CN211973634U - Manual hole digging pile earthwork vertical transportation and transportation bucket - Google Patents

Manual hole digging pile earthwork vertical transportation and transportation bucket Download PDF

Info

Publication number
CN211973634U
CN211973634U CN202020314024.5U CN202020314024U CN211973634U CN 211973634 U CN211973634 U CN 211973634U CN 202020314024 U CN202020314024 U CN 202020314024U CN 211973634 U CN211973634 U CN 211973634U
Authority
CN
China
Prior art keywords
bucket body
bucket
lantern ring
bottom lifting
lifting lug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020314024.5U
Other languages
Chinese (zh)
Inventor
吴熊熊
胡正红
吴鑫
邢好清
张斌
马林伟
吴文博
陈胜利
兰明林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd Of China Raiway First Group
Original Assignee
Fourth Engineering Co Ltd Of China Raiway First Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd Of China Raiway First Group filed Critical Fourth Engineering Co Ltd Of China Raiway First Group
Priority to CN202020314024.5U priority Critical patent/CN211973634U/en
Application granted granted Critical
Publication of CN211973634U publication Critical patent/CN211973634U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the technical field of the municipal administration construction technique and specifically relates to a novel artifical perpendicular transportation bucket of transporting in hole stake earthwork that digs. Comprises a bucket body, a bottom lifting lug, an anti-falling structure, a lifting handle, a bottom hanging plate, a fixed lantern ring, a movable lantern ring and a bolt; bottom lifting lugs are axially symmetrically arranged on the side wall of the bucket body, and the two bottom hanging plates are sleeved on the bottom lifting lugs and can rotate around the bottom lifting lugs; the upper ends of the two bottom hanging plates are fixedly connected with the two ends of the lifting handle; the outer end of the bottom lifting lug is provided with an anti-falling structure; the technical problems that in the prior art, the excavation pile earthwork allocation and transportation device is low in efficiency and earthwork is inconvenient to dump are solved. The structure is simpler, and the transportation is safer, and efficiency is higher, and it is more convenient that the earthwork is emptyd.

Description

Manual hole digging pile earthwork vertical transportation and transportation bucket
Technical Field
The utility model belongs to the technical field of the municipal administration construction technique and specifically relates to a novel artifical perpendicular transportation bucket of transporting in hole stake earthwork that digs.
Background
With the continuous development of cities, a lot of newly-built municipal works are all constructed in a limited space range, and although pile foundation construction generally reaches mechanized construction operation, in city construction, some machines cannot be constructed due to site limitation or external environment limitation. The new construction is limited by field and environmental factors, and the pile foundation construction can not be operated mechanically, so that the traditional construction method, namely manual hole digging and pile forming, is needed. The manual hole digging has high risk and great danger, and because of limited space operation, the exposure time of personnel in a dangerous environment is shortened, and the risk can be indirectly reduced, so a quick and efficient construction method is needed, the construction efficiency is improved as much as possible, the operation time is shortened, and the construction operation risk is reduced. In the manual hole digging operation, the vertical transportation time of earthwork directly determines the construction efficiency, and the traditional operation method comprises the following steps: the electric hoist is used for being matched with the bucket to carry out vertical transportation, after the bucket is transported to the ground, the lifting hook is unlocked manually, then the bucket is lifted out, after the bucket is lifted to the muck stacking position, earthwork in the bucket is transported integrally, and then the earthwork is dumped to a transport vehicle or an appointed muck storage position. Low efficiency, high danger coefficient and inconvenient earthwork pouring.
SUMMERY OF THE UTILITY MODEL
The utility model provides a novel artifical hole digging pile earthwork transports the well-bucket perpendicularly, has solved the handling bucket among the prior art, reachs the difficult technical problem who pours out of transport ground rear earthwork.
In order to achieve the above object, an embodiment of the present invention provides a bucket for vertical transportation and transportation of artificially excavated pile earthwork, which comprises a bucket body, a bottom lifting lug, an anti-dropping structure, a lifting handle, a bottom hanging plate, a fixed lantern ring, a movable lantern ring and a bolt; bottom lifting lugs are axially symmetrically arranged on the side wall of the bucket body, and the two bottom hanging plates are sleeved on the bottom lifting lugs and can rotate around the bottom lifting lugs; the upper ends of the two bottom hanging plates are fixedly connected with the two ends of the lifting handle; the outer end of the bottom lifting lug is provided with an anti-falling structure; two fixed lantern rings which are vertical to the bottom lifting lug on a straight line are arranged on the side wall of the bucket body on the upper part of any bottom lifting lug, and a gap for accommodating the insertion of the movable lantern ring is arranged between the two fixed lantern rings; the outer wall of the movable lantern ring is fixedly connected to a lifting handle which can enable the movable lantern ring to be inserted between the two fixed lantern rings; the distance between the bottom lifting lug and the bottom of the bucket body is less than half of the whole height of the bucket body; the bolt can be inserted into the through hole between the fixed lantern ring and the movable lantern ring.
Furthermore, anti-disengaging structure is an anti-disengaging baffle, anti-disengaging baffle one end fixed connection is in bottom lug outside end, and other end downward sloping fixed connection is on the lateral wall of well-bucket body.
Further, the bottom lug is cylindrical steel bar structure.
Furthermore, a shaft sleeve is fixedly arranged on the bottom lifting lug, and the bottom hanging plate is fixedly connected with the shaft sleeve.
Furthermore, the distance from the upper end of the fixed lantern ring to the upper edge of the bucket body is one third of the height of the bucket body.
Furthermore, the height of the bottom lifting lug from the bottom of the bucket body is less than one fifth of the whole height of the bucket body.
The embodiment of the utility model provides a beneficial effect who compares prior art is: the earthwork is more safely transferred and transported, and the earthwork can be poured out more conveniently after being transported to the destination, thereby saving time and labor.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic perspective view of an embodiment of the present invention.
Fig. 2 is a schematic side view of an embodiment of the present invention.
Fig. 3 is a usage state diagram of the embodiment of the present invention.
Description of reference numerals: 1. a bucket; 2. a bottom lifting lug; 3. an anti-drop baffle plate; 4. lifting the handle; 5. hanging a plate at the bottom; 6. a fixed collar; 7. a movable collar; 8. and (4) a bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a following technical scheme: a bucket for vertically transporting and transporting earthwork of a manual hole digging pile comprises a bucket body, a bottom lifting lug, an anti-falling structure, a lifting handle, a bottom hanging plate, a fixed lantern ring, a movable lantern ring and a bolt; bottom lifting lugs are axially symmetrically arranged on the side wall of the bucket body, and the two bottom hanging plates are sleeved on the bottom lifting lugs and can rotate around the bottom lifting lugs; the upper ends of the two bottom hanging plates are fixedly connected with the two ends of the lifting handle; the outer end of the bottom lifting lug is provided with an anti-falling structure; two fixed lantern rings which are vertical to the bottom lifting lug on a straight line are arranged on the side wall of the bucket body on the upper part of any bottom lifting lug, and a gap for accommodating the insertion of the movable lantern ring is arranged between the two fixed lantern rings; the outer wall of the movable lantern ring is fixedly connected to a lifting handle which can enable the movable lantern ring to be inserted between the two fixed lantern rings; the distance between the bottom lifting lug and the bottom of the bucket body is less than half of the whole height of the bucket body; the bolt can be inserted into the through hole between the fixed lantern ring and the movable lantern ring.
Before the earthwork is filled with the soil, the bolt is inserted into the fixed sleeve ring and the movable sleeve ring, so that the bucket body is fixed with the lifting handle to prevent the bucket body from overturning, then the bucket body is transported by a crane, and after the bucket body is transported to a destination, the bolt is pulled out. Thereby effectively solve the earthwork allocation and transportation bucket among the prior art, the earthwork is after allocating and transporting to the destination, and the technical problem that the earthwork is difficult for pouring out uses safelyr, and it is more convenient, labour saving and time saving to pour out the earthwork.
Referring to fig. 1-3, the embodiment of the present invention is described in detail, and an embodiment of the present invention provides a bucket for manual hole digging pile earthwork vertical transportation and transportation, including a bucket body 1, a bottom lifting lug 2, an anti-drop baffle 3, a lifting handle 4, a bottom hanging plate 5, a fixed lantern ring 6, a movable lantern ring 7 and a bolt 8; the bucket body 1 is a steel bucket, and the upper part of the bucket body is provided with an opening. The side wall of the bucket body 1 is axisymmetrically provided with bottom lifting lugs 2, and two steel bottom hanging plates 5 are vertically sleeved on the bottom lifting lugs 2 and can rotate around the bottom lifting lugs 2; the upper ends of the two bottom hanging plates 5 are welded at the two ends of the lifting handle 4; the outer end of the bottom lifting lug 2 is provided with an anti-drop baffle 3; and one end of the anti-falling baffle 3 is fixedly connected to the end head of the outer side of the bottom lifting lug 2, and the other end of the anti-falling baffle is downwards inclined by 45 degrees and fixedly welded on the side wall of the bucket body 1. Two fixed lantern rings 6 which are vertical to the bottom lifting lug 2 in a straight line are welded on the side wall of the bucket body 1 at the upper part of any bottom lifting lug 2, a gap for accommodating the insertion of a movable lantern ring 7 is formed between the two fixed lantern rings 6, the movable lantern ring 7 is inserted between the two fixed lantern rings 6 when the bucket body 1 is fixed, and then the bolt 8 is inserted for fixing; the outer wall of the movable lantern ring 7 is fixedly connected to a lifting handle 4 which can enable the movable lantern ring 7 to be inserted between the two fixed lantern rings 6; the distance between the bottom lifting lug 2 and the bottom of the bucket body 1 is less than half of the whole height of the bucket body, so that after the bucket body 1 is filled with earthwork and the bolt 8 is pulled out, the bucket body 1 can rotate around the bottom lifting lug 2, the bucket body 1 is opened downwards, and the earthwork is poured out; the bolt 8 can be inserted into a through hole between the fixed lantern ring 6 and the movable lantern ring 7 and is used for fixing the bucket body 1 to prevent rotation.
Exemplarily, anti-disengaging structure is 2 external diameters and is greater than the nut structure of the internal diameter in the hole on bottom link plate 5, realizes swing joint through the screw thread that matches with the nut in 2 outside end settings of bottom lug. Thereby being used for realizing the spacing of the bottom hanging plate 5.
Illustratively, to make the overall apparatus less costly, the further bottom lug 2 is of cylindrical rebar construction.
Exemplarily, in order to make the overturning of the bucket body 1 more flexible, further, a shaft sleeve is further fixedly arranged on the bottom lifting lug 2, and the bottom hanging plate 5 is fixedly connected with the shaft sleeve.
Illustratively, the distance from the upper end of the fixing collar 6 to the upper edge of the bucket body 1 is one third of the height of the bucket body 1.
Illustratively, the height of the bottom lifting lug 2 from the bottom of the bucket body 1 is less than one fifth of the whole height of the bucket body.
Exemplarily, bolt 8 is formed for the round steel clod wash, and the tip is buckled 90, prevents to drop, and the reinforcing bar diameter is less than the lantern ring internal bore can.
Exemplarily, promote handle 4 and form for the round steel cold-formed, the handle bottom sets up steel bottom link plate 5, and 5 bottom intermediate position trompils of bottom link plate, hole site penetrate bottom lug 2, promote handle 4 and bottom link plate 5 adoption welded connection, the full weld of welding seam.
The utility model discloses working process and theory of operation are:
before the work, insert the bolt 8 in the through-hole of the fixed lantern ring 6 and the activity lantern ring 7, it is fixed with well-bucket body 1, prevent rotatoryly, then the splendid attire earthwork completion in the well-bucket body 1 again, use electronic hoist, transfer promotion handle 4, along with the perpendicular handling of well-bucket to ground, electronic hoist translation well-bucket to earthwork parking position, the manual work is extracted bolt 8, well-bucket body 1 is because action of gravity, and the automatic toppling is accomplished the earthwork and is emptyd. After the earthwork is dumped and completed in the bucket, the bucket is reset by manual operation, when two fixed lantern rings 6 and a movable lantern ring 7 reach the same vertical line in the vertical direction, a bolt 8 is manually inserted into through holes of the fixed lantern rings 6 and the movable lantern rings 7, and the bucket body 1 is fixed. And then, transporting the bucket into the hole, and carrying out next cycle construction and reciprocating operation.
1. The utility model is suitable for a manual work is dug the hole and is become the stake construction, through the innovation to handling equipment, simplifies the earthwork transportation and emptys the operation flow, has reduced construction operation time for the construction progress reduces the exposure time of personnel in the risk environment then.
2. The utility model discloses all materials are the common log of site operation, and most materials all can utilize current waste material to improve, then artifical field processing preparation, consequently can reduce equipment purchase and manufacturing cost.
3. The utility model discloses the simple operation does not need the special personnel operation, only needs ordinary worker kind, and alone can accomplish the work of transporting, has consequently reduced the cost of labor.
4. The utility model discloses not only can be used for artifical bored pile construction operation, also can popularize and be applied to in the perpendicular transportation construction operation of a small amount of earthwork, can suitably enlarge equipment or adjusting device, then be applied to in the concrete construction operation.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a perpendicular transportation well-bucket of artifical hole digging pile earthwork, its characterized in that: comprises a bucket body (1), a bottom lifting lug (2), an anti-drop structure, a lifting handle (4), a bottom hanging plate (5), a fixed lantern ring (6), a movable lantern ring (7) and a bolt (8); the side wall of the bucket body (1) is axially symmetrically provided with bottom lifting lugs (2), and the two bottom hanging plates (5) are sleeved on the bottom lifting lugs (2) and can rotate around the bottom lifting lugs (2); the upper ends of the two bottom hanging plates (5) are fixedly connected with the two ends of the lifting handle (4); the outer end of the bottom lifting lug (2) is provided with an anti-falling structure; the side wall of the bucket body (1) at the upper part of any bottom lifting lug (2) is provided with two fixed lantern rings (6) which are in a vertical straight line with the bottom lifting lug (2), and a gap for accommodating the insertion of a movable lantern ring (7) is arranged between the two fixed lantern rings (6); the outer wall of the movable lantern ring (7) is fixedly connected to a lifting handle (4) which can enable the movable lantern ring (7) to be inserted between the two fixed lantern rings (6); the height from the bottom lifting lug (2) to the bottom of the bucket body (1) is less than half of the whole height of the bucket body (1); the plug pin (8) can be inserted into the through hole between the fixed lantern ring (6) and the movable lantern ring (7).
2. The manual bored pile earthwork vertical transport and transfer bucket according to claim 1, wherein: the anti-disengaging structure is an anti-disengaging baffle (3), one end of the anti-disengaging baffle (3) is fixedly connected to the end head of the outer side of the bottom lifting lug (2), and the other end of the anti-disengaging baffle is downwards inclined and fixedly connected to the side wall of the bucket body (1).
3. The manual hole digging pile earthwork vertical transportation and transfer bucket according to claim 2, which is characterized in that: the bottom lifting lug (2) is of a cylindrical steel bar structure.
4. The manual bored pile earthwork vertical transport and transfer bucket according to claim 3, wherein: the bottom lifting lug (2) is fixedly provided with a shaft sleeve, and the bottom hanging plate (5) is fixedly connected with the shaft sleeve.
5. The manual bored pile earthwork vertical transport and transfer bucket of claim 4, wherein: the distance between the upper end of the fixed lantern ring (6) and the upper edge of the bucket body (1) is one third of the height of the bucket body (1).
6. The manual hole digging pile earthwork vertical transportation and transfer bucket according to claim 5, wherein: the distance from the bottom lifting lug (2) to the bottom of the bucket body (1) is less than one fifth of the whole height of the bucket body (1).
CN202020314024.5U 2020-03-13 2020-03-13 Manual hole digging pile earthwork vertical transportation and transportation bucket Active CN211973634U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020314024.5U CN211973634U (en) 2020-03-13 2020-03-13 Manual hole digging pile earthwork vertical transportation and transportation bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020314024.5U CN211973634U (en) 2020-03-13 2020-03-13 Manual hole digging pile earthwork vertical transportation and transportation bucket

Publications (1)

Publication Number Publication Date
CN211973634U true CN211973634U (en) 2020-11-20

Family

ID=73394088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020314024.5U Active CN211973634U (en) 2020-03-13 2020-03-13 Manual hole digging pile earthwork vertical transportation and transportation bucket

Country Status (1)

Country Link
CN (1) CN211973634U (en)

Similar Documents

Publication Publication Date Title
CN108560545B (en) Construction method for preventing hole collapse of rotary digging pile and hole collapse preventing device
CN211973634U (en) Manual hole digging pile earthwork vertical transportation and transportation bucket
CN213867838U (en) Secant pile joint pipe
CN104652424A (en) Movable lifting hook for lifting reinforcing cage
CN201914835U (en) Vertical transportation cradle
CN215287675U (en) Hoisting tool for steel reinforcement cage
CN207553084U (en) A kind of variable diameters PHC piles
CN204551442U (en) A kind of reinforcing bar cage hoisting movable hook
CN211922777U (en) Device for cleaning silt in vertical concrete pile core
CN210973576U (en) Bucket locking and dumping integrated device
CN212126055U (en) Slag discharging barrel for manual hole digging pile
CN204940268U (en) Iron tower foundation stay rod stone excavation retaining wall and safeguard structure thereof
CN211691503U (en) Building material handling bucket
CN209797333U (en) semi-automatic lifting equipment for manual hole digging pile
CN209053107U (en) A kind of steel cofferdam
CN217146910U (en) Manual hole digging pile soil square dumping barrel
CN217377088U (en) Gantry crane turns over sediment auxiliary device
CN214733953U (en) Hand detachable hoisting device for digging foundation of iron tower
CN212200432U (en) Pile foundation concrete pouring device
CN219638419U (en) Concrete placement device for construction
CN214883661U (en) Quick soil sampling tool for precast tubular pile core
CN214495429U (en) Height-adjustable hopper for construction site
CN213709105U (en) Asphalt transportation turnover device for building construction
CN219527657U (en) A concrete placement device for mountain region
CN217229973U (en) Quick vertical hoisting device of engineering pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant