Surveying and mapping device for constructional engineering
Technical Field
The utility model relates to a building engineering technical field especially relates to a building engineering is with measuring mapping device.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. The building construction is a project entity which has a top cover, a beam column, a wall, a foundation and can form an internal space and meet the requirements of people on production, living, study and public activities, and the building construction is a project entity which is used for planning, surveying, designing, constructing, completing and other technical works and completed for newly building, reconstructing or expanding a building construction and an auxiliary structure facility and is matched with the building construction, the engineering entity and the installation project of lines, pipelines and equipment. Also refer to the construction engineering of various houses, buildings, also known as the construction work load, before the construction engineering is implemented, often need measure the building place to can be better carry out construction engineering, current mapping device is in the in-process of using, because of the mapping device stability can be relatively poor when measuring, lead to measuring the error, influence whole engineering later stage progress.
The in-process that current mapping device was using, when measuring because of mapping device stability can be relatively poor, lead to measuring the error, influence whole engineering later stage progress, therefore we have proposed a surveying and mapping device for building engineering is used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving current mapping device and being relatively poor in the use stability ability, leading to measuring error to influence the shortcoming of whole engineering later stage progress, and the mapping device is used in building engineering who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a surveying and mapping device for constructional engineering comprises a base, wherein four universal wheels are fixedly arranged at the bottom of the base, fixed plates are fixedly arranged on two sides of the base, two sliding rods are slidably arranged on the inner sides of the two fixed plates, the top ends of the two sliding rods on the same side are fixedly provided with the same connecting plate, springs are movably connected on the outer sides of the four sliding rods, the top ends of the springs are fixedly connected with the connecting plate, the bottom ends of the springs are fixedly connected with the fixed plates, two thread sleeves are fixedly arranged on the top portions of the two connecting plates, bolts are in threaded connection in the four thread sleeves, a plurality of first threaded holes are arranged on two sides of the base, four fixed seats are fixedly arranged on the top portion of the base, grooves are formed in the inner sides of the four fixed seats, threaded rods are rotatably arranged on the inner, the dwang is equipped with conical gear with the equal fixed cover in the outside of threaded rod, and two conical gear mesh mutually, the equal threaded connection in the outside of four threaded rods has the bracing piece, and the top fixed mounting of four bracing pieces has same supporting seat, and the bottom of pivot is installed in the top rotation of supporting seat, and the top fixed mounting of pivot has the surveying instrument, and one side fixed mounting of surveying instrument has the handle.
Preferably, the inner side of the thread bush and the outer side of the bolt are respectively provided with a group of internal threads and a group of external threads, and the internal threads are meshed with the external threads, so that the thread bush is in threaded connection with the bolt.
Preferably, the inner side of the fixing plate is provided with a sliding sleeve, and the sliding rod is connected with the fixing plate in a sliding manner through the sliding sleeve, so that the sliding rod is connected with the fixing plate in a sliding manner.
Preferably, the first screw holes of a plurality of are arranged from top to bottom in sequence, and the first screw holes of a plurality of are all matched with the bolt, so that the bolt is conveniently connected in the first screw holes in a threaded mode.
Preferably, the inboard of four bracing pieces all is equipped with the second screw hole, and the threaded rod all passes through the inboard of second screw hole threaded connection at the bracing piece, conveniently with threaded rod and bracing piece threaded connection.
Preferably, the sliding grooves are formed in the inner walls of the two sides of the four grooves, the sliding blocks are connected in the sliding grooves in a sliding mode, one end of a fixing rod is fixedly connected to one side of each sliding block, and the other end of each fixing rod and the fixing rod are fixedly mounted on the outer side of the supporting rod to play a certain limiting role.
The utility model discloses in, a building engineering is with measuring mapping device, through rotating the bolt with the bolt of both sides and roll out, then press the connecting plate, aim at the first screw hole of below with the bolt and roll into first screw hole with the bolt, can lift up whole equipment, whole equipment rocks when can preventing the use equipment, and stability is high, can not lead to the error because of rocking when having guaranteed to measure.
In the utility model, the surveying and mapping device for the building engineering drives four threaded rods to rotate through the meshing transmission of two bevel gears by rotating four rotating rods, then drives four supporting rods to ascend through the supporting rods according to the threaded connection relation of the second threaded hole, and simultaneously the sliding block ascends and moves in the sliding groove, so that the building engineering can be measured through the surveying and mapping instrument, and the height of the device is adjusted by rotating the rotating rods, thereby being convenient, rapid, time-saving and labor-saving;
the utility model discloses rational in infrastructure, the effectual stability convenient and fast who guarantees at the in-process device of measuring the survey and drawing, labour saving and time saving, great improvement work efficiency.
Drawings
Fig. 1 is a schematic structural view of a surveying and mapping device for construction engineering according to the present invention;
fig. 2 is a schematic structural diagram of a portion a of a surveying and mapping apparatus for construction engineering according to the present invention;
fig. 3 is a schematic structural diagram of a part B of a surveying and mapping apparatus for construction engineering according to the present invention;
fig. 4 is the utility model provides a survey and drawing device for building engineering's part C's schematic structure view.
In the figure: 1. a base; 2. a universal wheel; 3. a fixing plate; 4. a slide bar; 5. a connecting plate; 6. a spring; 7. a threaded sleeve; 8. a bolt; 9. a first threaded hole; 10. a fixed seat; 11. a threaded rod; 12. rotating the rod; 13. a bevel gear; 14. a support bar; 15. a second threaded hole; 16. a chute; 17. a slider; 18. fixing the rod; 19. a supporting seat; 20. a rotating shaft; 21. a surveying instrument; 22. a handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a surveying and mapping device for construction engineering, comprising a base 1, four universal wheels 2 fixedly installed at the bottom of the base 1, fixing plates 3 fixedly installed at both sides of the base 1, two sliding rods 4 slidably installed at the inner sides of the two fixing plates 3, a same connecting plate 5 fixedly installed at the top ends of the two sliding rods 4 at the same side, springs 6 movably connected at the outer sides of the four sliding rods 4, the top ends of the springs 6 fixedly connected with the connecting plate 5, the bottom ends of the springs 6 fixedly connected with the fixing plates 3, two thread sleeves 7 fixedly installed at the top of the two connecting plates 5, bolts 8 threadedly connected in the four thread sleeves 7, a plurality of first threaded holes 9 arranged at both sides of the base 1, four fixing seats 10 fixedly installed at the top of the base 1, grooves formed at the inner sides of the four fixing seats 10, threaded rods 11 rotatably installed on the inner walls at the bottoms, one side of four fixing bases 10 all rotates installs dwang 12, dwang 12 all fixes the cover with the outside of threaded rod 11 and is equipped with conical gear 13, two conical gear 13 mesh mutually, the equal threaded connection in the outside of four threaded rod 11 has bracing piece 14, the top fixed mounting of four bracing pieces 14 has same supporting seat 19, the top of supporting seat 19 is rotated and is installed the bottom of pivot 20, the top fixed mounting of pivot 20 has surveying instrument 21, one side fixed mounting of surveying instrument 21 has handle 22.
The inner side of the threaded sleeve 7 and the outer side of the bolt 8 are respectively provided with a group of internal threads and a group of external threads, the internal threads are meshed with the external threads, so that the threaded sleeve is in threaded connection with the bolt, the inner side of the fixed plate 3 is provided with a sliding sleeve, the sliding rod 4 is in sliding connection with the fixed plate 3 through the sliding sleeve, so that the sliding rod is in sliding connection with the fixed plate, a plurality of first threaded holes 9 are sequentially arranged from top to bottom, the plurality of first threaded holes 9 are matched with the bolt 8, the bolt is conveniently in threaded connection with the first threaded holes, the inner sides of the four supporting rods 14 are respectively provided with a second threaded hole 15, the threaded rods 11 are respectively in threaded connection with the inner sides of the supporting rods 14 through the second threaded holes 15, the threaded rods 11 are conveniently in threaded connection with the supporting rods 14, the inner walls of the two, the other end of the fixing rod 18 is fixedly arranged on the outer side of the supporting rod 14 to play a certain limiting role.
In the utility model, the device is firstly moved to the position to be measured through the universal wheel 2, then the bolt 8 is rotated to rotate out the bolts 8 at both sides, then the connecting plate 5 is pressed, the bolt 8 is aligned with the first threaded hole 9 at the lowest part to rotate the bolt 8 into the first threaded hole 9, the whole device can be lifted, the whole device can be prevented from shaking when the device is used, then the four threaded rods 11 can be driven to rotate through the meshing transmission of the two bevel gears 13 by rotating the four rotating rods 12, then the four supporting rods 14 can be driven to ascend through the threaded connection relation of the supporting rods 14 and the second threaded hole 15, meanwhile, the slide block 17 ascends and moves in the chute 16, at the moment, the building engineering can be measured through the mapper 21, the height of the device can be adjusted through rotating the rotating rods 12, the device is convenient and fast, time and labor are saved, can drive surveying instrument 21 through rotating handle 22 and rotate, more convenient measure building engineering, and device stability is high, great improvement work efficiency.