CN212027208U - Building deviation forming gap filling structure - Google Patents

Building deviation forming gap filling structure Download PDF

Info

Publication number
CN212027208U
CN212027208U CN201921922302.9U CN201921922302U CN212027208U CN 212027208 U CN212027208 U CN 212027208U CN 201921922302 U CN201921922302 U CN 201921922302U CN 212027208 U CN212027208 U CN 212027208U
Authority
CN
China
Prior art keywords
baffle
fixed plate
fixed
fixing plate
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921922302.9U
Other languages
Chinese (zh)
Inventor
戴响飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Wanfeng Construction Project Management Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921922302.9U priority Critical patent/CN212027208U/en
Application granted granted Critical
Publication of CN212027208U publication Critical patent/CN212027208U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model provides a building deviation forms gap and fills structure, include: the fixed plate, the baffle, the fixed plate comprises first fixed plate and second fixed plate, first fixed plate and second fixed plate inboard all fixed a plurality of fixed columns that are equipped with, first fixed plate and second fixed plate outside all fixed a plurality of mounting holes that are equipped with, first fixed plate and second fixed plate are inside all fixed a plurality of pores that are equipped with, first fixed plate and second fixed plate swing joint have the baffle, the baffle comprises baffle and No. two baffles. The utility model discloses a round hole that the hinge outside was equipped with uses the screw fixation to be inboard with No. two baffles for a baffle and No. two baffles can be laminated and a baffle and No. two baffles can rotate 180, and mounting hole and fixed orifices use the bolt to run through, and fixed plate and baffle that can move about play the effect of adjusting the fixed plate, and simple structure is practical, installs advantages such as simple.

Description

Building deviation forming gap filling structure
Technical Field
The utility model relates to a building engineering technical field, concretely relates to building deviation forms gap and fills structure.
Background
At present, the deviation of the building structure is possibly caused to form a gap in the construction process due to the complicated and diversified design of the building structure, the gap needs to be subjected to seam treatment for the sake of neat appearance and convenient decoration,
most of gaps among existing building structures are inverted cone-shaped cracks, and the processing mode is to directly plaster the gaps and then carry out decoration construction, but most of the problems of cracks, falling off of decoration materials and the like can occur after the seam processing method is used, the seam processing method cannot radically cure the problems, the efficiency is low, and adverse effects are brought to the credit of contractors, so that a building deviation forming gap filling structure needs to be designed urgently.
SUMMERY OF THE UTILITY MODEL
Problem (A)
An object of the utility model is to provide a building deviation forms gap and fills structure to solve the problem that above-mentioned background art provided.
(II) technical scheme
The utility model provides a building deviation forms gap and fills structure, include: the fixed plate, first fixed plate, the second fixed plate, the mounting hole, the hinge, the fixed column, the pore, a baffle, the fixed orifices, No. two baffles, the baffle, the fixed plate comprises first fixed plate and second fixed plate, first fixed plate and second fixed plate inboard all are fixed and are equipped with a plurality of fixed columns, first fixed plate and second fixed plate outside all are fixed and are equipped with a plurality of mounting holes, first fixed plate and second fixed plate inside all are fixed and are equipped with a plurality of pores, first fixed plate and second fixed plate swing joint have the baffle, the baffle comprises a baffle and No. two baffles, No. two baffles of baffle right-hand member fixedly connected with, No. two baffles of baffle middle-end all swing joint have the hinge.
Preferably, the first baffle and the second baffle can rotate 180 degrees.
Preferably, the mounting hole and the fixing hole are round, and the inside of the mounting hole and the inside of the fixing hole are hollow structures.
Preferably, the fixing hole may be fixed to the inner side of the wall using a bolt.
Preferably, the mounting hole and the fixing hole are in a symmetrical structure.
Preferably, the hinge outside is equipped with a plurality of round holes, and the round hole uses the screw fixation to run through and is fixed in the baffle of a and No. two inboard baffles.
Preferably, the mounting hole may be fixed through using a bolt.
(III) advantageous effects
The utility model provides a building deviation forms gap and fills structure, the round hole that is equipped with through the hinge outside uses the screw fixation in baffle and No. two baffle inboards for a baffle and No. two baffles can be laminated and a baffle and No. two baffles can rotate 180, and mounting hole and fixed orifices use the bolt to run through, and fixed plate and baffle that can move about play the effect of adjusting the fixed plate, and simple structure is practical, installs advantages such as simple.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic view of a partial structure of the present invention.
FIGS. 1-2: the device comprises a fixing plate-1, a first fixing plate 2, a second fixing plate-3, a mounting hole-4, a hinge-5, a fixing column-6, a pore-7, a first baffle-8, a fixing hole-9, a second baffle-10 and a baffle-11.
Detailed Description
The embodiments of the present invention will be described in further detail with reference to the drawings and examples. The following examples are intended to illustrate the invention but are not intended to limit the scope of the invention.
Referring to FIGS. 1-2;
the utility model discloses an implementation provides a building deviation forms gap and fills structure, include: fixed plate 1, first fixed plate 2, second fixed plate 3, mounting hole 4, hinge 5, fixed column 6, pore 7, baffle 8 No. one, fixed orifices 9, No. two baffles 10, baffle 11, fixed plate 1 comprises first fixed plate 2 and second fixed plate 3, first fixed plate 2 and 3 inboard all fixed a plurality of fixed columns 6 that are equipped with of second fixed plate, first fixed plate 2 and 3 outside all fixed a plurality of mounting holes 4 that are equipped with of second fixed plate, first fixed plate 2 and 3 inside all fixed a plurality of pores 7 that are equipped with of second fixed plate, first fixed plate 2 and 3 swing joint of second fixed plate have baffle 11, baffle 11 comprises baffle 8 and No. two baffles 10, No. two baffles 10 of 8 right-hand member fixedly connected with of baffle, the equal swing joint of middle-end of baffle 8 and No. two baffles 10 has hinge 5.
Wherein, baffle 8 and No. two baffles 10 all can rotate 180, and No. 8 baffles of being convenient for and No. two baffles 10 can closely laminate the wall, play fixed effect.
Wherein, mounting hole 4 and fixed orifices 9 are the circle, and mounting hole 4 and the inside hollow structure that is of fixed orifices 9, and the mounting hole 4 and the fixed orifices 9 of being convenient for can use the bolt to run through.
The fixing holes 9 can be fixed on the inner side of the wall by bolts, so that the fixing plate 1 and the baffle plate 11 can be fixed conveniently.
Wherein, mounting hole 4 and fixed orifices 9 are symmetrical structure, and the bolt of being convenient for can run through mounting hole 4 and fixed orifices 9 simultaneously inboardly, and then fixed plate 1 and baffle 11.
Wherein, hinge 5 outside is equipped with a plurality of round holes, and the round hole uses the screw fixation to run through and is fixed in No. 8 baffles and No. two baffles 10 inboards, is convenient for fixed hinge 5 for No. 8 baffles and No. two baffles 10 can rotate.
Wherein, the mounting hole 4 can use the bolt fastening to run through, and after the fixed plate 1 of being convenient for and baffle 11, use the bolt to run through the mounting hole 4 in the outside, can play the effect of refastening.
The working principle is as follows: firstly, a plurality of fixing columns 6 are fixedly arranged on the inner sides of the first fixing plate 2 and the second fixing plate 3, after the materials for filling the wall seams are filled around the fixing columns 6, the materials for filling the wall seams can be effectively fixed, so that the materials for filling the wall seams are not easy to fall off, secondly, a plurality of pores 7 are fixedly arranged in the first fixing plate 2 and the second fixing plate 3, the pores 7 can strengthen the bearing capacity of the first fixing plate 2 and the second fixing plate 3, so that the first fixing plate 2 and the second fixing plate 3 can be firmer, the service lives of the first fixing plate 2 and the second fixing plate 3 are prolonged, finally, a baffle 11 is movably connected with the first fixing plate 2 and the second fixing plate 3 through bolts, a second baffle 10 is fixedly connected with the right end of the first baffle 8, hinges 5 are movably connected with the middle ends of the first baffle 8 and the second baffle 10, and a plurality of round holes are arranged outside the hinges, and the round hole uses the screw fixation to run through and be fixed in No. 8 baffles and No. 10 baffles inboards, the fixed hinge 5 of being convenient for No. 8 baffles and No. 10 baffles can rotate 180, after being convenient for laminate the wall and fill the required material of wall seam, accomplish installation work.

Claims (7)

1. A building deviation forming gap filling structure is characterized by comprising: the fixing plate comprises a fixing plate (1), a first fixing plate (2), a second fixing plate (3), mounting holes (4), a hinge (5), fixing columns (6), pores (7), a first baffle (8), fixing holes (9), a second baffle (10) and a baffle (11), wherein the fixing plate (1) consists of the first fixing plate (2) and the second fixing plate (3), the inner sides of the first fixing plate (2) and the second fixing plate (3) are respectively fixedly provided with a plurality of fixing columns (6), the outer parts of the first fixing plate (2) and the second fixing plate (3) are respectively fixedly provided with a plurality of mounting holes (4), the inner parts of the first fixing plate (2) and the second fixing plate (3) are respectively fixedly provided with a plurality of pores (7), the first fixing plate (2) and the second fixing plate (3) are movably connected with a baffle (11), and the baffle (11) consists of the first baffle (8) and the second baffle (10), no. two baffle (10) of baffle (8) right-hand member fixedly connected with, equal swing joint has hinge (5) in baffle (8) and No. two baffle (10).
2. The building deviation forming gap filling structure according to claim 1, wherein: the first baffle (8) and the second baffle (10) can rotate 180 degrees.
3. The building deviation forming gap filling structure according to claim 1, wherein: the mounting hole (4) and the fixing hole (9) are round, and the mounting hole (4) and the fixing hole (9) are hollow.
4. The building deviation forming gap filling structure according to claim 1, wherein: the fixing hole (9) can be fixed on the inner side of the wall by penetrating through a bolt.
5. The building deviation forming gap filling structure according to claim 1, wherein: the mounting hole (4) and the fixing hole (9) are of a symmetrical structure.
6. The building deviation forming gap filling structure according to claim 1, wherein: the hinge (5) is externally provided with a plurality of round holes, and the round holes are fixed on the inner sides of the first baffle (8) and the second baffle (10) by screws in a penetrating manner.
7. The building deviation forming gap filling structure according to claim 1, wherein: the mounting hole (4) can be fixed through by using a bolt.
CN201921922302.9U 2019-11-08 2019-11-08 Building deviation forming gap filling structure Active CN212027208U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921922302.9U CN212027208U (en) 2019-11-08 2019-11-08 Building deviation forming gap filling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921922302.9U CN212027208U (en) 2019-11-08 2019-11-08 Building deviation forming gap filling structure

Publications (1)

Publication Number Publication Date
CN212027208U true CN212027208U (en) 2020-11-27

Family

ID=73477636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921922302.9U Active CN212027208U (en) 2019-11-08 2019-11-08 Building deviation forming gap filling structure

Country Status (1)

Country Link
CN (1) CN212027208U (en)

Similar Documents

Publication Publication Date Title
CN206737192U (en) A kind of assembled wall for being easy to assembling
CN102121311B (en) Mould releasing and combining device for large steel form and assembling method thereof
CN107151995A (en) A kind of road height limit beam
CN212027208U (en) Building deviation forming gap filling structure
CN214535091U (en) Super high-rise concrete pump pipe shock attenuation fixed bolster
CN111733973B (en) Anti-seismic building steel structure of high-rise building and connecting method thereof
CN205976596U (en) Assembly type building supporting frame
CN209244314U (en) A kind of building engineering construction template support structure
CN208815980U (en) A kind of steel plate concrete assembled wall board anti-side energy-consuming device for modular architectural
CN207362872U (en) A kind of earth-retaining wall bracket for conveniently building dismounting
CN206800649U (en) A kind of pre-buried solid bowl assembly for building industry
CN212175780U (en) Building pile foundation deviation prevention device
CN210669347U (en) Make things convenient for welding-free gallows of steel construction building electromechanical pipeline installation
CN211190861U (en) Building screening sand net of convenient folding transport
CN211447374U (en) Curtain wall construction of adaptable angle
CN206917061U (en) A kind of steel construction assembled wallboard
CN203034916U (en) Assembled construction barrier
CN209703751U (en) A kind of noise insulation bearing wall construction
CN208917993U (en) A kind of beam column energy consumption hinged joint
CN207405782U (en) A kind of pre-buried connecting elements structure between connecting wall
CN102311055B (en) Tower crane and its lower support assembly
CN208545051U (en) Attached wall mount structure for chip standard knot tower crane attached wall
CN209277520U (en) A kind of external wall construction climbing frame is connected and fixed device with metope
CN211622257U (en) Template for building
CN211396744U (en) Temporary support frame for mounting assembly type steel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230118

Address after: No. 435-438, Floor 4, Building 2, No. 405, West Section of Minfeng Avenue, High-tech Zone, Chengdu, Sichuan, 610000

Patentee after: Sichuan Wanfeng Construction Project Management Co.,Ltd.

Address before: 163000 Room 401, gate 3, No.2 Xinhua garden, Fumin Street, Saertu District, Daqing City, Heilongjiang Province

Patentee before: Dai Xiangfei