks can be mutually meshed with the sawtooth-shaped positioning grooves, the upper end of the inner wall of the lower pipe gallery is provided with a first fixing block, the first fixing block is provided with a sawtooth-shaped stopper protruding upwards, the lower end of the inner wall of the semicircular groove of the upper pipe gallery is provided with a second fixing block, the second fixing block is provided with a sawtooth-shaped limiting groove sunken upwards, the sawtooth-, this pin-connected panel piping lane can avoid using the reinforcing bar, and is with low costs.
Description
Technical Field
The utility model relates to a pin-connected panel piping lane.
Background
The pipe gallery is a public tunnel which is used for laying municipal pipelines such as air supply, water supply, municipal preset pipelines, power supply and communication cables in a centralized manner under the city, and is an advanced layout mode.
The preparation of the existing pipe gallery is generally carried out in two ways: firstly, the integral casting, secondly prefabricated concatenation. The integral casting mode has high requirement on manual vibration, the vibration is not compact, the possibility of microcracks appearing in the later period of the pipe gallery is high, and the hidden danger of water leakage can be left; and a lot of reinforcing bars that prefabricated concatenation piping lane needs pre-buried are used for the concatenation fixed, and the construction is more loaded down with trivial details, and the cost is higher.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model aims at providing an avoid using the reinforcing bar, the construction is simple, pin-connected panel piping lane with low costs.
The utility model provides a pair of pin-connected panel piping lane, its characterized in that: comprises an upper pipe gallery and a lower pipe gallery, wherein the cross section of the upper pipe gallery is in an arch shape with a semicircular groove in the middle of the bottom, the cross section of the lower pipe gallery is in a semicircular shape with an upward opening, bosses extending outwards horizontally are arranged on two sides of the semicircular upper end of the lower pipe gallery, a saw-toothed positioning block protruding upwards is arranged on each boss, saw-toothed positioning grooves recessed upwards are arranged at two ends of the arch bottom of the upper pipe gallery, the saw-toothed positioning blocks and the saw-toothed positioning grooves can be meshed with each other, two first fixing blocks extending inwards horizontally are symmetrically arranged on the upper end of the inner wall of the lower pipe gallery, a saw-toothed limiting block protruding upwards is arranged on each first fixing block, two second fixing blocks extending inwards horizontally are symmetrically arranged at the lower end of the inner wall of the semicircular groove of the upper pipe gallery, and a saw-, the sawtooth-shaped limiting block and the sawtooth-shaped limiting groove can be meshed with each other, and sawteeth on the sawtooth-shaped positioning block and sawteeth on the sawtooth-shaped limiting block are arranged in a mutually perpendicular mode.
Furthermore, the sawtooth on the cockscomb structure locating piece is followed the fore-and-aft direction of lower part piping lane sets up at interval side by side.
Furthermore, the sawtooth on the cockscomb structure stopper is followed the left and right sides direction of lower part piping lane sets up at interval side by side.
Further, first fixed block is located the middle part of the inner wall upper end of lower part piping lane, two first fixed blocks are bilateral symmetry and set up.
Furthermore, the semicircular diameter of the lower pipe gallery is the same as the diameter of the semicircular groove of the upper pipe gallery.
Further, width about the boss of lower part piping lane with the both ends width of upper portion piping lane arch bottom is the same.
Further, the front-back length of the lower pipe gallery is the same as the front-back length of the upper pipe gallery.
Borrow by above-mentioned scheme, the utility model discloses at least, have following advantage: this pin-connected panel piping lane falls into two parts about upper portion piping lane and lower part piping lane with the piping lane main part through upper portion piping lane, hoist upper portion piping lane to the lower part piping lane on with the piping lane, cockscomb structure constant head tank intermeshing on cockscomb structure locating piece through on the piping lane of lower part and the upper portion piping lane, it is fixed to make formation in the front and back direction between upper portion piping lane and the lower part piping lane, cockscomb structure spacing groove intermeshing on cockscomb structure stopper and the upper portion piping lane through on the piping lane of lower part, it is fixed to make formation in the left and right directions between upper portion piping lane and the lower part piping lane, and through the gravity of upper portion piping lane self, can make upper portion piping lane and lower part piping lane can not separate easily, thereby accomplish assembling of piping lane main part.
The above description is only an overview of the technical solution of the present invention, and in order to make the technical means of the present invention clearer and can be implemented according to the content of the description, the following detailed description is made with reference to the preferred embodiments of the present invention and accompanying drawings.
Drawings
Fig. 1 is a schematic structural view of the assembled pipe gallery of the present invention;
FIG. 2 is a schematic view of the present invention showing the engagement between the positioning block and the positioning groove;
fig. 3 is the utility model discloses the schematic diagram that cockscomb structure locating piece and cockscomb structure stopper distribute on well lower part piping lane.
Detailed Description
The following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
Example (b): a spliced pipe gallery comprises an upper pipe gallery 1 and a lower pipe gallery 2, wherein the cross section of the upper pipe gallery is in an arch shape with a semicircular groove in the middle of the bottom, the cross section of the lower pipe gallery is in a semicircular shape with an upward opening, bosses 3 extending outwards horizontally are arranged on two sides of the semicircular upper end of the lower pipe gallery, an upwards-convex zigzag positioning block 4 is arranged on each boss, upwards-concave zigzag positioning grooves 5 are arranged at two ends of the arch bottom of the upper pipe gallery, the zigzag positioning blocks and the zigzag positioning grooves can be meshed with each other, two first fixing blocks 6 extending inwards horizontally are symmetrically arranged on the upper end of the inner wall of the lower pipe gallery, an upwards-convex zigzag limiting block 7 is arranged on each first fixing block, two second fixing blocks 8 extending inwards horizontally are symmetrically arranged at the lower end of the inner wall of the semicircular groove of the upper pipe gallery, and an upwards-concave zigzag limiting groove 9 is arranged on each second fixing, the sawtooth-shaped limiting block and the sawtooth-shaped limiting groove can be meshed with each other, and sawteeth on the sawtooth-shaped positioning block and sawteeth on the sawtooth-shaped limiting block are arranged in a mutually perpendicular mode.
The sawtooth on the cockscomb structure locating piece is followed the fore-and-aft direction of lower part piping lane sets up at interval side by side.
The sawtooth on the cockscomb structure stopper is followed the left and right sides direction of lower part piping lane sets up at interval side by side.
First fixed block is located the mid portion of the inner wall upper end of lower part piping lane, two first fixed blocks are bilateral symmetry and set up.
The semicircular diameter of the lower pipe gallery is the same as the semicircular groove diameter of the upper pipe gallery.
The width about the boss of lower part piping lane with the both ends width of upper portion piping lane arch bottom is the same.
The length around the lower part piping lane with the length is the same around the upper portion piping lane.
This pin-connected panel piping lane falls into two parts about upper portion piping lane and lower part piping lane with the piping lane main part through upper portion piping lane, hoist upper portion piping lane to the lower part piping lane on with the piping lane, cockscomb structure constant head tank intermeshing on cockscomb structure locating piece through on the piping lane of lower part and the upper portion piping lane, it is fixed to make formation in the front and back direction between upper portion piping lane and the lower part piping lane, cockscomb structure spacing groove intermeshing on cockscomb structure stopper and the upper portion piping lane through on the piping lane of lower part, it is fixed to make formation in the left and right directions between upper portion piping lane and the lower part piping lane, and through the gravity of upper portion piping lane self, can make upper portion piping lane and lower part piping lane can not separate easily, thereby accomplish assembling of piping lane main part.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and variations can be made without departing from the technical principle of the present invention, and these modifications and variations should also be regarded as the protection scope of the present invention.
Claims (7)
1. The utility model provides a pin-connected panel piping lane which characterized in that: comprises an upper pipe gallery and a lower pipe gallery, wherein the cross section of the upper pipe gallery is in an arch shape with a semicircular groove in the middle of the bottom, the cross section of the lower pipe gallery is in a semicircular shape with an upward opening, bosses extending outwards horizontally are arranged on two sides of the semicircular upper end of the lower pipe gallery, a saw-toothed positioning block protruding upwards is arranged on each boss, saw-toothed positioning grooves recessed upwards are arranged at two ends of the arch bottom of the upper pipe gallery, the saw-toothed positioning blocks and the saw-toothed positioning grooves can be meshed with each other, two first fixing blocks extending inwards horizontally are symmetrically arranged on the upper end of the inner wall of the lower pipe gallery, a saw-toothed limiting block protruding upwards is arranged on each first fixing block, two second fixing blocks extending inwards horizontally are symmetrically arranged at the lower end of the inner wall of the semicircular groove of the upper pipe gallery, and a saw-, the sawtooth-shaped limiting block and the sawtooth-shaped limiting groove can be meshed with each other, and sawteeth on the sawtooth-shaped positioning block and sawteeth on the sawtooth-shaped limiting block are arranged in a mutually perpendicular mode.
2. The pin-connected panel piping lane of claim 1, its characterized in that: the sawtooth on the cockscomb structure locating piece is followed the fore-and-aft direction of lower part piping lane sets up at interval side by side.
3. The pin-connected panel piping lane of claim 2, its characterized in that: the sawtooth on the cockscomb structure stopper is followed the left and right sides direction of lower part piping lane sets up at interval side by side.
4. The pin-connected panel piping lane of claim 3, its characterized in that: first fixed block is located the mid portion of the inner wall upper end of lower part piping lane, two first fixed blocks are bilateral symmetry and set up.
5. The pin-connected panel piping lane of claim 4, its characterized in that: the semicircular diameter of the lower pipe gallery is the same as the semicircular groove diameter of the upper pipe gallery.
6. The pin-connected panel pipe gallery of claim 5, characterized in that: the width about the boss of lower part piping lane with the both ends width of upper portion piping lane arch bottom is the same.
7. The pin-connected panel pipe gallery of claim 6, characterized in that: the length around the lower part piping lane with the length is the same around the upper portion piping lane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020427195.9U CN212129223U (en) | 2020-03-30 | 2020-03-30 | Pin-connected panel piping lane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020427195.9U CN212129223U (en) | 2020-03-30 | 2020-03-30 | Pin-connected panel piping lane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212129223U true CN212129223U (en) | 2020-12-11 |
Family
ID=73672767
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020427195.9U Active CN212129223U (en) | 2020-03-30 | 2020-03-30 | Pin-connected panel piping lane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212129223U (en) |
-
2020
- 2020-03-30 CN CN202020427195.9U patent/CN212129223U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211499799U (en) | Shear force wall reinforcement | |
CN212129223U (en) | Pin-connected panel piping lane | |
KR101531238B1 (en) | Buttress structure construction method | |
CN212129226U (en) | Pin-connected panel utility tunnel | |
CN205355726U (en) | Pre -buried subassembly of wiring magazine | |
AU2018298511A1 (en) | Assembled building wall body and building house with combination of steel structure and concrete structure | |
CN208309637U (en) | A kind of assembled monolithic concrete structure pipe gallery standard paragraphs | |
CN206128420U (en) | Prefabricated building block | |
CN209723346U (en) | A kind of firm energy-saving building laminated floor slab | |
CN110185158B (en) | Special-shaped column node connection structure for assembly type building | |
CN207419776U (en) | A kind of steel pipe bundle and steel plate concrete combined shear wall constructional device | |
CN210341999U (en) | Internal fixing plastic water stop | |
CN205475322U (en) | Tongue -and -groove template under multicavity | |
CN109296112A (en) | The assembled of frame structure detachably fills wall | |
CN212533778U (en) | Take prefabricated two storehouse concrete box culvert of escape canal | |
CN213233950U (en) | Shear tooth of prefabricated two-way cross rib coincide superstructure of improved generation | |
CN213741211U (en) | Prefabricated trench steel reinforcement skeleton of two cabin sections | |
CN210370713U (en) | Inverted arch longitudinal water stop fixing device | |
CN211057853U (en) | Prefabricated formula utility tunnel | |
CN215630623U (en) | Prefabricated beam column connection structure | |
CN211472115U (en) | Box girder end plugging structure | |
CN217000838U (en) | External template of building assembly type steel structure building | |
CN210976332U (en) | High stability steel construction box post | |
CN218374681U (en) | Connecting structure of prefabricated wall panel | |
CN218148960U (en) | Be used for anti-bank structure of bathroom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |