CN212114618U - Installation auxiliary frame of electric power engineering - Google Patents

Installation auxiliary frame of electric power engineering Download PDF

Info

Publication number
CN212114618U
CN212114618U CN202020588085.0U CN202020588085U CN212114618U CN 212114618 U CN212114618 U CN 212114618U CN 202020588085 U CN202020588085 U CN 202020588085U CN 212114618 U CN212114618 U CN 212114618U
Authority
CN
China
Prior art keywords
clamp
fixing
auxiliary frame
fixed
installation auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020588085.0U
Other languages
Chinese (zh)
Inventor
李梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Yongchuan Electric Power Engineering Co ltd
Original Assignee
Anhui Yongchuan Electric Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Yongchuan Electric Power Engineering Co ltd filed Critical Anhui Yongchuan Electric Power Engineering Co ltd
Priority to CN202020588085.0U priority Critical patent/CN212114618U/en
Application granted granted Critical
Publication of CN212114618U publication Critical patent/CN212114618U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an installation auxiliary frame for electric power engineering, which comprises a base, a fixed clamping seat, a rotating pin, a fixed block and an arc-shaped fixed piece, the corner position of the bottom of the base is provided with an adjusting groove, the surface of the base is provided with a fixed clamping seat, the surface of the fixed block is fixed with a lower mounting clamp, the inner parts of the lower mounting clamp and the upper mounting clamp are both fixed with force-removing springs at equal intervals, the upper mounting clamp and the lower mounting clamp are provided with clamping mechanisms at one sides far away from the rotating pin, both sides of the top of the fixed clamp seat are hinged with adjustable fixed frames, adjusting screw's one end run through adjustable mount and with fixation clamp seat top fixed connection, the utility model discloses not only realized correcting the function to the level when installation auxiliary frame uses, avoided the phenomenon that the installation auxiliary frame takes place to drop when supporting power pipeline, prolonged the life cycle of installation auxiliary frame to power pipeline moreover.

Description

Installation auxiliary frame of electric power engineering
Technical Field
The utility model relates to an electric power engineering technical field specifically is an electric power engineering's installation auxiliary frame.
Background
The installation auxiliary frame is used for completing installation of equipment, parts and components under the action of external support, and is mainly suitable for installation of large or extremely small components which are difficult to complete by some workers, so that installation of a power pipeline in power engineering work can be completed by using the action of the external support.
The installation auxiliary frame on the market is various and can basically meet the use requirements of people, but certain problems still exist, and the specific problems include the following points:
1. when the traditional installation auxiliary frame is used, a horizontal correction function is rarely set, so that the phenomenon of inaccurate installation position of the electric power pipeline caused by deflection when the installation auxiliary frame is placed is caused;
2. when the traditional installation auxiliary frame is used, the clamping and fixing functions on the power pipeline are rarely set, so that the phenomenon that the power pipeline falls off in the using process is caused;
3. when the traditional installation auxiliary frame is used, the protection function on the power pipeline is rarely set, so that the service cycle of the power pipeline is shortened.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric power engineering's installation auxiliary frame to the incline easily takes place when putting forward the installation auxiliary frame among the above-mentioned background art of solution, the obscission of power pipeline easily takes place and shortens the problem of installation auxiliary frame to power pipeline life cycle.
In order to achieve the above object, the utility model provides a following technical scheme: an installation auxiliary frame for electric power engineering comprises a base, a fixing clamp seat, a rotating pin, a fixing block and an arc-shaped fixing piece, wherein an adjusting groove is formed in the corner position of the bottom of the base, an adjusting nut is hinged to the inside of the adjusting groove through a hinged ball, the surface of the base is provided with the fixing clamp seat, the fixing block is installed in the center position of the surface of the fixing clamp seat, a lower installation clamp is fixed on the surface of the fixing block, an upper installation clamp is fixedly connected to one side of the lower installation clamp through the rotating pin, force-unloading springs at equal intervals are fixed inside the lower installation clamp and the upper installation clamp, a clamping mechanism is installed on one side, far away from the rotating pin, of the upper installation clamp and the lower installation clamp, adjustable fixing frames are hinged to the two sides of the top of the fixing clamp seat, an adjusting screw is installed at the top of the adjustable fixing frames, one end of the adjusting screw penetrates through the adjustable fixing, and one side of the adjustable fixing frame is contacted with the surface of the upper mounting clamp.
Preferably, the corner position of the outer side wall of the base is provided with a correction groove, and a horizontal column is embedded in the correction groove.
Preferably, the inside of clamping mechanism has set gradually dead lever, fixation nut and threaded screw, the surface mounting who goes up the installation and press from both sides has the dead lever, and the one end of dead lever runs through the installation and presss from both sides and threaded connection has threaded screw.
Preferably, one end of the threaded screw rod penetrates through the lower mounting clamp and is in threaded connection with a fixing nut, and one end of the fixing nut is in contact with the bottom of the lower mounting clamp.
Preferably, the one end fixedly connected with arc stationary blade that the power of unloading spring kept away from the arc stationary blade to the rubber gasket has been laid on the surface of arc stationary blade.
Preferably, the bottom end of the adjusting nut is in threaded connection with a fixed screw seat, and the bottom end of the fixed screw seat is hinged with a supporting seat.
Compared with the prior art, the beneficial effects of the utility model are that: the installation auxiliary frame for the power engineering not only realizes the horizontal correction function when the installation auxiliary frame is used, avoids the phenomenon that the installation auxiliary frame falls off when supporting a power pipeline, but also prolongs the service cycle of the installation auxiliary frame on the power pipeline;
1. the adjusting nut in the adjusting groove at the corner position of the bottom of the base is sequentially rotated through the fixed screw seat, the supporting seat and the horizontal column, so that the height of the supporting seat is adjusted under the action of the fixed screw seat, the horizontal column in the correcting groove is observed at the same time until the horizontal column is in a horizontal state, and then the adjusting nut is reversely rotated so as to adjust the height of the supporting seat, so that the horizontal correcting function of the installation auxiliary frame during use is realized, and the phenomenon that the installation position of the power pipeline is inaccurate due to deflection when the installation auxiliary frame is placed is avoided;
2. the threaded screw rod is rotated to the inner part of the lower mounting clamp through the threaded screw rod, the fixing nut, the lower mounting clamp and the upper mounting clamp, then the fixing nut is rotated reversely to be fixedly connected with the bottom of the lower mounting clamp, and the electric power pipeline in the upper mounting clamp and the lower mounting clamp is clamped, so that the clamping and fixing effects of the mounting auxiliary frame on the electric power pipeline are realized, and the phenomenon that the electric power pipeline falls off in the using process is avoided;
3. through being provided with and unloading power spring, arc stationary blade and rubber gasket, in the power pipeline use, press from both sides and press from both sides the inside elasticity effect of unloading power spring with lower installation through last installation, promote arc stationary blade and surperficial rubber gasket and protect power pipeline, the outward appearance when having realized the installation auxiliary frame and using power pipeline is protected and is acted to the life cycle of installation auxiliary frame to power pipeline has been prolonged.
Drawings
Fig. 1 is a schematic view of the appearance structure of the utility model;
FIG. 2 is an enlarged schematic view of the clamping mechanism of the present invention;
fig. 3 is an enlarged schematic structural view of a point a in fig. 1 according to the present invention;
fig. 4 is a schematic diagram of a half-section enlarged structure at the position B in fig. 1 of the present invention.
In the figure: 1. a base; 2. fixing the clamp seat; 3. a rotation pin; 4. an adjustable fixing frame; 5. mounting a clamp; 6. an adjusting screw; 7. a clamping mechanism; 701. fixing the rod; 702. fixing a nut; 703. a threaded screw; 8. a fixed block; 9. hinging the ball; 10. an adjustment groove; 11. a supporting seat; 12. a lower mounting clip; 13. a rubber gasket; 14. a force-releasing spring; 15. an arc-shaped fixing sheet; 16. a correction slot; 17. a horizontal column; 18. adjusting the nut; 19. and fixing the screw seat.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: an installation auxiliary frame of electric power engineering comprises a base 1, a fixing clamp seat 2, a rotating pin 3, a fixing block 8 and an arc-shaped fixing piece 15, wherein adjusting grooves 10 are formed in the corner positions of the bottom of the base 1, adjusting nuts 18 are hinged to the inside of the adjusting grooves 10 through hinge balls 9, fixing screw seats 19 are in threaded connection with the bottom ends of the adjusting nuts 18, supporting seats 11 are hinged to the bottom ends of the fixing screw seats 19, correcting grooves 16 are formed in the corner positions of the outer side wall of the base 1, and horizontal columns 17 are embedded in the correcting grooves 16 and used for achieving a horizontal correcting function when the installation auxiliary frame is used;
the surface of the base 1 is provided with a fixed holder 2, a fixed block 8 is arranged at the central position of the surface of the fixed holder 2, the surface of the fixed block 8 is fixed with a lower mounting clamp 12, one side of the lower mounting clamp 12 is fixedly connected with an upper mounting clamp 5 through a rotating pin 3, the lower mounting clamp 12 and the upper mounting clamp 5 are both internally fixed with force-releasing springs 14 at equal intervals, one end of the force-releasing spring 14 far away from an arc-shaped fixed plate 15 is fixedly connected with the arc-shaped fixed plate 15, and a rubber gasket 13 is laid on the surface of the arc-shaped fixed plate 15 and used for protecting the appearance of a power pipeline in use;
a clamping mechanism 7 is arranged on one side of the upper mounting clamp 5 and one side of the lower mounting clamp 12, which are far away from the rotating pin 3, a fixing rod 701, a fixing nut 702 and a threaded screw rod 703 are sequentially arranged inside the clamping mechanism 7, the fixing rod 701 is arranged on the surface of the upper mounting clamp 5, and one end of the fixing rod 701 penetrates through the upper mounting clamp 5 and is in threaded connection with the threaded screw rod 703;
one end of the threaded screw 703 penetrates through the lower mounting clip 12 and is in threaded connection with a fixing nut 702, and one end of the fixing nut 702 is in contact with the bottom of the lower mounting clip 12;
when the auxiliary frame is used, the threaded screw rod 703 is rotated to the inside of the lower mounting clamp 12, and then the fixing nut 702 is rotated reversely to be fixedly connected with the bottom of the lower mounting clamp 12, so that the electric power pipeline in the upper mounting clamp 5 and the lower mounting clamp 12 is clamped, the clamping and fixing effects of the auxiliary frame on the electric power pipeline are realized, and the phenomenon that the electric power pipeline falls off in the using process is avoided;
the both sides at fixed holder 2 top all articulate has adjustable mount 4, and adjusting screw 6 is installed at the top of adjustable mount 4, and adjusting screw 6's one end runs through adjustable mount 4 and with fixed holder 2 top fixed connection, and one side of adjustable mount 4 contacts with the surface of last installation clamp 5.
The working principle is as follows: when in use, firstly, the base 1 is placed on a plane, the adjusting nuts 18 in the adjusting grooves 10 at the corner positions at the bottom of the base 1 are sequentially rotated to adjust the height of the supporting seat 11 under the action of the fixed screw seats 19, meanwhile, the horizontal columns 17 in the correcting grooves 16 are observed until the horizontal columns 17 are in a horizontal state, then, the adjusting nuts 18 are reversely rotated to adjust the height of the supporting seat 11, so that the horizontal correcting function of the installation auxiliary frame in use is realized, the phenomenon that the installation position of an electric power pipeline is inaccurate due to deflection when the installation auxiliary frame is placed is avoided, after the installation auxiliary frame is placed, the adjusting screws 6 at the top of the adjustable fixing frame 4 are rotated to be loosened with the adjustable fixing frame 4, the adjustable fixing frame 4 is loosened with the surface of the upper installation clamp 5, then, the fixing nuts 702 at the bottom of the lower installation clamp 12 are rotated to be loosened with the threaded screws 703, the threaded screw rod 703 is rotated under the action of the fixed rod 701, the upper mounting clamp 5 is lifted up, the threaded screw rod 703 is rotated under the action of the rotating pin 3, the electric power pipeline is placed inside the upper mounting clamp 5 and the lower mounting clamp 12, after the electric power pipeline is placed, the threaded screw rod 703 is rotated to the inside of the lower mounting clamp 12, then the fixing nut 702 is rotated reversely to be fixedly connected with the bottom of the lower mounting clamp 12, the electric power pipeline inside the upper mounting clamp 5 and the lower mounting clamp 12 is clamped, then the adjustable fixing frame 4 is placed on the surface of the upper mounting clamp 5, the adjusting screw 6 is rotated reversely to be fixedly connected with the top end of the fixing clamp seat 2, the clamping and fixing effect of the mounting auxiliary frame on the electric power pipeline is realized, the phenomenon that the electric power pipeline falls off in the using process is avoided, and in the using process of the electric power pipeline, the elastic action of the force-removing spring 14 inside the upper mounting clamp 5 and the lower mounting clamp 12, promote arc stationary blade 15 and surperficial rubber gasket 13 and protect electric power pipeline, outward appearance when having realized the installation auxiliary frame and using electric power pipeline is protected and is acted to prolonged electric power pipeline's life cycle, finally accomplished the use work of installation auxiliary frame.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides an electric power engineering's installation auxiliary frame, includes base (1), fixed holder (2), rotating pin (3), fixed block (8) and arc stationary blade (15), its characterized in that: the adjustable fixing clamp is characterized in that an adjusting groove (10) is formed in the corner position of the bottom of the base (1), an adjusting nut (18) is hinged to the inside of the adjusting groove (10) through a hinge ball (9), a fixing clamp seat (2) is installed on the surface of the base (1), a fixing block (8) is installed in the center position of the surface of the fixing clamp seat (2), a lower installing clamp (12) is fixed on the surface of the fixing block (8), an upper installing clamp (5) is fixedly connected to one side of the lower installing clamp (12) through a rotating pin (3), force-unloading springs (14) with equal intervals are fixed inside the lower installing clamp (12) and the upper installing clamp (5), a clamping mechanism (7) is installed on one side, far away from the rotating pin (3), of the upper installing clamp (5) and the lower installing clamp (12), and adjustable fixing frames (4) are hinged to the two sides of the top of the fixing clamp seat (2), and adjusting screws (6) are installed at the top of the adjustable fixing frame (4), one ends of the adjusting screws (6) penetrate through the adjustable fixing frame (4) and are fixedly connected with the top of the fixing clamp seat (2), and one side of the adjustable fixing frame (4) is in contact with the surface of the upper mounting clamp (5).
2. An installation auxiliary frame for electric power engineering according to claim 1, characterized in that: the corner position department of base (1) lateral wall all seted up correction groove (16), and the inside of correcting groove (16) is inlayed and is had horizontal post (17).
3. An installation auxiliary frame for electric power engineering according to claim 1, characterized in that: the clamping mechanism (7) is internally provided with a fixing rod (701), a fixing nut (702) and a threaded screw rod (703) in sequence, the surface of the upper mounting clamp (5) is provided with the fixing rod (701), and one end of the fixing rod (701) penetrates through the upper mounting clamp (5) and is in threaded connection with the threaded screw rod (703).
4. An installation auxiliary frame for electric power engineering according to claim 3, characterized in that: one end of the threaded screw rod (703) penetrates through the lower mounting clamp (12) and is in threaded connection with a fixing nut (702), and one end of the fixing nut (702) is in contact with the bottom of the lower mounting clamp (12).
5. An installation auxiliary frame for electric power engineering according to claim 1, characterized in that: one end of the force-discharging spring (14) far away from the arc-shaped fixing piece (15) is fixedly connected with the arc-shaped fixing piece (15), and a rubber gasket (13) is laid on the surface of the arc-shaped fixing piece (15).
6. An installation auxiliary frame for electric power engineering according to claim 1, characterized in that: the bottom end of the adjusting nut (18) is in threaded connection with a fixed screw seat (19), and the bottom end of the fixed screw seat (19) is hinged with a supporting seat (11).
CN202020588085.0U 2020-04-20 2020-04-20 Installation auxiliary frame of electric power engineering Expired - Fee Related CN212114618U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020588085.0U CN212114618U (en) 2020-04-20 2020-04-20 Installation auxiliary frame of electric power engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020588085.0U CN212114618U (en) 2020-04-20 2020-04-20 Installation auxiliary frame of electric power engineering

Publications (1)

Publication Number Publication Date
CN212114618U true CN212114618U (en) 2020-12-08

Family

ID=73640231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020588085.0U Expired - Fee Related CN212114618U (en) 2020-04-20 2020-04-20 Installation auxiliary frame of electric power engineering

Country Status (1)

Country Link
CN (1) CN212114618U (en)

Similar Documents

Publication Publication Date Title
CN212114618U (en) Installation auxiliary frame of electric power engineering
CN209896983U (en) Adjustable solar cell panel installing support
CN217443006U (en) Clamp for pressure resistance detection of metal product
CN213661534U (en) Solar power generation photovoltaic board mounting bracket
CN211694180U (en) Display screen installing support
CN220795312U (en) Film probe crimping module
CN211759571U (en) Portable cement wire pole welding stent
CN214678087U (en) Novel fine arts drawing board centre gripping device
CN220022660U (en) Auxiliary installation mechanism with good stability
CN218733151U (en) Lightning protection device for protecting ancient buildings
CN212444939U (en) Waterproof test mould clamping mechanism
CN217096684U (en) A frock clamp for processing installation long plate connecting hole
CN220647731U (en) Support structure for environmental monitoring
CN220411683U (en) Welding roller frame
CN220515921U (en) Polar plate welding device
CN218441520U (en) Environment-friendly metal sealing base
CN219087061U (en) Photovoltaic board installation fixed establishment
CN217482357U (en) Fixing frame for LED power supply
CN213394351U (en) Support frame for computer convenient to angle regulation
CN214800286U (en) Electric mechanism board
CN218695588U (en) Fixing equipment for welding large tower
CN213420382U (en) Outdoor display screen installing support
CN214474307U (en) Spectacle frame correcting tool
CN211118466U (en) Fixing device for engineering detection
CN220688232U (en) Hydroelectric buried pipeline fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201208

Termination date: 20210420

CF01 Termination of patent right due to non-payment of annual fee