CN211951897U - Building water supply and drainage pipeline - Google Patents

Building water supply and drainage pipeline Download PDF

Info

Publication number
CN211951897U
CN211951897U CN202020435062.6U CN202020435062U CN211951897U CN 211951897 U CN211951897 U CN 211951897U CN 202020435062 U CN202020435062 U CN 202020435062U CN 211951897 U CN211951897 U CN 211951897U
Authority
CN
China
Prior art keywords
arc
shaped plates
water supply
bolt
short
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020435062.6U
Other languages
Chinese (zh)
Inventor
唐赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020435062.6U priority Critical patent/CN211951897U/en
Application granted granted Critical
Publication of CN211951897U publication Critical patent/CN211951897U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses a building water supply and drainage pipeline, in particular to the technical field of water supply and drainage pipeline, comprising a pipeline main body, wherein the outer end of the pipeline main body is provided with a protection mechanism; protection mechanism includes two first arcs, first arc rear side is equipped with the second arc, two all fixed first horizontal pole that is equipped with between the first arc and between two second arcs, first horizontal pole top is equipped with a plurality of second horizontal poles, the fixed baffle that is equipped with in second horizontal pole both ends, fixed first waterproof cloth, per two of being equipped with between first horizontal pole and the second horizontal pole all fixed second waterproof cloth that is equipped with between the second horizontal pole, the second waterproof cloth is established at first waterproof cloth top. The utility model discloses an utilize first waterproof cloth and second waterproof cloth to shelter from the outside at the pipe connection mouth to prevent that the pipe connection mouth from being corroded and taking place to damage.

Description

Building water supply and drainage pipeline
Technical Field
The embodiment of the utility model provides a relate to water supply and drainage pipeline technical field, concretely relates to building water supply and drainage pipeline.
Background
The water supply and drainage task of building is to introduce the water from city water supply network or self-provided water source network into room, select the best water supply mode which is applicable, economical and reasonable, and send the water to various indoor sanitary wares, water nozzles, production devices and fire fighting equipments through water distribution pipes, and meet the requirements of water consumption on water quantity, water pressure and water quality.
In introducing the building with the water in the water supply pipe network, people often can communicate the delivery pipe in water supply pipe network and the building with the pipeline, but this junction is often exposed outside, and the interface of pipeline is in outdoor accepting rain, solarization, and long-time back kneck will be corroded, and then suffers the damage.
SUMMERY OF THE UTILITY MODEL
Therefore, the embodiment of the utility model provides a building water supply and drainage pipeline shelters from the outside at the pipe connection through utilizing first waterproof cloth and second waterproof cloth to prevent that the pipe connection from being corroded and taking place to damage, with the problem of solving among the prior art because the pipe connection exposes the pipe connection that leads to outside and is corroded and take place to damage.
In order to achieve the above object, the embodiment of the present invention provides the following technical solutions: a building water supply and drainage pipeline comprises a pipeline main body, wherein a protection mechanism is arranged at the outer end of the pipeline main body;
the protection mechanism comprises two first arc-shaped plates, the first arc-shaped plates are sleeved outside the pipeline main body, second arc-shaped plates are arranged on the rear sides of the first arc-shaped plates and movably connected with the first arc-shaped plates through hinges, the second arc-shaped plates are sleeved outside the pipeline main body, first cross rods are fixedly arranged between the two first arc-shaped plates and between the two second arc-shaped plates, a plurality of second cross rods are arranged at the tops of the first cross rods, part of the second cross rods are arranged between the two first arc-shaped plates, the other part of the second cross rods are arranged between the two second arc-shaped plates, baffle plates are fixedly arranged at two ends of the second cross rods and are arranged inside the first arc-shaped plates and the second arc-shaped plates, first rain cloth is fixedly arranged between the first cross rods and the second cross rods, and second rain cloth is fixedly arranged between every two second cross rods, the second waterproof cloth is arranged on the top of the first waterproof cloth.
Further, two second arc one side all is fixed and is equipped with the second short slab, the second short slab contacts with first arc.
Further, a second bolt is arranged on one side of the second short plate, the second bolt penetrates through the second short plate to be in contact with the first arc-shaped plate, and the second short plate is in threaded connection with the second bolt.
Further, wherein two the second horizontal pole top is all fixed and is equipped with two risers, and is a plurality of the riser is all established in first arc and second arc one side, and is a plurality of the riser contacts with first arc and second arc respectively, the riser top is fixed and is equipped with first short slab, first short slab is established at first arc and second arc top, and is a plurality of first short slab contacts with first arc and second arc respectively.
Further, a plurality of first short plate top all is equipped with first bolt, wherein two first bolt passes first short plate and contacts with first arc, two in addition first bolt passes first short plate and contacts with the second arc, first short plate passes through threaded connection with first bolt.
Further, first moving grooves are formed in the first arc-shaped plate and the second arc-shaped plate, and the first cross rod and the second cross rod are arranged inside the first cross rod.
Further, a second moving groove is formed in the first arc-shaped plate and the second bolt, and the baffle is arranged in the second moving groove.
The embodiment of the utility model provides a have following advantage:
the utility model discloses an utilize first horizontal pole and second horizontal pole to cover first waterproof cloth and second waterproof cloth in the outer end of pipeline main part to utilize first arc and second arc to fix first waterproof cloth and second waterproof cloth in the outside of pipeline main part, make it can keep out the wind and rain for pipeline main part, compare with prior art, the effectual condition of avoiding the pipeline main part to be drenched by rain and shine, thereby the effectual probability that reduces the corrosion of pipeline main part, and then the effectual pipeline main part that has protected.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It should be apparent that the drawings in the following description are merely exemplary, and that other embodiments can be derived from the drawings provided by those of ordinary skill in the art without inventive effort.
The structure, ratio, size and the like shown in the present specification are only used for matching with the content disclosed in the specification, so as to be known and read by people familiar with the technology, and are not used for limiting the limit conditions which can be implemented by the present invention, so that the present invention has no technical essential significance, and any structure modification, ratio relationship change or size adjustment should still fall within the scope which can be covered by the technical content disclosed by the present invention without affecting the efficacy and the achievable purpose of the present invention.
Fig. 1 is a schematic view of the overall structure provided by the present invention;
fig. 2 is a side view provided by the present invention;
fig. 3 is a cross-sectional view provided by the present invention;
fig. 4 is a schematic structural view of the first cross bar and the second cross bar provided by the present invention;
fig. 5 is a side view of the first and second arcuate plates provided by the present invention;
fig. 6 is a top view provided by the present invention.
In the figure: the pipeline comprises a first arc-shaped plate 1, a second arc-shaped plate 2, a first cross rod 3, a second cross rod 4, a baffle 5, first rain cloth 6, second rain cloth 7, a vertical plate 8, a first short plate 9, a first bolt 10, a second short plate 11, a second bolt 12, a first moving groove 13, a second moving groove 14 and a pipeline main body 15.
Detailed Description
The present invention is described in terms of specific embodiments, and other advantages and benefits of the present invention will become apparent to those skilled in the art from the following disclosure. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to the attached drawings 1-6 in the specification, the building water supply and drainage pipeline of the embodiment comprises a pipeline main body 15, wherein a protection mechanism is arranged at the outer end of the pipeline main body 15;
the protection mechanism comprises two first arc-shaped plates 1, the first arc-shaped plates 1 are sleeved outside a pipeline main body 15, second arc-shaped plates 2 are arranged on the rear sides of the first arc-shaped plates 1, the second arc-shaped plates 2 are movably connected with the first arc-shaped plates 1 through hinges, the second arc-shaped plates 2 are sleeved outside the pipeline main body 15, first cross rods 3 are fixedly arranged between the two first arc-shaped plates 1 and between the two second arc-shaped plates 2, a plurality of second cross rods 4 are arranged at the tops of the first cross rods 3, part of the second cross rods 4 are arranged between the two first arc-shaped plates 1, the other part of the second cross rods 4 are arranged between the two second arc-shaped plates 2, baffle plates 5 are fixedly arranged at the two ends of the second cross rods 4, the baffle plates 5 are arranged inside the first arc-shaped plates 1 and the second arc-shaped plates 2, first rain cloths 6 are fixedly arranged between the first cross rods 3 and the second cross rods 4, every two all fixed second tarpaulin 7 that is equipped with between second horizontal pole 4, second tarpaulin 7 is established at first tarpaulin 6 top.
Further, two 2 one sides of second arc all are fixed and are equipped with the short board 11 of second, the short board 11 of second contacts with first arc 1, is favorable to being in the same place first arc 1 and second arc 2 are fixed.
Further, second bolt 12 is arranged on one side of second short plate 11, second bolt 12 passes through second short plate 11 and contacts with first arc 1, second short plate 11 passes through threaded connection with second bolt 12, is favorable to fixing the position of second short plate 11.
Further, wherein two 4 tops of second horizontal pole are all fixed and are equipped with two risers 8, and are a plurality of riser 8 all establishes in first arc 1 and 2 one sides of second arc, and is a plurality of riser 8 contacts with first arc 1 and second arc 2 respectively, the fixed first short slab 9 that is equipped with in riser 8 top, first short slab 9 is established at first arc 1 and 2 tops of second arc, and is a plurality of first short slab 9 contacts with first arc 1 and second arc 2 respectively, is favorable to fixed two second horizontal poles 4 to be fixed respectively at first arc 1 and 2 tops of second arc.
Further, a plurality of first short plate 9 top all is equipped with first bolt 10, wherein two first bolt 10 passes first short plate 9 and contacts with first arc 1, two in addition first bolt 10 passes first short plate 9 and contacts with second arc 2, first short plate 9 passes through threaded connection with first bolt 10, is favorable to fixed first short plate 9's position.
Further, first moving groove 13 has all been seted up to first arc 1 and second arc 2 inside, first horizontal pole 3 and second horizontal pole 4 are established inside first horizontal pole 3, the removal of the second horizontal pole 4 of being convenient for.
Further, a second moving groove 14 is formed in each of the first arc-shaped plate 1 and the second bolt 12, and the baffle 5 is arranged in the second moving groove 14, so that the baffle 5 can move conveniently.
The implementation scenario is specifically as follows: the first arc-shaped plate 1 and the second arc-shaped plate 2 are sleeved outside the pipeline main body 15, the first arc-shaped plate 1 and the second arc-shaped plate 2 are in contact with the pipeline main body 15, then the second bolt 12 is screwed down, so that the first arc-shaped plate 1 and the second arc-shaped plate 2 are fixed outside the pipeline main body 15, then the second cross rod 4 at the top is pulled upwards along the first moving groove 13, the second cross rod 4 moves to drive the second rain cloth 7 to move upwards, meanwhile, the second cross rod 4 moves upwards to drive the baffle plates 5 at two ends to move upwards along the second moving groove 14, the second rain cloth 7 moves to drive the second cross rod 4 at the bottom to move upwards, the second cross rod 4 at the bottom moves upwards to drive the first rain cloth 6 to move upwards until the first rain cloth 6 is completely supported, so that the first rain cloth 6 and the second rain cloth 7 cover the outer end of the pipeline main body 15, thereby the pipeline main body 15 can avoid rain and sun, and then slow down the corrosion rate of pipeline main part 15, second horizontal pole 4 moves upwards simultaneously and drives riser 8 rebound, riser 8 removes and drives first short slab 9 and upwards move along first arc 1 and second arc 2, when first short slab 9 removed suitable position, stop to continue to move second horizontal pole 4 and screw up first bolt 10 at first short slab 9 top, thereby fix two second horizontal poles 4 respectively at the top of first arc 1 and second arc 2, when needing to inspect pipeline main part 15, only need unscrew second bolt 12, then move second horizontal pole 4 downwards and just can expose pipeline main part 15, thereby make things convenient for the staff to carry out the inspection maintenance to pipeline main part 15, this embodiment has specifically solved the problem that outdoor plumbing pipe interface was damaged by the corrosion among the prior art.
The working principle is as follows:
referring to the attached drawings 1-6 of the specification, the first arc-shaped plate 1 and the second arc-shaped plate 2 are sleeved outside the pipeline main body 15, the first arc-shaped plate 1 and the second arc-shaped plate 2 are made to contact with the pipeline main body 15, then the second bolt 12 is screwed, then the second cross rod 4 at the top is pulled upwards along the first moving groove 13, the second cross rod 4 drives the second rain cloth 7 to move upwards, the second cross rod 4 at the bottom of the second rain cloth 7 is driven to move upwards, the second cross rod 4 at the bottom drives the first rain cloth 6 to move upwards until the first rain cloth 6 is completely supported, and the first rain cloth 6 and the second rain cloth 7 are covered at the outer end of the pipeline main body 15.
Although the invention has been described in detail with respect to the general description and the specific embodiments, it will be apparent to those skilled in the art that modifications and improvements can be made based on the invention. Therefore, such modifications and improvements are intended to be within the scope of the invention as claimed.

Claims (7)

1. A building water supply and drainage pipeline, comprising a pipeline main body (15), characterized in that: the outer end of the pipeline main body (15) is provided with a protection mechanism;
the protection mechanism comprises two first arc-shaped plates (1), the first arc-shaped plates (1) are sleeved outside a pipeline main body (15), a second arc-shaped plate (2) is arranged on the rear side of each first arc-shaped plate (1), the second arc-shaped plates (2) are movably connected with the first arc-shaped plates (1) through hinges, the second arc-shaped plates (2) are sleeved outside the pipeline main body (15), first cross rods (3) are fixedly arranged between the two first arc-shaped plates (1) and between the two second arc-shaped plates (2), a plurality of second cross rods (4) are arranged at the tops of the first cross rods (3), part of the second cross rods (4) are arranged between the two first arc-shaped plates (1), the other part of the second cross rods (4) are arranged between the two second arc-shaped plates (2), baffle plates (5) are fixedly arranged at the two ends of the second cross rods (4), and the baffle plates (5) are arranged inside the first arc-shaped plates (1) and the second arc-shaped plates (2), fixed first waterproof cloth (6) that are equipped with between first horizontal pole (3) and second horizontal pole (4), per two all fixed second waterproof cloth (7) that are equipped with between second horizontal pole (4), second waterproof cloth (7) are established at first waterproof cloth (6) top.
2. The building water supply and drainage pipeline according to claim 1, wherein: two second short plates (11) are fixedly arranged on one sides of the second arc-shaped plates (2), and the second short plates (11) are in contact with the first arc-shaped plates (1).
3. The building water supply and drainage pipeline of claim 2, wherein: second short slab (11) one side is equipped with second bolt (12), second bolt (12) pass second short slab (11) and contact with first arc (1), second short slab (11) pass through threaded connection with second bolt (12).
4. The building water supply and drainage pipeline according to claim 1, wherein: wherein two second horizontal pole (4) top is all fixed and is equipped with two riser (8), and is a plurality of riser (8) are all established in first arc (1) and second arc (2) one side, and are a plurality of riser (8) contact with first arc (1) and second arc (2) respectively, riser (8) top is fixed and is equipped with first short slab (9), establish at first arc (1) and second arc (2) top first short slab (9), and is a plurality of first short slab (9) contact with first arc (1) and second arc (2) respectively.
5. The building water supply and drainage pipeline of claim 4, wherein: a plurality of first short plate (9) top all is equipped with first bolt (10), wherein two first bolt (10) pass first short plate (9) and contact with first arc (1), two in addition first bolt (10) pass first short plate (9) and contact with second arc (2), first short plate (9) pass through threaded connection with first bolt (10).
6. The building water supply and drainage pipeline according to claim 1, wherein: first moving grooves (13) are formed in the first arc-shaped plate (1) and the second arc-shaped plate (2), and the first cross rod (3) and the second cross rod (4) are arranged inside the first cross rod (3).
7. The building water supply and drainage pipeline according to claim 1, wherein: second moving grooves (14) are formed in the first arc-shaped plate (1) and the second bolt (12), and the baffle plate (5) is arranged in the second moving grooves (14).
CN202020435062.6U 2020-03-31 2020-03-31 Building water supply and drainage pipeline Expired - Fee Related CN211951897U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020435062.6U CN211951897U (en) 2020-03-31 2020-03-31 Building water supply and drainage pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020435062.6U CN211951897U (en) 2020-03-31 2020-03-31 Building water supply and drainage pipeline

Publications (1)

Publication Number Publication Date
CN211951897U true CN211951897U (en) 2020-11-17

Family

ID=73168693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020435062.6U Expired - Fee Related CN211951897U (en) 2020-03-31 2020-03-31 Building water supply and drainage pipeline

Country Status (1)

Country Link
CN (1) CN211951897U (en)

Similar Documents

Publication Publication Date Title
CN106269032A (en) A kind of waste and old mosaic tiles high-efficient treatment device
CN211951897U (en) Building water supply and drainage pipeline
CN107394601A (en) A kind of ring main unit rainwater-proof protection devices of SFR6 12
CN208604846U (en) A kind of architectural design roof cornice water-tight device
CN211114981U (en) Assembled residential type sunlight room
CN209082961U (en) Novel hanging basket device for pitched roof transformation
CN208817648U (en) A kind of high performance purifier for purification room
CN205822615U (en) A kind of integrated house corner fittings of special draining
CN210240820U (en) Building water supply and drainage pipeline quick connecting device
CN210421679U (en) Building water supply and drainage pipeline
CN210857659U (en) Energy-conserving curtain of architectural decoration
CN208566972U (en) Wisdom post house
CN208472857U (en) A kind of wash platform table top
CN207996523U (en) A kind of efficiently building dust-extraction unit
CN215368045U (en) Novel double-deck building curtain
CN218061156U (en) Building engineering is external heat preservation device for environmental protection
CN210947147U (en) Rain corrosion resistant top support frame for steel structure building
CN205822708U (en) The integrated house corner fittings that a kind of distribution is special
CN220757285U (en) Cleaning device for curtain wall engineering
CN103669296B (en) It is a kind of that self-stabilization type is horizontal draws steel-slag sand
CN205530671U (en) Light steel house with energy -conserving environmental protection
CN201128955Y (en) Curtain wall type solar energy flat plate collector
CN214364148U (en) Tower crane entrance to a cave water-stop device
CN219304921U (en) Wall-mounted building monitoring equipment at corner
CN218715603U (en) Power transformation framework assembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201117