CN212105914U - Quick installation device of mining single track anchor rod and hoist - Google Patents
Quick installation device of mining single track anchor rod and hoist Download PDFInfo
- Publication number
- CN212105914U CN212105914U CN202020454064.XU CN202020454064U CN212105914U CN 212105914 U CN212105914 U CN 212105914U CN 202020454064 U CN202020454064 U CN 202020454064U CN 212105914 U CN212105914 U CN 212105914U
- Authority
- CN
- China
- Prior art keywords
- recess
- groove
- fixture
- rod
- iii
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model provides a quick installation device of mining single track anchor rod and hoist, belongs to mining equipment technical field, can solve the complicated problem of installation procedure of current single track anchor rod, including drilling rod, fixture and go-between, the center at the both ends of fixture is equipped with recess I and recess II respectively, and the terminal surface of fixture is equipped with connecting hole I, and connecting hole I is located in the middle of recess I and recess II, the center of the one end of go-between is equipped with recess III, and the center of the other end is equipped with and lifts by crane the screw rod assorted screw thread mouth of stock, and the terminal surface of recess III is equipped with the connecting hole II that corresponds with connecting hole I, and the one end of drilling rod and the I welded connection of recess of fixture one end, recess III and the recess II of the. Through using the utility model discloses, can directly hang the special go-between with the single track and twist up promptly the tool to lock, labour saving and time saving, efficiency is very high.
Description
Technical Field
The utility model belongs to the technical field of mining equipment, concretely relates to quick installation device of mining single track anchor rod and hoist.
Background
In the underground coal mine in China, the transportation of materials mostly depends on a ground track, and a reel or a stepless winch steel wire rope is adopted for traction transportation, but the operation mode depending on the ground track has many defects, firstly, a roadway must have enough sectional area with width and height to accommodate the total area of a laid track and a vehicle, secondly, the ground track transportation is carried out, particularly, uneven (more than or equal to 4 degrees) gradient transportation is carried out, the connection between the vehicle and the steel wire rope is very critical, and since the vehicle and the steel wire rope are not firmly connected for many years, the occurrence of runaway and sports accidents happens, great economic loss is caused to material and human safety, the ground track transportation is a traditional transportation method, the relative safety coefficient is not high, and the transportation method is old. In recent years, the monorail crane takes the position occupying the height space of a roadway as an advantage, namely, an idle top plate at the high position of the roadway is used as a foundation, a hanging rail is installed at the top, the monorail crane lifts a heavy object and transports and walks in the air, and the transportation mode is a rail installed by taking the idle top plate at the high position of the roadway as a foundation, so that a belt, a chute and other transportation roadways can be directly communicated with the underground, and the monorail crane is very convenient. However, the track must be hung and installed at the top of the roadway by using anchor rods, the installation of the anchor rods is a very complicated process, and the traditional installation mode is as follows: drilling with a drill rod → pulling out the drill rod → loading a cartridge → installing a stirrer → advancing the drill rod → stirring → withdrawing the stirrer with a wrench → screwing on a special connecting ring of the monorail crane, the process is complex, the special connecting ring is not suitable to be screwed on directly, and the complex process causes low efficiency and low safety factor.
Disclosure of Invention
The utility model discloses to the complicated problem of installation procedure of current single track anchor rod, provide a mining single track anchor rod and quick installation device of hoist, use the utility model discloses the installation need not reuse spanner withdraw from the agitator, directly can hang single track and twist up special go-between, and enable special go-between and just expose exposed length to the right, and efficiency is very high, safe and reliable, convenient and fast.
The utility model adopts the following technical scheme:
the utility model provides a quick installation device of mining single track anchor rod and hoist, includes drilling rod, fixture and go-between, the center at the both ends of fixture is equipped with recess I and recess II respectively, and the terminal surface of fixture is equipped with connecting hole I, and connecting hole I is located in the middle of recess I and recess II, the center of the one end of go-between is equipped with recess III, and the center of the other end is equipped with and lifts by crane the screw rod assorted screw thread mouth of stock, and the terminal surface of recess III is equipped with connecting hole II that corresponds with connecting hole I, and the one end of drilling rod and the I welded connection of recess of fixture one end, and the recess III of go-between one end passes through.
The cross section of the drill rod is in a regular six-deformation mode.
The width of the groove I is larger than that of the drill rod.
And reinforcing plates are respectively arranged on two sides of the groove II.
The length of recess II and the diameter phase-match of recess III, the height phase-match of recess II and recess III.
The thickness of the groove II is matched with the width of the groove III.
The axis of the drill rod, the axis of the groove I, the axis of the groove II, the axis of the groove III and the axis of the threaded opening are located on the same straight line.
The utility model has the advantages as follows:
the utility model discloses simple structure, convenient to use directly can hang special go-between with the single track and twist up the tool to lock promptly, labour saving and time saving, and efficiency is very high, safe and reliable, very convenient and fast, more leading can expose exerted length with the control screw rod that special go-between is right, that is to say, to finding the screw rod and exposing this one step of technical key procedure of exerted length, the almost zero error of precision can make the go-between press close to basic roof or coal wall tightly.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
fig. 2 is a schematic front view of the fixture of the present invention;
fig. 3 is a schematic front view of the connection ring of the present invention;
fig. 4 is a schematic side view of the connection ring of the present invention;
fig. 5 is a schematic top view of the connection ring of the present invention;
wherein: 1-a drill rod; 2-a fixture; 3-connecting rings; 4-groove I; 5-groove II; 6-connecting hole I; 7-groove III; 8-a threaded opening; 9-connecting hole II; 10-reinforcing plate.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
As shown in the figure, the quick installation device of mining single track anchor rod and hoist, includes drilling rod 1, fixture 2 and go-between 3, the center at fixture 2's both ends is equipped with recess I4 and recess II 5 respectively, and fixture 2's terminal surface is equipped with connecting hole I6, and connecting hole I6 is located in the middle of recess I4 and recess II 5, the center of go-between 3's one end is equipped with recess III 7, and the center of the other end is equipped with and lifts by crane the screw rod assorted screw thread mouth 8 of stock, and the terminal surface of recess III 7 is equipped with connecting hole II 9 that corresponds with connecting hole I6, and I4 welded connection in recess of drilling rod 1's one end and fixture 2 one end, recess III 7 and II 5 of the recess of the fixture 2 other end of go.
The cross section of the drill rod 1 is in a regular six-deformation shape.
The width of the groove I4 is larger than that of the drill rod 1.
And reinforcing plates 10 are respectively arranged on two sides of the groove II 5.
The length of recess II 5 and the diameter phase-match of recess III 7, the height phase-match of the height of recess II 5 and recess III 7.
The thickness of the groove II 2 is matched with the width of the groove III 7.
The axial line of the drill rod 1, the axial line of the groove I4, the axial line of the groove II 5, the axial line of the groove III 7 and the axial line of the threaded opening 8 are positioned on the same straight line.
Drilling rod 1 is hexagonal drilling rod, and fixture 2 is the "fan-shaped" device that has the alloy steel sheet preparation of certain thickness, and drilling rod 1 and fixture 2 are welded as a whole with special stainless steel alloy welding rod, must ensure centrality and welding quality, ensure the utility model discloses the vibrations that cause because of the eccentricity during rotation take place, and the diameter of connecting hole I6 of fixture 2 is phi 20mm, and is identical with connecting hole II 9 above the go-between 3, and reinforcing plate 10 plays to add the muscle and lock the dual function of the single track go-between of hoisting accessory, and the screw hole 8 of go-between 3 is supporting with the screw rod of hoisting the stock.
The utility model discloses a use as follows:
the utility model discloses during the use, go-between 3 embolias in fixture 2, make connecting hole II 9 on the go-between 3 aim at with connecting hole I6 on fixture 2, it is a whole to fasten with the high strength bolt, hexagonal drilling rod and fixture are with pnematic anchor head (or electric power source) drive high-speed rotatory, the screw thread mouth 8 of go-between 3 is identical with the screw thread mouth of stock, the screw thread mouth 8 of go-between 3 precession stock is in the screw thread, thereby realize go-between 3 and rotate together, when hoisting in the stock coagulant on stock top and the coal wall (or roof) thoroughly congeal when as an organic whole, drag out the anchor head, demolish the fastening bolt who connects fixture 2 and go-between 3, go-between 3 and hexagonal drilling rod and fixture separation, go-between 3 and lift by crane the stock spiro union as an organic whole, reach and simplify (drilling rod is beaten the hole → extract drilling rod → loading volume → installation agitator → advance drilling rod → stirring → with the spanner retreat agitator → twist again and hang in the single track) installation agitator → find Length → withdraw the agitator with the spanner → twist the single track again and hang these several sets of complicated processes of special go-between 3, directly can hang special go-between with the single track and twist up promptly the tool to lock, labour saving and time saving, efficiency is very high, safe and reliable, very convenient and fast, more leading can expose exposed length with the control screw rod that special go-between is right, that is to (find accurate screw rod expose exposed length), the almost zero error of precision, can make the go-between closely press close to the coal wall, be an ideal agitating unit. Because what the anchor head adopted in the pit is with the supporting hexagonal hole of hexagonal drilling rod, so the utility model discloses well drilling rod and fixture adopt hexagonal drilling rod, and the configuration that can be according to the power supply in the in-service use is different, changes the connecting device in the drilling rod, reaches supporting connection, consequently, the utility model relates to a mining single track anchor rod and lock (hanging) quick installation device have extensive application and spreading value.
Claims (7)
1. The utility model provides a quick installation device of mining single track anchor rod and hoist which characterized in that: including drilling rod (1), fixture (2) and go-between (3), the center at the both ends of fixture (2) is equipped with recess I (4) and recess II (5) respectively, and the terminal surface of fixture (2) is equipped with connecting hole I (6), and connecting hole I (6) are located in the middle of recess I (4) and recess II (5), the center of the one end of go-between (3) is equipped with recess III (7), and the center of the other end is equipped with and lifts by crane screw rod assorted screw thread mouth (8) of stock, and the terminal surface of recess III (7) is equipped with connecting hole II (9) that correspond with connecting hole I (6), and the one end of drilling rod (1) and the recess I (4) welded connection of fixture (2) one end, and the recess III (7) of go-between (3) one end pass through bolted connection with recess II (5) of fixture (2.
2. The mining monorail crane anchor rod and hanger quick installation device of claim 1, characterized in that: the cross section of the drill rod (1) is in a regular six-deformation shape.
3. The mining monorail crane anchor rod and hanger quick installation device of claim 1, characterized in that: the width of the groove I (4) is larger than that of the drill rod (1).
4. The mining monorail crane anchor rod and hanger quick installation device of claim 1, characterized in that: and reinforcing plates (10) are respectively arranged on two sides of the groove II (5).
5. The mining monorail crane anchor rod and hanger quick installation device of claim 1, characterized in that: the length of groove II (5) and the diameter phase-match of groove III (7), the height phase-match of groove II (5) and groove III (7).
6. The mining monorail crane anchor rod and hanger quick installation device of claim 1, characterized in that: the thickness of the groove II (5) is matched with the width of the groove III (7).
7. The mining monorail crane anchor rod and hanger quick installation device of claim 1, characterized in that: the axis of the drill rod (1), the axis of the groove I (4), the axis of the groove II (5), the axis of the groove III (7) and the axis of the threaded opening (8) are located on the same straight line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020454064.XU CN212105914U (en) | 2020-04-01 | 2020-04-01 | Quick installation device of mining single track anchor rod and hoist |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020454064.XU CN212105914U (en) | 2020-04-01 | 2020-04-01 | Quick installation device of mining single track anchor rod and hoist |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212105914U true CN212105914U (en) | 2020-12-08 |
Family
ID=73637385
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020454064.XU Expired - Fee Related CN212105914U (en) | 2020-04-01 | 2020-04-01 | Quick installation device of mining single track anchor rod and hoist |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212105914U (en) |
-
2020
- 2020-04-01 CN CN202020454064.XU patent/CN212105914U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109989705B (en) | Engineering driller capable of efficiently discharging slag | |
CN206174896U (en) | Holder with function of breaking out | |
US7779904B2 (en) | Guide rail plate for top drive of a drilling system | |
CN212105914U (en) | Quick installation device of mining single track anchor rod and hoist | |
CN208843560U (en) | A kind of dedicated gripper of coal mine | |
CN116835429B (en) | Mining machinery metal drill lifting equipment | |
CN201486471U (en) | Locking and dismounting device of locking nut of reaming bit center pipe | |
CN211115881U (en) | Hydraulic power head for core sampling drilling machine and core sampling drilling machine | |
CN212173251U (en) | Energy-saving asphalt storage device for highway construction | |
CN210687233U (en) | Non-excavation rig towing pipe pull head | |
CN209513443U (en) | The pull-out test device of postposition conduit chemical anchor bolts | |
CN209308630U (en) | Core top direct drive type drilling device | |
CN208040373U (en) | A kind of specific purpose tool of rotary auxiliary LWD tool combination | |
CN217538620U (en) | Pole type back-off device | |
CN110107261B (en) | Rotational flow efficiency improving, corrosion preventing and wear resisting integrated lifting process and mechanical mining system | |
CN111634794A (en) | Non-welding type segmented hanging horse | |
CN217545548U (en) | Tool for replacing towing clamp of coal mining machine | |
CN217204034U (en) | Long spiral pile frame | |
CN220726334U (en) | Anchor bolt support construction equipment | |
CN216194753U (en) | Anti-seepage grouting equipment for earth dam | |
CN213391184U (en) | Loss-resistant connecting disc for mechanical power transmission | |
CN220791170U (en) | Petroleum drill pipe screwing-on and unscrewing device | |
CN219826740U (en) | Self-tightening rope-tightening type drilling workover rig | |
CN215979433U (en) | Anchor bolt supporting device for underground construction of mine | |
CN215746590U (en) | Make things convenient for fixed drill bit of spanner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201208 |
|
CF01 | Termination of patent right due to non-payment of annual fee |