CN212052938U - Digging device for positioning telegraph pole - Google Patents

Digging device for positioning telegraph pole Download PDF

Info

Publication number
CN212052938U
CN212052938U CN202020001750.1U CN202020001750U CN212052938U CN 212052938 U CN212052938 U CN 212052938U CN 202020001750 U CN202020001750 U CN 202020001750U CN 212052938 U CN212052938 U CN 212052938U
Authority
CN
China
Prior art keywords
screw
gear
rod
screw rod
fixedly installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020001750.1U
Other languages
Chinese (zh)
Inventor
吴素琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Wangsheng Electric Power Installation Engineering Co ltd
Original Assignee
Huian Yingchuang Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huian Yingchuang Technology Co Ltd filed Critical Huian Yingchuang Technology Co Ltd
Priority to CN202020001750.1U priority Critical patent/CN212052938U/en
Application granted granted Critical
Publication of CN212052938U publication Critical patent/CN212052938U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to the technical field of digging pits for telegraph poles, and discloses a digging pit device for positioning telegraph poles, which comprises a first gear, a second gear, a first screw rod, a motor, a fixed plate, a threaded sleeve, a drill bit, a second supporting plate, a horizontal correction device and a leveling bubbler, the fixed plate is fixedly arranged on the surface of the first screw rod close to the top, the bottom of the motor is fixedly arranged on the top of the fixed plate, a second gear is fixedly installed on an output shaft of the motor, a first gear is fixedly installed at the top of the first screw rod, the first gear is meshed with the second gear, the surface of the first screw is fixedly connected with the inner ring of the first bearing, the first bearing is fixedly installed on the fixing plate, the first screw rod penetrates through the middle portions of the threaded sleeve and the second supporting plate and is in threaded connection with the threaded sleeve, and a drill bit is fixedly installed at the bottom of the first screw rod. The utility model discloses reached and prevented the problem of drill bit angle skew when boring into soil, reached the effect of position excavation.

Description

Digging device for positioning telegraph pole
Technical Field
The utility model relates to a wire pole is with technical field that digs pit specifically is a wire pole location is with digging device.
Background
When the telegraph pole is installed, the ground is dug at a corresponding position, the telegraph pole is righted in a later stage, the existing device for digging the hole is different in size, namely a drill bit is used for drilling the soil and digging the hole at the corresponding position, but the telegraph pole is righted, the vertical posture of the telegraph pole with the ground is guaranteed, some telegraph poles need to be installed at a place with a higher or uneven slope, the place with the higher or uneven slope is dug, the hole formed due to the fact that the angle of the drill bit digging the hole can be deviated possibly is not vertical to the ground, the working difficulty of the telegraph pole in the later stage is directly influenced, meanwhile, the hole is filled with soil again when the telegraph pole is righted, and manpower and material resources are wasted.
SUMMERY OF THE UTILITY MODEL
The utility model provides a wire pole location is with digging device, this wire pole location is with digging device has solved the problem of drill bit to ground angle of digging a pit skew.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a pit digging device for positioning a telegraph pole comprises a first gear, a second gear, a first screw, a motor, a fixing plate, a screw sleeve, a drill bit, a second supporting plate, a horizontal correcting device and a leveling bubble device, wherein the fixing plate is fixedly arranged on the surface, close to the top, of the first screw;
the surface of the first screw is fixedly connected with an inner ring of a first bearing, the first bearing is fixedly arranged on a fixing plate, the first screws penetrate through the middle parts of the threaded sleeve and the second supporting plate and are in threaded connection with the threaded sleeve, and a drill bit is fixedly arranged at the bottom of the first screw;
horizontal orthotic devices includes, first backup pad, second bearing, carousel and second screw rod, the top and the swivel nut fixed connection of first backup pad, the bottom groove fixed mounting of first backup pad has the second bearing, the top of second screw rod and the inner ring fixed connection of second bearing, the fixed surface that the second screw rod is close to the top installs the carousel, the thread groove threaded connection that the bottom of second screw rod and the top of second backup pad were seted up.
Preferably, the top of the first supporting plate is fixedly provided with a leveling bubble device, and the leveling bubble device is the same as a central bubble on the measuring instrument.
Preferably, the bottom of one side of the second supporting plate is fixedly connected with the top of the metal rod, the bottom of the metal rod is located in the sleeve rod, a thread groove is formed in one side of the sleeve rod, the thread groove in the sleeve rod is in threaded connection with a screw, and the metal rod is movably connected with the sleeve rod through the screw.
Preferably, a pedal is fixedly installed at the bottom of one side of the loop bar, and a fixing nail is fixedly installed at the bottom of the loop bar.
Preferably, one end of the screw is provided with a rubber pad.
Preferably, the sum of the lengths of the first screw and the drill is three times the sum of the lengths of the metal rod and the sleeve rod.
Borrow by above-mentioned technical scheme, the utility model provides a wire pole location is with digging device. The method at least has the following beneficial effects:
(1) the digging device for positioning the telegraph pole is provided with a fixing nail through the bottom of the loop bar, the bottom of the loop bar is provided with a fixed pin which is inserted into the soil through manpower, the device is fixed, the second supporting plate is in a visual horizontal state through the metal rod adjusted by the elastic screw, and then the second screw rod on the horizontal correction device is passed through, the air bubbles in the leveling bubble device on the first supporting plate are centered by adjusting the rotary disc on the second screw rod, the first screw rod in the screw sleeve is in a posture vertical to the ground, if the bubbles of the leveling bubble device are not centered through the second screw rod, the adjustment is carried out again, through elasticity screw adjustment metal pole, let flattening bubbler in the first backup pad be close to the position placed in the middle, adjust the carousel on the second screw rod once more and let flattening bubbler's in the first backup pad bubble finally placed in the middle, reached the problem that prevents the drill bit angle skew when boring into soil.
(2) This wire pole is digging device for location through starter motor, lets the gear on the motor rotate, drives gear one and rotates to let first screw rod rotate, first screw rod rotates, drives the drill bit rotation of first screw rod bottom, carries out perpendicular digging to ground under the spacing of swivel nut, has reached the effect that the position dug the pit.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the present invention;
in the figure: the device comprises a first gear 1, a second gear 2, a motor 3, a first screw rod 4, a first bearing 5, a fixing plate 6 and a threaded sleeve 7;
8 horizontal correction devices, 801 first supporting plates, 802 second bearings, 803 turntables and 804 second screw rods;
9 second support plate, 10 metal rod, 11 screw, 12 loop bar, 13 drill bit, 14 leveling bubble machine.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, the present invention provides a technical solution: a pit digging device for positioning a telegraph pole comprises a first gear 1, a second gear 2, a first screw rod 4, a motor 3, a fixing plate 6, a threaded sleeve 7, a drill bit 13, a second supporting plate 9, a horizontal correcting device 8 and a leveling bubble device 14, wherein the fixing plate 6 is fixedly arranged on the surface, close to the top, of the first screw rod 4, the bottom of the motor 3 is fixedly arranged on the top of the fixing plate 6, the second gear 2 is fixedly arranged on an output shaft on the motor 3, the first gear 1 is fixedly arranged on the top of the first screw rod 4, and the first gear 1 is meshed with the second gear 2;
the surface of a first screw rod 4 is fixedly connected with an inner ring of the first bearing 5, the first bearing 5 is fixedly installed on a fixing plate 6, the first screw rods 4 penetrate through the middles of a threaded sleeve 7 and a second supporting plate 9 and are in threaded connection with the threaded sleeve 7, the bottom of one side of the second supporting plate 9 is fixedly connected with the top of a metal rod 10, the bottom of the metal rod 10 is located in the sleeve 12, one side of the sleeve 12 is provided with a threaded groove, the threaded groove in the sleeve 12 is in threaded connection with a screw 11, the metal rod 10 is movably connected with the sleeve 12 through the screw 11, the bottom of one side of the sleeve 12 is fixedly provided with a pedal, one end of the screw 11 is provided with a rubber pad, the friction force between the metal rod 10 and the sleeve 12 is increased, the device is supported more firmly, the bottom of the sleeve 12 is fixedly provided with a fixing nail, and the bottom of the first screw rod 4 is fixedly provided with;
the bottom of the loop bar 12 is provided with a fixing nail, the bottom of the loop bar 12 is provided with a fixing nail which is inserted into the soil through manpower, the device is fixed, the metal rod 10 is adjusted through the tightening screw 11, the second supporting plate 9 is in a visual horizontal state, and then the second screw 804 on the horizontal correcting device 8 is passed, the air bubbles in the leveling bubble device 14 on the first supporting plate 801 are centered by adjusting the rotary disc 803 on the second screw 804, the first screw rod 4 in the screw sleeve 7 is in a posture vertical to the ground, if the air bubbles of the leveling air bubble device 14 are not centered through the second screw rod 804, the air bubbles are adjusted again, the metal rod 10 is adjusted through the tightening screw 11, the leveling bubble device 14 on the first supporting plate 801 is close to the centered position, the rotating disc 803 on the second screw 804 is adjusted again, the bubbles of the leveling bubble device 14 on the first supporting plate 801 are finally centered, and the problem of preventing the drill bit from being angularly shifted when the drill bit drills into soil is solved.
The horizontal correction device 8 comprises a first support plate 801, a second bearing 802, a rotary table 803 and a second screw 804, wherein the top of the first support plate 801 is fixedly connected with a threaded sleeve 7, the bottom groove of the first support plate 801 is fixedly provided with the second bearing 802, the top of the second screw 804 is fixedly connected with an inner ring of the second bearing 802, the surface of the second screw 804 close to the top is fixedly provided with the rotary table 803, the bottom of the second screw 804 is in threaded connection with a threaded groove formed in the top of a second support plate 9, the top of the first support plate 801 is fixedly provided with a leveling bubble device 14, the leveling bubble device 14 is the same as a central bubble on a measuring instrument, the vision of a person cannot correctly judge whether an article reaches the true horizontal effect, and the true horizontal effect can be reached through external adjustment by the installation of the leveling bubble device 14;
through starter motor 3, let gear 2 on the motor 3 rotate, drive gear 1 and rotate to let first screw rod 4 rotate, first screw rod 4 rotates, drives the drill bit of first screw rod 4 bottom and rotates, carries out perpendicular excavation to ground under the spacing of swivel nut 7, has reached the effect that the position excavated the pit.
The sum of the lengths of the first screw rod 4 and the drill bit 13 is three times of the sum of the lengths of the metal rod 10 and the sleeve rod 12, and the main function is to enable the drill bit 13 to smoothly drill into soil so as to achieve the purpose of digging a pit 13 by the drill bit.
When in use, the device is firstly horizontally corrected, a fixing nail is arranged at the bottom of the loop bar 12, the bottom of the loop bar 12 is fixed by manpower, the device is fixed, the metal bar 10 is adjusted by the tightening screw 11, the second supporting plate 9 is in a visual horizontal state, and then the second screw 804 on the horizontal correction device 8 is passed, the air bubbles in the leveling bubble device 14 on the first supporting plate 801 are centered by adjusting the rotary disc 803 on the second screw 804, the first screw rod 4 in the screw sleeve 7 is in a posture vertical to the ground, if the air bubbles of the leveling air bubble device 14 are not centered through the second screw rod 804, the air bubbles are adjusted again, adjusting the metal rod 10 through the tightening screw 11 to enable the leveling bubble device 14 on the first supporting plate 801 to be close to the centered position, and adjusting the rotary table 803 on the second screw 804 again to enable the bubbles of the leveling bubble device 14 on the first supporting plate 801 to be finally centered;
when digging a pit, the gear 2 on the motor 3 is rotated to drive the gear 1 to rotate by starting the motor 3, so that the first screw rod 4 is rotated, the first screw rod 4 is rotated to drive the drill bit 13 at the bottom of the first screw rod 4 to rotate, and the pit is vertically dug on the ground under the limit of the screw sleeve 7. The whole device is operated.
It is right above that the utility model provides a wire pole location is with digging device introduces in detail. The utility model discloses it is right to have used specific individual example the utility model discloses a principle and implementation have been elucidated, and the explanation of above embodiment is only used for helping understanding the utility model discloses a method and core thought thereof. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.

Claims (6)

1. The utility model provides a wire pole location is with digging device, includes gear (1), gear two (2), first screw rod (4), motor (3), fixed plate (6), swivel nut (7), drill bit (13) and second backup pad (9) its characterized in that: the automatic leveling device is characterized by further comprising a horizontal correcting device (8) and a leveling bubble device (14), the fixing plate (6) is fixedly installed on the surface, close to the top, of the first screw (4), the bottom of the motor (3) is fixedly installed on the top of the fixing plate (6), a second gear (2) is fixedly installed on an output shaft of the motor (3), a first gear (1) is fixedly installed on the top of the first screw (4), and the first gear (1) is meshed with the second gear (2);
the surface of the first screw (4) is fixedly connected with an inner ring of the first bearing (5), the first bearing (5) is fixedly installed on the fixing plate (6), the first screws (4) penetrate through the middle parts of the threaded sleeves (7) and the second supporting plate (9) and are in threaded connection with the threaded sleeves (7), and a drill bit (13) is fixedly installed at the bottom of the first screw (4);
horizontal orthotic devices (8) include, first backup pad (801), second bearing (802), carousel (803) and second screw rod (804), the top and swivel nut (7) fixed connection of first backup pad (801), the bottom groove fixed mounting of first backup pad (801) has second bearing (802), the top of second screw rod (804) and the inner ring fixed connection of second bearing (802), surface fixed mounting that second screw rod (804) are close to the top has carousel (803), the thread groove threaded connection that the bottom of second screw rod (804) and the top of second backup pad (9) were seted up.
2. The utility pole positioning apparatus of claim 1, wherein: the top of the first supporting plate (801) is fixedly provided with a leveling bubble device (14), and the leveling bubble device (14) is the same as a central bubble on the measuring instrument.
3. The utility pole positioning apparatus of claim 1, wherein: the bottom of one side of the second supporting plate (9) is fixedly connected with the top of the metal rod (10), the bottom of the metal rod (10) is located in the sleeve rod (12), a thread groove is formed in one side of the sleeve rod (12), the thread groove in the sleeve rod (12) is in threaded connection with the screw (11), and the metal rod (10) is movably connected with the sleeve rod (12) through the screw (11).
4. The utility pole positioning apparatus of claim 3, wherein: the bottom of one side of the loop bar (12) is fixedly provided with a pedal, and the bottom of the loop bar (12) is fixedly provided with a fixing nail.
5. The utility pole positioning apparatus of claim 3, wherein: and one end of the screw (11) is provided with a rubber pad.
6. The utility pole positioning apparatus of claim 5, wherein: the sum of the lengths of the first screw (4) and the drill bit (13) is three times that of the metal rod (10) and the sleeve rod (12).
CN202020001750.1U 2020-01-01 2020-01-01 Digging device for positioning telegraph pole Active CN212052938U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020001750.1U CN212052938U (en) 2020-01-01 2020-01-01 Digging device for positioning telegraph pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020001750.1U CN212052938U (en) 2020-01-01 2020-01-01 Digging device for positioning telegraph pole

Publications (1)

Publication Number Publication Date
CN212052938U true CN212052938U (en) 2020-12-01

Family

ID=73535965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020001750.1U Active CN212052938U (en) 2020-01-01 2020-01-01 Digging device for positioning telegraph pole

Country Status (1)

Country Link
CN (1) CN212052938U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152977A (en) * 2021-04-16 2021-07-23 国网山东省电力公司枣庄供电公司 Electric power construction is with supplementary construction equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152977A (en) * 2021-04-16 2021-07-23 国网山东省电力公司枣庄供电公司 Electric power construction is with supplementary construction equipment

Similar Documents

Publication Publication Date Title
CN109723271B (en) Rod burying device
CN212052938U (en) Digging device for positioning telegraph pole
CN205510758U (en) Seedling planting digging device
CN108797580B (en) Height-adjustable building pile
CN108266180B (en) Use method of three-axis wireless inclinometer calibration rack
CN216898874U (en) Detection device for detecting sedimentation height
CN215929105U (en) Mapping and positioning device for engineering mapping
CN115573660A (en) Deviation-preventing positioning frame for rock and soil exploration drilling and use method thereof
CN108007715A (en) The closed soil sampling apparatus of one kind drilling
CN213597887U (en) Drilling rig for geotechnical engineering investigation
CN211477121U (en) Shock-proof type total powerstation for electric power construction site
CN215290143U (en) Deep foundation pit supporting earth-retaining water-resisting device
CN221925122U (en) Tunnel construction data mapping device
CN221922934U (en) Building survey and drawing frame for construction
CN218349494U (en) Angle adjusting device of land measuring instrument
CN219343164U (en) Bored pile reinforcing apparatus
CN218863768U (en) Stable bracket
CN215810579U (en) Water conservancy is supervised with filling up thickness detection device
CN215632932U (en) Rotating base for petroleum logging instrument
CN219137794U (en) Building foundation pit monitoring device
CN218119134U (en) Portable road and bridge foundation pit detection device who transports
CN110607816A (en) Mechanical arm of earth boring machine
CN212083053U (en) A support for anchor rod is drawn and is detected experiment
CN221466243U (en) Display device for engineering management
CN220704532U (en) Device for deep earthwork excavation of foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A pit digging device for pole positioning

Effective date of registration: 20201222

Granted publication date: 20201201

Pledgee: Zhuang Jingjiang

Pledgor: Huian Yingchuang Technology Co.,Ltd.

Registration number: Y2020980009707

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210602

Granted publication date: 20201201

Pledgee: Zhuang Jingjiang

Pledgor: Huian Yingchuang Technology Co.,Ltd.

Registration number: Y2020980009707

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230614

Address after: 200080 7th floor, No.137 Haining Road, Hongkou District, Shanghai

Patentee after: Shanghai Wangsheng Electric Power Installation Engineering Co.,Ltd.

Address before: 362000 Room 201, No. 58-2, Yangkeng Village, Luoyang Town, Hui'an County, Quanzhou City, Fujian Province

Patentee before: Huian Yingchuang Technology Co.,Ltd.