CN212045389U - Positioning and drilling equipment for engineering construction - Google Patents

Positioning and drilling equipment for engineering construction Download PDF

Info

Publication number
CN212045389U
CN212045389U CN202020336910.8U CN202020336910U CN212045389U CN 212045389 U CN212045389 U CN 212045389U CN 202020336910 U CN202020336910 U CN 202020336910U CN 212045389 U CN212045389 U CN 212045389U
Authority
CN
China
Prior art keywords
hole
threaded rod
base
thick bamboo
disc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020336910.8U
Other languages
Chinese (zh)
Inventor
王超然
周欢
聂珲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiyuan Vocational and Technical College
Original Assignee
Jiyuan Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiyuan Vocational and Technical College filed Critical Jiyuan Vocational and Technical College
Priority to CN202020336910.8U priority Critical patent/CN212045389U/en
Application granted granted Critical
Publication of CN212045389U publication Critical patent/CN212045389U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Drilling And Boring (AREA)

Abstract

The utility model provides a location drilling equipment for engineering building, the on-line screen storage device comprises a base, be equipped with the disc directly over the base, disc up end middle part position has seted up the round hole, be equipped with first threaded rod in the round hole, disc upside and downside all are equipped with first nut, a threaded rod upper end installation location section of thick bamboo, a location section of thick bamboo outward appearance is personally submitted annular equidistance and has seted up three through-hole, be equipped with the second threaded rod in the through-hole, a location section of thick bamboo inboard and the outside all are equipped with the second nut, the one end that the second threaded rod is in a location section of thick bamboo is fixed with the ball cover, roll in the ball cover and install the spheroid, compare with prior art, the utility model: the support to the cylinder cutter is realized, the labor intensity is reduced, the accuracy of drilling is improved, and the drilling tool is suitable for cylinder cutters with different diameters.

Description

Positioning and drilling equipment for engineering construction
Technical Field
The utility model relates to a location drilling equipment for engineering building belongs to the drilling equipment field.
Background
In the engineering construction process, often utilize the section of thick bamboo sword to drill on the wall, at present, when utilizing the section of thick bamboo sword drilling, because of lacking bearing structure, the weight of electric drill and section of thick bamboo sword is supported by the manpower completely, causes to punch easily and the skew appears, and intensity of labour is big, and the potential safety hazard is great.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a not enough to prior art exists, the utility model aims at providing a location drilling equipment for engineering building to propose when utilizing the section of thick bamboo sword to drill in solving above-mentioned background art, because of lacking bearing structure, the weight of electric drill and section of thick bamboo sword is supported by the manpower completely, causes easily to punch and the skew appears, and intensity of labour is big, the great problem of potential safety hazard, the utility model discloses realize reducing intensity of labour to the support of section of thick bamboo sword, improve the accuracy of drilling, be applicable to the section of thick bamboo sword of different diameters.
In order to achieve the above purpose, the present invention is realized by the following technical solution: the utility model provides a location drilling equipment for engineering building, includes the base, be equipped with the disc directly over the base, two branches are installed to terminal surface symmetry under the disc, branch lower extreme and base fixed connection, disc up end middle position has seted up the round hole, be equipped with first threaded rod in the round hole, disc upside and downside all are equipped with first nut, first nut meshing is on first threaded rod, a threaded rod upper end installation location section of thick bamboo, the base up end is equipped with the balancing weight, the location section of thick bamboo surface is annular equidistance and has seted up three through-hole, be equipped with the second threaded rod in the through-hole, a location section of thick bamboo inboard and the outside all are equipped with the second nut, the second nut meshing is on the second threaded rod, the one end that the second threaded rod is in a location section of thick bamboo is fixed with the bowl, the ball body is installed in the bowl.
Furthermore, a straight thread cylinder is meshed at the upper end of the first threaded rod and is fixedly connected with the positioning cylinder.
Furthermore, four adjusting feet are uniformly arranged on the lower end face of the base.
Furthermore, two handles are symmetrically installed on the upper end face of the balancing weight, two insertion holes are symmetrically formed in the lower end face of the balancing weight, two insertion columns matched with the insertion holes are fixed on the upper end face of the base, and the insertion columns are inserted into the insertion holes.
Further, the lower end of the supporting rod is sleeved with a first sleeve, the first sleeve is fixedly connected with the base, a first through hole is formed in the outer surface of the first sleeve, a first threaded hole matched with the first through hole is formed in the outer surface of the lower end of the supporting rod, a first bolt is arranged in the first through hole, and the first bolt is meshed in the first threaded hole.
Furthermore, a second sleeve is sleeved on the upper end of the supporting rod and fixedly connected with the disc, a second through hole is formed in the outer surface of the second sleeve, a second threaded hole matched with the second through hole is formed in the outer surface of the upper end of the supporting rod, a second bolt is arranged in the second through hole, and the second bolt is meshed in the second threaded hole.
The utility model has the advantages that: the utility model discloses a position in the round hole on the disc of first threaded rod of adjustment, and utilize the relative position of two fixed first threaded rods of first nut and disc, realize the convenient adjustment of location section of thick bamboo height, adjust a location section of thick bamboo to suitable position according to the height of wall drilling promptly, when drilling, with section of thick bamboo sword assigns in a location section of thick bamboo, a location section of thick bamboo plays the effect of location direction, prevent that the skew appears at drilling in-process in the section of thick bamboo sword, improve the accuracy of drilling, a location section of thick bamboo realizes the support to the section of thick bamboo sword simultaneously, play the effect that reduces intensity of labour, the security is improved.
The utility model discloses according to the position in the through-hole on a location section of thick bamboo of the diameter adjustment three second threaded rod of section of thick bamboo sword, all contact with the section of thick bamboo sword surface until the spheroid in the three ball cover, utilize the position of the fixed second threaded rod of two second nuts afterwards, be convenient for carry out spacing direction to the section of thick bamboo sword of different diameters, enlarge application scope.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic structural view of the positioning and drilling equipment for engineering construction of the present invention;
FIG. 2 is an enlarged view of the location A of the positioning and drilling equipment for engineering construction;
FIG. 3 is a perspective view of a disc in the positioning and drilling device for engineering construction according to the present invention;
FIG. 4 is a cross-sectional view of a positioning cylinder in the positioning and drilling equipment for engineering construction according to the present invention;
FIG. 5 is a schematic view of the assembly of the support rod, the base and the disc in the positioning and drilling device for engineering construction according to the present invention;
FIG. 6 is a schematic view of the assembly of the counterweight and the base in the positioning and drilling equipment for engineering construction according to the present invention;
in the figure: 1-base, 2-adjusting foot, 3-balancing weight, 4-first sleeve, 5-support rod, 6-second sleeve, 7-disc, 8-first nut, 9-first threaded rod, 10-straight thread cylinder, 11-positioning cylinder, 12-handle, 13-second nut, 14-sphere, 15-spherical cover, 16-second threaded rod, 17-round hole, 18-through hole, 19-jack, 20-plug column, 21-first threaded hole, 22-first through hole, 23-first bolt, 24-second bolt, 25-second through hole and 26-second threaded hole.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1-6, the present invention provides a technical solution: the utility model provides a location drilling equipment for engineering building, includes base 1, is equipped with disc 7 directly over base 1, and two branches 5 are installed to disc 7 lower terminal surface symmetry, 5 lower extremes of branch and base 1 fixed connection, and fixed connection base 1 and disc 7 are realized to branch 5.
Round hole 17 has been seted up to disc 7 up end middle part position, be equipped with first threaded rod 9 in the round hole 17, disc 7 upside and downside all are equipped with first nut 8, first nut 8 meshing is on first threaded rod 9, threaded rod upper end installation location section of thick bamboo 11, position in round hole 17 on disc 7 through adjustment first threaded rod 9, and utilize the relative position of two first nut 8 fixed first threaded rod 9 and disc 7, realize the convenient adjustment of a location section of thick bamboo 11 height, adjust a location section of thick bamboo 11 to suitable position according to the height of wall drilling promptly, when drilling, place the section of thick bamboo sword in a location section of thick bamboo 11, a location section of thick bamboo 11 plays the effect of location direction, prevent that the skew appears in the drilling process of section of thick bamboo sword, improve the accuracy of drilling, a location section of thick bamboo 11 realizes the support to the section of thick bamboo sword simultaneously, play the effect that reduces intensity of labour, and safety is improved.
The base 1 up end is equipped with balancing weight 3, and the back that finishes is placed to base 1 position, places balancing weight 3 on base 1, improves the stability that base 1 placed.
Three through holes 18 are formed in the outer surface of the positioning cylinder 11 in an annular equidistant mode, a second threaded rod 16 is arranged in each through hole 18, second nuts 13 are arranged on the inner side and the outer side of the positioning cylinder 11, the second nuts 13 are meshed on the second threaded rods 16, a spherical cover 15 is fixed at one end, located in the positioning cylinder 11, of each second threaded rod 16, spherical bodies 14 are installed in the spherical covers 15 in a rolling mode, the positions of the three second threaded rods 16 in the through holes 18 in the positioning cylinder 11 are adjusted according to the diameter of a cylinder cutter until the spherical bodies 14 in the three spherical covers 15 are all in contact with the outer surface of the cylinder cutter, then the positions of the second threaded rods 16 are fixed through the two second nuts 13, limiting and guiding can be conveniently carried out on the cylinder cutters with different diameters.
The upper end of the first threaded rod 9 is meshed with a straight threaded cylinder 10, the straight threaded cylinder 10 is fixedly connected with a positioning cylinder 11, one end of the first threaded rod 9 is screwed into the straight threaded cylinder 10 on the positioning cylinder 11, and the first threaded rod 9 and the positioning cylinder 11 are convenient to disassemble and assemble.
Four adjusting feet 2 are evenly arranged on the lower end face of the base 1, and the adjusting feet 2 are installed on the base 1, so that the placing state of the base 1 can be conveniently adjusted.
Two handles 12 are installed to 3 up end symmetries of balancing weight, two jacks 19 have been seted up to 3 down end symmetries of balancing weight, 1 up end of base is fixed with two and jack 19 matched with insert post 20, insert post 20 and assign in jack 19, install handle 12 on balancing weight 3, be convenient for move balancing weight 3, when placing balancing weight 3 on base 1, make the post 20 of inserting on base 1 assign in jack 19 on balancing weight 3, realize the restriction to 3 positions of balancing weight.
The pot head is equipped with first sleeve 4 under 5 spinal branch poles, first sleeve 4 and base 1 fixed connection, first interlude hole 22 has been seted up to 4 surface of first sleeve, 5 lower extreme surfaces of spinal branch poles seted up with first screw hole 21 of first interlude hole 22 matched with, be equipped with first bolt 23 in the first interlude hole 22, first bolt 23 meshes in first screw hole 21, pass first bolt 23 first interlude hole 22 meshing in first screw hole 21, be convenient for branch 5 and base 1's separation.
The upper end cover of branch 5 is equipped with second sleeve 6, second sleeve 6 and disc 7 fixed connection, second interlude hole 25 has been seted up to 6 surfaces of second sleeve, 5 upper end surfaces of branch offer with second interlude hole 25 matched with second screw hole 26, be equipped with second bolt 24 in the second interlude hole 25, second bolt 24 meshes in second screw hole 26, pass second bolt 24 second interlude hole 25 meshing in second screw hole 26, be convenient for branch 5 and disc 7's separation.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a location drilling equipment for engineering construction, includes base (1), its characterized in that: be equipped with disc (7) directly over base (1), two branch (5) are installed to disc (7) lower terminal surface symmetry, branch (5) lower extreme and base (1) fixed connection, disc (7) up end middle part position has seted up round hole (17), be equipped with first threaded rod (9) in round hole (17), disc (7) upside and downside all are equipped with first nut (8), first nut (8) meshing is on first threaded rod (9), threaded rod upper end installation position section of thick bamboo (11), base (1) up end is equipped with balancing weight (3), position section of thick bamboo (11) outward appearance is personally submitted annular equidistance and has seted up three through-hole (18), be equipped with second threaded rod (16) in through-hole (18), position section of thick bamboo (11) inboard and outside all are equipped with second nut (13), second nut (13) meshing is on second threaded rod (16), one end, located on the positioning barrel (11), of the second threaded rod (16) is fixed with a ball cover (15), and a spherical body (14) is installed in the ball cover (15) in a rolling mode.
2. The positioning and drilling equipment for engineering construction according to claim 1, characterized in that: the upper end of the first threaded rod (9) is meshed with a straight threaded cylinder (10), and the straight threaded cylinder (10) is fixedly connected with a positioning cylinder (11).
3. The positioning and drilling equipment for engineering construction according to claim 1, characterized in that: four adjusting feet (2) are uniformly arranged on the lower end face of the base (1).
4. The positioning and drilling equipment for engineering construction according to claim 1, characterized in that: two handles (12) are installed to balancing weight (3) up end symmetry, two jack (19) have been seted up to balancing weight (3) lower terminal surface symmetry, base (1) up end is fixed with two and jack (19) matched with insert post (20), insert post (20) and assign in jack (19).
5. The positioning and drilling equipment for engineering construction according to claim 1, characterized in that: the supporting rod is characterized in that a first sleeve (4) is sleeved at the lower end of the supporting rod (5), the first sleeve (4) is fixedly connected with the base (1), a first penetrating hole (22) is formed in the outer surface of the first sleeve (4), a first threaded hole (21) matched with the first penetrating hole (22) is formed in the outer surface of the lower end of the supporting rod (5), a first bolt (23) is arranged in the first penetrating hole (22), and the first bolt (23) is meshed in the first threaded hole (21).
6. The positioning and drilling equipment for engineering construction according to claim 1, characterized in that: the supporting rod (5) is sleeved with a second sleeve (6), the second sleeve (6) is fixedly connected with the disc (7), a second penetrating hole (25) is formed in the outer surface of the second sleeve (6), a second threaded hole (26) matched with the second penetrating hole (25) is formed in the outer surface of the upper end of the supporting rod (5), a second bolt (24) is arranged in the second penetrating hole (25), and the second bolt (24) is meshed in the second threaded hole (26).
CN202020336910.8U 2020-03-17 2020-03-17 Positioning and drilling equipment for engineering construction Expired - Fee Related CN212045389U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020336910.8U CN212045389U (en) 2020-03-17 2020-03-17 Positioning and drilling equipment for engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020336910.8U CN212045389U (en) 2020-03-17 2020-03-17 Positioning and drilling equipment for engineering construction

Publications (1)

Publication Number Publication Date
CN212045389U true CN212045389U (en) 2020-12-01

Family

ID=73529363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020336910.8U Expired - Fee Related CN212045389U (en) 2020-03-17 2020-03-17 Positioning and drilling equipment for engineering construction

Country Status (1)

Country Link
CN (1) CN212045389U (en)

Similar Documents

Publication Publication Date Title
CN102839750A (en) Soft steel-rolling seismic isolation bearing
CN105457316A (en) Game type abrasive disc
CN212045389U (en) Positioning and drilling equipment for engineering construction
CN203684778U (en) Telescopic type temporary line erection pole
CN106638969A (en) Container portable house
CN209837767U (en) Assembled horizontal prefabricated component supports support body
CN204843050U (en) High altitude drilling equipment
CN208747581U (en) A kind of transmission line high-altitude operation self-powered platform
CN115326039B (en) Device for keeping engineering measurement marker post vertical in real time and using method thereof
CN211532136U (en) Liftable ancient tree support frame
CN212865950U (en) Connecting piece for foundation pit support
CN212478458U (en) A building bearing diagonal structure for construction
CN209844400U (en) Novel building engineering supports device
CN204741062U (en) Remove antenna and embrace pole
CN220187716U (en) Building construction is surveyed and is used mark post
CN218061705U (en) Earthquake-resistant structure for integrated house
CN207458463U (en) A kind of Electronic Culture transmission device
CN215760575U (en) Datum line pay-off device
CN215643582U (en) Progress display board for construction management of building engineering
CN203475810U (en) Overhanging scaffold bearing structure
CN217353724U (en) Assembled strutting arrangement for civil engineering
CN220191599U (en) Stable structure that farmland support was built
CN211815994U (en) Corner structure of flood control wall
CN210563054U (en) Entrance canopy structure for constructing large cantilever effect
CN216044835U (en) Adjustable stand

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201

CF01 Termination of patent right due to non-payment of annual fee