CN212010292U - Novel building engineering project management process show instrument - Google Patents

Novel building engineering project management process show instrument Download PDF

Info

Publication number
CN212010292U
CN212010292U CN202021069795.9U CN202021069795U CN212010292U CN 212010292 U CN212010292 U CN 212010292U CN 202021069795 U CN202021069795 U CN 202021069795U CN 212010292 U CN212010292 U CN 212010292U
Authority
CN
China
Prior art keywords
plate
fixedly connected
sliding
project management
engineering project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021069795.9U
Other languages
Chinese (zh)
Inventor
李华忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021069795.9U priority Critical patent/CN212010292U/en
Application granted granted Critical
Publication of CN212010292U publication Critical patent/CN212010292U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a show technical field specifically is a novel building engineering project management flow show instrument, which comprises a fixing plate and i, the inside threaded connection of fixed plate has the fixed screw, the top fixedly connected with montant of fixed plate, the top fixedly connected with horizontal pole of montant, the spout has been seted up to one side of montant, the inside swing joint of spout has the slide, one side fixedly connected with show board of slide. The utility model has the advantages that: when the content on the show board is watched or rewritten to needs, the pulling arm-tie pulls out spacing post from the inside in spacing hole, then the height of manual regulation show board, confirm again after high with spacing post inject spacing hole's inside again and carry out the rigidity, the purpose of convenient to use has been reached, when sliding the show board, the volleyball wheel and the montant roll connection of show board one side, just sliding friction is rolling friction, reduce frictional force, thereby adjust the position of show board more easily.

Description

Novel building engineering project management process show instrument
Technical Field
The utility model relates to a show technical field, especially a novel building engineering project management flow show instrument.
Background
In the building work process, in order to realize the show to the construction progress, often need use building construction progress management display device, present building construction progress management display device generally includes a plate body, the administrator is when using, need manually write project name and current project progress on the plate body, and when the project progress changes, need wipe the project progress on the plate body and write the project progress again, because of show board height is usually for fixing, the inconvenient viewing and the rewriting of the characters that are located the eminence, consequently, need improve.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art's shortcoming, provide a novel building engineering project management flow show instrument.
The purpose of the utility model is realized through the following technical scheme: a novel building engineering project management process display tool comprises a fixing plate, wherein the fixing plate is in threaded connection with a fixing screw, the top of the fixing plate is fixedly connected with a vertical rod, the top of the vertical rod is fixedly connected with a cross rod, one side of the vertical rod is provided with a sliding groove, the sliding groove is movably connected with a sliding plate, one side of the sliding plate is fixedly connected with a display plate, one side of the display plate is fixedly connected with a handle, one side of the sliding plate is provided with a limiting hole, one side of the display plate, which is close to the sliding plate, is provided with a row wheel, one side of the vertical rod is provided with a through hole, the inside of the through hole is movably connected with a limiting column, one end of the limiting column is fixedly connected with a pulling plate, one side of the pulling plate, which is close to the limiting column, the outer fixed surface of fixed axle is connected with the rope box, the surface of rope box is provided with the connection rope, the one end and the show board fixed connection of connecting the rope.
Optionally, the number of the vertical rods is two, the vertical rods are fixedly connected with the ground through fixing screws, and the two vertical rods are respectively located on the left side and the right side of the bottom of the cross rod.
Optionally, the sliding grooves are rectangular grooves, the number of the sliding grooves is two, the two sliding grooves correspond in position, the number of the sliding plates is two, and the two sliding plates are respectively located on the left side and the right side of the display board.
Optionally, the limiting holes are circular holes, the limiting holes are linearly arrayed on one side of the sliding plate, and the row wheels are linearly arrayed on one side of the display plate.
Optionally, the limiting column is located in the middle of the vertical rod, the limiting hole is communicated with the through hole, and the limiting hole is matched with the through hole.
Optionally, the rope box is internally provided with coil springs, the number of the rope boxes is two, and the two rope boxes are respectively positioned at the left side and the right side of the fixed shaft.
The utility model has the advantages of it is following:
1. this novel building engineering project management flow show instrument, through setting up the slide, the inside swing joint of spout has the slide, one side fixedly connected with show board of slide, when needs watch or rewrite the content on the show board, the pulling arm is pulled out spacing post from the inside in spacing hole, then the height of manual regulation show board, confirm again after the height with spacing post inject spacing hole's inside again and carry out the rigidity, easy operation has reached the purpose of convenient to use.
2. This novel building engineering project management flow show instrument, through setting up the gang wheel, one side that the show board is close to the slide is provided with the gang wheel, the gang wheel linear array is in one side of show board, in the time of the slip show board, the gang wheel and the montant roll connection of show board one side, just sliding friction is rolling friction, reduce frictional force, thereby adjust the position of show board more easily, the effect of supplementary reseing can be played when the wind spring of the inside of rope box is netted the lifting at the show board, time saving and labor saving's purpose has been reached.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the display board of the present invention;
FIG. 3 is a schematic structural view of the spacing post of the present invention;
fig. 4 is a schematic view of the internal structure of the cross bar of the present invention.
In the figure: 1-fixing plate, 2-fixing screw, 3-vertical rod, 4-transverse rod, 5-sliding chute, 6-sliding plate, 7-display plate, 8-handle, 9-limiting hole, 10-row wheel, 11-limiting column, 12-pulling plate, 13-spring, 14-adjusting groove, 15-fixing shaft, 16-rope box and 17-connecting rope.
Detailed Description
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1-4, a novel construction engineering project management flow display tool comprises a fixing plate 1, a fixing screw 2 is connected to the inner thread of the fixing plate 1, a vertical rod 3 is fixedly connected to the top of the fixing plate 1, a horizontal rod 4 is fixedly connected to the top of the vertical rod 3, a sliding groove 5 is formed in one side of the vertical rod 3, a sliding plate 6 is movably connected to the inner portion of the sliding groove 5, when the content on the display plate 7 needs to be viewed or rewritten, a pulling plate 12 is pulled to pull out a limiting column 11 from the inner portion of a limiting hole 9, the height of the display plate 7 is manually adjusted, the limiting column 11 is inserted into the inner portion of the limiting hole 9 again after the height is determined to be fixed in position, the operation is simple, the purpose of convenient use is achieved, the display plate 7 is fixedly connected to one side of the sliding plate 6, a handle 8 is fixedly connected, one side of the display board 7 close to the sliding plate 6 is provided with a row wheel 10, when the display board 7 is slid, the row wheel 10 on one side of the display board 7 is in rolling connection with the vertical rod 3, so that the sliding friction is rolling friction, and the friction force is reduced, thereby the position of the display board 7 is easier to adjust, a coil spring inside the rope box 16 can play a role of auxiliary reset when the display board 7 is lifted on a net, so that the purposes of time saving and labor saving are achieved, one side of the vertical rod 3 is provided with a through hole, the inside of the through hole is movably connected with a limit column 11, one end of the limit column 11 is fixedly connected with a pulling plate 12, one side of the pulling plate 12 close to the limit column 11 is fixedly connected with a spring 13, the spring 13 is a tension spring, the inside of the cross rod 4 is provided with an adjusting groove 14, the inside of the adjusting groove 14 is fixedly connected with a fixed, one end of the connecting rope 17 is fixedly connected with the display board 7.
As an optimal technical solution of the utility model: the quantity of montant 3 is two, montant 3 passes through fixed screw 2 and ground fixed connection, two montants 3 are located the left and right sides of horizontal pole 4 bottom respectively, spout 5 is the rectangular channel, the quantity of spout 5 is two, the position of two spout 5 is corresponding, the quantity of slide 6 is two, two slide 6 are located the left and right sides of show board 7 respectively, spacing hole 9 is the circular port, spacing hole 9 linear array is in one side of slide 6, the linear array of volleyball 10 is in one side of show board 7, spacing post 11 is located the middle part position of montant 3, spacing hole 9 is linked together with the through-hole, spacing hole 9 and through-hole looks adaptation, the inside of rope box 16 is provided with the wind spring, the quantity of rope box 16 is two, two rope boxes 16 are located the left and right sides of fixed axle 15 respectively.
The working process of the utility model is as follows: when the content on the display board 7 needs to be watched or rewritten, the pulling pull plate 12 pulls out the limiting column 11 from the inside of the limiting hole 9, then the height of the display board 7 is manually adjusted, the limiting column 11 is inserted into the inside of the limiting hole 9 again after the height is determined to be fixed, the operation is simple, the purpose of convenient use is achieved, when the display board 7 is slid, the row wheel 10 on one side of the display board 7 is in rolling connection with the vertical rod 3, the sliding friction is rolling friction, the friction force is reduced, the position of the display board 7 is easier to adjust, the coil spring in the rope box 16 can play a role of assisting in resetting when the display board 7 is lifted on the net, and the purposes of time saving and labor saving are achieved.
To sum up, when the novel construction project management process display tool is used, the slide plate 6 is movably connected inside the sliding groove 5, the display plate 7 is fixedly connected to one side of the slide plate 6, when the content on the display plate 7 needs to be watched or rewritten, the pull plate 12 is pulled to pull out the limiting column 11 from the inside of the limiting hole 9, then the height of the display plate 7 is manually adjusted, the limiting column 11 is inserted into the limiting hole 9 again after the height is determined to fix the position, the operation is simple, the purpose of convenient use is achieved, the volleyball 10 is arranged on one side of the display plate 7 close to the slide plate 6, the volleyball 10 is linearly arrayed on one side of the display plate 7, when the display plate 7 is slid, the volleyball 10 on one side of the display plate 7 is connected with the vertical rod 3 in a rolling manner, the sliding friction is the rolling friction, the friction force is reduced, and the position of the display plate 7 is easier to adjust, the coil spring in the rope box 16 can play a role in assisting the reset when the display board 7 is lifted on the net, thereby achieving the purpose of saving time and labor.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a novel building engineering project management flow show instrument which characterized in that: comprises a fixed plate (1), the inner part of the fixed plate (1) is in threaded connection with a fixed screw (2), the top of the fixed plate (1) is fixedly connected with a vertical rod (3), the top of the vertical rod (3) is fixedly connected with a cross rod (4), one side of the vertical rod (3) is provided with a sliding chute (5), the inner part of the sliding chute (5) is movably connected with a sliding plate (6), one side of the sliding plate (6) is fixedly connected with a display plate (7), one side of the display plate (7) is fixedly connected with a handle (8), one side of the sliding plate (6) is provided with a limiting hole (9), one side of the display plate (7) close to the sliding plate (6) is provided with a rowed wheel (10), one side of the vertical rod (3) is provided with a through hole, the inner part of the through hole is movably connected with a limiting column (11, one side fixedly connected with spring (13) that arm-tie (12) are close to spacing post (11), adjustment tank (14) have been seted up to the inside of horizontal pole (4), inside fixedly connected with fixed axle (15) of adjustment tank (14), the outer fixed surface of fixed axle (15) is connected with rope box (16), the surface of rope box (16) is provided with connects rope (17), the one end and show board (7) fixed connection of connecting rope (17).
2. The novel construction engineering project management process display tool of claim 1, wherein: the number of the vertical rods (3) is two, the vertical rods (3) are fixedly connected with the ground through fixing screws (2), and the two vertical rods (3) are respectively located on the left side and the right side of the bottom of the cross rod (4).
3. The novel construction engineering project management process display tool of claim 1, wherein: the display board is characterized in that the sliding grooves (5) are rectangular grooves, the number of the sliding grooves (5) is two, the positions of the sliding grooves (5) are corresponding, the number of the sliding plates (6) is two, and the sliding plates (6) are respectively located on the left side and the right side of the display board (7).
4. The novel construction engineering project management process display tool of claim 1, wherein: the limiting holes (9) are circular holes, the limiting holes (9) are linearly arrayed on one side of the sliding plate (6), and the row wheels (10) are linearly arrayed on one side of the display plate (7).
5. The novel construction engineering project management process display tool of claim 1, wherein: the limiting column (11) is located in the middle of the vertical rod (3), the limiting hole (9) is communicated with the through hole, and the limiting hole (9) is matched with the through hole.
6. The novel construction engineering project management process display tool of claim 1, wherein: the rope box (16) is internally provided with coil springs, the number of the rope boxes (16) is two, and the two rope boxes (16) are respectively positioned at the left side and the right side of the fixed shaft (15).
CN202021069795.9U 2020-06-11 2020-06-11 Novel building engineering project management process show instrument Expired - Fee Related CN212010292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021069795.9U CN212010292U (en) 2020-06-11 2020-06-11 Novel building engineering project management process show instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021069795.9U CN212010292U (en) 2020-06-11 2020-06-11 Novel building engineering project management process show instrument

Publications (1)

Publication Number Publication Date
CN212010292U true CN212010292U (en) 2020-11-24

Family

ID=73418974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021069795.9U Expired - Fee Related CN212010292U (en) 2020-06-11 2020-06-11 Novel building engineering project management process show instrument

Country Status (1)

Country Link
CN (1) CN212010292U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114005349A (en) * 2021-11-26 2022-02-01 四川建筑职业技术学院 Construction progress model for building engineering management
CN116092397A (en) * 2023-04-10 2023-05-09 吉林省国迅广告有限公司 Billboard supporting equipment and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114005349A (en) * 2021-11-26 2022-02-01 四川建筑职业技术学院 Construction progress model for building engineering management
CN116092397A (en) * 2023-04-10 2023-05-09 吉林省国迅广告有限公司 Billboard supporting equipment and method

Similar Documents

Publication Publication Date Title
CN212010292U (en) Novel building engineering project management process show instrument
CN108999429A (en) A kind of architectural engineering support device
CN208749145U (en) A kind of architectural engineering support device
CN208433128U (en) A kind of Portable type art teaching aid
CN206987419U (en) A kind of house roof ash-shoveling device
CN216218678U (en) Soil drilling machine for garden engineering
CN213095721U (en) Hand propelled big-arch shelter is planted medicine sprinkler of usefulness
CN212373856U (en) Steel bar support bracket convenient for adjusting size of hydraulic straightener
CN208400331U (en) A kind of English teaching hearing devices
CN209591452U (en) Publicity board is used in a kind of propagation of rural culture
CN205252383U (en) But sports of height -adjusting and width and healthy parallel bars for course
CN206442683U (en) A kind of forest culture and management seeder
CN215609224U (en) Volleyball training device
CN220308652U (en) Adjustable drawing frame for geological mapping
CN206268757U (en) Adjustment type images sucker horse
CN219446648U (en) Walking mechanism with sowing equipment convenient to replace
CN214861049U (en) Tennis racket production is with net twine equipment of tightening of flare-outing
CN219720087U (en) Fine arts platform base convenient to location
CN216277242U (en) Portable building construction rail
CN212544549U (en) Improved generation is disseminator parcel frame for municipal garden
CN209749251U (en) Case is planted in gardens
WO2019080250A1 (en) Height adjustable writing board
CN205408406U (en) Novel plowing device
CN208540887U (en) A kind of adjustable music easel
CN215582777U (en) Plum is planted with seedling auxiliary stay device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201124

Termination date: 20210611