CN220704532U - Device for deep earthwork excavation of foundation pit - Google Patents
Device for deep earthwork excavation of foundation pit Download PDFInfo
- Publication number
- CN220704532U CN220704532U CN202322053092.7U CN202322053092U CN220704532U CN 220704532 U CN220704532 U CN 220704532U CN 202322053092 U CN202322053092 U CN 202322053092U CN 220704532 U CN220704532 U CN 220704532U
- Authority
- CN
- China
- Prior art keywords
- support frame
- deep
- mounting
- excavation
- mounting frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
Abstract
本实用新型涉及基坑装置技术领域,具体为一种用于基坑深层土方开挖的装置,包括:支撑架;通过在支撑架的一端连接有液压装置,可以调节支撑架的位置,电动转盘转动时使得液压装置及支撑架转动,进而可以同时对附近的基坑进行深度开挖,使得整体更加灵活,通过在安装架的两端对称安装螺母座,升降电机带动丝杆转动时,安装架可以随螺母座稳定地升降,通过将安装架一端的导向筒套接在导杆外部,使得安装架不易倾斜抖动,并且开挖时通过定位板的固定作用,可以使得整体更加稳定,通过在开采口的一侧安装深度测量仪,通过轴销将深度测量仪固定在安装座内,便于对深度测量仪进行拆装,而且可以测得实时的开挖深度,精确度高。
The utility model relates to the technical field of foundation pit devices, specifically a device for deep earth excavation in foundation pits, which includes: a support frame; by connecting a hydraulic device to one end of the support frame, the position of the support frame can be adjusted, and the electric turntable When rotating, the hydraulic device and the support frame rotate, and the nearby foundation pit can be excavated at the same time, making the whole body more flexible. By installing nut seats symmetrically on both ends of the mounting frame, when the lifting motor drives the screw rod to rotate, the mounting frame It can rise and fall stably with the nut seat. By connecting the guide barrel at one end of the mounting frame to the outside of the guide rod, the mounting frame is less likely to tilt and shake. During excavation, the fixing effect of the positioning plate can make the whole body more stable. A depth measuring instrument is installed on one side of the mouth, and the depth measuring instrument is fixed in the mounting base through a shaft pin, which facilitates the disassembly and assembly of the depth measuring instrument, and can measure the real-time excavation depth with high accuracy.
Description
技术领域Technical Field
本实用新型涉及用于基坑装置技术领域,具体为一种用于基坑深层土方开挖的装置。The utility model relates to the technical field of devices for foundation pits, specifically a device for deep earth excavation of foundation pits.
背景技术Background technique
基坑是在基础设计位置按基底标高和基础平面尺寸所开挖的土坑,开挖前应根据地质水文资料,结合现场附近建筑物情况,决定开挖方案,并作好防水排水工作。The foundation pit is an earth pit excavated at the foundation design location according to the base elevation and foundation plane dimensions. Before excavation, the excavation plan should be determined based on geological and hydrological data and the conditions of nearby buildings on site, and waterproofing and drainage work should be done.
现有技术中,在施工现场有着大量的基坑,每一个基坑都需要进行深层开挖作业,开挖的附近需要进行对开挖装置的固定,从而保证开挖作业的稳定进行。In the existing technology, there are a large number of foundation pits at the construction site, and each foundation pit requires deep excavation operations. The excavation device needs to be fixed near the excavation to ensure the stable progress of the excavation operations.
但是,现有的开挖装置不够灵活,若更换基坑,则需要进行大量的搬运工作,消耗大量的人力物力,无法同时对附近的基坑进行深度开挖,且每次进行深度开挖时稳定性差,作业人员通过开挖装置的下降距离粗略判断其深度,精确度低。However, the existing excavation equipment is not flexible enough. If the foundation pit is replaced, a lot of transportation work is required, which consumes a lot of manpower and material resources. It is impossible to carry out deep excavation on nearby foundation pits at the same time. In addition, the stability is poor during each deep excavation. The operators roughly judge the depth by the descending distance of the excavation device, which has low accuracy.
实用新型内容Utility model content
本实用新型的目的在于提供一种用于基坑深层土方开挖的装置,以解决上述背景技术中提出的问题。The purpose of this utility model is to provide a device for deep earth excavation of foundation pits to solve the problems raised in the above background technology.
为实现上述目的,本实用新型提供如下技术方案:一种用于基坑深层土方开挖的装置,包括:支撑架,支撑架的上端固定安装有顶板,顶板的下方设置有安装架,安装架的一端底部安装有螺旋钻,安装架的另一端底部对称且固定安装有导向筒;In order to achieve the above purpose, the present utility model provides the following technical solution: a device for deep earth excavation of foundation pits, including: a support frame, a top plate is fixedly installed on the upper end of the support frame, and an installation frame is provided below the top plate. An auger is installed at the bottom of one end of the mounting bracket, and a guide barrel is symmetrically and fixedly installed at the bottom of the other end of the mounting bracket;
所述安装架的两侧对称且固定连接有螺母座,两个螺母座的内部均连接有丝杆,两个丝杆的上端均贯穿顶板并连接有升降电机;Nut seats are symmetrically and fixedly connected to both sides of the mounting frame, and screw rods are connected to the interiors of the two nut seats. The upper ends of the two screw rods penetrate the top plate and are connected to lift motors;
所述支撑架靠近螺旋钻的一端底壁固定连接有定位板并开设有开采口,支撑架的另一端固定连接有液压装置,液压装置的一端底部固定安装有电动转盘,液压装置的上端设置有控制台。The bottom wall of one end of the support frame close to the spiral drill is fixedly connected with a positioning plate and has a mining opening, the other end of the support frame is fixedly connected with a hydraulic device, an electric turntable is fixedly installed at the bottom of one end of the hydraulic device, and a control console is arranged at the upper end of the hydraulic device.
优选的,所述安装架的上端安装有开挖电机,螺旋钻的上端贯穿安装架并和开挖电机的转动轴固定连接。Preferably, an excavation motor is installed on the upper end of the mounting frame, and the upper end of the auger penetrates the mounting frame and is fixedly connected to the rotating shaft of the excavation motor.
优选的,两个所述导向筒的内部均滑动连接有导杆,两个导杆的两端均固定安装在支撑架上。Preferably, guide rods are slidably connected inside the two guide cylinders, and both ends of the two guide rods are fixedly mounted on the support frame.
优选的,两个所述螺母座均螺纹套接在丝杆上,且两个丝杆的下端均转动连接有固定板,固定板的一端侧壁和支撑架固定连接。Preferably, the two nut seats are threadedly connected to the screw rods, and the lower ends of the two screw rods are rotatably connected to fixed plates, and one end side wall of the fixed plates is fixedly connected to the support frame.
优选的,所述导杆的底端外部套接有下缓冲弹簧,下缓冲弹簧的底端和支撑架固定连接,下缓冲弹簧的上端固定连接有压环,压环滑动安装在导杆的表面。Preferably, a lower buffer spring is connected to the bottom end of the guide rod. The bottom end of the lower buffer spring is fixedly connected to the support frame. The upper end of the lower buffer spring is fixedly connected to a pressure ring. The pressure ring is slidably installed on the surface of the guide rod. .
优选的,所述安装架靠近两个导杆的上端均固定安装有上缓冲弹簧,且两个上缓冲弹簧均套接在导杆的外部。Preferably, upper buffer springs are fixedly mounted on the mounting frame close to the upper ends of the two guide rods, and the two upper buffer springs are sleeved on the outside of the guide rods.
优选的,所述支撑架靠近开采口的底壁上端固定安装有安装座,安装座的上端连接有深度检测仪,且安装座的侧壁安装有轴销。Preferably, a mounting seat is fixedly mounted on the upper end of the bottom wall of the support frame close to the mining opening, a depth detector is connected to the upper end of the mounting seat, and an axle pin is installed on the side wall of the mounting seat.
优选的,所述深度检测仪的底端侧壁开设有固定槽,轴销的一端贯穿安装座并滑动插入固定槽中,且深度检测仪和控制台电性连接。Preferably, a fixing groove is provided on the bottom side wall of the depth detector, one end of the shaft pin passes through the mounting base and is slidably inserted into the fixing groove, and the depth detector is electrically connected to the console.
优选的,所述轴销的外部设有伸拉弹簧,伸拉弹簧的一端和安装座的侧壁固定连接,伸拉弹簧的另一端和轴销远离安装座的一端固定连接。Preferably, an extension spring is provided on the outside of the shaft pin, one end of the extension spring is fixedly connected to the side wall of the mounting base, and the other end of the extension spring is fixedly connected to an end of the shaft pin away from the mounting base.
与现有技术相比,本实用新型的有益效果是:Compared with the existing technology, the beneficial effects of this utility model are:
本实用新型通过在支撑架的一端连接有液压装置,可以调节支撑架的位置,电动转盘转动时使得液压装置及支撑架转动,进而可以同时对附近的基坑进行深度开挖,使得整体更加灵活,通过在安装架的两端对称安装螺母座,升降电机带动丝杆转动时,安装架可以随螺母座稳定地升降,通过将安装架一端的导向筒套接在导杆外部,使得安装架不易倾斜抖动,并且开挖时通过定位板的固定作用,可以使得整体更加稳定,通过在开采口的一侧安装深度测量仪,通过轴销将深度测量仪固定在安装座内,便于对深度测量仪进行拆装,而且可以测得实时的开挖深度,精确度高。By connecting a hydraulic device to one end of the support frame, the utility model can adjust the position of the support frame. When the electric turntable rotates, the hydraulic device and the support frame rotate, and the nearby foundation pit can be deeply excavated at the same time, making the whole body more flexible. , by installing nut seats symmetrically at both ends of the mounting frame, when the lifting motor drives the screw rod to rotate, the mounting frame can rise and fall stably with the nut seats, and by connecting the guide barrel at one end of the mounting frame to the outside of the guide rod, the mounting frame is not easily Tilt and shake, and the fixation of the positioning plate during excavation can make the whole body more stable. By installing the depth measuring instrument on one side of the mining opening, the depth measuring instrument is fixed in the mounting base through the shaft pin, which facilitates the depth measuring instrument. It can be disassembled and assembled, and the real-time excavation depth can be measured with high accuracy.
附图说明Description of drawings
图1为本实用新型整体结构立体示意图;Figure 1 is a three-dimensional schematic diagram of the overall structure of the utility model;
图2为本实用新型整体结构侧面示意图;Figure 2 is a schematic side view of the overall structure of the utility model;
图3为本实用新型局部结构爆炸示意图;Figure 3 is an explosion schematic diagram of a partial structure of the utility model;
图4为本实用新型局部结构立体示意图。Figure 4 is a schematic three-dimensional view of the partial structure of the utility model.
图中:1、支撑架;2、顶板;3、开采口;4、安装架;5、螺母座;6、丝杆;7、升降电机;8、导向筒;9、导杆;10、开挖电机;11、螺旋钻;12、安装座;13、深度检测仪;14、固定槽;15、轴销;16、伸拉弹簧;17、定位板;18、液压装置;19、电动转盘;20、控制台;21、上缓冲弹簧;22、下缓冲弹簧;23、压环;24、固定板。In the picture: 1. Support frame; 2. Roof plate; 3. Mining opening; 4. Installation frame; 5. Nut seat; 6. Screw rod; 7. Lifting motor; 8. Guide cylinder; 9. Guide rod; 10. Opening Digging motor; 11. Auger; 12. Mounting seat; 13. Depth detector; 14. Fixed slot; 15. Axis pin; 16. Extension spring; 17. Positioning plate; 18. Hydraulic device; 19. Electric turntable; 20. Console; 21. Upper buffer spring; 22. Lower buffer spring; 23. Pressure ring; 24. Fixed plate.
具体实施方式Detailed ways
为了使本实用新型的目的、技术方案进行清楚、完整地描述,及优点更加清楚明白,以下结合附图对本实用新型实施例进行进一步详细说明。应当理解,此处所描述的具体实施例是本实用新型一部分实施例,而不是全部的实施例,仅仅用以解释本实用新型实施例,并不用于限定本实用新型实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。In order to clearly and completely describe the purpose and technical solution of the present utility model, and make the advantages more clear, the embodiments of the present utility model will be further described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described here are part of the embodiments of the present invention, rather than all embodiments. They are only used to explain the embodiments of the present invention and are not used to limit the embodiments of the present invention. Those of ordinary skill in the art All other embodiments obtained without creative efforts belong to the scope of protection of the present utility model.
在本实用新型的描述中,需要说明的是,术语“中心”、“中”、“上”、“下”、“左”、“右”、“内”、“外”、“顶”、“底”、“侧”、“竖直”、“水平”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“一”、“第一”、“第二”、“第三”、“第四”、“第五”、“第六”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present utility model, it should be noted that the terms "center", "middle", "upper", "lower", "left", "right", "inner", "outer", "top", The orientations or positional relationships indicated by "bottom", "side", "vertical", "horizontal", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than instructions. Or it is implied that the device or component mentioned must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be construed as a limitation of the present invention. In addition, the terms "a", "first", "second", "third", "fourth", "fifth" and "sixth" are used for descriptive purposes only and are not to be understood as indicating or implying relative importance.
在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should be noted that, unless otherwise clearly stated and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense. For example, it can be a fixed connection or a removable connection. Detachable connection, or integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be an internal connection between two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.
出于简明和说明的目的,实施例的原理主要通过参考例子来描述。在以下描述中,很多具体细节被提出用以提供对实施例的彻底理解。然而明显的是,对于本领域普通技术人员,这些实施例在实践中可以不限于这些具体细节。在一些实例中,没有详细地描述公知方法和结构,以避免无必要地使这些实施例变得难以理解。另外,所有实施例可以互相结合使用。For purposes of simplicity and explanation, the principles of the embodiments are described primarily by reference to examples. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the embodiments. However, it will be apparent to those of ordinary skill in the art that these embodiments may be practiced without being limited to these specific details. In some instances, well-known methods and structures are not described in detail to avoid unnecessarily obscuring the embodiments. Additionally, all embodiments can be used in combination with each other.
请参阅图1至图4,本实用新型提供一种技术方案:一种用于基坑深层土方开挖的装置,包括:支撑架1,支撑架1的上端固定安装有顶板2,顶板2的下方设置有安装架4,安装架4的一端底部安装有螺旋钻11,安装架4的另一端底部对称且固定安装有导向筒8;安装架4的上端安装有开挖电机10,螺旋钻11的上端贯穿安装架4并和开挖电机10的转动轴固定连接。两个导向筒8的内部均滑动连接有导杆9,两个导杆9的两端均固定安装在支撑架1上。导杆9的底端外部套接有下缓冲弹簧22,下缓冲弹簧22的底端和支撑架1固定连接,下缓冲弹簧22的上端固定连接有压环23,压环23滑动安装在导杆9的表面。安装架4靠近两个导杆9的上端均固定安装有上缓冲弹簧21,且两个上缓冲弹簧21均套接在导杆9的外部。Please refer to Figures 1 to 4. The present utility model provides a technical solution: a device for deep earth excavation in foundation pits, including: a support frame 1. A roof plate 2 is fixedly installed on the upper end of the support frame 1. The top plate 2 is An installation frame 4 is provided below. An auger 11 is installed at the bottom of one end of the installation frame 4. A guide tube 8 is symmetrically and fixedly installed at the bottom of the other end of the installation frame 4; an excavation motor 10 and an auger 11 are installed at the upper end of the installation frame 4. The upper end passes through the mounting frame 4 and is fixedly connected with the rotating shaft of the excavation motor 10. Guide rods 9 are slidingly connected inside the two guide cylinders 8 , and both ends of the two guide rods 9 are fixedly mounted on the support frame 1 . The bottom end of the guide rod 9 is sleeved with a lower buffer spring 22. The bottom end of the lower buffer spring 22 is fixedly connected to the support frame 1. The upper end of the lower buffer spring 22 is fixedly connected to a pressure ring 23. The pressure ring 23 is slidably installed on the guide rod. 9 surface. The upper ends of the mounting bracket 4 close to the two guide rods 9 are fixedly installed with upper buffer springs 21 , and the two upper buffer springs 21 are sleeved on the outside of the guide rods 9 .
安装架4的两侧对称且固定连接有螺母座5,两个螺母座5的内部均连接有丝杆6,两个丝杆6的上端均贯穿顶板2并连接有升降电机7;两个螺母座5均螺纹套接在丝杆6上,且两个丝杆6的下端均转动连接有固定板24,固定板24的一端侧壁和支撑架1固定连接。There are nut seats 5 symmetrically and fixedly connected to both sides of the mounting frame 4. The two nut seats 5 are connected with screw rods 6 inside. The upper ends of the two screw rods 6 both penetrate the top plate 2 and are connected to the lifting motor 7; the two nuts The seats 5 are threadedly connected to the screw rods 6, and the lower ends of the two screw rods 6 are rotatably connected to a fixing plate 24. One end side wall of the fixing plate 24 is fixedly connected to the support frame 1.
支撑架1靠近螺旋钻11的一端底壁固定连接有定位板17并开设有开采口3,支撑架1的另一端固定连接有液压装置18,液压装置18的一端底部固定安装有电动转盘19,液压装置18的上端设置有控制台20。支撑架1靠近开采口3的底壁上端固定安装有安装座12,安装座12的上端连接有深度检测仪13,且安装座12的侧壁安装有轴销15。深度检测仪13的底端侧壁开设有固定槽14,轴销15的一端贯穿安装座12并滑动插入固定槽14中,且深度检测仪13和控制台20电性连接。轴销15的外部设有伸拉弹簧16,伸拉弹簧16的一端和安装座12的侧壁固定连接,伸拉弹簧16的另一端和轴销15远离安装座12的一端固定连接。The bottom wall of one end of the support frame 1 close to the auger 11 is fixedly connected with a positioning plate 17 and has a mining opening 3. The other end of the support frame 1 is fixedly connected with a hydraulic device 18. An electric turntable 19 is fixedly installed at the bottom of one end of the hydraulic device 18. A console 20 is provided at the upper end of the hydraulic device 18 . A mounting base 12 is fixedly installed on the upper end of the bottom wall of the support frame 1 close to the mining opening 3. A depth detector 13 is connected to the upper end of the mounting base 12, and a shaft pin 15 is installed on the side wall of the mounting base 12. A fixing slot 14 is formed on the bottom side wall of the depth detector 13 . One end of the shaft pin 15 penetrates the mounting base 12 and is slidably inserted into the fixing slot 14 . The depth detector 13 is electrically connected to the console 20 . An extension spring 16 is provided on the outside of the shaft pin 15 . One end of the extension spring 16 is fixedly connected to the side wall of the mounting base 12 , and the other end of the extension spring 16 is fixedly connected to an end of the shaft pin 15 away from the mounting base 12 .
本装置工作时,通过在支撑架1的一端连接有液压装置18,可以调节支撑架1的位置,电动转盘19转动时使得液压装置18及支撑架1转动,进而可以同时对附近的基坑进行深度开挖,使得整体更加灵活,通过在安装架4的两端对称安装螺母座5,升降电机7带动丝杆6转动时,安装架4可以随螺母座5稳定地升降,通过将导向筒8滑动套接在导杆9外部,使得安装架4不易倾斜抖动,并且开挖时通过定位板17的固定作用,可以使得整体更加稳定,安装架4升降时,通过上缓冲弹簧22和下缓冲弹簧21可以避免安装架4和支撑架1发生碰撞,以免影响整体的稳固性,通过在开采口3的一侧安装深度测量仪13,通过抽拉轴销15可以对深度测量仪13进行固定和拆卸,而且便于测得实时的开挖深度,并通过控制台20显示给作业人员,精确度高。When the device is working, the position of the support frame 1 can be adjusted by connecting the hydraulic device 18 to one end of the support frame 1. When the electric turntable 19 rotates, the hydraulic device 18 and the support frame 1 rotate, so that the nearby foundation pit can be inspected at the same time. Deep excavation makes the whole body more flexible. By installing nut seats 5 symmetrically on both ends of the mounting frame 4, when the lifting motor 7 drives the screw rod 6 to rotate, the mounting frame 4 can rise and fall stably with the nut seat 5. By moving the guide cylinder 8 The sliding sleeve is connected to the outside of the guide rod 9, so that the mounting frame 4 is not easy to tilt and shake, and the fixing effect of the positioning plate 17 during excavation can make the whole body more stable. When the mounting frame 4 is raised and lowered, the upper buffer spring 22 and the lower buffer spring 21 can avoid the collision between the installation frame 4 and the support frame 1, so as not to affect the overall stability. By installing the depth measuring instrument 13 on one side of the mining opening 3, the depth measuring instrument 13 can be fixed and disassembled by pulling the shaft pin 15. , and it is convenient to measure the real-time excavation depth and display it to the operator through the console 20 with high accuracy.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those of ordinary skill in the art will understand that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention. , substitutions and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322053092.7U CN220704532U (en) | 2023-08-02 | 2023-08-02 | Device for deep earthwork excavation of foundation pit |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202322053092.7U CN220704532U (en) | 2023-08-02 | 2023-08-02 | Device for deep earthwork excavation of foundation pit |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN220704532U true CN220704532U (en) | 2024-04-02 |
Family
ID=90441761
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202322053092.7U Active CN220704532U (en) | 2023-08-02 | 2023-08-02 | Device for deep earthwork excavation of foundation pit |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN220704532U (en) |
-
2023
- 2023-08-02 CN CN202322053092.7U patent/CN220704532U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN115235812A (en) | Soil layer sampling device for building construction foundation detection | |
| CN218762397U (en) | A horizontal fixing device for land development surveying and mapping | |
| CN106193133A (en) | A kind of slope section bridge pile foundation three-dimensional stress model assay device | |
| CN214306162U (en) | Adjustable foundation pit monitoring device | |
| CN220704532U (en) | Device for deep earthwork excavation of foundation pit | |
| CN218324729U (en) | Rock drilling device | |
| CN221837636U (en) | A sampling structure for detecting quality of building rock and soil pile foundation | |
| CN219511823U (en) | Rock and soil sampling device for geotechnical engineering | |
| CN113405839A (en) | Auxiliary supervision robot | |
| CN215929105U (en) | Mapping and positioning device for engineering mapping | |
| CN218766077U (en) | Soil sampling device for geotechnical investigation | |
| CN217174807U (en) | A support pile with monitoring of horizontal displacement of foundation pit | |
| CN207456453U (en) | A kind of target plummet stability tripod used for geological prospecting | |
| CN217174712U (en) | Field test hole manual backfill device | |
| CN117249816A (en) | Automatic lifting and leveling device for total station | |
| CN218380775U (en) | A thickness measuring gauge | |
| CN210135879U (en) | Verticality tester for civil construction | |
| CN219121357U (en) | A soil and rock backfill height measuring device | |
| CN215051732U (en) | A semi-automatic ramp device | |
| CN211816225U (en) | Static sounding appearance earth anchor | |
| CN211952108U (en) | Total station for cadastral surveying and mapping of adaptation many places adaptation | |
| CN216081467U (en) | Land management is with mapping device that can place instrument | |
| CN217058765U (en) | A pile hole diameter detection device for construction supervision | |
| CN219640957U (en) | Foundation pit settlement detector | |
| CN117053039A (en) | Stable total station based on mine measurement |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |