CN212104018U - Can quick geotechnological tubular bag of concatenation - Google Patents
Can quick geotechnological tubular bag of concatenation Download PDFInfo
- Publication number
- CN212104018U CN212104018U CN201922192922.8U CN201922192922U CN212104018U CN 212104018 U CN212104018 U CN 212104018U CN 201922192922 U CN201922192922 U CN 201922192922U CN 212104018 U CN212104018 U CN 212104018U
- Authority
- CN
- China
- Prior art keywords
- zipper
- cloth
- top cloth
- locking
- piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004744 fabric Substances 0.000 claims abstract description 76
- 239000004746 geotextile Substances 0.000 claims description 14
- 238000003780 insertion Methods 0.000 claims description 14
- 230000037431 insertion Effects 0.000 claims description 14
- 239000002689 soil Substances 0.000 abstract description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 5
- 230000018044 dehydration Effects 0.000 abstract description 3
- 238000006297 dehydration reaction Methods 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 abstract description 2
- 238000000926 separation method Methods 0.000 abstract description 2
- 238000005406 washing Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 8
- 238000007605 air drying Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 239000004927 clay Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 238000009958 sewing Methods 0.000 description 1
- 239000010802 sludge Substances 0.000 description 1
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a can splice geotechnological tube bag fast, including top cloth and backer, top cloth and backer are water-permeable cloth, and top cloth and backer adopt the zip fastener structure to connect and form confined inner chamber, the zip fastener structure disposes the locking mechanism who prevents the zip fastener and open, and locking mechanism has unlocking structure. The beneficial effects are as follows: 1. the utility model makes the earthwork pipe bag prefabricated and assembled, ensures the component quality and improves the site construction efficiency; 2. the base cloth and the top cloth of the utility model are connected by the zipper, and the zipper seam can drain water without affecting the drainage effect of the mucky soil; 3. the utility model discloses a pin-connected panel structure separately prefabricated backer and top cloth, can be in the geotechnique's pipe bag mud or silt dehydration completion back, pull open the zip fastener, will push up cloth and backer separation, but recycle improves geotechnique's pipe bag's reuse rate after the washing is accomplished.
Description
Technical Field
The utility model belongs to the technical field of the geotechnique's piping bag, especially, can splice's geotechnique's piping bag fast.
Background
In recent years, a large number of coastal land reclamation projects are carried out in many coastal areas, part of newly hydraulically-filled soft soil layers have the water content of more than 80 percent and extremely low strength and bearing capacity, deep soft clay soil layers are widely distributed below the hydraulically-filled soil layers, and the soil layers have the characteristics of high water content, high compressibility, low strength and bearing capacity and the like.
The traditional slurry treatment method mainly comprises a slurry tank sedimentation air drying method, a tank car external transportation to a specified place stacking method and a mechanical squeezing method. The method has the problems of high mud treatment cost, low efficiency, easy leakage, pollution to the urban environment, potential safety hazard, post-land treatment and recovery and the like. Therefore, the geotextile tube bags with higher efficiency, lower consumption and more environmental protection are increasingly popular. However, in the existing engineering, the sewing efficiency of the top cloth and the bottom cloth of the geotextile tube bag is low, and the geotextile tube bag can be used only once, so that the purchasing cost of the geotextile tube bag is greatly improved. In order to improve the splicing efficiency of the soil engineering pipe bags, improve the sufficient utilization rate of the soil engineering pipe bags, reduce the use amount of the soil engineering pipe bags, save social resources, save the cost for treating dredger fill and mucky soil and improve the competitiveness, the soil engineering pipe bags capable of being spliced quickly and the use method thereof are needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a can splice fast's geotechnique's pipe bag is provided, this geotechnique's pipe bag's easy dismounting and repeatedly usable. The utility model also provides an application method of above-mentioned geotechnological pipe bag that can splice fast.
Therefore, the utility model provides a pair of geotechnological tube bag that can splice fast, including top cloth and backer, top cloth and backer are the water-permeable cloth, and top cloth and backer adopt the zip fastener structure to connect and form confined inner chamber, the zip fastener structure disposes the locking mechanism who prevents the zip fastener and open, and locking mechanism has unlocking structure.
Furthermore, the zipper is a double-head zipper, a filling hole is reserved in the center of the top cloth, the double-head zippers are arranged on the four sides of the top cloth and the base cloth, and the top cloth and the base cloth are connected into a whole through the double-head zippers.
Further, the double-end zipper comprises a first zipper puller and a second zipper puller, the first zipper puller and the second zipper puller are connected to a first zipper strip and a second zipper strip in a sliding mode, the first zipper strip and the second zipper strip are sewn on the edge of the top cloth and the edge of the bottom cloth respectively, a first zipper piece and a second zipper piece are prefabricated on the outer wall of one side of the first zipper puller and the outer wall of one side of the second zipper puller in the opposite direction respectively, fixed insertion holes are formed in the first zipper piece and the second zipper piece, and a zipper locking function is achieved by inserting locking insertion pins into the fixed insertion holes.
Furthermore, the second zipper plate is provided with two second locking plates which are parallel and have intervals, the first zipper plate is provided with a first locking plate, the fixing insertion holes are respectively formed in the first locking plate and the two second locking plates, the three fixing insertion holes are aligned with each other after the first locking plate is inserted into the two second locking plates, and the locking bolt penetrates through the three fixing insertion holes and is locked with the opposite end through a nut.
Further, the top cloth and the bottom cloth are formed by folding a piece of geotextile, and the zipper structures are arranged on three side ends of the top cloth and the bottom cloth to form a zipper structure capable of opening and closing three sides.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses prefabricate geotechnological pipe bag, assemble, geotechnological pipe bag comprises backer, top cloth, the double-end zip fastener that has the locking function and subassembly, and the component can be prefabricated in the mill, has ensured that the component quality has also improved site operation efficiency.
2. The base cloth and the top cloth of the utility model are connected by the zipper, and the zipper seam can drain water without influencing the drainage effect of the mucky soil.
3. The utility model discloses a pin-connected panel structure separately prefabricated backer and top cloth, can be in the geotechnological tube in mud or silt dehydration accomplish the back, pull open the zip fastener, will push up cloth and backer separation, but recycle improves geotechnological tube bag's reuse rate after the washing is accomplished, reduces geotechnological tube bag's use amount, has reduced construction cost.
Drawings
Fig. 1 is the structure schematic diagram of the utility model discloses a geotechnological pipe bag that can splice fast.
Fig. 2 is a schematic diagram of the top cloth structure of the present invention.
Fig. 3 is a schematic view of the structure of the base fabric of the present invention.
Fig. 4 is a schematic structural view of the double-end zipper with locking function of the present invention.
Fig. 5 is a schematic view of the locking structure of the double-end zipper with the locking function of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the following examples, which are provided for illustration only and are not intended to limit the invention.
Referring to fig. 1-5, the utility model discloses the geotechnique's piping bag that can splice fast that embodiment 1 provided, including top cloth 1 and backer 2, top cloth 1 and backer 2 are water-permeable cloth, adopt geotechnological cloth at present, and top cloth 1 and backer 2 adopt the zip fastener structure to connect and form confined inner chamber, the zip fastener structure disposes the locking mechanism who prevents the zip fastener and open, and locking mechanism has unlocking structure. The zipper is constructed as a double-end zipper 3, a filling hole 101 is reserved in the center of the top cloth 1, the double-end zipper 3 is arranged on four sides of the top cloth 1 and the base cloth 2, the top cloth 1 and the base cloth 2 are connected into a whole through the double-end zipper 3, the double-end zipper 3 comprises a first zipper puller 7 and a second zipper puller 8, the first zipper puller 7 and the second zipper puller 8 are connected onto a first zipper strip 5 and a second zipper strip 6 in a sliding manner, the first zipper strip 5 and the second zipper strip 6 are respectively sewn on the edges of the top cloth 11 and the base cloth 12, after the zipper strips and the zipper pullers are spliced, the zipper puller can be pulled to realize the closing of the first zipper strip 5 and the second zipper strip 6, a first zipper piece 9 and a second zipper piece 10 are respectively prefabricated on the outer wall of one side of the first zipper strip 7 and the second zipper strip 8, and fixed insertion holes are respectively arranged on the first zipper piece 9 and the second zipper piece 10, the zipper lock function is achieved by inserting a locking bolt 13 into the fixing insertion hole.
Referring to fig. 4 and 5, the locking mechanism is specifically configured to: the second zipper plate 10 is provided with two second locking plates 11 which are parallel and have intervals, the first zipper plate is provided with a first locking plate 12, the fixing insertion holes are respectively formed in the first locking plate 12 and the two second locking plates 11, the three fixing insertion holes are aligned with each other after the first locking plate 12 is inserted into the two second locking plates 11, and the locking bolt 13 penetrates through the three fixing insertion holes and is locked with the opposite end through a nut.
Referring to fig. 1, embodiment 2 of the present invention is substantially the same as embodiment 1, and the difference is only in embodiment 2: the top cloth 1 and the bottom cloth 2 are formed by folding a piece of geotextile, and the zipper structures are arranged on three side ends of the top cloth 1 and the bottom cloth 2 to form a zipper structure capable of opening and closing three sides.
The utility model also provides an above-mentioned geotechnological pipe bag's that can splice fast application method, including following step:
1) manufacturing a top cloth 1 and a bottom cloth 2 by adopting geotextile, covering the bottom cloth with the top cloth, and aligning each corner of the two pieces of cloth;
2) ensuring that the first zipper puller 7 and the second zipper puller 8 of the double-end zipper 3 are parallel to the top end below the double-end zipper, inserting the locking bolt 13 into the zipper pullers, and pulling up the zipper pullers to seal the whole geotextile tube bag;
3) inserting a locking bolt 13 into the fixed insertion holes of the first zipper piece 9 and the second zipper piece 10 and then locking nuts to complete the assembly of the geotextile tube bag;
4) after the completion of the dehydration of the mud or sludge in the geotechnical pipe bag is confirmed, the locking bolt 13 is pulled out, and the zipper is unzipped;
5) lifting the base fabric 2, and excavating a soil body dehydrated by mud or silt;
6) and (3) putting the top cloth 1, the base cloth 2, the double-end zipper 3 and the components thereof into clear water for cleaning, and leaving the cloth for next use after air drying.
Claims (5)
1. The utility model provides a can splice geotechnological tubular bag fast which characterized in that: the waterproof cloth comprises top cloth and base cloth, wherein the top cloth and the base cloth are water-permeable cloth, the top cloth and the base cloth are connected by a zipper structure to form a closed inner cavity, the zipper structure is provided with a locking mechanism for preventing the zipper from being opened, and the locking mechanism is provided with an unlocking structure.
2. The quick-splicing geotextile tube bag according to claim 1, wherein: the zipper is a double-end zipper, a filling hole is reserved in the center of the top cloth, the double-end zippers are arranged on the four sides of the top cloth and the bottom cloth, and the top cloth and the bottom cloth are connected into a whole through the double-end zippers.
3. The quick-splicing geotextile tube bag according to claim 2, wherein: the double-end zipper comprises a first zipper puller and a second zipper puller, wherein the first zipper puller and the second zipper puller are connected to a first zipper strip and a second zipper strip in a sliding mode, the first zipper strip and the second zipper strip are respectively sewn at the edge of the top cloth and the edge of the bottom cloth, a first zipper piece and a second zipper piece are respectively prefabricated on the outer wall of one side of the first zipper puller and the outer wall of one side of the second zipper puller in the opposite direction, fixed insertion holes are formed in the first zipper piece and the second zipper piece, and a zipper locking function is achieved by inserting locking bolts into the fixed insertion holes.
4. The quick-splicing geotextile tube bag according to claim 3, wherein: the second zipper plate is provided with two second locking pieces which are parallel and have intervals, the first zipper plate is provided with a first locking piece, the fixed jacks are respectively arranged on the first locking piece and the two second locking pieces, the three fixed jacks are aligned with each other after the first locking piece is inserted into the two second locking pieces, and the locking bolt penetrates through the three fixed jacks and is locked with the opposite end by a nut.
5. The quick-spliceable geotextile tube bag according to claim 1, 2, 3 or 4, wherein: the top cloth and the bottom cloth are formed by folding a piece of geotextile, and the zipper structures are arranged on three side ends of the top cloth and the bottom cloth to form a zipper structure capable of opening and closing three sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922192922.8U CN212104018U (en) | 2019-12-10 | 2019-12-10 | Can quick geotechnological tubular bag of concatenation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922192922.8U CN212104018U (en) | 2019-12-10 | 2019-12-10 | Can quick geotechnological tubular bag of concatenation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212104018U true CN212104018U (en) | 2020-12-08 |
Family
ID=73621033
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922192922.8U Active CN212104018U (en) | 2019-12-10 | 2019-12-10 | Can quick geotechnological tubular bag of concatenation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212104018U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111088789A (en) * | 2019-12-10 | 2020-05-01 | 浙江工业大学 | Rapid-splicing geotextile tube bag and using method thereof |
-
2019
- 2019-12-10 CN CN201922192922.8U patent/CN212104018U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111088789A (en) * | 2019-12-10 | 2020-05-01 | 浙江工业大学 | Rapid-splicing geotextile tube bag and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212104019U (en) | Novel geotechnical pipe bag sludge dewatering device combined with vacuum preloading | |
CN111088790A (en) | Novel geotechnical pipe bag sludge dewatering device combined with vacuum preloading and sludge dewatering method thereof | |
CN212104018U (en) | Can quick geotechnological tubular bag of concatenation | |
CN101748721A (en) | Large-area soft soil foundation duplex negative pressure consolidation processing method | |
CN107326896A (en) | One kind combination steel construction support pile and construction method | |
CN111088789A (en) | Rapid-splicing geotextile tube bag and using method thereof | |
CN212641468U (en) | Pit-in-pit rapid construction structure | |
CN220057982U (en) | Waterproof curtain of foundation pit support pile | |
CN111764396A (en) | Construction method for water-rich stratum pit-in-pit | |
CN104018487B (en) | Vacuum preloading shallow-layer solidification method based on newly-reclaimed ultra-soft soil foundation | |
CN204370461U (en) | Multiple chamber steel pipe pile diaphragm wall | |
KR101459703B1 (en) | Method for draining and reinfrocing dredged reclaimed land | |
CN211898475U (en) | Double steel-pipe pile cofferdam | |
CN212612403U (en) | Reusable zipper type soil engineering pipe bag with multiple water drainage paths | |
CN211973461U (en) | Buckled composite steel pile continuous wall | |
CN212001021U (en) | Soft soil foundation reinforcing structure in dredger fill area | |
CN210134009U (en) | Take geotechnological tubular bag of inner core | |
CN113653003A (en) | Flood prevention sand box for hydraulic engineering and use method thereof | |
CN111910617A (en) | Side-expansion compaction composite vacuum drainage type soft foundation reinforcing system and construction method | |
CN208844593U (en) | Latch type steel pipe pile cofferdam construction device | |
CN206245306U (en) | Navigation channel basement process vacuum system | |
CN112979125A (en) | Bidirectional vacuum electroosmosis reinforced geotextile tube bag dehydration system and method | |
CN212670545U (en) | Side expansion compaction composite vacuum drainage type soft foundation reinforcing system | |
CN206245325U (en) | One kind lock steel pipe and Combined concrete pile cofferdam | |
CN205917682U (en) | Soft soil foundation integral type well dotted arranges vacuum system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: Chaohui 6th District, Gongshu District, Hangzhou City, Zhejiang Province, 310023 Patentee after: JIANG University OF TECHNOLOGY Patentee after: Zhejiang Yidong Engineering Technology Co.,Ltd. Address before: No.288, Liuhe Road, Xihu District, Hangzhou City, Zhejiang Province, 310023 Patentee before: JIANG University OF TECHNOLOGY Patentee before: HANGZHOU YIDONG GEOTECHNICAL ENGINEERING Co.,Ltd. |
|