CN212063628U - Building construction site temporary electricity utilization supervision and safety risk management and control system - Google Patents

Building construction site temporary electricity utilization supervision and safety risk management and control system Download PDF

Info

Publication number
CN212063628U
CN212063628U CN202020890692.2U CN202020890692U CN212063628U CN 212063628 U CN212063628 U CN 212063628U CN 202020890692 U CN202020890692 U CN 202020890692U CN 212063628 U CN212063628 U CN 212063628U
Authority
CN
China
Prior art keywords
data
monitoring
power
distribution
electric equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020890692.2U
Other languages
Chinese (zh)
Inventor
黄立耕
李大钧
陶恩正
张世安
周磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Lida Electrical Co ltd
Original Assignee
Hefei Lida Electrical Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Lida Electrical Co ltd filed Critical Hefei Lida Electrical Co ltd
Priority to CN202020890692.2U priority Critical patent/CN212063628U/en
Application granted granted Critical
Publication of CN212063628U publication Critical patent/CN212063628U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The utility model relates to an electricity utilization supervision technical field especially relates to building construction site temporary electricity utilization supervision and safe risk management and control system, including data acquisition system and data management system, data acquisition system includes consumer and distribution system, distribution system includes the switch box, and a consumer corresponds a switch box, and two switch boxes correspond a distribution electronic box, and all distribution electronic boxes correspond a main distribution box. The system can monitor and analyze the electricity utilization condition of the whole construction site at any time, strengthen the electricity utilization and energy consumption management of the construction site, reduce the electricity utilization and energy consumption, reduce the production cost and greatly improve the work efficiency of the electricity utilization monitoring management; the system adopts a three-level power distribution system of a main distribution box, a distribution box and a switch box, and the arrangement of a main power supply isolating switch, a main circuit breaker, a distribution power isolating switch and a leakage protector ensures the electrical safety of equipment.

Description

Building construction site temporary electricity utilization supervision and safety risk management and control system
Technical Field
The utility model relates to a power consumption supervision technical field especially relates to the interim power consumption supervision of building construction site and safe risk management and control system.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place.
In the process of building construction, various electric equipment such as a concrete mixer, a crane and the like are needed. The construction site has more equipment, larger power consumption and more complex power consumption condition, and is not convenient for managing the power consumption and the power consumption safety of the construction site.
Aiming at the problems, a temporary electricity utilization supervision and safety risk management and control system for a building construction site is designed.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building construction site electricity consumption supervision and safe risk management and control system temporarily to solve above-mentioned technical problem.
The utility model discloses a solve above-mentioned technical problem, adopt following technical scheme to realize:
a temporary electricity utilization supervision and safety risk management and control system for a building construction site comprises a data acquisition system and a data management system,
the data acquisition system comprises electric equipment and a power distribution system, the power distribution system comprises switch boxes, one electric equipment corresponds to one switch box, two switch boxes correspond to one distribution box, all the distribution boxes correspond to one main distribution box, a first electric power monitoring instrument is installed in each switch box, a second electric power monitoring instrument and a wireless transmission device are installed in each main distribution box, the electric power monitoring instruments measure the current, the voltage, the power factor and the electric energy parameters of the electric equipment,
the power utilization data acquired by the data acquisition system is transmitted through a wireless sensing network;
the data management system comprises a monitoring room, wherein an intelligent gateway and a monitoring computer provided with monitoring software are arranged in the monitoring room, the intelligent gateway reads data of the power monitoring instrument through a wireless network and forwards the data to the monitoring computer through an Ethernet;
after the monitoring software on the monitoring computer reads the data, the data is analyzed, counted, calculated and judged, the power utilization data of each monitoring point is displayed on a human-computer interface, and historical data, reports and curves are generated.
Preferably, be provided with main power isolator and master circuit breaker in the main distribution box, the switch box divide the distribution box in all be provided with branch power isolator and earth leakage protector.
Preferably, the data management system further comprises a fault processing module, the monitoring software on the monitoring computer judges the transmitted data, the information of the electric equipment with the fault is transmitted to a mobile phone of a maintenance worker through a wireless network, and the maintenance worker overhauls the equipment.
Preferably, the data management system further comprises an early warning module, the early warning module is used for inputting the basic information of each piece of electric equipment into the monitoring software, an early warning threshold value is set, the monitoring software is used for recording and analyzing the data of the electric equipment, and the data is transmitted to a mobile phone of a maintenance worker through a wireless network early warning signal after reaching the early warning value;
the basic information of the electric equipment comprises: the working time, the electricity utilization information and the maintenance times of the electric equipment.
Preferably, the data acquisition system further comprises a video monitoring device, the video monitoring device comprises a camera installed on the periphery of the electric equipment, and a picture shot by the camera is transmitted to the monitoring computer through the wireless network by the image transmission equipment.
Preferably, the data acquisition system further comprises a positioning device, the positioning device comprises a GPS positioner installed on the electric equipment, and the GPS positioner is connected to the monitoring computer.
Preferably, a TN-S zero-connection protection system is adopted in the circuit of the power distribution system.
The utility model has the advantages that:
1. the system can monitor and analyze the electricity utilization condition of the whole construction site at any time, strengthen the electricity utilization and energy consumption management of the construction site, reduce the electricity utilization and energy consumption, reduce the production cost and greatly improve the work efficiency of the electricity utilization monitoring management;
the system adopts a three-level power distribution system of a main distribution box, a distribution box and a switch box, and the arrangement of a main power supply isolating switch, a main circuit breaker, a distribution power supply isolating switch and a leakage protector ensures the electricity utilization safety of equipment;
2. in the data management system, due to the arrangement of the fault processing module, the system actively reminds maintenance personnel and maintains the electric equipment, and construction workers do not need to call the maintenance personnel, so that the operation procedures are saved;
the early warning module is arranged for early warning maintenance personnel according to the working time, the electricity utilization information and the maintenance frequency of the electric equipment, reminding the maintenance personnel to pay attention to the electric equipment or overhauling the electric equipment in advance, reducing the probability of equipment damage and improving the progress of building construction;
3. in the data acquisition system, the video monitoring device transmits the field condition of the electric equipment in real time, so that the working state of the electric equipment can be more clearly known;
the setting of positioner makes things convenient for maintenance personal to look for the electrical equipment's positional information to making statistics of electrical equipment's positional information.
Drawings
Fig. 1 is a schematic diagram of the power distribution system of the present invention.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the present invention easy to understand, the present invention will be further explained below with reference to the following embodiments and the accompanying drawings, but the following embodiments are only the preferred embodiments of the present invention, and not all embodiments are included. Based on the embodiments in the implementation, other embodiments obtained by those skilled in the art without any creative work belong to the protection scope of the present invention.
Specific embodiments of the present invention will be described below with reference to the accompanying drawings.
Example 1
As shown in fig. 1, the system for monitoring temporary power utilization and managing and controlling safety risk in a construction site includes a data acquisition system and a data management system,
the data acquisition system comprises electric equipment and a power distribution system, wherein a circuit of the power distribution system adopts a TN-S zero connection protection system, the power distribution system comprises switch boxes, one electric equipment corresponds to one switch box, two switch boxes correspond to one distribution box, all the distribution boxes correspond to one main distribution box, a first electric power monitoring instrument is installed in each switch box, a second electric power monitoring instrument and a wireless transmission device are installed in each main distribution box, the electric power monitoring instruments measure the current, the voltage, the power factor and the electric energy parameters of the electric equipment, a main power supply isolating switch and a main circuit breaker are arranged in each main distribution box, and a sub power supply isolating switch and a leakage protector are respectively arranged in each switch box and each distribution box,
the power utilization data acquired by the data acquisition system is transmitted through a wireless sensing network;
the data management system comprises a monitoring room, an intelligent gateway and a monitoring computer provided with monitoring software are arranged in the monitoring room, the intelligent gateway reads data of the power monitoring instrument through a wireless network and forwards the data to the monitoring computer through the Ethernet;
after the monitoring software on the monitoring computer reads the data, the data is analyzed, counted, calculated and judged, the power utilization data of each monitoring point is displayed on a human-computer interface, and historical data, reports and curves are generated.
Example 2
As shown in fig. 1, the system for monitoring temporary power utilization and managing and controlling safety risk in a construction site includes a data acquisition system and a data management system,
the data acquisition system comprises electric equipment and a power distribution system, wherein a circuit of the power distribution system adopts a TN-S zero connection protection system, the power distribution system comprises switch boxes, one electric equipment corresponds to one switch box, two switch boxes correspond to one distribution box, all the distribution boxes correspond to one main distribution box, a first electric power monitoring instrument is installed in each switch box, a second electric power monitoring instrument and a wireless transmission device are installed in each main distribution box, the electric power monitoring instruments measure the current, the voltage, the power factor and the electric energy parameters of the electric equipment, a main power supply isolating switch and a main circuit breaker are arranged in each main distribution box, and a sub power supply isolating switch and a leakage protector are respectively arranged in each switch box and each distribution box,
the power utilization data acquired by the data acquisition system is transmitted through a wireless sensing network;
the data management system comprises a monitoring room, an intelligent gateway and a monitoring computer provided with monitoring software are arranged in the monitoring room, the intelligent gateway reads data of the power monitoring instrument through a wireless network and forwards the data to the monitoring computer through the Ethernet;
after the monitoring software on the monitoring computer reads the data, the data is analyzed, counted, calculated and judged, the power utilization data of each monitoring point is displayed on a human-computer interface, and historical data, reports and curves are generated.
The data management system also comprises a fault processing module, monitoring software on the monitoring computer judges the transmitted data, the information of the electric equipment with the fault is transmitted to a mobile phone of a maintenance person through a wireless network, and the maintenance person overhauls the equipment.
The data management system also comprises an early warning module which is used for inputting the basic information of each electric equipment into the monitoring software, setting an early warning threshold value, recording and analyzing the data of the electric equipment by the monitoring software, and transmitting the data to a mobile phone of a maintenance worker through a wireless network early warning signal after the data reaches the early warning value;
the basic information of the electric equipment comprises: the working time, the electricity utilization information and the maintenance times of the electric equipment.
The data acquisition system also comprises a video monitoring device, the video monitoring device comprises a camera arranged on the periphery of the electric equipment, and a picture shot by the camera is transmitted to the monitoring computer by the image transmission equipment through a wireless network; the data acquisition system also comprises a positioning device, wherein the positioning device comprises a GPS positioner arranged on the electric equipment, and the GPS positioner is connected with the monitoring computer.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise contact between the first and second features not directly. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. A temporary electricity utilization supervision and safety risk management and control system for a building construction site comprises a data acquisition system and a data management system,
the method is characterized in that: the data acquisition system comprises electric equipment and a power distribution system, the power distribution system comprises switch boxes, one electric equipment corresponds to one switch box, two switch boxes correspond to one distribution box, all the distribution boxes correspond to one main distribution box, a first electric power monitoring instrument is installed in each switch box, a second electric power monitoring instrument and a wireless transmission device are installed in each main distribution box, the electric power monitoring instruments measure the current, the voltage, the power factor and the electric energy parameters of the electric equipment,
the power utilization data acquired by the data acquisition system is transmitted through a wireless sensing network;
the data management system comprises a monitoring room, wherein an intelligent gateway and a monitoring computer provided with monitoring software are arranged in the monitoring room, the intelligent gateway reads data of the power monitoring instrument through a wireless network and forwards the data to the monitoring computer through an Ethernet;
after the monitoring software on the monitoring computer reads the data, the data is analyzed, counted, calculated and judged, the power utilization data of each monitoring point is displayed on a human-computer interface, and historical data, reports and curves are generated.
2. The system according to claim 1, wherein the system comprises: be provided with total power isolator and master circuit breaker in the main distribution box, the switch box divide and all be provided with in the distribution box and divide power isolator and earth leakage protector.
3. The system according to claim 1, wherein the system comprises: the data management system also comprises a fault processing module, monitoring software on the monitoring computer judges the transmitted data, the information of the electric equipment with the fault is transmitted to a mobile phone of a maintenance worker through a wireless network, and the maintenance worker overhauls the equipment.
4. The system according to claim 1, wherein the system comprises: the data management system also comprises an early warning module which is used for inputting the basic information of each piece of electric equipment into the monitoring software, setting an early warning threshold value, recording and analyzing the data of the electric equipment by the monitoring software, and transmitting the data to a mobile phone of a maintenance worker through a wireless network early warning signal after the data reaches the early warning value;
the basic information of the electric equipment comprises: the working time, the electricity utilization information and the maintenance times of the electric equipment.
5. The system according to claim 1, wherein the system comprises: the data acquisition system also comprises a video monitoring device, wherein the video monitoring device comprises a camera arranged on the periphery of the electric equipment, and a picture shot by the camera is transmitted to the monitoring computer by the image transmission equipment through a wireless network.
6. The system according to claim 1, wherein the system comprises: the data acquisition system also comprises a positioning device, wherein the positioning device comprises a GPS positioner arranged on the electric equipment, and the GPS positioner is connected with the monitoring computer.
7. The system according to claim 1, wherein the system comprises: a TN-S zero connection protection system is adopted in the circuit of the power distribution system.
CN202020890692.2U 2020-05-25 2020-05-25 Building construction site temporary electricity utilization supervision and safety risk management and control system Active CN212063628U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020890692.2U CN212063628U (en) 2020-05-25 2020-05-25 Building construction site temporary electricity utilization supervision and safety risk management and control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020890692.2U CN212063628U (en) 2020-05-25 2020-05-25 Building construction site temporary electricity utilization supervision and safety risk management and control system

Publications (1)

Publication Number Publication Date
CN212063628U true CN212063628U (en) 2020-12-01

Family

ID=73521063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020890692.2U Active CN212063628U (en) 2020-05-25 2020-05-25 Building construction site temporary electricity utilization supervision and safety risk management and control system

Country Status (1)

Country Link
CN (1) CN212063628U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113191635A (en) * 2021-04-30 2021-07-30 中建安装集团南京建设有限公司 Intelligent management system for electric energy of construction engineering site

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113191635A (en) * 2021-04-30 2021-07-30 中建安装集团南京建设有限公司 Intelligent management system for electric energy of construction engineering site
CN113191635B (en) * 2021-04-30 2022-02-25 中建安装集团南京建设有限公司 Intelligent management system for electric energy of construction engineering site

Similar Documents

Publication Publication Date Title
CN111555459A (en) Building construction site temporary electricity utilization supervision and safety risk management and control system
CN106597213B (en) Distributed electric line upkeep operation safeguard protection digitized monitoring system
CN101995583B (en) Wired network-based earthquake real-time monitoring method
CN103679559A (en) Visual grid system and fault identification method thereof
CN109919451B (en) Digital power grid system and method based on real power grid topology analysis and safety knowledge base
CN105242626A (en) Line safety intelligent auxiliary monitoring system
CN106655523A (en) Smart electric service system
CN206431183U (en) Monitoring alarm temporarily drops in line voltage
CN104700226A (en) Equipment and device for monitoring environmental protection measures in transmission and transformation project construction process
CN110031732A (en) A kind of comprehensive on-line monitoring system of cable sheath
CN212063628U (en) Building construction site temporary electricity utilization supervision and safety risk management and control system
CN110244163A (en) Stop send a telegram in reply event hierarchy intelligence analysis method and device in a kind of area
CN203688655U (en) Online monitoring system for monitoring distribution of DC (direct current) in AC (alternating current) network
CN110749786A (en) Transmission line distributed fault diagnosis system suitable for power internet of things
CN108882143A (en) A kind of transmission line of electricity external force damage prevention device and its control method based on the induction of GPS+ field strength
CN111131519A (en) Intelligent operation and maintenance cloud platform for transformer substation
CN113206544B (en) Power grid GIC monitoring device based on transformer high-voltage incoming and outgoing lines
CN114065955A (en) Power cable visual monitoring maintenance management system based on GIS
CN204362217U (en) A kind of power transmission line corridor large-scale moving object limit for height prior-warning device
CN217478903U (en) Deformation monitoring device for tower crane
CN212845583U (en) Intelligent high-voltage cable grounding monitoring system
CN205802820U (en) Safety of tower crane monitoring device based on ZigBee and video following
CN206301021U (en) Power transmission line lightning shielding fault location monitoring system
CN205091588U (en) Supplementary monitoring system of circuit safety intelligence
CN210270219U (en) Outer broken early warning device is prevented to cable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant