CN220688232U - Hydroelectric buried pipeline fixing device - Google Patents

Hydroelectric buried pipeline fixing device Download PDF

Info

Publication number
CN220688232U
CN220688232U CN202322130153.5U CN202322130153U CN220688232U CN 220688232 U CN220688232 U CN 220688232U CN 202322130153 U CN202322130153 U CN 202322130153U CN 220688232 U CN220688232 U CN 220688232U
Authority
CN
China
Prior art keywords
support
fixedly connected
buried pipeline
support frame
strut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322130153.5U
Other languages
Chinese (zh)
Inventor
翁浩博
刘洪丽
刘华君
李冲冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Yidi Pipeline Manufacturing Co ltd
Original Assignee
Hebei Yidi Pipeline Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Yidi Pipeline Manufacturing Co ltd filed Critical Hebei Yidi Pipeline Manufacturing Co ltd
Priority to CN202322130153.5U priority Critical patent/CN220688232U/en
Application granted granted Critical
Publication of CN220688232U publication Critical patent/CN220688232U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model relates to the technical field of hydropower buried pipelines, and discloses a hydropower buried pipeline fixing device which comprises a first support and a second support, wherein adjacent sides of the first support and the second support are contacted, threaded fastening rods are connected to the middle parts of the first support and the second support in a threaded mode, clamping rings are fixedly connected to the adjacent sides of the threaded fastening rods, turning hands are fixedly connected to the sides, away from each other, of the threaded fastening rods, fastening caps are connected to the sides, away from each other, of the threaded fastening rods, and the fastening caps are contacted with the sides, away from each other, of the first support and the second support. According to the utility model, the clamping ring is driven to clamp the hydropower buried pipeline by rotating the threaded fastening rods at two sides, the size of the clamping ring can be adjusted by driving the threaded fastening rods at two sides, the hydropower buried pipeline can be supported and fixed, and the adjustment of the size can be carried out to adapt to different pipeline models.

Description

Hydroelectric buried pipeline fixing device
Technical Field
The utility model relates to the technical field of hydropower buried pipelines, in particular to a hydropower buried pipeline fixing device.
Background
The utility model provides a fixing device of hydropower buried pipe, is one kind at hydropower construction time, and the pipeline system of hydropower is offered the road junction on ground generally, then buries the pipeline in the road junction, when burying the pipeline, need fix through fixing device between pipeline and the road junction, because the pipeline model is different, need use the fixing device of different models, and the suitability is relatively poor, and the diameter is fixed, can not adapt to according to different diameter pipelines, does not have height-adjusting's function yet simultaneously.
Disclosure of Invention
The utility model aims to solve the defects in the prior art and provides a fixing device for a water-electricity buried pipeline.
In order to achieve the above purpose, the present utility model adopts the following technical scheme: the utility model provides a water electricity buries ground pipeline fixing device, includes first strut and second strut, adjacent one side contact of first strut and second strut, the equal threaded connection in middle part of first strut and second strut has the screw thread fastening pole, the equal fixedly connected with snap ring in adjacent one side of screw thread fastening pole, the equal fixedly connected with of screw thread fastening pole is separated one side and is changeed the hand, equal threaded connection has the fastening cap on the screw thread fastening pole, the fastening cap all is separated one side contact with first strut and second strut.
As a further description of the above technical solution:
the bottom of one side of first strut and second strut is equal fixedly connected with fixing base apart from, the bottom of fixing base is equal fixedly connected with first bracing piece apart from one side, first bracing piece all with the inside sliding connection of second bracing piece, the bottom of first bracing piece all is provided with the second fixed slot, equal distance is provided with a plurality of first fixed slot on the second bracing piece, first fixed slot and second fixed slot all with first fixing bolt threaded connection.
As a further description of the above technical solution:
the front end and the rear end of the clamping ring, which are away from one side, are fixedly connected with one end of the connecting rust-proof spring, and the other end of the connecting rust-proof spring is fixedly connected with one side, adjacent to the first support frame and the second support frame.
As a further description of the above technical solution:
and the adjacent sides of the clamping rings are provided with anti-slip arc-cushioning plates.
As a further description of the above technical solution:
the top and the bottom of first strut and second strut all fixedly connected with fixed block, the middle part of fixed block all is provided with the screw thread groove, screw thread groove all with fastening bolt threaded connection.
As a further description of the above technical solution:
the front end and the rear end of one side of the first support frame, which is close to the second support frame, are fixedly connected with clamping columns, clamping grooves are formed in the front end and the rear end of one side of the second support frame, which is close to the first support frame, and the clamping grooves are clamped with the clamping columns.
As a further description of the above technical solution:
and friction-preventing plates are arranged on adjacent sides of the first support frame and the second support frame.
The utility model has the following beneficial effects:
1. according to the utility model, the two side screw tightening rods are sequentially rotated, one side screw tightening rod rotates to drive the clamping ring on one side to be contacted with one side of the hydropower buried pipeline, the other side screw tightening rod rotates to drive the clamping ring on the other side to be contacted with the other side of the hydropower buried pipeline, the hydropower buried pipeline is clamped by the clamping rings on the two sides, and the clamping rings are driven by the screw tightening rods on the two sides to adjust the size, so that the hydropower buried pipeline is supported and fixed, and the size can be adjusted to adapt to different pipeline models.
2. According to the utility model, the second fixing groove at the bottom of the first supporting rod is aligned with the first fixing groove at different positions on the second supporting rod, and the first supporting rod and the second supporting rod are fixed through the first fixing bolt, so that the height of the support can be adjusted, and the support height of the hydropower buried pipeline fixing device can be adjusted.
Drawings
FIG. 1 is a structural exploded view of a water-electricity buried pipeline fixing device according to the present utility model;
FIG. 2 is a side view of a water-electric buried pipeline fixing device according to the present utility model;
fig. 3 is a front view of a fixing device for a water-electricity buried pipeline according to the present utility model.
Legend description:
1. a first bracket; 2. a second bracket; 3. a threaded fastening rod; 4. a clasp; 5. a fastening cap; 6. turning hands; 7. a fixing seat; 8. a first support bar; 9. a second support bar; 10. a first fixing groove; 11. a second fixing groove; 12. a first fixing bolt; 13. connecting an anti-rust spring; 14. an anti-slip arc pad; 15. a fixed block; 16. a thread groove; 17. a fastening bolt; 18. a clamping groove; 19. and (5) clamping the column.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, one embodiment provided by the present utility model is: the utility model provides a water electric buried pipeline fixing device, including first strut 1 and second strut 2, the adjacent one side contact of first strut 1 and second strut 2, equal threaded connection in the middle part of first strut 1 and second strut 2 has screw thread fastening pole 3, the equal fixedly connected with snap ring 4 in screw thread fastening pole 3 adjacent one side, screw thread fastening pole 3 is the equal fixedly connected with turning hands 6 from one side, equal threaded connection has fastening cap 5 on screw thread fastening pole 3, fastening cap 5 all is contacted with first strut 1 and second strut 2 from one side, through placing first strut 1 and second strut 2 in the both sides of water electric buried pipeline and fix it through fastening bolt 17, then according to the size of water electric buried pipeline, then carry out in proper order and rotate screw thread fastening pole 3 with both sides, screw thread fastening pole 3 of one side rotates the snap ring 4 that is driving one side then contacts to water electric buried pipeline one side, screw thread fastening pole 3 of the opposite side rotates the snap ring 4 that is driving the opposite side then contacts the opposite side buried pipeline, carry out the screw thread fastening pole 4 through the both sides and then contacts the both sides buried pipeline, carry out the clamp cap 4 through the both sides with water electric buried pipeline and carry out the clamp fastening pole 3 through carrying out the clamp cap through the first strut 1 and the second strut 2 and then, carry out the clamp fastening on the both sides through the screw thread fastening pole 3 through the first strut 2 and the second strut is fixed.
The first strut 1 and the second strut 2 are all fixedly connected with fixing base 7 from one side bottom mutually, the bottom of fixing base 7 is all fixedly connected with first bracing piece 8 from one side mutually, first bracing piece 8 all with the inside sliding connection of second bracing piece 9, the bottom of first bracing piece 8 all is provided with second fixed slot 11, equal distance is provided with a plurality of first fixed slot 10 on the second bracing piece 9, first fixed slot 10 and second fixed slot 11 all with first fixing bolt 12 threaded connection, through carrying out the second fixed slot 11 with first bracing piece 8 bottom and the first fixed slot 10 of different positions on the second bracing piece 9 well, and fix first bracing piece 8 and second bracing piece 9 through first fixing bolt 12, and can adjust height, carry out the height that adapts to the support.
The front end and the rear end of the side, which is away from each other, of the snap ring 4 are fixedly connected with one end of the connecting rust-proof spring 13, the other end of the connecting rust-proof spring 13 is fixedly connected to the adjacent side of the first support frame 1 and the second support frame 2, and the first support frame 1 and the second support frame 2 are connected with the snap ring 4 together for fixation through the arrangement of the connecting rust-proof spring 13.
The adjacent one side of snap ring 4 all is provided with slipmat arc board 14, through slipmat arc board 14's setting, when the snap ring 4 of both sides carries out contact water and electricity buried pipeline and centre gripping, increases frictional contact face.
The top and the bottom of first strut 1 and second strut 2 are all fixedly connected with fixed block 15, and the middle part of fixed block 15 all is provided with thread groove 16, and thread groove 16 all with fastening bolt 17 threaded connection, through the setting of fixed block 15 to carry out the screw thread fixation through the thread groove 16 on fastening bolt 17 and the fixed block 15, consolidate the fixed of first strut 1 and second strut 2, and conveniently dismantle.
The front end and the back end of one side of the first support frame 1, which is close to the second support frame 2, are fixedly connected with clamping columns 19, the front end and the back end of one side of the second support frame 2, which is close to the first support frame 1, are provided with clamping grooves 18, the clamping grooves 18 are clamped with the clamping columns 19, and the stability is improved by clamping and fixing the clamping columns 19 on the first support frame 1 and the clamping grooves 18 on the second support frame 2 together.
The friction-preventing plates are arranged on the adjacent sides of the first support frame 1 and the second support frame 2, and friction plates are arranged on the sides, close to the first support frame 1 and the second support frame 2, of the two support frames, so that the contact friction force is increased when the hydropower buried pipeline is fixed.
Working principle: through placing first strut 1 and second strut 2 in the both sides of water and electricity buried pipeline and fixing it through fastening bolt 17, then according to the size of water and electricity buried pipeline, then go on in proper order with the screw thread tightening pole 3 of both sides and rotate, the screw thread tightening pole 3 of one side rotates the snap ring 4 that drives one side then contacts one side of water and electricity buried pipeline, the screw thread tightening pole 3 of opposite side rotates the snap ring 4 that drives the opposite side then contacts the opposite side of water and buried pipeline, clamp water and buried pipeline through the snap ring 4 of both sides, then just through the fastening cap 5 on the screw thread tightening pole 3 of both sides, rotate on screw thread tightening pole 3 through the fastening cap 5 of both sides on first strut 1 and second strut 2, and screw thread tightening pole 3 of both sides is driving snap ring 4 and can be adjusted the size, be close to and keep away from the regulation size with snap ring 4, adapt to the pipeline model of different models, thereby make support buried pipeline support and fix, and can adjust the size and adapt to different pipelines, through the first support rod 8 and the second support rod height through the first support groove 9, make the first support device with the first support rod height through the first support rod 9, the height-adjusting device is fixed with the first support rod height through the first support rod 9.
Finally, it should be noted that: the foregoing description is only illustrative of the preferred embodiments of the present utility model, and although the present utility model has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements or changes may be made without departing from the spirit and principles of the present utility model.

Claims (7)

1. The utility model provides a water electricity buries ground pipeline fixing device, includes first strut (1) and second strut (2), its characterized in that: the novel support is characterized in that adjacent sides of the first support (1) and the second support (2) are in contact, the middle parts of the first support (1) and the second support (2) are in threaded connection with a threaded fastening rod (3), a clamping ring (4) is fixedly connected to one adjacent side of the threaded fastening rod (3), a rotating hand (6) is fixedly connected to one opposite side of the threaded fastening rod (3), a fastening cap (5) is fixedly connected to the threaded fastening rod (3), and the fastening cap (5) is in contact with one opposite side of the first support (1) and the second support (2).
2. A hydropower buried pipeline fixing apparatus according to claim 1, wherein: the novel support is characterized in that the first support (1) and the second support (2) are fixedly connected with a fixing seat (7) from the bottom of one side, the bottom of the fixing seat (7) is fixedly connected with a first support rod (8) from one side, the first support rod (8) is slidably connected with the inside of the second support rod (9), the bottom of the first support rod (8) is provided with a second fixing groove (11), a plurality of first fixing grooves (10) are uniformly formed in the second support rod (9) at equal intervals, and the first fixing grooves (10) and the second fixing grooves (11) are in threaded connection with a first fixing bolt (12).
3. A hydropower buried pipeline fixing apparatus according to claim 1, wherein: the front end and the rear end of the clamping ring (4) which are away from one side are fixedly connected with one end of the connecting rust-proof spring (13), and the other end of the connecting rust-proof spring (13) is fixedly connected with one side, adjacent to the first support frame (1) and the second support frame (2).
4. A hydropower buried pipeline fixing apparatus according to claim 1, wherein: an anti-slip arc-filling plate (14) is arranged on the adjacent side of the clamping ring (4).
5. A hydropower buried pipeline fixing apparatus according to claim 1, wherein: the top and the bottom of first strut (1) and second strut (2) are all fixedly connected with fixed block (15), the middle part of fixed block (15) all is provided with screw thread groove (16), screw thread groove (16) all with fastening bolt (17) threaded connection.
6. A hydropower buried pipeline fixing apparatus according to claim 1, wherein: the clamping columns (19) are fixedly connected to the front end and the rear end of one side, close to the second support frame (2), of the first support frame (1), clamping grooves (18) are formed in the front end and the rear end of one side, close to the first support frame (1), of the second support frame (2), and the clamping grooves (18) are clamped with the clamping columns (19).
7. A hydropower buried pipeline fixing apparatus according to claim 1, wherein: and friction-preventing plates are arranged on adjacent sides of the first support frame (1) and the second support frame (2).
CN202322130153.5U 2023-08-09 2023-08-09 Hydroelectric buried pipeline fixing device Active CN220688232U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322130153.5U CN220688232U (en) 2023-08-09 2023-08-09 Hydroelectric buried pipeline fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322130153.5U CN220688232U (en) 2023-08-09 2023-08-09 Hydroelectric buried pipeline fixing device

Publications (1)

Publication Number Publication Date
CN220688232U true CN220688232U (en) 2024-03-29

Family

ID=90402812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322130153.5U Active CN220688232U (en) 2023-08-09 2023-08-09 Hydroelectric buried pipeline fixing device

Country Status (1)

Country Link
CN (1) CN220688232U (en)

Similar Documents

Publication Publication Date Title
CN220688232U (en) Hydroelectric buried pipeline fixing device
CN213598951U (en) Supporting device convenient for angle adjustment for intelligent video telephone
CN211702117U (en) A communication cell phone stand for outdoor live
CN215445438U (en) Fixing device for butt joint of gas pipelines
CN213452118U (en) Anti-seismic support with balanced tension
CN212137142U (en) Cable mounting bracket convenient to height-adjusting
CN209927190U (en) Electromagnetic flowmeter convenient to installation
CN214100659U (en) Support convenient to carry out fixed stay to cable protection pipe
CN213299428U (en) Multifunctional support
CN210575069U (en) Fixing frame for music scores
CN209979674U (en) Anemoscope support
CN213987849U (en) Interactive whiteboard with liquid crystal display screen
CN214890086U (en) Intelligent iron tower high point support of adjustable turning to
CN216382838U (en) Support device of heating pipeline convenient to connect
CN216555945U (en) Pipe strap convenient to adjust
CN213420382U (en) Outdoor display screen installing support
CN216590547U (en) Pipeline positioning support for water supply and drainage engineering
CN216269670U (en) Cell phone stand with multifunctional instrument
CN220822475U (en) Length-adjustable galvanized wire pipe
CN215912197U (en) Broadcast iron stand with reinforced adjustable clamping plate mechanism
CN217469828U (en) Single-column support of photovoltaic module
CN216083385U (en) A outdoor projection arrangement for internet education
CN217949959U (en) Fender structure is enclosed with protection in housing construction
CN215653654U (en) Damping adjusting device of bicycle trainer
CN216202121U (en) Edge calculation acquisition terminal with adjustable height

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant