CN212115372U CN202020954277.9U CN202020954277U CN212115372U CN 212115372 U CN212115372 U CN 212115372U CN 202020954277 U CN202020954277 U CN 202020954277U CN 212115372 U CN212115372 U CN 212115372U
Authority
CN
China
Prior art keywords
client
server
project
project data
database
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020954277.9U
Other languages
Chinese (zh)
Inventor
周亮
吕征宇
阚竟生
刘鑫
王紫雷
稽志良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Design Co ltd
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Design Co ltd
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Design Co ltd, State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Design Co ltd
Priority to CN202020954277.9U priority Critical patent/CN212115372U/en
Application granted granted Critical
Publication of CN212115372U publication Critical patent/CN212115372U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model relates to a power transmission and transformation project data integrated management system, include and design side, consultant side, the constructor, the customer end that owner side and project management side correspond respectively, a plurality of customer ends respectively with service end intercommunication connection, the service end includes the network server who is connected with database and file memory respectively, network server includes interconnect's intranet server and outer net server, intranet server respectively with the design side customer end, consultant side customer end interconnect, outer net server respectively with the constructor customer end, owner side customer end, project management side customer end interconnect. Compared with the prior art, the utility model discloses a set up the customer end that corresponds to different project participants, be connected each customer end with the server side, utilize the intranet server and the extranet server of server side, through concentrated storage and management project data for the project participant can follow the server side and acquire project data and carry out interoperation.

Description

Power transmission and transformation project data integrated management system
Technical Field
The utility model belongs to the technical field of power transmission and transformation engineering design technique and specifically relates to a power transmission and transformation engineering project data integrated management system is related to.
Background
The power transmission and transformation project design is a multi-professional collaborative design process, mainly comprising professional designs such as civil engineering, heating and ventilation projects, electrical engineering, water supply and drainage projects and the like, and a plurality of project participants (including a project manager client, an owner client, a construction client, a designer client and an advisor client) are required to carry out collaborative design jointly in the design process, so that the whole power transmission and transformation project design process comprises a large amount of design project data which come from different project participants, in order to ensure that data sharing can be realized among the project participants, the prior art is that data interaction is respectively and independently carried out among the project participants or a shared folder/center file is constructed, and therefore the purpose of realizing immediate and rapid data sharing is realized, but the two modes have the following problems: different project data have different formats and attributes, and a shared folder or central file mode has hidden data security risks and uncontrollable versions, and after receiving project data of other project participants, a user may have problems that the project data cannot be read and interoperation is performed on the project data.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an integrated management system of power transmission and transformation project data in order to overcome the defect that above-mentioned prior art exists, on the basis that guarantees that the user can acquire project data fast, can realize reading project data immediately and interoperate's purpose.
The purpose of the utility model can be realized through the following technical scheme: a power transmission and transformation project data integrated management system comprises a plurality of clients corresponding to different project participants respectively, wherein the clients comprise a designer client, an advisor client, a constructor client, an owner client and a project manager client, the clients are mutually communicated with a server respectively, the server comprises a network server, a database and a file memory, the network server is connected to the database and the file memory respectively, the network server comprises an intranet server and an extranet server which are mutually connected, the intranet server is mutually connected with the designer client and the advisor client respectively, the extranet server is mutually connected with the constructor client, the owner client and the project manager client respectively, the intranet server receives project data from the designer client and the advisor client, the project data are transmitted to an extranet server in real time, the extranet server carries out standardized processing on the project data from an intranet server according to a power transmission and transformation project digital handover standard so as to obtain project data with uniform format and attribute, and a construction party client, an owner party client and a project management party client can read the project data from a design party client and an advisor party client in real time and carry out project data interoperation; in addition, after receiving project data from the constructor client, the owner client and the project management client, the extranet server performs standardized processing on the project data to obtain project data with uniform format and attribute, and transmits the project data to the intranet server in real time, so that the designer client and the advisor client can read the project data from the constructor client, the owner client and the project management client in real time and perform project data interoperation.
Furthermore, the intranet server is connected to the database and the file storage respectively, and the extranet server is connected to the database and the file storage respectively.
Furthermore, the designer client, the advisor client, the constructor client, the owner client and the project manager client are respectively connected to the database in a unidirectional way to realize remote access.
Further, the file storage is specifically a NAS network storage.
Further, the database is specifically a distributed database.
Further, the client is a Vault client, and the intranet server and the extranet server are Vault servers.
Further, the client is connected with the server in a communication mode through the network switch.
Compared with the prior art, the utility model has the advantages of it is following:
the utility model provides a power transmission and transformation project data integrated management system, through the project data storage of different project participators in the server, set up the customer end corresponding to different project participators, and set up intranet server and outer net server of interconnect at the server, connect intranet server with consultant's customer end, design side customer end, realize project collaborative design; the extranet server is connected with the client of the construction party, the client of the owner party and the client of the project management party, so that the standardized transfer of project data is realized, and different project participants can acquire the project data in the standard format through respective clients and carry out interoperation.
Two, the utility model discloses a set up the database of being connected respectively with intranet server, outer net server at the server side, be connected each customer end with the database respectively for different project participant homoenergetic obtains the project data from the database with strange land access mode, in addition, the utility model discloses set up the file storage who is connected respectively with intranet server, outer net server at the server side, can realize project data sharing on the basis of guaranteeing data security.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a diagram illustrating a specific structure of a server in an embodiment;
wherein: 1. server, 101, web server, 1011, intranet server, 1012, extranet server, 102, database, 103, file store, 201, designer client, 202, advisor client, 203, builder client, 204, owner client, 205, project manager client, 3, network switch.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
Example (b):
as shown in fig. 1, an integrated management system for electric transmission and transformation project data comprises a server 1 which is connected with a designer client 201, an advisor client 202, a constructor client 203, an owner client 204 and a project manager client 205 through a network switch 3, the designer client 201, the advisor client 202, the constructor client 203, the owner client 204 and the project manager client 205 are clients corresponding to different project participants, the server 1 includes a network server 101, a database 102 and a file memory 103, the network server 101 is connected to the database 102 and the file memory 103, the server 1 is used for performing centralized storage management on project data from different project participants, receiving and managing the project data by using the network server 101, and storing the project data by using the database 102 and the file memory 103.
Specifically, as shown in fig. 2, the network server 101 includes an intranet server 1011 and an extranet server 1012 connected to each other, the intranet server 1011 is connected to the database 102 and the file storage 103, the extranet server 1012 is connected to the database 102 and the file storage 103, respectively, and the designer client 201, the advisor client 202, the constructor client 203, the owner client 204, and the project manager client 205 are connected to the database 102 in one direction, respectively, to realize remote access;
the internal network server 1011 is connected with the designer client 201 and the advisor client 202, respectively, the designer client 201 and the advisor client 202 perform project data interaction through the internal network server 1011 to realize professional collaborative design of the power transmission and transformation project, the external network server 1012 is connected with the constructor client 203, the owner client 204 and the project management client 205, respectively, the constructor client 203, the owner client 204 and the project management client 205 perform project data interaction through the external network server 1012 to realize standardized transfer of project data by the external network server 1012, wherein, the internal network server 1011 receives project data from the designer client 201 and the advisor client 202, then transmits the project data to the external network server 1012 in real time, the external network server 1012 performs standardized processing on the project data from the internal network server 1011 according to the power transmission and transformation project digitalized transfer standard, so as to obtain project data with uniform format and attribute, and enable the constructor client 203, the owner client 204 and the project manager client 205 to read project data from the designer client 201 and the advisor client 202 in real time and perform project data interoperation; the extranet server 1012 receives project data from the constructor client 203, the owner client 204, and the project manager client 205, standardizes the project data to obtain project data having a uniform format and attributes, and transmits the project data to the intranet server 1011 in real time, so that the designer client 201 and the advisor client 202 can read project data from the constructor client 203, the owner client 204, and the project manager client 205 on the fly and interoperate the project data.
In this embodiment, the database 102 is a distributed database, the file storage 103 is an NAS network storage, the designer client 201, the advisor client 202, the builder client 203, the owner client 204, and the project manager client 205 are all in the form of a Vault client, and the intranet server 1011 and the extranet server 1012 are all in the form of a Vault server. The utility model discloses a found a distributed's power transmission and transformation project data integration management system for different project participants can visit and share project data in arbitrary time, place, simultaneously through setting up intranet and extranet server, can carry out the standardized management of concentrating to different project data, make different project participants can directly carry out the interoperation after acquireing project data.

Claims (5)

1. The integrated management system for the power transmission and transformation project data is characterized by comprising a plurality of clients corresponding to different project participants respectively, wherein the clients comprise a designer client (201), an advisor client (202), a constructor client (203), an owner client (204) and a project manager client (205), the clients are in communication connection with a server (1) respectively, the server (1) comprises a network server (101), a database (102) and a file memory (103), the network server (101) is connected to the database (102) and the file memory (103) respectively, the network server (101) comprises an intranet server (1011) and an extranet server (1012) which are connected with each other, and the intranet server (1011) is connected with the designer client (201) and the advisor client (202) respectively, the extranet server (1012) is respectively connected with the construction side client (203), the owner side client (204) and the project management side client (205), the file storage (103) is a NAS network storage, the client is a Vault client, and the intranet server (1011) and the extranet server (1012) are Vault servers.
2. The integrated management system for the data of the electric transmission and transformation project according to claim 1, wherein the intranet server (1011) is connected to the database (102) and the file storage (103), and the extranet server (1012) is connected to the database (102) and the file storage (103).
3. The integrated management system for the data of the electric transmission and transformation project according to claim 1, wherein the designer client (201), the advisor client (202), the constructor client (203), the owner client (204) and the project manager client (205) are respectively connected to the database (102) in a unidirectional way.
4. The integrated management system for electric transmission and transformation project data as claimed in claim 1, characterized in that the database (102) is a distributed database.
5. The integrated management system for the data of the electric transmission and transformation project according to claim 1, characterized in that the client is connected with the server (1) in a communication mode through a network switch (3).
CN202020954277.9U 2020-05-30 2020-05-30 Power transmission and transformation project data integrated management system Active CN212115372U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020954277.9U CN212115372U (en) 2020-05-30 2020-05-30 Power transmission and transformation project data integrated management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020954277.9U CN212115372U (en) 2020-05-30 2020-05-30 Power transmission and transformation project data integrated management system

Publications (1)

Publication Number Publication Date
CN212115372U true CN212115372U (en) 2020-12-08

Family

ID=73614808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020954277.9U Active CN212115372U (en) 2020-05-30 2020-05-30 Power transmission and transformation project data integrated management system

Country Status (1)

Country Link
CN (1) CN212115372U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112053128A (en) * 2020-09-03 2020-12-08 国网上海电力设计有限公司 Power grid engineering standardization family database data management system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112053128A (en) * 2020-09-03 2020-12-08 国网上海电力设计有限公司 Power grid engineering standardization family database data management system and method
CN112053128B (en) * 2020-09-03 2023-12-01 国网上海电力设计有限公司 Power grid engineering standardized family database data management system and method

Similar Documents

Publication Publication Date Title
CN109787815B (en) Government information resources shared system based on block chain
CN109685504B (en) Block chain-based shared economy accounting method
CN103345478A (en) Universal identification coding system for smart city construction
CN101911040A (en) Alliance access
CN109359933A (en) A kind of innovation undertaking hatching system and method based on block chain
CN102067112A (en) Federated uptake throttling
CN114528346A (en) Method for sharing transaction of multi-source heterogeneous data assets by depending on block chain
CN212115372U (en) Power transmission and transformation project data integrated management system
CN109636122A (en) Intelligent house ornamentation management system and method based on VR
Hatala et al. The eduSource Communication Language: implementing open network for learning repositories and services
CN101114373B (en) Court network commitment execution system
CN108388679A (en) Tripartite's sincerity attend a school by taking daily trips feelings management cloud platform
CN116916191A (en) Vehicle network information interaction method and system based on edge computing technology
CN109544419A (en) A kind of alumnus management and family's school communication method and system
CN112468385B (en) Virtual grouping configuration method and device, storage medium and electronic device
Lin et al. Enhance generalized exchange economy using blockchain: a time banking case study
CN115358707A (en) Electronic government affair service cooperation method and system
CN210927674U (en) Industrial Internet system architecture based on standard communication protocol
CN111181743B (en) Account attribute configuration method and device
CN207037740U (en) A kind of information trading device based on O2O electric business platforms
CN205899604U (en) Visual management system that traces to source
CN112737917B (en) Account configuration method and device, storage medium and electronic device
CN103001782A (en) Method, system and server for managing social networks
CN103957263A (en) Mobile phone contact circle system and establishment method thereof
CN115936604A (en) Construction project conference management system based on cloud platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant