CN211012957U - On-spot mapping device of building engineering cost - Google Patents

On-spot mapping device of building engineering cost Download PDF

Info

Publication number
CN211012957U
CN211012957U CN201922141507.XU CN201922141507U CN211012957U CN 211012957 U CN211012957 U CN 211012957U CN 201922141507 U CN201922141507 U CN 201922141507U CN 211012957 U CN211012957 U CN 211012957U
Authority
CN
China
Prior art keywords
box body
mapping
surveying
inner panel
lifter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922141507.XU
Other languages
Chinese (zh)
Inventor
尹秀清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922141507.XU priority Critical patent/CN211012957U/en
Application granted granted Critical
Publication of CN211012957U publication Critical patent/CN211012957U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a: a field surveying and mapping device for construction engineering cost comprises a surveying and mapping main body, wherein a display and an eyepiece are arranged on the surveying and mapping main body, and an adjusting screw and a positioning buckle are arranged at one end of the surveying and mapping main body; the survey and drawing main part is connected with the lifter of lower part, the lifter removes in the box body, box body both ends fixed mounting has the inner panel, be equipped with on the inner panel with box body upper groove complex lug, the inner panel is installed in gomphosis piece bottom, gomphosis piece both ends are equipped with the gomphosis groove of mutually supporting. The adjustable use height of mapping device under the effect that the lifter is connected to and through the inner panel with the stable box body of putting into of location knot, the inner panel is a complete cuboid structure through the box body cooperation behind the gomphosis piece lock, realize safe, convenient carrying. The equipment has the advantages of reasonable structural design and convenient carrying.

Description

On-spot mapping device of building engineering cost
Technical Field
The utility model belongs to the technical field of engineering equipment, concretely relates to on-spot mapping device of building engineering cost.
Background
Surveying instruments, in short, are instruments and devices for data acquisition, processing, output, etc. designed and manufactured for surveying and mapping operations. In engineering construction, various instruments in aspects of orientation, distance measurement, angle measurement, height measurement, mapping, photogrammetry and the like are required for measurement in planning and designing, construction and operation management stages.
The utility model discloses an applied for on-spot mapping device of building engineering cost in the patent of CN207946094U, the device combines the terminal intrinsic notch fastening of side to install in equipment below inner wall through the shell, directly pass through the palm wrench movement frame when carrying out on-the-spot survey and drawing, it is rotatory to make the pivot drive the driving gear along the intrinsic rack continuous meshing of the inside side wall of shell, the transmission power of motion draws driven gear and continues the rotation according to the dead axle level, adjust mapping equipment's direction, save artifical labour and time, thereby keep the accuracy of drawing the measured data position, improve work efficiency. But it has the disadvantage that the device portability issue is not taken into account.
The utility model discloses a construction engineering cost on-site mapping device for CN206038007U, including the surveying instrument, a controller, landing leg and display, surveying instrument fixed mounting is in the top of revolving stage, one side of surveying instrument is equipped with infrared detection instrument, be fixed connection between revolving stage and the base, the right side of base is connected with notebook place the platform, the controller is installed in the telescopic outside of landing leg, and be electric connection between controller and the surveying instrument, be connected through adjusting bolt between landing leg and the landing leg sleeve, instrument mounting platform's right-hand member is connected with the base, spirit level fixed mounting is in instrument mounting platform's top, printer fixed mounting is in instrument mounting platform's top, display fixed mounting is in instrument mounting platform's top. The construction project cost site surveying and mapping device is designed aiming at the working property and the working environment of construction project cost surveying and mapping workers, and is strong in pertinence. The portable water-cooled water-.
Therefore, there is a need for a portable construction cost on-site mapping device that is accurate in measurement.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a portable on-spot mapping device for building engineering cost to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a field surveying and mapping device for construction engineering cost comprises a surveying and mapping main body, wherein a display and an eyepiece are arranged on the surveying and mapping main body, and an adjusting screw and a positioning buckle are arranged at one end of the surveying and mapping main body; the survey and drawing main part is connected with the lifter of lower part, the lifter removes in the box body, box body both ends fixed mounting has the inner panel, be equipped with on the inner panel with box body upper groove complex lug, the inner panel is installed in gomphosis piece bottom, gomphosis piece both ends are equipped with the gomphosis groove of mutually supporting.
The adjustable use height of mapping device under the effect that the lifter is connected to and through the inner panel with the stable box body of putting into of location knot, the inner panel is a complete cuboid structure through the box body cooperation behind the gomphosis piece lock, realize safe, convenient carrying.
Preferably, the box body include locating piece, vertical spout, horizontal spout and slot, the locating piece sets up at the box body both ends, vertical spout, horizontal spout are the cross, the slot sets up in the box body bottom, and the locating piece is detained the survey and drawing main part in the fixed box body of cooperation with the location, and the position of survey and drawing main part when the spout of cross is convenient for survey and drawing removes, and the setting of slot can use the original height of the fixed survey and drawing main part of the steel pipe on building engineering cost scene.
Preferably, the number of the embedded blocks is two, and the two embedded blocks are clamped and fixed through the embedded groove, so that the two embedded blocks are conveniently and completely buckled.
Preferably, the inner plates are arranged in two numbers, and the inner plates are respectively in sliding connection with the box body and the embedded blocks, so that the quick use and storage of the surveying and mapping main body in the box body are realized.
Preferably, the height of survey and drawing main part be no less than the box body height, realize that the location of survey and drawing main part is deposited.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the survey and drawing main part is buckled stable the putting into box body through inner panel and location, and the inner panel cooperates through the box body after with the gomphosis piece lock to a complete cuboid structure, realizes safe, convenient carrying.
(2) The inside two-way spout that sets up of box body realizes the nimble removal of survey and drawing main part, and the fixed stability when improving survey and drawing main part box body of the inside locating piece of box body and inner panel.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the inner surface of the box of the present invention;
fig. 3 is a schematic view of the bottom structure of the box body of the present invention.
In the figure: 1. surveying and mapping the subject; 2. a display; 3. an eyepiece; 4. a fitting groove; 5. an inner plate; 6. a bump; 7. a box body; 7-1, positioning blocks; 7-2, a longitudinal chute; 7-3, a transverse chute; 7-4, a slot; 8. a groove; 9. a fitting block; 10. a lifting rod; 11. adjusting the screw; 12 positioning buckle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, a field mapping apparatus for construction cost of construction engineering includes a mapping main body 1, characterized in that: the surveying and mapping main body 1 is provided with a display 2 and an ocular lens 3, and one end of the surveying and mapping main body 1 is provided with an adjusting screw 11 and a positioning buckle 12; the surveying and mapping main body 1 is connected with a lower lifting rod 10, and the lifting rod 10 moves in the box body 7.
The two ends of the box body 7 are fixedly provided with the inner plates 5, the box body 7 comprises a positioning block 7-1, a longitudinal sliding groove 7-2, a transverse sliding groove 7-3 and a slot 7-4, the positioning block 7-1 is arranged at the two ends of the box body 7, the longitudinal sliding groove 7-2 and the transverse sliding groove 7-3 are crossed, the slot 7-4 is arranged at the bottom of the box body 7, the positioning block and the positioning buckle are matched to fix a surveying and mapping main body in the box body, the crossed sliding groove is convenient for position movement of the surveying and mapping main body during surveying and mapping, and the slot can be arranged to use the original height of the steel pipe fixing surveying and mapping main body.
The inner plate 5 is provided with a convex block 6 matched with a groove 8 on the box body 7, the inner plate 5 is arranged at the bottom of the embedding block 9, the number of the inner plates 5 is two, and the inner plates 5 are respectively connected with the box body 7 and the embedding block 9 in a sliding manner. The two ends of the tabling block 9 are provided with tabling grooves 4 which are matched with each other, the two tabling blocks 9 are arranged in two, and the two tabling blocks are clamped and fixed through the tabling grooves 4, so that the two tabling blocks are conveniently and completely buckled. The inner plate 5 and the tabling block 9 are of a retractable structure and are fixedly connected with the box body 7 after being matched with the box body after being retracted.
Survey and drawing main part 1 highly be not less than 7 heights of box body, and survey and drawing device is adjustable use height under the effect that the lifter is connected to and detain stable putting into the box body through inner panel and location, the inner panel cooperates through the box body after with the gomphosis piece lock and is a complete cuboid structure, realizes safe, convenient carrying.
The utility model relates to an on-spot mapping device of building engineering cost is when using, at first will survey and draw main part 1 and box body 7 separation, open gomphosis piece 9, remove inner panel 5 through the cooperation of lug 6 and recess 8, open box body 7, slot adjusting device height through lifter 10 and box body bottom, will survey and draw main part 1 to rise to corresponding height, the position of surveying and drawing main part is adjusted to criss-cross vertical chute 7-2 and horizontal spout 7-3, adjust through the regulation spiral 11 on surveying and drawing main part 1 after accomplishing, eyepiece 3 and display 2 carry out the regulation of surveying and drawing main part 1, observe. After the test is accomplished, detain 12 through inner panel 5 and location with survey and drawing the stable box body of putting into of main part 1, the inner panel 5 cooperates through the box body after with the gomphosis piece 9 lock and is a complete cuboid structure, accomplishes and accomodates, and the device is a complete cuboid structure at last.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (6)

1. A construction cost's on-spot mapping device, includes survey and drawing main part (1), its characterized in that: the surveying and mapping main body (1) is provided with a display (2) and an eyepiece (3), and one end of the surveying and mapping main body (1) is provided with an adjusting screw (11) and a positioning buckle (12); survey and drawing main part (1) is connected with lifter (10) of lower part, lifter (10) remove in box body (7), box body (7) both ends fixed mounting has inner panel (5), be equipped with on inner panel (5) with box body (7) upper groove (8) complex lug (6), inner panel (5) are installed in gomphosis piece (9) bottom, gomphosis piece (9) both ends are equipped with gomphosis groove (4) of mutually supporting.
2. The on-site construction cost mapping apparatus according to claim 1, wherein: the box body (7) comprises positioning blocks (7-1), longitudinal sliding grooves (7-2), transverse sliding grooves (7-3) and inserting grooves (7-4), the positioning blocks (7-1) are arranged at two ends of the box body (7), the longitudinal sliding grooves (7-2) and the transverse sliding grooves (7-3) are crossed, and the inserting grooves (7-4) are arranged at the bottom of the box body (7).
3. The on-site construction cost mapping apparatus according to claim 1, wherein: the number of the embedded blocks (9) is two, and the two embedded blocks are clamped and fixed through the embedded groove (4).
4. The on-site construction cost mapping apparatus according to claim 1, wherein: the two inner plates (5) are arranged, and the inner plates (5) are respectively connected with the box body (7) and the embedded block (9) in a sliding mode.
5. The on-site construction cost mapping apparatus according to claim 3, wherein: the inner plate (5) and the embedded block (9) are of a retractable structure and are fixedly connected with the box body (7) after being matched with the box body after being retracted.
6. The on-site construction cost mapping apparatus according to claim 1, wherein: the height of the surveying and mapping main body (1) is not less than the height of the box body (7).
CN201922141507.XU 2019-12-04 2019-12-04 On-spot mapping device of building engineering cost Expired - Fee Related CN211012957U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922141507.XU CN211012957U (en) 2019-12-04 2019-12-04 On-spot mapping device of building engineering cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922141507.XU CN211012957U (en) 2019-12-04 2019-12-04 On-spot mapping device of building engineering cost

Publications (1)

Publication Number Publication Date
CN211012957U true CN211012957U (en) 2020-07-14

Family

ID=71472440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922141507.XU Expired - Fee Related CN211012957U (en) 2019-12-04 2019-12-04 On-spot mapping device of building engineering cost

Country Status (1)

Country Link
CN (1) CN211012957U (en)

Similar Documents

Publication Publication Date Title
CN211012957U (en) On-spot mapping device of building engineering cost
CN208333468U (en) For the support frame in tunnel top placement total station
CN211601790U (en) Measuring tool for building engineering management
CN210950614U (en) Construction mapping device
CN214893290U (en) Land surveying and mapping device for homeland resources
CN213336097U (en) Special gradient measuring device of building engineering
CN212131911U (en) Measuring tool is used in installation of portable building machine electricity
CN204162436U (en) A kind of silicon core mounting device of reducing furnace
CN208333463U (en) It is a kind of can automatic lifting total station
CN218545672U (en) Large-area deep foundation pit engineering monitoring equipment
CN217358499U (en) Automatic perpendicularity capturing system for vertical prefabricated part
CN218411155U (en) Vault settlement monitoring device
CN211317291U (en) Surveying equipment for planning
CN218346196U (en) Deep foundation pit supporting structure
CN214173357U (en) Building engineering cost is with device for on-spot survey and drawing
CN221035006U (en) Adjustable geological survey level
CN211289427U (en) Surveying and mapping device convenient to move
CN213748343U (en) Distance measuring device for architectural design
CN219655662U (en) Auxiliary tool for surveying and mapping
CN218623215U (en) Adjustable construction safety work frame
CN217762918U (en) Road and bridge construction is with measuring appurtenance
CN216099745U (en) Cutting machine for construction
CN213579381U (en) Verticality real-time detection device for building construction quality control
CN219629227U (en) Bearing frame with adjustable display angle
CN218211158U (en) Wall detection device for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200714