CN212121000U - Spiral conveyor of building rubbish finished product - Google Patents
Spiral conveyor of building rubbish finished product Download PDFInfo
- Publication number
- CN212121000U CN212121000U CN202020712770.XU CN202020712770U CN212121000U CN 212121000 U CN212121000 U CN 212121000U CN 202020712770 U CN202020712770 U CN 202020712770U CN 212121000 U CN212121000 U CN 212121000U
- Authority
- CN
- China
- Prior art keywords
- water
- tank
- driving shaft
- pond
- spiral
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Cleaning By Liquid Or Steam (AREA)
Abstract
The utility model provides a spiral conveyor of building rubbish finished product, including pan feeding mouth, washing pond, screw conveyer, the pan feeding mouth is located the top of wasing the pond, and screw conveyer is slope connection and installs in wasing the pond, and screw conveyer one end is located pan feeding mouth below, the other end stretches out and washs the pond. The spiral conveyor comprises a spiral guide vane, a driving shaft, a shell and a motor, wherein the spiral guide vane is connected and installed on the driving shaft, the motor drives the driving shaft to rotate, the driving shaft is installed in the shell, and the upper half part of the shell is provided with an opening and the lower half part is in a half-barrel shape. The spraying system is also included, and a water outlet device of the spraying system is arranged above the screw conveyor. This openly can carry effectively to the construction waste finished product to carry out the secondary and spray, make the construction waste finished product cleanliness higher.
Description
Technical Field
The utility model relates to a mechanical equipment especially relates to a building rubbish finished product spiral conveyor.
Background
Construction waste is solid waste generated during the process of building construction, reconstruction, extension or demolition. The construction waste has a wide erosion effect on our living environment, and if the construction waste is subjected to a long-term irrespective attitude, the construction waste has adverse effects on urban environmental sanitation, living conditions, land quality assessment and the like. Firstly, after a large amount of construction waste is piled in the land, the quality of the soil can be reduced, and the production capacity of the soil is reduced; the construction waste is stacked in the air, so that the air quality is influenced, and some dust particles can be suspended in the air and are harmful to the health of human bodies; in the stacking process of the construction waste, the long-term stacking means that harmful substances of the construction waste permeate into underground water areas to pollute water environment; if the construction waste is piled up in the city, the urban environment and the attractiveness are not favorable; the building rubbish stacking may have some potential safety hazards, and some accidents may happen at any time. A large amount of solid wastes are generated due to the massive removal of cities, and the treatment of construction wastes is urgent.
A common treatment mode of the construction waste at present is as follows: the building garbage is crushed and washed to obtain a finished product, and finally, the finished product is subjected to post-treatment (such as removing wood chips and plastic sheets through a winnowing machine) to obtain a qualified building material, so that the recycling of the building garbage is realized. The washing process is carried out in the washing tank, dirt such as slurry of the construction waste is washed, the construction waste is washed to obtain a primary finished product, and the finished product needs to be conveyed out of the washing tank. The finished weight of the construction waste is large, the construction waste is conveyed to the outside of the cleaning pool from the lower part of the cleaning pool, if a general conveying belt is adopted for conveying, the conveying effect is poor because the construction waste slides downwards easily under the action of gravity in the conveying process. How to effectively convey the materials becomes a problem to be solved urgently.
SUMMERY OF THE UTILITY MODEL
In order to solve at least one among the above-mentioned technical problem, this disclosure provides a building rubbish finished product spiral conveyor, has solved the problem that building rubbish finished product was carried away from wasing the pond.
According to an aspect of the present disclosure, a building rubbish finished product spiral conveyor is related to, including pan feeding mouth, washing pond, screw conveyer, the pan feeding mouth is located the top of wasing the pond, and screw conveyer is slope connection and installs in wasing the pond, and screw conveyer one end is located pan feeding mouth below, the other end stretches out and washs the pond.
According to at least one embodiment of this disclosure, screw conveyer includes spiral guide vane, driving shaft, casing, motor, and spiral guide vane connects and installs on the driving shaft, and the motor drives the driving shaft and rotates, and the driving shaft is installed in the casing, and first opening of casing, lower half are half barrel-shaped.
According to at least one embodiment of this disclosure, still include the sprinkler system, the water outlet device of sprinkler system installs the top at the screw conveyer.
According to at least one embodiment of this disclosure, the spraying system includes sedimentation tank, overflow tank and spray machine, and sedimentation tank, overflow tank establish in the below of wasing the pond, and the sedimentation tank is connected with the overflow tank, washs the bottom of the pool and is equipped with the delivery port, and the delivery port is located the top of sedimentation tank, and the pumping device of spray machine installs in the overflow tank, and the effluent plant of spray machine installs in the top of screw conveyer, pumping device and effluent plant pass through supply pipe connection.
According to at least one embodiment of the present disclosure, a separation wall is disposed between the sedimentation tank and the overflow tank, an overflow gap for supplying water to overflow is disposed at an upper portion of the separation wall, and the sedimentation tank is connected to the overflow tank through the overflow gap.
According to at least one embodiment of the present disclosure, the water outlet device of the spraying machine is a nozzle.
According to at least one embodiment of the present disclosure, the nozzle is a pressurized nozzle.
According to at least one embodiment of the present disclosure, the water pumping device of the sprayer is a water pump for pumping water from the overflow tank.
According to at least one embodiment of the present disclosure, the spraying machine is further provided with a water inlet pipe located in the cleaning tank.
According to at least one embodiment of the present disclosure, a valve is provided between the water inlet pipe and the water supply pipe.
The spiral conveying device for the building waste finished products is used for a building waste treatment process, building waste enters a shell of a spiral conveyor from a feeding port, and the finished products are conveyed through the spiral conveyor after being washed by washing equipment. The motor drives the driving shaft to rotate, and the driving shaft drives the spiral guide blades to rotate, so that the construction waste finished products between the spiral guide blades are pushed forward until the construction waste finished products are taken away from the cleaning pool. The system further comprises a spraying system, after the sewage generated after the construction waste is washed is precipitated and cleaned, the cleaning water is pumped to the water outlet device by using the water pumping device, the construction waste finished product is sprayed for the second time, and the washing effect of the construction waste finished product is enhanced. This openly can carry effectively to the construction waste finished product to carry out the secondary and spray, make the construction waste finished product cleanliness higher.
Drawings
The accompanying drawings, which are included to provide a further understanding of the disclosure and are incorporated in and constitute a part of this specification, illustrate exemplary embodiments of the disclosure and together with the description serve to explain the principles of the disclosure.
Fig. 1 is a schematic structural diagram according to one embodiment of the present disclosure.
Detailed Description
The present disclosure will be described in further detail with reference to the drawings and embodiments. It is to be understood that the specific embodiments described herein are for purposes of illustration only and are not to be construed as limitations of the present disclosure. It should be further noted that, for the convenience of description, only the portions relevant to the present disclosure are shown in the drawings.
It should be noted that the embodiments and features of the embodiments in the present disclosure may be combined with each other without conflict. The present disclosure will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
In at least one embodiment of this disclosure, this disclosure provides a spiral conveyor of building rubbish finished product, including pan feeding mouth 1, washing pond 2, screw conveyer as shown in fig. 1, pan feeding mouth 1 is located the top of washing pond 2, and screw conveyer is slope connection and installs in washing pond 2, and screw conveyer one end is located pan feeding mouth 1 below, the other end stretches out washing pond 2.
According to another embodiment of the present disclosure, as shown in fig. 1, the screw conveyor includes a screw guide vane 14, a driving shaft 13, a housing 3, and a motor, wherein the screw guide vane 14 is connected to the driving shaft 13, the motor drives the driving shaft 13 to rotate, the driving shaft 13 is installed in the housing 3, and an upper half portion and a lower half portion of the housing 3 are in a half-barrel shape.
The motor may be located in a suitable position depending on the field conditions and is therefore not shown in the schematic.
Construction waste enters the shell 3 of the screw conveyor from the feeding port 1, and a finished product is conveyed by the screw conveyor after being washed by washing equipment (which is not in the protection scope of the disclosure and therefore is not shown in the schematic diagram). The motor drives the driving shaft 13 to rotate, and the driving shaft 13 drives the spiral guide blades 14 to rotate, so that the construction waste finished products between the spiral guide blades 14 are pushed forward until the construction waste finished products are taken away from the cleaning pool 2.
According to a further embodiment of the present disclosure, a spraying system is further included, and the water outlet device 15 of the spraying system is installed above the screw conveyor.
And a spraying system is utilized to carry out secondary washing on the finished building garbage products, so that the washing effect is enhanced.
According to still another embodiment of the present disclosure, the spraying system includes a sedimentation tank 11, an overflow tank 8 and a spraying machine, the sedimentation tank 11 and the overflow tank 8 are arranged below the cleaning tank 2, the sedimentation tank 11 is connected with the overflow tank 8, the bottom of the cleaning tank 2 is provided with a water outlet 12, the water outlet 12 is positioned above the sedimentation tank 11, a water pumping device 7 of the spraying machine is arranged in the overflow tank 8, a water outlet device 15 of the spraying machine is arranged above the screw conveyer, and the water pumping device 7 and the water outlet device 15 are connected through a water supply pipe 6.
After the finished building garbage is washed by the washing equipment in the washing tank 2, the sewage in the washing tank 2 flows out through the water outlet 12 and flows into the sedimentation tank 11. Pollutants such as mud and the like are precipitated to the lower layer in the sedimentation tank 11, the upper layer clean water flows into the overflow tank 8, the water pumping device 7 of the spraying machine pumps out the clean water in the overflow tank 8 and flows out from the water outlet device 15 through the water supply pipe 6 to carry out secondary washing on the building rubbish finished product on the spiral conveyor.
According to another embodiment of the present disclosure, a separation wall 10 is provided between the sedimentation tank 11 and the overflow tank 8, an overflow gap 9 for supplying water to overflow is provided at an upper portion of the separation wall 10, and the sedimentation tank 11 is connected with the overflow tank 8 through the overflow gap 9.
After the sewage is precipitated in the sedimentation tank 11, dirt such as slurry is precipitated to the lower layer, and the upper layer clean water overflows to the overflow tank 8 through the overflow port 9.
According to yet another embodiment of the present disclosure, the water outlet means 15 of the spraying machine is a nozzle.
The spraying mode of the nozzle washes the area big, strengthens the secondary washing effect to the building rubbish finished product.
According to yet another embodiment of the present disclosure, the nozzle is a pressurized nozzle.
And a pressurized nozzle is used for pressurizing and spraying the cleaning water, so that the secondary washing effect on the finished building garbage is enhanced.
According to a further embodiment of the present disclosure, the water pumping device 7 of the sprinkler is a water pump that pumps water from the overflow tank 8.
The water pump can adopt a submersible pump and can pump water in water.
According to a further embodiment of the present disclosure, the spraying machine is further equipped with a water inlet pipe 5 located in the washing tank 2.
Except that the spray thrower can draw water from overflow tank 8, if the off-the-shelf pollution condition of building rubbish is lighter, wash the quality of water on 2 upper strata in pond better, then usable inlet tube 5 draws and washs 2 upper strata water in pond and carry out the secondary and wash to the off-the-shelf building rubbish.
According to yet another embodiment of the present disclosure, a valve 4 is provided between the inlet pipe 5 and the supply pipe 6.
The water inlet pipe 5 is controlled by the valve 4, and the valve 4 is closed, so that the spraying machine pumps water from the overflow tank 8; and opening the valve 4, and pumping water from the cleaning pool 2 by the sprayer.
This openly can carry effectively to the construction waste finished product to carry out the secondary and spray, make the construction waste finished product cleanliness higher.
In the description herein, reference to the description of the terms "one embodiment/mode," "some embodiments/modes," "example," "specific example," or "some examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment/mode or example is included in at least one embodiment/mode or example of the application. In this specification, the schematic representations of the terms used above are not necessarily intended to be the same embodiment/mode or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments/modes or examples. Furthermore, the various embodiments/aspects or examples and features of the various embodiments/aspects or examples described in this specification can be combined and combined by one skilled in the art without conflicting therewith.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present application, "plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
It will be understood by those skilled in the art that the foregoing embodiments are merely for clarity of illustration of the disclosure and are not intended to limit the scope of the disclosure. Other variations or modifications may occur to those skilled in the art, based on the foregoing disclosure, and are still within the scope of the present disclosure.
Claims (10)
1. The utility model provides a spiral conveyor of building rubbish finished product which characterized in that: including pan feeding mouth, washing pond, screw conveyer, the pan feeding mouth is located the top of wasing the pond, and screw conveyer is slope connection and installs in wasing the pond, and screw conveyer one end is located pan feeding mouth below, the other end stretches out and washs the pond.
2. The spiral conveying device for finished building garbage products as claimed in claim 1, wherein: the spiral conveyor comprises a spiral guide vane, a driving shaft, a shell and a motor, wherein the spiral guide vane is connected and installed on the driving shaft, the motor drives the driving shaft to rotate, the driving shaft is installed in the shell, and the upper half part of the shell is provided with an opening and the lower half part is in a half-barrel shape.
3. The spiral conveying device for finished building garbage products as claimed in claim 1, wherein: the spraying system is also included, and a water outlet device of the spraying system is arranged above the screw conveyor.
4. The spiral conveying device for finished building garbage products as claimed in claim 3, wherein: the spraying system comprises a sedimentation tank, an overflow tank and a spraying machine, wherein the sedimentation tank and the overflow tank are arranged below the cleaning tank, the sedimentation tank is connected with the overflow tank, a water outlet is formed in the bottom of the cleaning tank and located above the sedimentation tank, a water pumping device of the spraying machine is arranged in the overflow tank, a water outlet device of the spraying machine is arranged above the screw conveyor, and the water pumping device and the water outlet device are connected through a water supply pipe.
5. The spiral conveying device for finished building garbage products as claimed in claim 4, wherein: and a separation wall is arranged between the sedimentation tank and the overflow tank, an overflow port for supplying water to overflow is arranged at the upper part of the separation wall, and the sedimentation tank is connected with the overflow tank through the overflow port.
6. The spiral conveying device for finished building garbage products as claimed in claim 4, wherein: the water outlet device of the spraying machine is a nozzle.
7. The spiral conveying device for finished building garbage products as claimed in claim 6, wherein: the nozzle is a pressurized nozzle.
8. The spiral conveying device for finished building garbage products as claimed in claim 4, wherein: and the water pumping device of the spraying machine is a water pump for pumping water from the overflow tank.
9. The spiral conveying device for finished building garbage products as claimed in claim 4, wherein: the spraying machine is also provided with a water inlet pipe positioned in the cleaning pool.
10. The spiral conveying device for finished building rubbish products as claimed in claim 9, wherein: a valve is arranged between the water inlet pipe and the water supply pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020712770.XU CN212121000U (en) | 2020-04-30 | 2020-04-30 | Spiral conveyor of building rubbish finished product |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020712770.XU CN212121000U (en) | 2020-04-30 | 2020-04-30 | Spiral conveyor of building rubbish finished product |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212121000U true CN212121000U (en) | 2020-12-11 |
Family
ID=73692250
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020712770.XU Active CN212121000U (en) | 2020-04-30 | 2020-04-30 | Spiral conveyor of building rubbish finished product |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212121000U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111408572A (en) * | 2020-04-30 | 2020-07-14 | 湖州恒通机械设备有限公司 | Spiral conveyor of building rubbish finished product |
-
2020
- 2020-04-30 CN CN202020712770.XU patent/CN212121000U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111408572A (en) * | 2020-04-30 | 2020-07-14 | 湖州恒通机械设备有限公司 | Spiral conveyor of building rubbish finished product |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106430741A (en) | Multifunctional sludge, sewage and dirt treatment machine of septic tank | |
CN214695835U (en) | River channel desilting auxiliary device | |
CN101723478A (en) | Mobile device for treating, recovering and reusing sewage | |
CN212121000U (en) | Spiral conveyor of building rubbish finished product | |
CN202729965U (en) | Oil field skid-mounted type oil field waste treatment device | |
CN211445470U (en) | Riverbed sludge recycling treatment device | |
CN111282705A (en) | Construction waste treatment device | |
CN205473049U (en) | Doublestage deposits formula grit separation sewage cycle equipment of recycling | |
CN111804662B (en) | Sea sand desalination system and use method thereof | |
CN111408572A (en) | Spiral conveyor of building rubbish finished product | |
CN205289068U (en) | Automatically cleaning sand and stone separator | |
KR101251568B1 (en) | Dehydration process for sludge and apparatus for the same | |
CN207102875U (en) | Sand-stone separator | |
CN107174844B (en) | Washing and sweeping vehicle sewage recycling device, working method and washing and sweeping vehicle | |
CN211100460U (en) | Medicine bubble cleaning machine | |
CN111359966B (en) | Continuous flushing machine for waste plastic fragments | |
CN211436915U (en) | Oil garbage separator | |
CN211965150U (en) | High-pressure water washing device for construction waste treatment | |
CN212550775U (en) | A environmental protection water conservation cleaning equipment for scented tea class | |
CN103332808B (en) | Sewage purification and recycling integrated device of multifunctional cleaning and sweeping vehicle | |
CN208599941U (en) | A kind of split type large-scale sand washer | |
CN112591940A (en) | Coating wastewater treatment equipment and coating wastewater treatment method | |
CN220411893U (en) | Waste collection device is taken in grit production | |
CN220939774U (en) | A dust device for concrete production place | |
CN218108835U (en) | Garbage station deodorization system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |