CN212105129U - Building template with sealing function - Google Patents
Building template with sealing function Download PDFInfo
- Publication number
- CN212105129U CN212105129U CN202020011206.5U CN202020011206U CN212105129U CN 212105129 U CN212105129 U CN 212105129U CN 202020011206 U CN202020011206 U CN 202020011206U CN 212105129 U CN212105129 U CN 212105129U
- Authority
- CN
- China
- Prior art keywords
- groove
- template body
- fixedly connected
- clamping
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007789 sealing Methods 0.000 title claims abstract description 19
- 238000009415 formwork Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Abstract
The utility model relates to the technical field of building, and a building templates with sealing function is disclosed, including template body one and template body two, the front end of template body one has seted up recess one on the surface, set up recess two on the rear end inner wall of recess one, set up recess three on the left and right sides inner wall of recess one, the inside fixedly connected with rubber gas tank of recess two, both ends fixedly connected with gasbag on the surface about the rubber gas tank. This building templates with sealing function, the inside gas of rubber gas tank enters into the inside of the gasbag of the left and right sides, and then makes the gasbag produce the inflation, can make the gasbag fill the gap that exists between recess one and recess two insides and fixture block one and the fixed block like this, and then make between template body one and the template body two inseparabler of block, can make can not take place to leak when pouring into the concrete, improved building templates's leakproofness.
Description
Technical Field
The utility model relates to a building technical field specifically is a building templates with sealed function.
Background
The building formwork is a temporary supporting structure, which is manufactured according to the design requirements, so that the concrete structure and the members are formed according to the specified positions and geometric dimensions, the correct positions of the concrete structure and the members are kept, and the self weight of the building formwork and the external load acting on the building formwork are borne. The purpose of the template engineering is to ensure the quality and the construction safety of the concrete engineering, accelerate the construction progress and reduce the engineering cost. When the existing building template is used, the sealing performance is poor easily and concrete leakage is easily caused by splicing a plurality of blocks. Accordingly, there is a need for a building panel with a sealing function.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a building templates with sealing function has possessed and to have expanded through the gasbag can be in the inside of recess one, and then makes fixed block and recess one realize seamless butt joint, and then makes building templates's sealed effect advantage such as better, has solved building templates when carrying out the use, and the leakproofness is not good, causes the problem of the leakage of concrete easily.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a building template with a sealing function comprises a template body I and a template body II, wherein the template body I and the template body II are the same in size, a groove I is formed in the front end surface of the template body I, a groove II is formed in the rear end inner wall of the groove I, a groove III is formed in the left side inner wall and the right side inner wall of the groove I, a rubber air box is fixedly connected to the inside of the groove II, air bags are fixedly connected to the left side surface and the right side surface of the rubber air box, fixing blocks are fixedly connected to the rear end surface of the template body II, a first clamping block is fixedly connected to the rear end surface of each fixing block, a clamping groove is formed in the upper end surface of the template body I, a sliding groove is formed in the inner wall of the clamping groove, a groove IV is formed in the lower end of the inner wall of the clamping groove, and a second clamping block is fixedly connected to the lower end surface of the template, and a clamping plate is fixedly connected to the surface of the lower side of the right end of the second clamping block.
Preferably, the number of the third grooves is two, the two third grooves are symmetrically arranged at the center of the first groove, and the rear ends of the third grooves are communicated with the left end and the right end of the second groove.
Preferably, the shape of draw-in groove is conical, the spout is the slope setting, the inclination of spout is the same with the inclination of draw-in groove inner wall.
Preferably, the opening of the fourth groove and the inner bottom surface of the clamping groove are located on the same horizontal plane, and the rear end of the fourth groove is communicated with the lower end of the sliding groove.
Preferably, the second fixture block is conical, and the size of the second fixture block is matched with the shape of the clamping groove.
Preferably, the left end of the clamping plate is vertically and fixedly connected with the surface of the right end of the second clamping block.
(III) advantageous effects
Compared with the prior art, the utility model provides a building templates with sealing function possesses following beneficial effect:
1. this building templates with sealing function, the fixed block of two rear ends of template body is in the inside of recess one, and then make a fixture block in the inside of recess two, and then make a pair of rubber gas tank of fixture block produce the extrusion, and then make the rubber gas tank and then produce deformation, make the inside gas of rubber gas tank enter into the inside of the gasbag of the left and right sides, and then make the gasbag produce the inflation, can make the gasbag fill the gap that exists between recess one and two inside and fixture block one of recess and the fixed block like this, and then make the block inseparabler between template body one and the template body two, can make can not take place to leak when pouring into the concrete, the leakproofness of building templates has been improved.
2. This building templates with sealing function, the draw-in groove has been seted up on the upper end surface of template body, through the inside that can insert the draw-in groove with fixture block two, carry out the block with the cardboard through the inside spout of draw-in groove, and then make the cardboard slide in the inside of spout, and then make fixture block two insert the inside of draw-in groove, rotate fixture block two in the inside of draw-in groove through rotating the template body, and then make the cardboard slide the inside of recess four, and then make cardboard and recess four carry out the block, make two template bodies like this and can carry out better block, also make two more neatly of template body blocks about making simultaneously, the fastening nature of building templates has been increased.
Drawings
Fig. 1 is a schematic structural view of a building template with a sealing function according to the present invention;
FIG. 2 is a schematic structural view of the second template body of the present invention;
FIG. 3 is a schematic structural view of the template body of the present invention;
fig. 4 is a schematic view of the second structure of the fixture block of the present invention.
In the figure: the novel combined type formwork comprises a first formwork body, a second formwork body, a first groove, a third groove, a second groove, a third groove, a fourth groove, a third groove, a second groove, a rubber air box, a 6 rubber air bag, a 7 air bag, a 8 fixing block, a first clamping block, a 10 clamping groove, a 11 sliding groove, a fourth groove, a 13 clamping block and a 14 clamping plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a new technical solution: a building template with a sealing function comprises a template body I1 and a template body II 2, wherein the size of the template body I1 is the same as that of the template body II 2, a groove I3 is formed in the front end surface of the template body I1, the groove I3 is formed in the center of the front end surface of the template body I1, a groove II 5 is formed in the inner wall of the rear end of the groove I3, grooves III 4 are formed in the inner walls of the left side and the right side of the groove I3, the number of the grooves III 4 is two, the two grooves III 4 are symmetrically arranged from the center of the groove I3, the rear end of the groove III 4 is communicated with the left end and the right end of the groove II 5, a rubber air box 6 is fixedly connected inside the groove II 5, the rubber air box 6 has certain flexibility and elasticity, air bags 7 are fixedly connected to the surfaces of the left end and the right end of the rubber air box 6, the air bags 7 are fixedly connected inside, the air bag 7 can be expanded through the gas in the rubber gas box 6, the fixed block 8 is fixedly connected on the rear end surface of the template body 2, the fixed block 8 is fixedly connected at the center of the rear end surface of the template body 2, the first fixture block 9 is fixedly connected on the rear end surface of the fixed block 8, the first fixture block 9 is fixedly connected at the center of the rear end surface of the fixed block 8, the upper end surface of the template body 1 is provided with a clamping groove 10, the clamping groove 10 is conical, the clamping groove 10 is arranged at the center of the upper end surface of the template body 1, the inner wall of the clamping groove 10 is provided with a sliding groove 11, the sliding groove 11 is obliquely arranged, the inclination angle of the sliding groove 11 is the same as that of the inner wall of the clamping groove 10, the lower end of the inner wall of the clamping groove 10 is provided with a groove four 12, the opening of the groove four 12 is positioned on the same horizontal, the lower end surface of the template body I1 is fixedly connected with a clamping block II 13, the clamping block II 13 is conical, the size of the clamping block II 13 is matched with the shape of the clamping groove 10, the lower side surface of the right end of the clamping block II 13 is fixedly connected with a clamping plate 14, the left end of the clamping plate 14 is vertically and fixedly connected with the surface of the right end of the clamping block II 13, when a building template needs to be used, a plurality of templates are generally needed to be matched for use, the fixing block 8 at the rear end of the template body II 2 is clamped in the groove I3, the clamping block I9 is clamped in the groove II 5, the clamping block I9 extrudes the rubber air box 6, the rubber air box 6 is further deformed, air in the rubber air box 6 enters the air bags 7 at the left side and the right side, the air bags 7 are further expanded, and the air bags 7 can fill gaps between the insides of the groove I3 and the groove II 5 and the clamping block I9 and the fixing block 8, and then make between template body 1 and the template body two 2 block inseparabler, through having seted up draw-in groove 10 on the upper end surface at template body 1, through the inside that can insert draw-in groove 10 with fixture block two 13, carry out the block through inside spout 11 of draw-in groove 10 and cardboard 14, and then make cardboard 14 slide in the inside of spout 11, and then make the inside that fixture block two 13 inserted draw-in groove 10, rotate fixture block two 13 in the inside of draw-in groove 10 through rotating the template body, and then make cardboard 14 slide the inside of recess four 12, and then make cardboard 14 and recess four 12 block, make two template bodies can carry out better block like this, also make two piece upper and lower template body block more orderly simultaneously.
The working principle is as follows:
when the building template needs to be used, a plurality of templates are generally needed to be matched for use, the fixing block 8 at the rear end of the template body II 2 is clamped inside the groove I3, the clamping block I9 is clamped inside the groove II 5, the clamping block I9 extrudes the rubber air box 6, the rubber air box 6 is deformed, air inside the rubber air box 6 enters the air bags 7 at the left side and the right side, the air bags 7 expand, gaps between the insides of the groove I3 and the groove II 5 and between the clamping block I9 and the fixing block 8 can be filled by the air bags 7, the clamping between the template body I1 and the template body II 2 is tighter, the clamping groove 10 is formed in the upper end surface of the template body 1, and the clamping block II 13 can be inserted into the clamping groove 10, carry out the block through inside spout 11 of draw-in groove 10 and cardboard 14, and then make cardboard 14 slide in the inside of spout 11, and then make two 13 inside that insert draw-in groove 10 of fixture block, rotate two 13 inside at draw-in groove 10 of fixture block through rotating the template body, and then make cardboard 14 slide the inside of recess four 12, and then make cardboard 14 and recess four 12 carry out the block, make two template bodies like this can carry out better block, also make two piece upper and lower template body blocks's more neatly simultaneously.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a building templates with sealing function, includes template body one (1) and template body two (2), the size of template body one (1) and template body two (2) is the same, its characterized in that: a first groove (3) is formed in the front end surface of the first template body (1), a second groove (5) is formed in the inner wall of the rear end of the first groove (3), a third groove (4) is formed in the inner walls of the left side and the right side of the first groove (3), a rubber air box (6) is fixedly connected to the inside of the second groove (5), air bags (7) are fixedly connected to the surfaces of the left end and the right end of the rubber air box (6), the air bags (7) are fixedly connected to the insides of the second groove (5) and the third groove (4), a fixed block (8) is fixedly connected to the surface of the rear end of the second template body (2), a first clamping block (9) is fixedly connected to the surface of the rear end of the fixed block (8), a first clamping groove (10) is formed in the upper end surface of the first template body (1), a sliding groove (11) is formed in the inner wall of the clamping groove (10), and a fourth groove, and a second clamping block (13) is fixedly connected to the surface of the lower end of the first template body (1), and a clamping plate (14) is fixedly connected to the surface of the lower side of the right end of the second clamping block (13).
2. The building template with sealing function according to claim 1, wherein: the number of the grooves III (4) is two, the grooves III (4) are symmetrically arranged at the center of the groove I (3), and the rear end of the groove III (4) is communicated with the left end and the right end of the groove II (5).
3. The building template with sealing function according to claim 1, wherein: the shape of draw-in groove (10) is conical, spout (11) are the slope setting, the inclination of spout (11) is the same with the inclination of draw-in groove (10) inner wall.
4. The building template with sealing function according to claim 1, wherein: the opening of the fourth groove (12) and the inner bottom surface of the clamping groove (10) are located on the same horizontal plane, and the rear end of the fourth groove (12) is communicated with the lower end of the sliding groove (11).
5. The building template with sealing function according to claim 1, wherein: the shape of the second clamping block (13) is conical, and the size of the second clamping block (13) is matched with the shape of the clamping groove (10).
6. The building template with sealing function according to claim 1, wherein: the left end of the clamping plate (14) is vertically and fixedly connected with the right end surface of the second clamping block (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020011206.5U CN212105129U (en) | 2020-01-02 | 2020-01-02 | Building template with sealing function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020011206.5U CN212105129U (en) | 2020-01-02 | 2020-01-02 | Building template with sealing function |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212105129U true CN212105129U (en) | 2020-12-08 |
Family
ID=73625217
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020011206.5U Expired - Fee Related CN212105129U (en) | 2020-01-02 | 2020-01-02 | Building template with sealing function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212105129U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112796412A (en) * | 2021-01-14 | 2021-05-14 | 许昌学院 | Fireproof steel structure for building |
CN113338301A (en) * | 2021-06-24 | 2021-09-03 | 王科彩 | Construction foundation ditch is with repairable formula steel bearing structure of grout |
CN117005669A (en) * | 2023-10-07 | 2023-11-07 | 中交四航局第五工程有限公司 | Auxiliary device for assembling steel template |
-
2020
- 2020-01-02 CN CN202020011206.5U patent/CN212105129U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112796412A (en) * | 2021-01-14 | 2021-05-14 | 许昌学院 | Fireproof steel structure for building |
CN113338301A (en) * | 2021-06-24 | 2021-09-03 | 王科彩 | Construction foundation ditch is with repairable formula steel bearing structure of grout |
CN117005669A (en) * | 2023-10-07 | 2023-11-07 | 中交四航局第五工程有限公司 | Auxiliary device for assembling steel template |
CN117005669B (en) * | 2023-10-07 | 2023-12-08 | 中交四航局第五工程有限公司 | Auxiliary device for assembling steel template |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212105129U (en) | Building template with sealing function | |
CN207749672U (en) | Assembled building block and assembled wall | |
CN105947368B (en) | Combined pallet | |
CN211922738U (en) | Welding-free type water stop steel plate connecting piece | |
CN211853107U (en) | Butt joint equipment for metal thin-wall air pipe in smoke discharge engineering | |
CN205918099U (en) | Firm quick detachable type plastic building template | |
CN109853521B (en) | Stepless amplitude-modulation joint type steel sheet pile device | |
CN214364944U (en) | Aluminum template for preventing leakage of window part | |
CN210507154U (en) | Concrete splicing formwork for road and bridge construction | |
CN212248355U (en) | Deformation joint structure at complex joint of pipe gallery | |
CN211080769U (en) | Positioning splicing structure box column | |
CN204165207U (en) | A kind of section bar splicing structure and panel and casing | |
CN218373624U (en) | Device is built fast to kickboard for hydraulic engineering | |
CN218288696U (en) | Engine packaging box with dustproof function | |
CN214297077U (en) | Hollow plastic plate splicing box | |
CN109797881A (en) | One Seed King font end buckling restrained brace | |
CN206545396U (en) | Building template fixture and building template system | |
CN218264326U (en) | Environment-friendly steel structure | |
CN213176339U (en) | Accurate cold drawn steel pipe for air bag generator of convenient concatenation | |
CN206545395U (en) | Negative and positive angle building template and building template system | |
CN212801196U (en) | Sealing rubber strip for double-cavity type profile steel of telescopic device | |
CN213508084U (en) | Template for ultrahigh hollow thin-wall pier construction | |
CN208307369U (en) | A kind of bag with square bottom | |
CN217182868U (en) | Integrated combined assembled power tube pillow | |
CN214464398U (en) | Mining inflation gas stack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201208 |
|
CF01 | Termination of patent right due to non-payment of annual fee |