CN212096180U - Guardrail board repair tools - Google Patents
Guardrail board repair tools Download PDFInfo
- Publication number
- CN212096180U CN212096180U CN202020489870.0U CN202020489870U CN212096180U CN 212096180 U CN212096180 U CN 212096180U CN 202020489870 U CN202020489870 U CN 202020489870U CN 212096180 U CN212096180 U CN 212096180U
- Authority
- CN
- China
- Prior art keywords
- long rod
- guardrail board
- steel rope
- guardrail
- support frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model relates to a guardrail board maintenance tool, which comprises a long rod, wherein the head part of the long rod is fixedly provided with a backing plate, the tail part of the long rod is sleeved with a support frame, a steel rope is arranged at the position close to the head part of the long rod, one end of the steel rope is fixedly connected with the long rod, the other end of the steel rope is provided with a hook, and the steel rope is provided with a plurality of hanging rings; this device has played very big convenient effect in guardrail board maintenance process, and at guardrail board change in-process, utilize the peculiar device stand of guardrail board concatenation department, with its as the strong point, the ingenious stock that utilizes, when dismantling and installing guardrail board, in time raises or lowers the stock for conveniently lift and unload guardrail board, alleviateed workman intensity of labour.
Description
Technical Field
The utility model belongs to highway maintenance repair equipment field, concretely relates to guardrail board repair tools.
Background
Along with the rapid development of social economy, traffic convenience becomes a main factor, the development of highways in China is solved at present, but safety is still an important factor concerned by people, the highway guardrail plate is used as basic safety equipment of the highways, plays an important role in road traffic safety, and as an important component part of road facilities, the importance of the highway guardrail plate is more and more emphasized by people; the highway guardrail plate absorbs collision energy by utilizing the deformation of the soil foundation, the upright post and the cross beam, forces the out-of-control vehicle to change the direction and recover the normal running direction, prevents the vehicle from rushing out of the road, protects the vehicle and passengers and reduces the loss caused by accidents.
Compared with common steel, the highway guardrail plate has lower hardness and is easy to be damaged by machinery, so that the highway guardrail plate needs to be carefully handled and placed lightly in construction; guardrail board is the bolt concatenation between board and board, board and the stand in the installation, often can appear because of not in time adjusting guardrail board and prevent hindering the bolt elasticity between the piece, causes the linear distortion of guardrail board, local unsmooth scheduling problem, and the installation is dismantled to current guardrail board simultaneously, mainly still uses the manpower as leading to, and the manual operation degree of difficulty is great, and required number is more, and the maintenance progress is slow, and the maintenance process security is not high.
SUMMERY OF THE UTILITY MODEL
To above technical problem, the utility model discloses the technical effect that will reach provides one kind and uses manpower sparingly, the maintenance is convenient, can improve the simple and easy type guardrail board repair tools of guardrail board maintenance process security simultaneously.
For solving above-mentioned technical problem, a guardrail board repair tools, including the stock, the fixed backing plate, the afterbody cover that is provided with of head of stock have the support frame, be close to stock head position department is provided with the steel cable, steel cable one end with stock fixed connection, the other end are provided with the couple, and are provided with a plurality of links on this steel cable.
Further, the support frame comprises a sleeve and a support, the sleeve is fixed at the top end of the support, and the sleeve is sleeved with the tail of the long rod.
Further, the bottom end of the support is a tripod.
Furthermore, the long rod, the backing plate and the support frame are all made of rigid materials.
Further, the distance between the steel rope and the backing plate is 15-30 cm.
Further, the height of the support frame is 80-90 cm.
Further, the bottom of the base plate is provided with an anti-skid gasket.
Compared with the prior art, the utility model has the following advantage:
1. the utility model discloses at guardrail board change in-process, utilize the peculiar device stand of guardrail board concatenation department, with it as the strong point, the ingenious stock that utilizes, when dismantling and installing guardrail board, in time raise or lower the stock for conveniently lift and unload guardrail board, played very big convenient effect in guardrail board maintenance process, alleviateed workman intensity of labour.
2. The utility model discloses facilitate the use, combine raising and lowering of stock to and the regulation of steel cable length, can make the guardrail board height make the adjustment at any time, the alignment of screw when the guardrail board installation of being convenient for docks, in time adjusting bolt elasticity has greatly alleviateed the manual operation degree of difficulty, has improved the accuracy of guardrail board installation simultaneously, and the anticollision effect of guardrail board has also been ensured in the improvement of guardrail board installation accuracy.
3. The utility model discloses the support frame of device plays certain firm effect, and when guardrail board both ends all had the screw to aim at, overlaps the support frame on the stock, and firm stock position makes things convenient for both ends to carry out the bolt installation simultaneously to and the regulation of bolt elasticity, avoid the guardrail board distortion problem to appear in the installation.
4. The utility model provides high guardrail board maintenance efficiency has reduced maintenance workman's quantity, very big improvement guardrail board maintenance installation progress, also improved the security of maintenance process simultaneously.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
In the figure: 1. the steel wire rope hanging bracket comprises a long rod, 2 parts of a support frame, 2-1 parts of a sleeve, 2-2 parts of a support frame, 3 parts of a base plate, 4 parts of a steel wire rope, 4-1 parts of a hook, 4-2 parts of a hanging ring.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
As shown in fig. 1, the maintenance tool for the guardrail plate comprises a long rod 1, wherein a base plate 3 is fixedly arranged at the head part of the long rod 1, a support frame 2 is sleeved at the tail part of the long rod 1, a steel rope 4 is arranged at a position close to the head part of the long rod 1, one end of the steel rope 4 is fixedly connected with the long rod 1, a hook 4-1 is arranged at the other end of the steel rope 4, and a plurality of hanging rings 4-2 are arranged on the steel rope 4; the supporting frame 2 consists of a sleeve 2-1 and a support 2-2, the sleeve 2-1 is fixed at the top end of the support 2-2, and the sleeve 2-1 is sleeved with the tail part of the long rod 1; the bottom end of the bracket 2-2 is a tripod; the long rod 1, the backing plate 3 and the support frame 2 are all made of rigid materials; the distance between the steel rope 4 and the backing plate 3 is 15-30 cm; the height of the support frame 2 is 80-90 cm; the bottom of the backing plate 3 is provided with an anti-skid gasket.
The utility model discloses a working process does: the length of a standard guardrail plate of a highway is 4320mm, the distance between standard upright posts of the highway is 4000mm, the distance between the top end of the upright post of a single-layer guardrail and the elevation of a pavement is 75cm, the two ends of the guardrail plate are spliced by bolts, the upright post and the anti-blocking block are stably arranged at the corresponding splicing and mounting position, the anti-blocking block is fixedly arranged on the upright post, and the installation of the guardrail plate is that the two ends of the guardrail plate are spliced by the anti-blocking block bolts at the corresponding position; when the guardrail plate is mounted and dismounted, the device can simultaneously lift up the two ends of the guardrail plate so as to ensure that the bolts at the two ends of the guardrail plate are accurately mounted; before the device is used, the long rod 1 is separated from the support frame 2, the backing plate 3 is placed at the top end of the upright post of the guardrail plate to ensure that the upright post is stably placed and cannot slide, the steel rope 4 penetrates through the bottom of the guardrail plate, the hook 4-1 on the steel rope 4 is buckled on the hanging ring 4-2 at a proper position, then the two ends of the guardrail plate are simultaneously lifted, the long rod 1 is lifted or lowered by lifting or adjusting the left and right positions of the long rod 1, the screw hole on the guardrail plate is aligned with the screw hole on the anti-blocking block, then the bolt is inserted and pre-tightened, namely the bolt is in a state of incomplete fastening, then the height of the long rod 1 is lowered, the position of the hook 4-1 and the hanging ring 4-2 on the steel rope 4 is adjusted, the steel rope 4 is in a state of lifting the guardrail plate, at the moment, the support frame 2 is sleeved at the tail end of, the whole device is in a stable state, then the screw holes on the guardrail plate and the profile of the guardrail plate are checked, if the position and the profile are both proper, the bolts can be tightened to finish the installation of the guardrail plate, if the position of the guardrail plate is inclined, the support frame 2 at the inclined position can be removed, and the position of the guardrail plate can be conveniently adjusted by operating the long rod 1 at the position, so that the screw holes are ensured to be aligned and installed; this device ingenious utilization stock, when dismantling and installing the guardrail board, in time raise or lower the stock for conveniently lift and unload the guardrail board, alleviateed workman intensity of labour, very big reduction the manual operation degree of difficulty, improved the accuracy of guardrail board installation simultaneously, the anticollision effect of guardrail board has also been ensured in the improvement of guardrail board installation accuracy.
Claims (7)
1. The utility model provides a guardrail board repair tools, includes stock (1), its characterized in that: the head of the long rod (1) is fixedly provided with a base plate (3), the tail of the long rod is sleeved with a support frame (2), a steel rope (4) is arranged at a position close to the head of the long rod (1), one end of the steel rope (4) is fixedly connected with the long rod (1), the other end of the steel rope is provided with a hook (4-1), and the steel rope (4) is provided with a plurality of hanging rings (4-2).
2. A balustrade panel maintenance tool according to claim 1, wherein: the support frame (2) is composed of a sleeve (2-1) and a support (2-2), the sleeve (2-1) is fixed at the top end of the support (2-2), and the sleeve (2-1) is sleeved with the tail of the long rod (1).
3. A balustrade panel maintenance tool according to claim 2, wherein: the bottom end of the support (2-2) is a tripod.
4. A balustrade panel maintenance tool according to claim 1, wherein: the long rod (1), the backing plate (3) and the support frame (2) are all made of rigid materials.
5. A balustrade panel maintenance tool according to claim 1, wherein: the distance between the steel rope (4) and the backing plate (3) is 15-30 cm.
6. A balustrade panel maintenance tool according to claim 1, wherein: the height of the support frame (2) is 80-90 cm.
7. A balustrade panel maintenance tool according to claim 1, wherein: and an anti-skid gasket is arranged at the bottom of the backing plate (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020489870.0U CN212096180U (en) | 2020-04-07 | 2020-04-07 | Guardrail board repair tools |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020489870.0U CN212096180U (en) | 2020-04-07 | 2020-04-07 | Guardrail board repair tools |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212096180U true CN212096180U (en) | 2020-12-08 |
Family
ID=73630798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020489870.0U Expired - Fee Related CN212096180U (en) | 2020-04-07 | 2020-04-07 | Guardrail board repair tools |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212096180U (en) |
-
2020
- 2020-04-07 CN CN202020489870.0U patent/CN212096180U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107227686A (en) | A kind of tunnel-type anchorage pre-stress system locating support construction method | |
CN212096180U (en) | Guardrail board repair tools | |
CN201762069U (en) | Insulated ladder for lifting maintenance platform | |
CN213328682U (en) | Mounting structure suitable for heavy scattered cable saddle | |
CN210887998U (en) | Road and bridge construction attachment strap structure | |
CN210948003U (en) | Building construction safety rail guard convenient to adjust | |
CN2286284Y (en) | Boiler furnace repair platform | |
CN114575251B (en) | Large-span steel truss arch bridge construction system and construction method | |
CN113718724B (en) | Operation platform for replacing arc-shaped gate side water stop rubber and construction method thereof | |
CN213013946U (en) | Jack support for T-beam bottom-penetrating type hogging moment tensioning construction | |
CN210563326U (en) | Overhead unit type overhead sliding splicing operation platform | |
CN113488314A (en) | Outdoor transformer mounting structure and construction method for mounting outdoor transformer by using structure | |
CN204125116U (en) | Wellhead blowout preventor checking maintenance platform | |
CN111463689A (en) | Distribution transformer hangs core and overhauls specialized tool | |
CN217870155U (en) | Hoisting type highway height limiting frame | |
CN213834386U (en) | Portable carrier roller changer of steel wire rope core belt conveyor | |
CN213086658U (en) | Municipal infrastructure maintenance management system | |
CN220866892U (en) | Special convenient workpiece for replacing crown block cab | |
CN212609410U (en) | Simple tool for installing steel guardrail | |
CN212984884U (en) | A safety device for ground is repaired and is under construction | |
CN210976520U (en) | Outer wind-resistant column installation subsection point operation platform | |
CN219157465U (en) | Fixing structure convenient for mounting traffic sign boards on two sides of cross beam | |
CN211646111U (en) | Intelligent lifting height limiting frame | |
CN217324999U (en) | Large-span steel truss arch bridge construction system | |
CN203345912U (en) | Portable special suspension tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201208 |