CN211954164U - On-spot mapping device of building engineering cost - Google Patents
On-spot mapping device of building engineering cost Download PDFInfo
- Publication number
- CN211954164U CN211954164U CN202021075641.0U CN202021075641U CN211954164U CN 211954164 U CN211954164 U CN 211954164U CN 202021075641 U CN202021075641 U CN 202021075641U CN 211954164 U CN211954164 U CN 211954164U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- framework
- pinion
- side wall
- output shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Transmission Devices (AREA)
Abstract
The utility model discloses an on-spot mapping device of building engineering cost, the fruit pick-up device comprises a frame body, a plurality of locking universal wheels of framework bottom fixedly connected with, be equipped with the bearer bar in the framework, the framework top is equipped with the storage port with bearer bar looks adaptation, framework lateral wall fixedly connected with motor, the one end that the motor was kept away from to the output shaft is rotated with the framework inside wall and is connected, the output shaft is connected with the axis of rotation through meshing mechanism, the one end that the motor was kept away from to the axis of rotation rotates with the framework inside wall to be connected, be equipped with adjustment mechanism on the installation piece, the installation piece is connected with the rotor plate, adjustment mechanism passes through coupling mechanism and is connected with the rotor plate, the rotor plate. The utility model discloses a cooperation of motor, output shaft, axis of rotation, first gear wheel, second gear wheel, first pinion, second pinion and rack is used, has realized the regulation to the device survey and drawing height.
Description
Technical Field
The utility model relates to a building engineering survey and drawing technical field especially relates to a building engineering cost is at scene mapping device.
Background
The workpiece is taken into a computer to be processed and amplified by 18 to 230 times by combining with an optical, mechanical and electrical integration, the processed workpiece is displayed on a screen, the processed workpiece can be directly photographed and filed or surface observation, measurement and drawing can be carried out, measured data can be subjected to SPC statistics to prepare an EXCEL report, a drawing file can be converted into AUTOCAD application, an AUTOCAD graph can also be called into computer software to be compared with the workpiece to prepare data, and the data can be stored and printed on the computer and further can be transmitted through a network.
The traditional construction project cost on-site mapping device has single function, cannot adjust height and angle, and cannot visually know relevant information of construction of a project in time, so that estimation and mapping of workers are influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the existing problems in the prior art and providing a construction engineering cost on-site mapping device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a construction engineering cost on-site surveying and mapping device comprises a frame body, wherein a plurality of locking universal wheels are fixedly connected to the bottom of the frame body, a protective frame is arranged in the frame body, a containing opening matched with the protective frame is formed in the top of the frame body, a motor is fixedly connected to the outer side wall of the frame body, an output shaft is fixedly connected to the output end of the motor, one end, away from the motor, of the output shaft is rotatably connected with the inner side wall of the frame body, the output shaft is connected with a rotating shaft through a meshing mechanism, one end, away from the motor, of the rotating shaft is rotatably connected with the inner side wall of the frame body, the protective frame is connected with the meshing mechanism, a telescopic rod is fixedly connected to the bottom of the protective frame, a sliding plate is fixedly connected to the top of the telescopic rod, an installation block, the rotating plate is connected with a surveying instrument body through a fixing mechanism.
Preferably, the meshing mechanism includes the first gear wheel of fixed connection at the output shaft lateral wall, the second gear wheel has been cup jointed to the axis of rotation lateral wall is fixed, first gear wheel is connected with the meshing of second gear wheel, output shaft and axis of rotation lateral wall are fixed the cup joint respectively and are had first pinion and second pinion, bearer bar lateral wall fixedly connected with and the rack of first pinion and second pinion looks adaptation, first pinion and second pinion and rack toothing are connected.
Preferably, installation piece top fixedly connected with fixed block, fixed block lateral wall fixedly connected with axis of rotation, be equipped with the rotation mouth with the looks adaptation of axis of rotation on the rotor plate, the rotation mouth inside wall rotates with the axis of rotation lateral wall and cup joints.
Preferably, adjustment mechanism is including seting up the mounting groove on the installation piece, mounting groove inside wall fixedly connected with dead lever, dead lever lateral wall sliding connection has the slider, dead lever lateral wall cover is equipped with reset spring, the reset spring both ends respectively with slider bottom and mounting groove inside wall fixed connection, be equipped with a plurality of spacing grooves that are linked together with the mounting groove on the installation piece, sliding connection has the gag lever post on the slider, spacing groove and gag lever post looks adaptation.
Preferably, the connecting mechanism comprises a connecting block fixedly connected to the bottom of the rotating plate, and the connecting block is rotatably connected with the sliding block through a connecting rod.
Preferably, fixed establishment includes that two fixed connection are the connecting plate that the symmetry set up at the rotor plate top, two all seted up the screw thread mouth on the connecting plate, screw thread mouth inside wall threaded connection has the threaded rod, two the relative one end of threaded rod offsets with the surveying instrument body.
Compared with the prior art, the utility model has the following advantage:
1. the utility model discloses a cooperation of motor, output shaft, axis of rotation, first gear wheel, second gear wheel, first pinion, second pinion and rack is used, has realized the regulation to the device survey and drawing height.
2. The utility model discloses an installation piece, rotor plate, connecting plate, threaded rod, connecting rod, dead lever, slider and reset spring's cooperation is used, has realized the regulation to the survey and drawing angle.
Drawings
Fig. 1 is a schematic view of a front connection structure of a construction cost on-site surveying and mapping device provided by the utility model;
FIG. 2 is a schematic view of the connection structure of the engagement mechanism in the construction cost on-site surveying and mapping apparatus of the present invention;
fig. 3 is the utility model provides a building engineering cost on-site mapping device's an enlarged view of A department.
In the figure: the device comprises a frame body 1, a protective frame 2, a motor 3, an output shaft 4, a rotating shaft 5, a first bull gear 6, a second bull gear 7, a first pinion 8, a second pinion 9, a telescopic rod 10, a sliding plate 11, a mounting block 12, a rotating plate 13, a connecting plate 14, a threaded rod 15, a surveying instrument body 16, a mounting groove 17, a fixing rod 18, a sliding block 19, a return spring 20 and a connecting rod 21.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-3, an on-site mapping device for construction cost of building engineering comprises a frame body 1, a plurality of locking universal wheels are fixedly connected to the bottom of the frame body 1, a protection frame 2 is arranged in the frame body 1, a containing opening matched with the protection frame 2 is formed in the top of the frame body 1, a motor 3 is fixedly connected to the outer side wall of the frame body 1, an output shaft 4 is fixedly connected to the output end of the motor 3, one end, away from the motor 3, of the output shaft 4 is rotatably connected to the inner side wall of the frame body 1, the output shaft 4 is connected with a rotating shaft 5 through a meshing mechanism, one end, away from the motor 3, of the rotating shaft 5 is rotatably connected to the inner side wall of the frame;
the protective frame 2 is connected with an engaging mechanism, the engaging mechanism comprises a first large gear 6 fixedly connected to the outer side wall of the output shaft 4, a second large gear 7 is fixedly sleeved on the outer side wall of the rotating shaft 5, the first large gear 6 is meshed with the second large gear 7, a first small gear 8 and a second small gear 9 are fixedly sleeved on the outer side walls of the output shaft 4 and the rotating shaft 5 respectively, a rack matched with the first small gear 8 and the second small gear 9 is fixedly connected to the side wall of the protective frame 2, the first small gear 8 and the second small gear 9 are meshed with the rack, wherein the first large gear 6 is meshed with the second large gear 7, the rotating directions of the output shaft 4 and the rotating shaft 5 are opposite, and therefore the protective frame 2 can move towards the same direction by the first small gear 8 and the second small gear 9;
the bottom in the protective frame 2 is fixedly connected with a telescopic rod 10, the top of the telescopic rod 10 is fixedly connected with a sliding plate 11, wherein the telescopic rod 10 is the prior art, detailed description is omitted, and the surveying instrument body 16 is placed in the protective frame 2 for protection when not needed;
the top of the sliding plate 11 is fixedly connected with an installation block 12, the top of the installation block 12 is fixedly connected with a fixed block, the outer side wall of the fixed block is fixedly connected with a rotating shaft, a rotating port matched with the rotating shaft is arranged on a rotating plate 13, the inner side wall of the rotating port is rotatably sleeved with the outer side wall of the rotating shaft, an adjusting mechanism is arranged on the installation block 12 and comprises an installation groove 17 arranged on the installation block 12, a fixed rod 18 is fixedly connected to the inner side wall of the installation groove 17, the outer side wall of the fixed rod 18 is slidably connected with a sliding block 19, a reset spring 20 is sleeved on the outer side wall of the fixed rod 18, two ends of the reset spring 20 are;
the mounting block 12 is provided with a plurality of limiting grooves communicated with the mounting groove 17, the sliding block 19 is connected with a limiting rod in a sliding manner, the limiting grooves are matched with the limiting rod, when the angle is adjusted, the sliding block 19 can be fixed only by inserting the limiting rod into the corresponding limiting grooves in a sliding manner, so that the angle is fixed, and the stability of the device is improved;
The utility model discloses specific theory of operation as follows:
in an initial state, a surveying instrument body 16 is placed on a rotating plate 13, the surveying instrument body 16 is fixed between two connecting plates 14 through the matching use of a threaded rod 15 and a threaded opening, when the surveying instrument body is required to be used, a motor 3 is started, the motor 3 works to drive an output shaft 4 to rotate, the output shaft 4 rotates to drive a first big gear 6 to rotate, and the first big gear 6 rotates to drive a second big gear 7 to rotate so as to drive a rotating shaft 5 to rotate;
the output shaft 4 and the rotating shaft 5 rotate to drive the first pinion 8 and the second pinion 9 to rotate, and the first pinion 8 and the second pinion 9 are meshed with the rack on the side wall of the protection frame 2 to further lift the protection frame 2, wherein the motor 3 is a servo motor, which is the prior art and is not described in detail herein, and the motor 3 drives the output shaft 4 to rotate forward and backward to further control the lifting of the protection frame 2;
when not needing, can accomodate surveying instrument body 16 inside into bearer bar 2, when needs use, stretch out bearer bar 2 with surveying instrument body 16 through telescopic link 10 outside, when needs angle regulation, slide block 19 about only needing, slide block 19 from top to bottom can drive rotor plate 13 through connecting rod 21 and take place to deflect, and then drive surveying instrument body 16 angle on the rotor plate 13 and take place to deflect, has improved the application scope of device.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a construction engineering cost on-site mapping device, includes framework (1), its characterized in that, a plurality of locking universal wheels of framework (1) bottom fixedly connected with, be equipped with protecting frame (2) in framework (1), framework (1) top is equipped with the storage opening with protecting frame (2) looks adaptation, framework (1) lateral wall fixedly connected with motor (3), motor (3) output end fixedly connected with output shaft (4), the one end that motor (3) were kept away from in output shaft (4) is connected with framework (1) inside wall rotation, output shaft (4) are connected with axis of rotation (5) through engagement mechanism, the one end that motor (3) were kept away from in axis of rotation (5) is connected with framework (1) inside wall rotation, protecting frame (2) are connected with engagement mechanism, bottom fixedly connected with telescopic link (10) in protecting frame (2), telescopic link (10) top fixedly connected with slide (11), slide (11) top fixedly connected with installation piece (12), be equipped with adjustment mechanism on installation piece (12), installation piece (12) are connected with rotor plate (13), adjustment mechanism passes through coupling mechanism and is connected with rotor plate (13), rotor plate (13) are connected with surveying instrument body (16) through fixed establishment.
2. The on-site mapping device of building engineering cost of claim 1, characterized in that, meshing mechanism includes first gear wheel (6) of fixed connection at output shaft (4) lateral wall, second gear wheel (7) has been cup jointed to axis of rotation (5) lateral wall is fixed, first gear wheel (6) is connected with the meshing of second gear wheel (7), output shaft (4) and axis of rotation (5) lateral wall are fixed respectively and have been cup jointed first pinion (8) and second pinion (9), fender casing (2) lateral wall fixedly connected with the rack of first pinion (8) and second pinion (9) looks adaptation, first pinion (8) and second pinion (9) are connected with the rack toothing.
3. The construction cost on-site surveying and mapping device according to claim 1, wherein a fixed block is fixedly connected to the top of the mounting block (12), a rotating shaft is fixedly connected to the outer side wall of the fixed block, a rotating port matched with the rotating shaft is formed in the rotating plate (13), and the inner side wall of the rotating port is rotatably sleeved with the outer side wall of the rotating shaft.
4. The construction cost field surveying and mapping device according to claim 1, wherein the adjusting mechanism includes a mounting groove (17) formed on the mounting block (12), a fixing rod (18) is fixedly connected to an inner side wall of the mounting groove (17), a sliding block (19) is slidably connected to an outer side wall of the fixing rod (18), a return spring (20) is sleeved on an outer side wall of the fixing rod (18), two ends of the return spring (20) are respectively fixedly connected to a bottom of the sliding block (19) and an inner side wall of the mounting groove (17), a plurality of limiting grooves communicated with the mounting groove (17) are formed on the mounting block (12), a limiting rod is slidably connected to the sliding block (19), and the limiting grooves are matched with the limiting rod.
5. A construction cost on-site surveying and mapping device according to claim 4, characterized in that said connection mechanism comprises a connection block fixedly connected to the bottom of the rotating plate (13), said connection block being rotatably connected to the slide block (19) by means of a connection rod (21).
6. The construction cost on-site surveying and mapping device according to claim 1, wherein the fixing mechanism comprises two connecting plates (14) which are fixedly connected to the top of the rotating plate (13) and symmetrically arranged, each of the two connecting plates (14) is provided with a threaded opening, a threaded rod (15) is connected to the inner side wall of each threaded opening in a threaded manner, and the opposite ends of the two threaded rods (15) abut against the surveying and mapping instrument body (16).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021075641.0U CN211954164U (en) | 2020-06-10 | 2020-06-10 | On-spot mapping device of building engineering cost |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021075641.0U CN211954164U (en) | 2020-06-10 | 2020-06-10 | On-spot mapping device of building engineering cost |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211954164U true CN211954164U (en) | 2020-11-17 |
Family
ID=73159483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021075641.0U Expired - Fee Related CN211954164U (en) | 2020-06-10 | 2020-06-10 | On-spot mapping device of building engineering cost |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211954164U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112432033A (en) * | 2020-12-14 | 2021-03-02 | 江苏理工学院 | Electronic information display device based on user experience |
CN113188019A (en) * | 2021-05-18 | 2021-07-30 | 河南慎远工程咨询有限公司 | Engineering mapping equipment appurtenance |
CN113811125A (en) * | 2021-09-23 | 2021-12-17 | 山东省国土测绘院 | Data acquisition communicator for internet information security construction |
CN114198622A (en) * | 2021-11-29 | 2022-03-18 | 安徽华顺工程建设咨询有限公司 | Building engineering cost mapping equipment |
CN114674298A (en) * | 2022-03-31 | 2022-06-28 | 宏源工程管理有限公司 | Building engineering cost on-site mapping device based on BIM technology |
CN115031126A (en) * | 2022-05-31 | 2022-09-09 | 陈磊刚 | Screen display positioning device for remote sensing mapping of territorial space planning and use method thereof |
-
2020
- 2020-06-10 CN CN202021075641.0U patent/CN211954164U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112432033A (en) * | 2020-12-14 | 2021-03-02 | 江苏理工学院 | Electronic information display device based on user experience |
CN113188019A (en) * | 2021-05-18 | 2021-07-30 | 河南慎远工程咨询有限公司 | Engineering mapping equipment appurtenance |
CN113811125A (en) * | 2021-09-23 | 2021-12-17 | 山东省国土测绘院 | Data acquisition communicator for internet information security construction |
CN114198622A (en) * | 2021-11-29 | 2022-03-18 | 安徽华顺工程建设咨询有限公司 | Building engineering cost mapping equipment |
CN114674298A (en) * | 2022-03-31 | 2022-06-28 | 宏源工程管理有限公司 | Building engineering cost on-site mapping device based on BIM technology |
CN115031126A (en) * | 2022-05-31 | 2022-09-09 | 陈磊刚 | Screen display positioning device for remote sensing mapping of territorial space planning and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211954164U (en) | On-spot mapping device of building engineering cost | |
CN209820477U (en) | Open-air engineering survey and drawing auxiliary device | |
CN113465537A (en) | Three-dimensional laser scanner and system thereof | |
CN214308600U (en) | Intelligent CCD visual positioner | |
CN106704778A (en) | tripod head camera | |
CN215952570U (en) | Convenient operation tool of displacement monitoring point | |
CN217875137U (en) | Distance measuring device for telescopic cross arm | |
CN214641621U (en) | High-precision docking device for laser vision fusion in complex illumination environment | |
CN214666628U (en) | Underwater three-dimensional laser scanning structure convenient to fix and disassemble | |
CN214870413U (en) | Three-degree-of-freedom attitude adjusting device | |
CN211321764U (en) | Electric automation control cabinet with antiskid | |
CN213840311U (en) | Camera supporting device | |
CN213840107U (en) | Multi-angle building surveying instrument for building engineering | |
CN218411155U (en) | Vault settlement monitoring device | |
CN214500753U (en) | Remote sensing type multifunctional electric power surveying instrument | |
CN215807661U (en) | Building construction supervision device based on BIM | |
CN214309586U (en) | Soil sampling device for agricultural environmental protection | |
CN220120977U (en) | Distance measuring equipment for measurement | |
CN217167012U (en) | Precise chamfering device for mechanical arm upper cover | |
CN113701731B (en) | Convenient operating tool for displacement monitoring point | |
CN212677232U (en) | Panoramic shooting network camera | |
CN211012957U (en) | On-spot mapping device of building engineering cost | |
CN220418466U (en) | Land resource mapping device | |
CN221629422U (en) | Concealed security camera | |
CN212273591U (en) | Face recognition instrument |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201117 Termination date: 20210610 |
|
CF01 | Termination of patent right due to non-payment of annual fee |