CN212054912U - PG9351FA gas turbine unit performance heater water inlet pipe - Google Patents

PG9351FA gas turbine unit performance heater water inlet pipe Download PDF

Info

Publication number
CN212054912U
CN212054912U CN202020517236.3U CN202020517236U CN212054912U CN 212054912 U CN212054912 U CN 212054912U CN 202020517236 U CN202020517236 U CN 202020517236U CN 212054912 U CN212054912 U CN 212054912U
Authority
CN
China
Prior art keywords
performance heater
gas
gas turbine
pg9351fa
turbine unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020517236.3U
Other languages
Chinese (zh)
Inventor
王乾远
章焰
濮鸿威
虞辉
吴韩睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Nanjing Gas Turbine Power Generation Co ltd
Original Assignee
Huaneng Nanjing Gas Turbine Power Generation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Nanjing Gas Turbine Power Generation Co ltd filed Critical Huaneng Nanjing Gas Turbine Power Generation Co ltd
Priority to CN202020517236.3U priority Critical patent/CN212054912U/en
Application granted granted Critical
Publication of CN212054912U publication Critical patent/CN212054912U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model relates to a gas turbine heat exchanger technical field just discloses a PG9351FA gas turbine unit performance heater inlet channel, including the performance heater, the inner wall fixed mounting of performance heater has water side and gas side, the top fixed mounting of performance heater has the export of water side. PG9351FA gas turbine unit performance heater inlet channel, through the hydrophobic pressure of third number province's pipeline and temperature in the supporting waste heat boiler of utilization, connect the pipeline to performance heater entrance, the heating natural gas temperature, heat the natural gas to ideal state, can make PG9351FA gas turbine unit hot state start to 60% the time, the combustion mode switches successfully smoothly, improve gas turbine's efficiency, improve the economic nature, simultaneously pass through screw thread post fixed connection through the fixed block that sets up and takeover, the convenience is dismantled the takeover, it is more convenient to use, simultaneously more convenient maintenance, it is longer to have guaranteed equipment life.

Description

PG9351FA gas turbine unit performance heater water inlet pipe
Technical Field
The utility model relates to a gas turbine heat exchanger technical field specifically is a PG9351FA gas turbine unit performance heater inlet channel.
Background
With the popularization and application of clean energy technology, the proportion of the installation and the operation of the heavy-duty gas turbine in China is more and more. The general company of america (GE), one of the three major main plants, has a large market share in the heavy duty gas turbine market, as the market dominant class F gas turbine, is the active unit with the largest machine capacity in the global scope at present, and for the GE PG9371FB gas turbine, it has three major components, i.e. compressor, combustor, turbine, and the working principle is: the gas compressor is used for heating and boosting the inlet gas, mixing and combusting the inlet gas and the pretreated natural gas in the combustion chamber, and pushing the turbine to do work, so that the process of converting chemical fuel into kinetic energy is realized.
The temperature of the pressure water of the medium-pressure economizer of the matched waste heat boiler is low in the starting process, natural gas cannot be heated to the temperature with higher efficiency, and due to the fact that the temperature of the natural gas is low, when the PG9351FA gas turbine unit is started to 60% in a hot state, the combustion mode switching is prone to failure, so that the safety of the unit is affected, the temperature of the natural gas cannot reach an ideal value, the combustion temperature is also lower than the ideal value during combustion, the power generation efficiency of the gas turbine is reduced, and the economical efficiency is reduced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
To prior art's not enough, the utility model provides a PG9351FA gas turbine unit performance heater inlet channel possesses advantages such as natural gas temperature control is stable, has solved foretell problem.
(II) technical scheme
In order to achieve the above object, the present invention provides the following technical solutions: a PG9351FA gas turbine unit performance heater water inlet pipeline comprises a performance heater, wherein the inner wall of the performance heater is fixedly provided with a water side and a gas side, the top end of the performance heater is fixedly provided with a water side outlet, the top end of the performance heater is provided with a gas side inlet, the bottom end of the performance heater is provided with a gas side outlet, the bottom end of the performance heater is provided with a water side inlet, the bottom end of the gas side outlet is fixedly provided with a fixed block, the top end of the fixed block is fixedly provided with a connecting plate, one end of the connecting plate, far away from the gas side outlet, is fixedly provided with an elastic sheet, one side of the elastic sheet, far away from the connecting plate, is fixedly provided with a partition plate, the left side and the right side of the gas side outlet are fixedly provided with mounting frames, the top end of the mounting, the bottom fixed mounting who takes over has No. three high provinces pipelines, the right side intercommunication of No. three high provinces pipelines has well province to the nature and adds the pipeline, well province to the inner wall fixed mounting that the nature adds the pipeline has the activity fan, the buffering tongue has been seted up to the bottom of taking over, the inner wall fixed mounting that No. three high provinces pipelines has electric valve.
Preferably, the gas-side inlet is located to the right of the water-side outlet, and the water-side inlet is located to the right of the gas-side outlet.
Preferably, the top end of the threaded column penetrates through the connecting pipe and extends to the upper portion of the fixing block to be movably connected with the bolt through threads, and the number of the threaded columns is two.
Preferably, the number of the connecting plates is two, one side of each connecting plate, which is back to the back, is fixedly connected with the inner wall of the gas side outlet, and the opposite side of each connecting plate is fixedly connected with the elastic sheet.
Preferably, the fixed blocks are L-shaped, and the two fixed blocks are movably connected with the mounting frames on the left side and the right side of the air side outlet.
Preferably, a sealing gasket is fixedly mounted between the fixing block on the same side and the opposite side of the top end of the connecting pipe, and the sealing gasket is located on the opposite side of the two threaded columns.
(III) advantageous effects
Compared with the prior art, the utility model provides a PG9351FA gas turbine unit performance heater inlet channel possesses following beneficial effect:
1. this PG9351FA gas turbine unit performance heater inlet channel, through the hydrophobic pressure of No. three high province's pipeline and temperature in utilizing supporting waste heat boiler, connect the pipeline to performance heater entrance, heat the natural gas temperature, heat the natural gas to ideal state, can make PG9351FA gas turbine unit hot state start to 60% the time, the combustion mode switches successfully smoothly, improve gas turbine's efficiency, improve the economic nature, simultaneously pass through screw thread post fixed connection through the fixed block that sets up and takeover, the convenience is dismantled the takeover, it is more convenient to use, simultaneously more convenient maintenance, it is longer to have guaranteed that equipment life.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of the gas side outlet structure of the present invention;
FIG. 3 is an enlarged view of the structure at the position A of the present invention;
fig. 4 is a schematic diagram of the operation of the utility model.
In the figure: 1-performance heater, 2-gas side, 3-water side, 4-water side outlet, 5-gas side inlet, 6-water side inlet, 7-gas side outlet, 8-fixed block, 9-connecting plate, 10-elastic sheet, 11-clapboard, 12-bolt, 13-threaded column, 14-connecting pipe, 15-third high-efficiency pipeline, 16-electric valve, 17-middle-efficiency adding pipeline, 18-movable fan and 19-buffer convex groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a PG9351FA gas turbine unit performance heater water inlet pipe comprises a performance heater 1, a water side 3 and a gas side 2 are fixedly installed on the inner wall of the performance heater 1, a water side outlet 4 is fixedly installed on the top end of the performance heater 1, a gas side inlet 5 is installed on the top end of the performance heater 1, the gas side inlet 5 is located on the right side of the water side outlet 4, a water side inlet 6 is located on the right side of the gas side outlet 7, a gas side outlet 7 is installed on the bottom end of the performance heater 1, a water side inlet 6 is installed on the bottom end of the gas side outlet 7, a fixing block 8 is fixedly installed on the bottom end of the gas side outlet 7, the fixing block 8 is L-shaped, the two fixing blocks 8 are movably connected with a mounting frame on the left side and the right side of the gas side outlet 7, a sealing gasket is fixedly installed between the fixing block 8 on the same, the top end of the fixed block 8 is fixedly provided with two connecting plates 9, the back sides of the two connecting plates 9 are fixedly connected with the inner wall of the gas side outlet 7, the opposite sides of the two connecting plates 9 are fixedly connected with the elastic sheet 10, one end of the connecting plate 9 far away from the gas side outlet 7 is fixedly provided with the elastic sheet 10, one side of the elastic sheet 10 far away from the connecting plate 9 is fixedly provided with a partition 11, the left side and the right side of the gas side outlet 7 are fixedly provided with mounting frames, the top end of each mounting frame is fixedly provided with a bolt 12, the inner wall of each bolt 12 is movably connected with a threaded column 13, the top end of each threaded column 13 penetrates through the connecting pipe 14 and extends to the upper part of the fixed block 8 to be movably connected with the bolt 12 through threads, the number of the threaded columns 13 is two, the bottom end of the fixed block 8 is movably connected with a connecting pipe 14, the bottom end, the inner wall of the Zhongxiaojian pipeline 17 is fixedly provided with a movable fan 18, the bottom end of the connecting pipe 14 is provided with a buffer convex groove 19, and the inner wall of the third Gaoshui pipeline 15 is fixedly provided with an electric valve 16.
The working principle is that the performance heater 1 can transfer the heat of hot fluid to cold fluid, the inside of the performance heater 1 is divided into a gas side 2 and a water side 3, the gas side 2 is provided with a plurality of parallel pipelines penetrating through the water side 3, fins are arranged on the outer sides of the pipelines and are used for prolonging the fluid circulation path of the water side 3, so that the gas side 2 can better absorb the heat of the water side 3, natural gas flows in from a gas side inlet 5 and flows out from a gas side outlet 7, a third high-pressure province pipeline 15 is converged into a buffer convex groove 19 of a middle-pressure province heating pipeline 17, the middle-pressure province heating temperature is improved, under the condition of 30 percent, under the condition of keeping the flow rate of a middle-pressure economizer outlet unchanged, 4.1kg/s and 164 ℃ (the temperature is considered to be reduced in the same amplitude as under the rated condition, when the temperature of the middle-pressure province fluid is improved to be about 10 ℃, the required temperature is 3 high-pressure province heating water 4.2kg/, when the unit is started in a hot state (the unit is not used in a cold state and a warm state), after the high-pressure bypass is started and the high-pressure is higher than the medium-pressure 1-2BAR, the water side 3 of the performance heater 1 is gradually merged into the three high-pressure pipelines 15 to supply hot water so as to improve the inlet temperature of the water supply side 3, when the temperature matching of the gas turbine is completed, the steam turbine is used for steam admission, the hot water from the three high-pressure pipelines 15 is cut off, the hot water of the performance heater 1 is completely used as the outlet water of the medium-pressure economizer, and meanwhile, in order to prevent overpressure, protection when the high-pressure is higher than 4.9Mpa needs to be set, and.
In conclusion, this PG9351FA gas turbine unit performance heater inlet channel, through utilizing the hydrophobic pressure and temperature of No. three province's pipeline 15 in supporting waste heat boiler, connect the pipeline to performance heater 1 entrance, heating natural gas temperature, heat the natural gas to ideal state, can make PG9351FA gas turbine unit hot starting to 60% time, combustion mode switches successfully smoothly, improve gas turbine's efficiency, improve economic nature, pass through the fixed block 8 that sets up and takeover 14 through screw post 13 fixed connection simultaneously, conveniently dismantle takeover 14, and it is more convenient to use, and more convenient maintenance simultaneously, guaranteed that equipment life is longer.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A PG9351FA gas turbine unit performance heater inlet pipe, comprising a performance heater (1), characterized in that: the inner wall of the performance heater (1) is fixedly provided with a water side (3) and a gas side (2), the top end of the performance heater (1) is fixedly provided with a water side outlet (4), the top end of the performance heater (1) is provided with a gas side inlet (5), the bottom end of the performance heater (1) is provided with a gas side outlet (7), the bottom end of the performance heater (1) is provided with a water side inlet (6), the bottom end of the gas side outlet (7) is fixedly provided with a fixed block (8), the top end of the fixed block (8) is fixedly provided with a connecting plate (9), one end of the connecting plate (9) far away from the gas side outlet (7) is fixedly provided with an elastic sheet (10), one side of the elastic sheet (10) far away from the connecting plate (9) is fixedly provided with a partition plate (11), and the left and right sides of, the utility model discloses a pipeline construction method, including the installation frame, the top fixed mounting of mounting bracket has bolt (12), the inner wall swing joint of bolt (12) has threaded column (13), the bottom swing joint of fixed block (8) has takeover (14), the bottom fixed mounting of takeover (14) has No. three high provinces pipeline (15), the right side intercommunication of No. three high provinces pipeline (15) has in to save to the nature and adds pipeline (17), in save to the inner wall fixed mounting that the nature adds pipeline (17) have activity fan (18), buffering tongue (19) have been seted up to the bottom of takeover (14), the inner wall fixed mounting that No. three high provinces pipeline (15) has electric valve (16).
2. The PG9351FA gas turbine unit performance heater water inlet pipe of claim 1, wherein: the gas side inlet (5) is positioned on the right side of the water side outlet (4), and the water side inlet (6) is positioned on the right side of the gas side outlet (7).
3. The PG9351FA gas turbine unit performance heater water inlet pipe of claim 1, wherein: the top end of the threaded column (13) penetrates through the connecting pipe (14) and extends to the upper part of the fixing block (8) to be movably connected with the bolt (12) through threads, and the number of the threaded columns (13) is two.
4. The PG9351FA gas turbine unit performance heater water inlet pipe of claim 1, wherein: the number of the connecting plates (9) is two, one side of each of the two connecting plates (9), which is back to the back, is fixedly connected with the inner wall of the gas side outlet (7), and the opposite side of each of the two connecting plates (9) is fixedly connected with the elastic sheet (10).
5. The PG9351FA gas turbine unit performance heater water inlet pipe of claim 1, wherein: the shape of fixed block (8) is L shape, two fixed block (8) and the mounting bracket swing joint of gas side export (7) left and right sides.
6. The PG9351FA gas turbine unit performance heater water inlet pipe of claim 1, wherein: fixed block (8) and the relative one side in top of takeover (14) of homonymy between fixed mounting have sealed the pad, two sealed pad is located the relative one side of two screw thread posts (13).
CN202020517236.3U 2020-04-09 2020-04-09 PG9351FA gas turbine unit performance heater water inlet pipe Expired - Fee Related CN212054912U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020517236.3U CN212054912U (en) 2020-04-09 2020-04-09 PG9351FA gas turbine unit performance heater water inlet pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020517236.3U CN212054912U (en) 2020-04-09 2020-04-09 PG9351FA gas turbine unit performance heater water inlet pipe

Publications (1)

Publication Number Publication Date
CN212054912U true CN212054912U (en) 2020-12-01

Family

ID=73541432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020517236.3U Expired - Fee Related CN212054912U (en) 2020-04-09 2020-04-09 PG9351FA gas turbine unit performance heater water inlet pipe

Country Status (1)

Country Link
CN (1) CN212054912U (en)

Similar Documents

Publication Publication Date Title
US10968784B2 (en) Flexible coal-fired power generation system and operation method thereof
CN111928219B (en) Distributed combined cooling heating and power system utilizing gas and complementary solar energy
EP3130779A1 (en) Solar thermal and bigcc-integrated hybrid power generation system
CN1811303A (en) Single-effect heat pump/double-effect cooling absorption set and combined heat, electricity and cold supply system
CN107355272B (en) Helium-steam combined cycle combined heat, power and cold supply system and method
CN104832290A (en) Distributed type energy resource flue gas waste heat deep utilization system
CN203594565U (en) Steam-driven driving system for solar thermal power generation large power pump
CN212054912U (en) PG9351FA gas turbine unit performance heater water inlet pipe
CN109854318B (en) Biomass direct-fired cogeneration system and method
CN204704011U (en) A kind of distributed energy fume afterheat deep exploitation system
CN202692214U (en) Novel direct air-cooling unit high-efficiency heating system
CN212006793U (en) Dry-wet combined cooling and steam exhaust direct heat supply efficient condenser system
CN213980964U (en) Cold and heat quantity optimal utilization system between coal press of low-heat-value combined cycle unit
CN115337755A (en) High-efficient CCS carbon entrapment system based on retrieve waste heat and coupling heat supply
CN211701750U (en) Tower type power generation frequency conversion pump set
CN210717768U (en) Heat supply network initial station system utilizing exhaust steam of condenser of thermal power plant
CN208347882U (en) A kind of SOFC fuel cell and internal combustion engine combustion gas distributed couplings system
CN204729187U (en) A kind of distributed energy resource system based on Stirling engine
CN106705020A (en) Self-heat-absorption type heat exchanger combination
CN112483251A (en) Double Rankine cycle waste heat recovery system with water vapor and organic working medium coupled
CN111121481A (en) Dry-wet combined cooling and steam exhaust direct heat supply efficient condenser system and use method thereof
CN215723481U (en) High-efficient type flue gas waste heat recovery system
CN205549977U (en) Carbon dioxide capture system is jointly assisted with geothermal energy to solar energy
CN111969948B (en) Solar energy efficient utilization device
CN209782594U (en) Sewage source heat pump boiler economizer system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201

CF01 Termination of patent right due to non-payment of annual fee