CN212091582U - Waste gas treatment tower for petroleum additive production - Google Patents

Waste gas treatment tower for petroleum additive production Download PDF

Info

Publication number
CN212091582U
CN212091582U CN202020558905.1U CN202020558905U CN212091582U CN 212091582 U CN212091582 U CN 212091582U CN 202020558905 U CN202020558905 U CN 202020558905U CN 212091582 U CN212091582 U CN 212091582U
Authority
CN
China
Prior art keywords
pipe
storage tank
waste gas
water storage
gas treatment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020558905.1U
Other languages
Chinese (zh)
Inventor
杨建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aoyuan Petroleum Technology Co ltd
Original Assignee
Aoyuan Petroleum Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aoyuan Petroleum Technology Co ltd filed Critical Aoyuan Petroleum Technology Co ltd
Priority to CN202020558905.1U priority Critical patent/CN212091582U/en
Application granted granted Critical
Publication of CN212091582U publication Critical patent/CN212091582U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of waste gas treatment, in particular to a waste gas treatment tower for petroleum auxiliary agent production, which can effectively prevent particles from entering a circulating water system to block a spraying device, ensure the process and effect of waste gas treatment and improve the use reliability, and comprises a tower body, a water storage tank, a circulating pump and the spraying device, wherein the bottom of the left end of the tower body is provided with an air inlet pipe, the top of the tower body is provided with an air outlet pipe, and the bottom of the tower body is provided with a water return pipe communicated with the water storage tank; still include first barrel, second barrel, first support, second support, loading hopper, filling tube and driving motor, the inside of storage water tank is provided with places the chamber to placing the vertical baffle that is provided with of intracavity, the baffle will be placed the chamber and separate into filter chamber and apotheca, and be provided with the intercommunicating pore at the top of baffle, still include first fender lid, second fender lid, first ball bearing, filter screen, second ball bearing, puddler, driven gear, pivot and driving gear.

Description

Waste gas treatment tower for petroleum additive production
Technical Field
The utility model relates to a waste gas treatment's technical field especially relates to a waste gas treatment tower is used in production of petroleum auxiliary agent.
Background
As is well known, a waste gas treatment tower for petroleum additive production is an auxiliary device for treating waste gas generated in the process of petroleum additive production, and is widely used in the field of environmental protection; the existing waste gas treatment tower for producing the petroleum auxiliary agent comprises a tower body, a water storage tank and a circulating pump, wherein a working chamber is arranged inside the tower body, a spraying device is arranged in the working chamber, an air inlet pipe is arranged at the bottom of the left end of the tower body, an air outlet pipe is arranged at the top end of the tower body, a water return pipe communicated with the water storage tank is arranged at the bottom end of the tower body, the input end of the circulating pump is communicated with the water storage tank, and the output end of the circulating pump extends into the working chamber; when the existing waste gas treatment tower for producing the petroleum additive is used, waste gas enters a tower body through an air inlet pipe, water in a water storage tank is pumped into a spraying device through a circulating pump to spray the waste gas, the sprayed gas is discharged from an air outlet pipe, and the water in the tower body flows back to the water storage tank through a return pipe; the existing waste gas treatment tower for producing the petroleum additive is used for finding that waste gas contains certain particles, and the particles are easy to block a spraying device when entering circulating water, so that the process of waste gas treatment is influenced, and the use reliability is low.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a be not enough to prior art, the utility model provides a can prevent effectively that the particulate matter from causing the jam to spray set in getting into circulating water system, guarantee exhaust-gas treatment's process and effect, improve the exhaust-gas treatment tower for oil auxiliary agent production of use reliability.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a waste gas treatment tower for petroleum additive production comprises a tower body, a water storage tank and a circulating pump, wherein a working chamber is arranged inside the tower body, a spraying device is arranged in the working chamber, an air inlet pipe is arranged at the bottom of the left end of the tower body, an air outlet pipe is arranged at the top end of the tower body, and a water return pipe communicated with the water storage tank is arranged at the bottom end of the tower body; the water storage tank is characterized by further comprising a first cylinder body, a second cylinder body, a first support, a second support, a feeding hopper, a feeding pipe and a driving motor, wherein a placing cavity is formed in the water storage tank, a partition plate is vertically arranged in the placing cavity and divides the placing cavity into a filtering chamber and a storage chamber, a communication hole is formed in the top of the partition plate, the filtering chamber is communicated with the storage chamber through the communication hole, the bottom ends of the first support and the second support are both connected with the inner bottom wall of the filtering chamber, the top ends of the first support and the second support are respectively connected with the bottom ends of the first cylinder body and the second cylinder body, the first cylinder body is located in the second cylinder body, a first blocking cover and a second blocking cover are respectively arranged at the bottom end of the first cylinder body and the top end of the second cylinder body, a first mounting through hole which is vertically communicated is formed in the middle of the second blocking cover, and a first ball bearing is fixedly mounted in the first mounting, the outside of second barrel is provided with the filter screen, the loading hopper is installed on the top of storage water tank to be provided with second installation through-hole in the bottom of loading hopper, fixed mounting has second ball bearing in the second installation through-hole, the top of loading tube passes second ball bearing and stretches into to the loading hopper in, and first ball bearing is passed to the bottom of loading tube and stretches into to first barrel in, and is provided with a plurality of puddlers in the outside of loading tube, and the outside of loading tube is provided with driven gear, driving motor installs on the top of storage water tank to be provided with the pivot at driving motor's bottom output, the bottom of pivot stretches into to in the filter chamber to be provided with the driving gear in the bottom of pivot, driving gear and driven gear meshing, the output of wet return passes first ball bearing and stretches into the bottom to first barrel.
Preferably, the middle part of the top end of the first blocking cover is provided with a third support, a first baffle is arranged on the top end of the third support, the baffle is provided with a plurality of groups of first sieve pores, the bottom end of the feeding pipe is provided with a second baffle, the bottom end of the second baffle is tightly attached to the top end of the first baffle, a plurality of groups of second sieve pores are arranged on the second baffle, and the plurality of groups of second sieve pores are respectively positioned right above the plurality of groups of first sieve pores.
Preferably, the top end of the loading hopper is provided with a sealing cover.
Preferably, the top end of the water storage tank is provided with a water replenishing pipe communicated with the storage chamber, and the input end of the circulating pump extends into the storage chamber from the top end of the water storage tank.
Preferably, the filter screen is located the below of intercommunicating pore, the bottom intercommunication of first barrel is provided with first blow off pipe, the diapire of storage water tank is passed to the below of storage water tank in the bottom of first blow off pipe, the bottom of storage water tank be provided with the communicating second blow off pipe of filter chamber to all be provided with the blowoff valve on first blow off pipe and second blow off pipe.
Preferably, spray set includes fixed bolster, fixed pipe, installation pipe and a plurality of shower, fixed bolster fixed mounting is in the top of working chamber, fixed pipe fixed mounting is on the fixed bolster, and the top of fixed pipe communicates with the output of circulating pump, the bottom and a plurality of shower intercommunication of installation pipe, threaded connection is passed through with the bottom of fixed pipe in the top of installation pipe, and the bottom of a plurality of showers all communicates and is provided with the multiunit shower, and one side of tower body is provided with someone shape hole.
(III) advantageous effects
Compared with the prior art, the utility model provides a waste gas treatment tower is used in production of petroleum auxiliary agent possesses following beneficial effect:
1. this exhaust-gas treatment tower is used in petroleum auxiliary agent production, water in the tower body flows back to in the first barrel through the wet return, carry the flocculating agent in the first barrel and mix with the water in the first barrel through loading hopper and loading tube, make the water in the first barrel become the flocculating constituent, the outside of the ascending overflow of water in the first barrel to first barrel flows down along the second barrel, the flocculating constituent deposit is in the bottom of filter chamber, the supernatant rises in the filter chamber and filters through the filter screen, water after the filtration flows back to the entering circulating water system in the apotheca through the intercommunicating pore, can prevent effectively that the particulate matter from causing the jam to spray set in getting into circulating water system, guarantee exhaust-gas treatment's process and effect, improve the use reliability.
2. This exhaust-gas treatment tower is used in petroleum auxiliary agent production drives the driving gear through driving motor and rotates, and the driving gear drives driven gear and the filling tube slowly rotates, stirs water and flocculating agent in to first barrel through the puddler on the filling tube for flocculating agent and water intensive mixing improve the flocculation effect, and the outside water of first barrel is not influenced by the disturbance, does benefit to the flocculating constituent and deposits.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is a schematic plan view of the present invention;
fig. 3 is a schematic view of a part of an enlarged structure at a in fig. 2 according to the present invention;
fig. 4 is an exploded view of the first and second baffles of the present invention;
in the drawings, the reference numbers: 1. a tower body; 2. a water storage tank; 3. a circulation pump; 4. an air inlet pipe; 5. an air outlet pipe; 6. a water return pipe; 7. a first cylinder; 8. a second cylinder; 9. a first bracket; 10. a second bracket; 11. a hopper; 12. a feed tube; 13. a drive motor; 14. a partition plate; 15. a first shield cover; 16. a second shield cover; 17. a first ball bearing; 18. a filter screen; 19. a second ball bearing; 20. a stirring rod; 21. a driven gear; 22. a rotating shaft; 23. a driving gear; 24. a third support; 25. a first baffle plate; 26. a first screen hole; 27. a second baffle; 28. a second sieve pore; 29. a sealing cover; 30. a water replenishing pipe; 31. a first drain pipe; 32. a second sewage draining pipe; 33. fixing a bracket; 34. a fixed tube; 35. installing a pipe; 36. a shower pipe; 37. a shower head; 38. a human-shaped hole is formed.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the waste gas treatment tower for petroleum additive production of the present invention comprises a tower body 1, a water storage tank 2 and a circulating pump 3, wherein a working chamber is arranged inside the tower body 1, and a spraying device is arranged in the working chamber, an air inlet pipe 4 is arranged at the bottom of the left end of the tower body 1, an air outlet pipe 5 is arranged at the top end of the tower body 1, and a water return pipe 6 communicated with the water storage tank 2 is arranged at the bottom end of the tower body 1; the water storage tank is characterized by further comprising a first barrel body 7, a second barrel body 8, a first support 9, a second support 10, a feeding hopper 11, a feeding pipe 12 and a driving motor 13, a placing cavity is arranged inside the water storage tank 2, a partition plate 14 is vertically arranged in the placing cavity, the partition plate 14 partitions the placing cavity into a filtering chamber and a storage chamber, a communication hole is formed in the top of the partition plate 14, the filtering chamber is communicated with the storage chamber through the communication hole, the bottom ends of the first support 9 and the second support 10 are both connected with the inner bottom wall of the filtering chamber, the top ends of the first support 9 and the second support 10 are respectively connected with the bottom ends of the first barrel body 7 and the second barrel body 8, the first barrel body 7 is located inside the second barrel body 8, a first blocking cover 15 and a second blocking cover 16 are respectively arranged at the bottom end of the first barrel body 7 and the top end of the second barrel body 8, a first installation through hole which is vertically communicated is formed in the middle of the second blocking, a first ball bearing 17 is fixedly installed in the first installation through hole, a filter screen 18 is arranged on the outer side of the second barrel 8, the charging hopper 11 is installed on the top end of the water storage tank 2, a second installation through hole is arranged at the bottom end of the charging hopper 11, a second ball bearing 19 is fixedly installed in the second installation through hole, the top end of the charging pipe 12 penetrates through the second ball bearing 19 and extends into the charging hopper 11, the bottom end of the charging pipe 12 penetrates through the first ball bearing 17 and extends into the first barrel 7, a plurality of stirring rods 20 are arranged on the outer side of the charging pipe 12, a driven gear 21 is arranged on the outer side of the charging pipe 12, the driving motor 13 is installed on the top end of the water storage tank 2, a rotating shaft 22 is arranged at the output end of the bottom of the driving motor 13, the bottom end of the rotating shaft 22 extends into the filter chamber, a driving gear 23 is arranged at the bottom end of the rotating shaft 22, and the driving, the output end of the water return pipe 6 passes through a first ball bearing 17 and extends into the bottom of the first cylinder 7, water in the tower body 1 flows back into the first cylinder 7 through the water return pipe 6, a flocculating agent is conveyed into the first cylinder 7 through the feeding hopper 11 and the feeding pipe 12 and is mixed with the water in the first cylinder 7, so that the water in the first cylinder 7 forms a flocculating constituent, the water in the first cylinder 7 rises and overflows to the outside of the first cylinder 7 and flows downwards along the second cylinder 8, the flocculating constituent is deposited at the bottom of the filtering chamber, supernatant liquid rises in the filtering chamber and is filtered through the filtering screen 18, the filtered water flows back into the storage chamber through the communicating hole and enters the circulating water system, particulate matters can be effectively prevented from entering the circulating water system to block a spraying device, the process and the effect of waste gas treatment are ensured, the use reliability is improved, the driving motor 13 drives the driving gear 23 to rotate, the driving gear 23 drives the driven gear 21 and the feed pipe 12 to rotate slowly, the water and the flocculating agent in the first cylinder 7 are stirred by the stirring rod 20 on the feed pipe 12, so that the flocculating agent and the water are fully mixed, the flocculation effect is improved, the water outside the first cylinder 7 is not influenced by disturbance and is beneficial to flocculating agent precipitation, the middle part of the top end of the first baffle cover 15 is provided with a third bracket 24, the top end of the third bracket 24 is provided with a first baffle plate 25, the baffle plate is provided with a plurality of groups of first sieve holes 26, the bottom end of the feed pipe 12 is provided with a second baffle plate 27, the bottom end of the second baffle plate 27 is tightly attached to the top end of the first baffle plate 25, the second baffle plate 27 is provided with a plurality of groups of second sieve holes 28, the plurality of groups of second sieve holes 28 are respectively positioned right above the plurality of groups of first sieve holes 26, the top end of the feed hopper 11 is provided with a sealing cover 29, guarantee the leakproofness, when out of work at ordinary times, guarantee through sealed lid 29 that the flocculating agent in the loading hopper 11 can not derive from second sieve mesh 28, sealed lid 29 is opened in the during operation, at filling tube 12 pivoted in-process, first sieve mesh 26 is just to the time with second sieve mesh 28 from top to bottom, and partly flocculating agent derives through second sieve mesh 28 and first sieve mesh 26, realizes automatic material conveying, adjusts through the rotational speed to driving motor 13, can adjust the reinforced volume.
The utility model discloses a waste gas treatment tower is used in production of petroleum auxiliary agent, the top of storage water tank 2 be provided with the communicating moisturizing pipe 30 of apotheca, the input of circulating pump 3 stretches into to the apotheca from the top of storage water tank 2 in, through moisturizing pipe 30 convenient toward the fresh water of reservoir interior replenishment.
The utility model discloses a waste gas treatment tower is used in petroleum auxiliary agent production, filter screen 18 is located the below of intercommunicating pore, the bottom intercommunication of first barrel 7 is provided with first blow off pipe 31, the diapire of storage water tank 2 to the below of storage water tank 2 are passed to the bottom of first blow off pipe 31, the bottom of storage water tank 2 be provided with the communicating second blow off pipe 32 of filter chamber to all be provided with the blowoff valve on first blow off pipe 31 and second blow off pipe 32, the impurity that produces in the first barrel 7 is derived through first blow off pipe 31, and the impurity in the first barrel 7 outside is derived through second blow off pipe 32.
The utility model discloses a waste gas treatment tower is used in oil auxiliary agent production, spray set includes fixed bolster 33, fixed pipe 34, installation pipe 35 and a plurality of shower 36, fixed bolster 33 fixed mounting is in the top of working chamber, fixed pipe 34 fixed mounting is on fixed bolster 33, and the top of fixed pipe 34 communicates with the output of circulating pump 3, the bottom of installation pipe 35 and a plurality of shower 36 intercommunication, and threaded connection is passed through with the bottom of fixed pipe 34 in the top of installation pipe 35, and the bottom of a plurality of shower 36 all communicates and is provided with multiunit shower head 37, and one side of tower body 1 is provided with someone shape hole 38; circulating pump 3 is with water through fixed pipe 34, installation pipe 35 pump send to group 36 and from shower head 37 blowout, and installation pipe 35 and fixed pipe 34 pass through threaded connection, conveniently dismantle the maintenance to installation pipe 35 and shower 36, maintain through the humanoid hole.
The utility model discloses a waste gas treatment tower is used in petroleum auxiliary agent production, when using, the water in the tower body 1 flows back to first barrel 7 through wet return 6, carry the flocculating agent in the first barrel 7 and mix with the water in the first barrel 7 through loading hopper 11 and filling tube 12, make the water in the first barrel 7 become the flocculating constituent, the water in the first barrel 7 rises and overflows to the outside of first barrel 7 and flows down along second barrel 8, the flocculating constituent deposit is in the bottom of filter chamber, the supernatant rises in the filter chamber and filters through filter screen 18, the water after the filtration flows back to the storage chamber through the intercommunicating pore and gets into circulating water system, can prevent effectively that the particulate matter from getting into circulating water system and causing the jam to spray set, guarantee waste gas treatment's process and effect, use reliability is improved, drive driving gear 23 rotation through driving motor 13, driving gear 23 drives driven gear 21 and the slow rotation of filling tube 12, water and flocculating agent through puddler 20 on the filling tube 12 in to first barrel 7 stir, make flocculating agent and water intensive mixing, improve the flocculation effect, the outside water of first barrel 7 is not influenced by the disturbance, do benefit to the flocculating agent and deposit, the impurity that produces in the first barrel 7 exports through first blow off pipe 31, the impurity in the first barrel 7 outside exports through second blow off pipe 32, conveniently supply new water in the apotheca through moisturizing pipe 30.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A waste gas treatment tower for petroleum additive production comprises a tower body (1), a water storage tank (2) and a circulating pump (3), wherein a working cavity is arranged inside the tower body (1), a spraying device is arranged in the working cavity, an air inlet pipe (4) is arranged at the bottom of the left end of the tower body (1), an air outlet pipe (5) is arranged at the top end of the tower body (1), and a water return pipe (6) communicated with the water storage tank (2) is arranged at the bottom end of the tower body (1); the water storage tank is characterized by further comprising a first barrel body (7), a second barrel body (8), a first support (9), a second support (10), a feeding hopper (11), a feeding pipe (12) and a driving motor (13), a placing cavity is formed in the water storage tank (2), a partition plate (14) is vertically arranged in the placing cavity, the partition plate (14) divides the placing cavity into a filtering chamber and a storage chamber, a communication hole is formed in the top of the partition plate (14), the filtering chamber and the storage chamber are communicated through the communication hole, the bottom ends of the first support (9) and the second support (10) are connected with the inner bottom wall of the filtering chamber, the top ends of the first support (9) and the second support (10) are connected with the bottom ends of the first barrel body (7) and the second barrel body (8) respectively, the first barrel body (7) is located in the second barrel body (8), and a first blocking cover (15) and a second blocking cover (13) are arranged at the bottom end of the first barrel body (7) and the top end of the second barrel body (8) respectively A blocking cover (16), a first mounting through hole which is through from top to bottom is arranged in the middle of the second blocking cover (16), a first ball bearing (17) is fixedly arranged in the first mounting through hole, a filter screen (18) is arranged on the outer side of the second barrel (8), the loading hopper (11) is arranged on the top end of the water storage tank (2), a second mounting through hole is arranged at the bottom end of the loading hopper (11), a second ball bearing (19) is fixedly arranged in the second mounting through hole, the top end of the loading pipe (12) penetrates through the second ball bearing (19) and extends into the loading hopper (11), the bottom end of the loading pipe (12) penetrates through the first ball bearing (17) and extends into the first barrel (7), a plurality of stirring rods (20) are arranged on the outer side of the loading pipe (12), a driven gear (21) is arranged on the outer side of the loading pipe (12), and the driving motor (13) is arranged on the top end of the water storage tank (2), and be provided with pivot (22) at the bottom output of driving motor (13), the bottom of pivot (22) stretches into to the filter chamber in to be provided with driving gear (23) in the bottom of pivot (22), driving gear (23) and driven gear (21) meshing, the output of wet return (6) passes first ball bearing (17) and stretches into the bottom to first barrel (7).
2. The waste gas treatment tower for petroleum auxiliary production is characterized in that a third support (24) is arranged in the middle of the top end of the first blocking cover (15), a first baffle plate (25) is arranged at the top end of the third support (24), the baffle plate is provided with a plurality of groups of first sieve holes (26), a second baffle plate (27) is arranged at the bottom end of the feeding pipe (12), the bottom end of the second baffle plate (27) is tightly attached to the top end of the first baffle plate (25), a plurality of groups of second sieve holes (28) are arranged on the second baffle plate (27), and the plurality of groups of second sieve holes (28) are respectively positioned right above the plurality of groups of first sieve holes (26).
3. The waste gas treatment tower for petroleum auxiliary production according to claim 2, wherein a sealing cover (29) is provided at the top end of the hopper (11).
4. The waste gas treatment tower for petroleum auxiliary production is characterized in that the top end of the water storage tank (2) is provided with a water replenishing pipe (30) communicated with the storage chamber, and the input end of the circulating pump (3) extends into the storage chamber from the top end of the water storage tank (2).
5. The waste gas treatment tower for petroleum auxiliary production is characterized in that the filter screen (18) is positioned below the communicating hole, a first drain pipe (31) is communicated with the bottom end of the first cylinder (7), the bottom end of the first drain pipe (31) penetrates through the bottom wall of the water storage tank (2) to the position below the water storage tank (2), a second drain pipe (32) communicated with the filter chamber is arranged at the bottom end of the water storage tank (2), and drain valves are arranged on the first drain pipe (31) and the second drain pipe (32).
6. The waste gas treatment tower for petroleum auxiliary production is characterized in that the spraying device comprises a fixed support (33), a fixed pipe (34), an installation pipe (35) and a plurality of spraying pipes (36), the fixed support (33) is fixedly installed at the top of the working cavity, the fixed pipe (34) is fixedly installed on the fixed support (33), the top end of the fixed pipe (34) is communicated with the output end of the circulating pump (3), the bottom end of the installation pipe (35) is communicated with the plurality of spraying pipes (36), the top end of the installation pipe (35) is connected with the bottom end of the fixed pipe (34) through threads, the bottom ends of the plurality of spraying pipes (36) are communicated with a plurality of groups of spraying heads (37), and one side of the tower body (1) is provided with a hole (38).
CN202020558905.1U 2020-04-15 2020-04-15 Waste gas treatment tower for petroleum additive production Expired - Fee Related CN212091582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020558905.1U CN212091582U (en) 2020-04-15 2020-04-15 Waste gas treatment tower for petroleum additive production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020558905.1U CN212091582U (en) 2020-04-15 2020-04-15 Waste gas treatment tower for petroleum additive production

Publications (1)

Publication Number Publication Date
CN212091582U true CN212091582U (en) 2020-12-08

Family

ID=73640501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020558905.1U Expired - Fee Related CN212091582U (en) 2020-04-15 2020-04-15 Waste gas treatment tower for petroleum additive production

Country Status (1)

Country Link
CN (1) CN212091582U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112870895A (en) * 2021-01-15 2021-06-01 厦门奈克斯新材料有限公司 A exhaust treatment device for production of sticky goods of industry
CN115301028A (en) * 2022-10-10 2022-11-08 航天氢能沧州气体有限公司 Synthetic gas washing tower purification treatment device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112870895A (en) * 2021-01-15 2021-06-01 厦门奈克斯新材料有限公司 A exhaust treatment device for production of sticky goods of industry
CN115301028A (en) * 2022-10-10 2022-11-08 航天氢能沧州气体有限公司 Synthetic gas washing tower purification treatment device

Similar Documents

Publication Publication Date Title
CN212091582U (en) Waste gas treatment tower for petroleum additive production
CN115108683A (en) Sewage treatment equipment for ecological environment treatment
CN216141373U (en) Epoxy process water recycle equipment
CN211896409U (en) Novel waste water treatment purifies jar
CN114873778B (en) Coal slime water treatment system for coal washing and selecting processing
CN114524554B (en) Chemical wastewater treatment device capable of carrying out solid-liquid separation and treatment method
CN213369454U (en) Novel intelligent fish tank filtering system
CN212504341U (en) Waste water filtering treatment device
CN207957993U (en) Application degreasing wasting liquid processing unit
CN113402059A (en) Chemical wastewater recycling device
CN221344044U (en) Cooling water purification device for polyethylene pipeline production
CN118289982B (en) Photocatalytic oxidation deep thallium removal equipment and thallium removal process
CN216336711U (en) Energy-conserving serial-type sewage treatment air supporting machine
CN113860448B (en) Sewage treatment case that sewage treatment used
CN220215623U (en) Dust collector is used in compound vitamin production
CN220642810U (en) Water treatment, purification, circulation and transportation integrated machine
CN117550746B (en) Hydroxyl oxidation device for electroplating wastewater treatment and treatment process thereof
CN217794945U (en) Sewage filtering device with automatic cleaning function
CN118005220B (en) Industrial wastewater resource regeneration system and process thereof
CN217265225U (en) Movable micro-filter for water purification treatment
CN213012335U (en) Sewage treatment equipment containing chemical components
CN221740005U (en) Flocculation reaction precipitation equipment of source water factory
CN215852997U (en) Automotive interior spare plating solution storage device
CN219384799U (en) Environment protection device with waste water recovery function
CN210385118U (en) Zinc-containing ore pulp sedimentation tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201208