CN212103680U - Pier shaft sprays maintenance system - Google Patents
Pier shaft sprays maintenance system Download PDFInfo
- Publication number
- CN212103680U CN212103680U CN202020177678.8U CN202020177678U CN212103680U CN 212103680 U CN212103680 U CN 212103680U CN 202020177678 U CN202020177678 U CN 202020177678U CN 212103680 U CN212103680 U CN 212103680U
- Authority
- CN
- China
- Prior art keywords
- frame
- spraying
- pier
- pier shaft
- spray
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a pier shaft sprays maintenance system aims at solving the pier shaft and sprays maintenance work efficiency low, and intensity of labour is big, sprays the inequality, and the maintenance effect is not good not enough. The utility model discloses an including spraying the frame, the shower, the protection frame, geotechnological cloth, the water tank, a water pump, the time relay switch, it all installs at pier shaft top to spray frame and protection frame, the protection frame is higher than spraying the frame, geotechnological cloth is laid on pier shaft top surface, geotechnological cloth edge downwardly extending is on the pier shaft lateral wall, geotechnological cloth and the laminating of pier shaft surface, the shower is installed on spraying the frame, shower and water pump delivery port intercommunication, water pump water inlet and water tank intercommunication, the time relay switch is connected with the water pump electricity, the interval is equipped with a plurality of holes that spray on the shower, the hole that sprays sets up towards the pier shaft, the protection frame upper cover closes the protection casing, the protection casing covers the. The pier body spraying and maintaining system has the advantages that the pier body spraying and maintaining work efficiency is high, the labor intensity is reduced, the spraying is uniform, and the maintaining effect is good.
Description
Technical Field
The utility model relates to a pier shaft maintenance technique, more specifically say, it relates to a pier shaft sprays maintenance system.
Background
A plurality of bridges need to be erected in the highway and railway construction process, the bridges need to be erected on piers, a plurality of piers need to be poured, and water spraying maintenance needs to be carried out after pouring of the piers is completed so as to guarantee the structural strength of concrete and prevent cracking. At present, the common practice is that the spray pipe is directly adopted to spray towards the pier body, the working efficiency is low, the labor intensity is high, the spraying is uneven, and the maintenance effect is not good.
SUMMERY OF THE UTILITY MODEL
The utility model overcomes the pier shaft sprays maintenance work efficiency low, and intensity of labour is big, sprays the inequality, and the maintenance effect is not good not enough, provides a pier shaft and sprays maintenance system, and the pier shaft sprays maintenance work efficiency high, has reduced intensity of labour, sprays evenly, and the maintenance is effectual.
In order to solve the technical problem, the utility model discloses a following technical scheme: the utility model provides a pier shaft sprays maintenance system, including spraying the frame, the shower, the protection frame, geotechnological cloth, the water tank, a water pump, the time relay switch, it all installs at pier shaft top with the protection frame to spray the frame, the protection frame is higher than spraying the frame, geotechnological cloth is laid on pier shaft top surface, geotechnological cloth edge downwardly extending is on the pier shaft lateral wall, geotechnological cloth and pier shaft surface laminating, the shower is installed on spraying the frame, shower and water pump delivery port intercommunication, water pump water inlet and water tank intercommunication, time relay switch is connected with the water pump electricity, the interval is equipped with a plurality of holes that spray on the shower, the hole that sprays sets up towards the pier shaft, the protection frame upper cover closes the protection casing, the protection casing covers the.
When the pier shaft sprays maintenance, the water pump draws water and carries rivers to the shower in, sprays the pier shaft top with rivers through the hole that sprays on the shower, and the geotechnological cloth of laying at pier shaft top makes rivers evenly soak the pier shaft, has played fine water conservation effect moreover. The geotextile edge extends downwards to the side wall of the pier body to drain water flow, so that the water flow flows to the side wall of the pier body, and the pier body is maintained in all directions. During the maintenance, the pier shaft is completely covered by the protective cover, so that the pier shaft is well protected, and the pier shaft is prevented from being dried too fast during the maintenance. The time relay switch controls the switch of the water pump in a timing mode, and automatic work of the water pump is achieved. The pier body spraying and maintaining system has the advantages that the pier body spraying and maintaining work efficiency is high, the labor intensity is reduced, the spraying is uniform, and the maintaining effect is good.
Preferably, the geotextile at the position of the side wall of the pier body is sleeved with a fixed rope sleeve. The fixed rope sling plays a good role in fixing the geotextile, and prevents the geotextile from separating from the surface of the pier body.
Preferably, the protective cover is externally wound with a spiral rope. The spiral rope plays a good fixed action to the protection casing, makes the protection casing tighten more to the parcel of pier shaft, is favorable to reducing the windage, and the protection is more reliable.
Preferably, the protection frame comprises an upper support, a lower support and a connecting rod, the size of the upper support is smaller than that of the lower support, the lower support is connected to the top of the pier body, and the connecting rod is obliquely connected between the upper support and the lower support. The protective frame with the structure is convenient for mounting the protective cover.
Preferably, the spray rack is in a waist circle shape, two longitudinal rods are arranged at the left part and the right part of the spray rack, and a reinforcing rod is connected between one longitudinal rod and the end part of the spray rack. The spraying frame has good structural strength and reliable connection.
As preferred, spray joint is all installed to the hole position that sprays on the shower, the rotatable swivel housing of installation in the spray joint, sets up the apopore of a plurality of radial settings on the swivel housing, and the installation drives pivoted rotating vane by rivers in the swivel housing, and the hole setting that sprays is on spray joint, and the hole that sprays is rectangular arc structure along circumference, and the apopore slides along with the swivel housing rotation and sprays the hole.
High-pressure rivers impact in the shower drives rotating vane and rotates to realize the rotation of rotary sleeve, apopore on the rotary sleeve slides along with the rotary sleeve rotation and sprays the hole, and the spray regime of rivers is from the one end to the other end that sprays the hole, has improved the spray regime greatly, guarantees that every position homoenergetic at pier shaft top sprays rivers, improves water spray maintenance effect.
Compared with the prior art, the beneficial effects of the utility model are that: the pier body spraying and maintaining system has the advantages that the pier body spraying and maintaining efficiency is high, the labor intensity is reduced, the spraying is uniform, and the maintaining effect is good.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a side view of the present invention;
fig. 3 is a schematic structural view of the spray frame of the present invention;
fig. 4 is a schematic structural view of the shower head of the present invention;
in the figure: 1. spray frame, 2, shower, 3, protection frame, 4, geotechnological cloth, 5, water tank, 6, water pump, 7, spray hole, 8, protection casing, 9, upper bracket, 10, lower carriage, 11, connecting rod, 12, vertical pole, 13, stiffener, 14, shower head, 15, swivel housing, 16, apopore, 17, rotating vane, 18, bearing, 19, pier shaft.
Detailed Description
The technical solution of the present invention is further described in detail by the following specific embodiments in combination with the accompanying drawings:
example (b): the utility model provides a pier shaft sprays maintenance system (see figure 1 to figure 4), including spray frame 1, the shower 2, the fender bracket 3, geotechnological cloth 4, the water tank 5, a water pump 6, the time relay switch, spray frame and fender bracket are all installed at pier shaft 19 tops, the fender bracket is higher than spray frame, geotechnological cloth is laid on pier shaft top surface, geotechnological cloth edge downwardly extending is on the pier shaft lateral wall, geotechnological cloth and the laminating of pier shaft surface, the shower is installed on spray frame, shower and water pump delivery port intercommunication, the water pump water inlet communicates with the water tank, the time relay switch is connected with the water pump electricity, the interval is equipped with a plurality of spray holes 7 on the shower, spray the hole and set up towards the pier shaft, the fender bracket upper cover closes protection casing 8, the protection casing covers the pier shaft completely. The geotextile at the side wall of the pier body is sleeved with a fixed rope sleeve. The protective cover is wound with a spiral rope. The protection frame comprises an upper support 9, a lower support 10 and a connecting rod 11, wherein the size of the upper support is smaller than that of the lower support, the lower support is connected to the top of the pier body, and the connecting rod is obliquely connected between the upper support and the lower support. The spray rack is in a waist circle shape, two longitudinal rods 12 are arranged at the left part and the right part of the spray rack, and a reinforcing rod 13 is connected between one longitudinal rod and the end part of the spray rack. The shower pipes are arranged along the contour path of the shower rack. Spray hole position on the shower all installs spray header 14, and rotatable swivel housing 15 of shower header interior installation sets up a plurality of radial apopores that set up on the swivel housing 16, and the installation drives pivoted rotating vane 17 by rivers in the swivel housing, and the hole setting sprays on spray header, and the hole that sprays is rectangular arc structure along circumference, and the apopore slides along with swivel housing rotation and sprays the hole. A bearing 18 is arranged between the rotary sleeve and the spray joint.
When the pier shaft sprays maintenance, the water pump draws water and carries rivers to the shower in, sprays the pier shaft top with rivers through the hole that sprays on the shower, and the geotechnological cloth of laying at pier shaft top makes rivers evenly soak the pier shaft, has played fine water conservation effect moreover. The geotextile edge extends downwards to the side wall of the pier body to drain water flow, so that the water flow flows to the side wall of the pier body, and the pier body is maintained in all directions. During the maintenance, the pier shaft is completely covered by the protective cover, so that the pier shaft is well protected, and the pier shaft is prevented from being dried too fast during the maintenance. The time relay switch controls the switch of the water pump in a timing mode, and automatic work of the water pump is achieved. The pier body spraying and maintaining system has the advantages that the pier body spraying and maintaining work efficiency is high, the labor intensity is reduced, the spraying is uniform, and the maintaining effect is good.
The above-described embodiments are merely preferred and are not intended to limit the present invention in any way, and other variations and modifications may be made without departing from the spirit and scope of the invention as defined in the appended claims.
Claims (6)
1. The utility model provides a pier shaft sprays maintenance system, which is characterized by, including spraying the frame, the shower, the protection frame, geotechnological cloth, the water tank, a water pump, time relay switch, it all installs at pier shaft top with the protection frame to spray the frame, the protection frame is higher than spraying the frame, geotechnological cloth is laid on pier shaft top surface, geotechnological cloth edge downwardly extending is on the pier shaft lateral wall, geotechnological cloth and pier shaft surface laminating, the shower is installed on spraying the frame, shower and water pump delivery port intercommunication, water pump water inlet and water tank intercommunication, time relay switch is connected with the water pump electricity, the interval is equipped with a plurality of holes that spray on the shower, the hole that sprays sets up towards the pier shaft, the protection frame upper cover closes the protection casing, the protection casing.
2. The spraying maintenance system for pier bodies according to claim 1, wherein the geotextile at the position of the side wall of the pier body is sleeved with a fixed rope sleeve.
3. The pier body spray maintenance system of claim 1, wherein a spiral rope is wound around the protective cover.
4. The spray maintenance system for pier bodies according to claim 1, wherein the protective frame comprises an upper frame, a lower frame, and a connecting rod, the upper frame is smaller than the lower frame, the lower frame is connected to the top of the pier body, and the connecting rod is connected between the upper frame and the lower frame in an inclined manner.
5. The pier body spraying maintenance system according to any one of claims 1 to 4, wherein the spray frame is waist-round, two vertical rods are arranged at the left part and the right part of the spray frame, and a reinforcing rod is connected between one vertical rod and the end part of the spray frame.
6. The pier body spraying maintenance system according to any one of claims 1 to 4, wherein a spraying joint is installed at the position of the spraying hole on the spraying pipe, a rotatable rotary sleeve is installed in the spraying joint, a plurality of water outlet holes are radially formed in the rotary sleeve, a rotary blade driven by water flow to rotate is installed in the rotary sleeve, the spraying hole is formed in the spraying joint, the spraying hole is in an elongated arc structure along the circumferential direction, and the water outlet holes slide through the spraying hole along with the rotation of the rotary sleeve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020177678.8U CN212103680U (en) | 2020-02-17 | 2020-02-17 | Pier shaft sprays maintenance system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020177678.8U CN212103680U (en) | 2020-02-17 | 2020-02-17 | Pier shaft sprays maintenance system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212103680U true CN212103680U (en) | 2020-12-08 |
Family
ID=73632981
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020177678.8U Active CN212103680U (en) | 2020-02-17 | 2020-02-17 | Pier shaft sprays maintenance system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212103680U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115500184A (en) * | 2022-09-01 | 2022-12-23 | 中国一冶集团有限公司 | Maintenance cover device suitable for vase mound |
-
2020
- 2020-02-17 CN CN202020177678.8U patent/CN212103680U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115500184A (en) * | 2022-09-01 | 2022-12-23 | 中国一冶集团有限公司 | Maintenance cover device suitable for vase mound |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207468504U (en) | A kind of mobile spray curing system of pier stud | |
CN212103680U (en) | Pier shaft sprays maintenance system | |
CN108380429B (en) | A kind of bridge construction Reinforced Concrete in Bridge spraying equipment | |
CN208542292U (en) | A kind of road and bridge construction crushing and screening device | |
CN111926817A (en) | Component for cleaning and pumping mud in pile, mud pumping equipment and method | |
CN109338880A (en) | A kind of overpass rainwater-collecting reuse means | |
CN209338970U (en) | A kind of road maintenance road cutting machine | |
CN106218826A (en) | Floating on water waste cleaning device | |
CN207024790U (en) | A kind of water anchor point formula inhales the algae water filtration device of algae | |
CN206581236U (en) | A kind of drainage arrangement of storage station | |
CN208975415U (en) | A kind of building civil engineering tower crane environmental protection type sprinkling device for reducing dust | |
CN108661024A (en) | A kind of water anchor point formula suction algae device | |
CN207667205U (en) | Defoaming device for thickener and underflow ore discharge device | |
CN108654179A (en) | A kind of water anchor point formula inhales the algae water filtration device of algae | |
CN211513580U (en) | Finish machining conveyor of cement for building bridge | |
CN215785232U (en) | Sand washing machine for sand preparation production line | |
CN108684503A (en) | A kind of afforestation irrigation rig | |
CN204892106U (en) | Novel sand washer | |
CN110604037A (en) | Irrigation system | |
CN212971050U (en) | Hydraulic engineering is circulation irrigation and drainage device for farmland | |
CN210302944U (en) | Tower crane spray set | |
CN221626847U (en) | Bridge pier shaft concrete column health preserving device | |
CN217856794U (en) | Grit processing is with equipment that sprays | |
CN207665697U (en) | A kind of water-saving gardens environmental protection irrigation equipment | |
CN207376536U (en) | A kind of Bridge guardrail cleaning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |