CN210421679U - Building water supply and drainage pipeline - Google Patents

Building water supply and drainage pipeline Download PDF

Info

Publication number
CN210421679U
CN210421679U CN201920907555.2U CN201920907555U CN210421679U CN 210421679 U CN210421679 U CN 210421679U CN 201920907555 U CN201920907555 U CN 201920907555U CN 210421679 U CN210421679 U CN 210421679U
Authority
CN
China
Prior art keywords
connecting pipe
pipe
water supply
drainage pipeline
cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920907555.2U
Other languages
Chinese (zh)
Inventor
郭杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Zhongyuan Construction Development Co.,Ltd.
Original Assignee
Quanzhou Dewang Machinery Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quanzhou Dewang Machinery Technology Co ltd filed Critical Quanzhou Dewang Machinery Technology Co ltd
Priority to CN201920907555.2U priority Critical patent/CN210421679U/en
Application granted granted Critical
Publication of CN210421679U publication Critical patent/CN210421679U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a building water supply and drainage pipe, connecting pipe including many interconnect, the top the upper end of connecting pipe is connected with into water cover, the below the lower extreme of connecting pipe is connected with the outlet pipe, many the junction cover of connecting pipe is equipped with the connection pipe fitting, the lateral wall of connecting the pipe fitting runs through and is equipped with a plurality of inflation screws, the inner wall of intaking the cover is equipped with places the mouth, it is equipped with clear stifled mechanism to place in the mouth, the lateral wall of outlet pipe is equipped with and draws with clear stifled mechanism connection and get the mechanism, the lateral wall of connecting pipe is connected with through joint mechanism and plants the platform. The utility model discloses it is rational in infrastructure, can plant the platform at pipeline side wall mounting and be used for planting the plant, strengthen the aesthetic property when improving the environmental protection to clear stifled of going on that can be quick.

Description

Building water supply and drainage pipeline
Technical Field
The utility model relates to a housing construction technical field especially relates to a building water supply and drainage pipe.
Background
Along with the continuous improvement of living standard of people, people have higher and higher requirements on various supporting facilities in the building, and the water supply and drainage system is used as an important supporting facility in the building, and the installation and construction quality of the water supply and drainage system is closely related to the normal living operation of people.
Current drainage pipe is generally direct along the wall installation, exposes outside, influences the holistic aesthetic property of wall to because drainage pipe generally is used for discharging away the rainwater on the roof, rubbish on the roof often can cause the jam of pipeline in the rainwater gets into drainage pipe, the mode of clear stifled at present often uses the big water yield to erode, and the comparatively serious pipeline of jam is usually hardly cleared up to this kind of mode of clear stifled, and causes the waste of water resource.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the building drainage pipe that proposes, it can plant the platform in pipeline side wall mounting and be used for planting the plant, strengthens the aesthetic property when improving the environmental protection to clear stifled the going on that can be quick.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a building drainage pipe, includes many interconnect's connecting pipe, the top the upper end of connecting pipe is connected with into water cover, the below the lower extreme of connecting pipe is connected with the outlet pipe, many the junction cover of connecting pipe is equipped with the connection pipe fitting, the lateral wall of connecting the pipe fitting runs through and is equipped with a plurality of inflation screws, the inner wall of intaking the cover is equipped with places the mouth, it is equipped with in the mouth and clearly blocks up the mechanism to place, the lateral wall of outlet pipe is equipped with and clearly blocks up the pulling that the mechanism is connected and gets the mechanism, the lateral wall of connecting pipe is connected with through joint mechanism and plants the.
Preferably, clear stifled mechanism is including placing the intraoral clear stifled ball of placing, the upper end of clear stifled ball is equipped with the thread groove, the upper end of the cover that intakes runs through be equipped with thread groove threaded connection's first bolt.
Preferably, the outer wall of the blockage removing ball is wrapped with elastic sponge.
Preferably, the pulling mechanism comprises two connecting rods fixed on the side wall of the water outlet pipe, a rotating shaft is rotatably connected between the two connecting rods, a pull rope is fastened on the rotating shaft, one end of the pull rope extends into the water inlet cover along the connecting pipes, and one end of the pull rope in the water inlet cover is fastened with the bottom of the blockage removing ball.
Preferably, the clamping mechanism is including setting up the joint groove on the connecting pipe lateral wall, two clamps of joint inslot, two lock through two second bolts between the clamp, two the terminal of clamp and the lateral wall fixed connection who plants the platform.
Preferably, one end of the rotating shaft is fixedly connected with a rotating handle.
Compared with the prior art, the utility model, its beneficial effect does:
1. the lateral wall at many connecting pipes is equipped with the joint groove, can plant the platform as required selective installation, can plant different plants, improves holistic aesthetic property on the one hand, and on the other hand improves the environmental protection.
2. The water inlet cover is internally provided with a blockage removing mechanism, the side wall of the water outlet pipe is provided with a pulling mechanism, when the blockage in the connecting pipe is serious, the blockage removing ball can be taken down and placed at the pipe opening of the connecting pipe above, and then the pulling rope is pulled downwards at the position of the water outlet pipe to drive the blockage removing ball to push out the blockage in the connecting pipe, so that the blockage removing effect is obvious, and the use is convenient.
Drawings
FIG. 1 is a schematic structural view of a building water supply and drainage pipeline provided by the present invention;
FIG. 2 is an enlarged schematic view of the structure at the A position of the building water supply and drainage pipeline provided by the present invention;
fig. 3 is the utility model provides a planting platform sketch map of building water supply and drainage pipeline.
In the figure: 1 cover, 2 connection pipe fittings, 3 clamps, 4 inflation screws, 5 second bolts, 6 joint grooves, 7 connecting pipes, 8 outlet pipes, 9 connecting rods, 10 stay cords, 11 first bolts, 12 clear stifled balls, 13 place mouthful, 14 elasticity sponge, 15 planting platforms of intaking.
Detailed Description
In order to make the above objects, features and advantages of the present invention more comprehensible, embodiments of the present invention are described in detail below with reference to the accompanying drawings. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. The present invention can be embodied in many different forms other than those specifically described herein, and it will be apparent to those skilled in the art that similar modifications can be made without departing from the spirit and scope of the invention, and it is therefore not to be limited to the specific embodiments disclosed below.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only and do not represent the only embodiments.
Referring to fig. 1-3, a building water supply and drainage pipeline, connecting pipe 7 including many interconnect, the upper end of the top connecting pipe 7 is connected with into water cover 1, the lower extreme of below connecting pipe 7 is connected with outlet pipe 8, the junction cover of many connecting pipes 7 is equipped with connects pipe fitting 2, the lateral wall of connecting pipe fitting 2 runs through and is equipped with a plurality of expansion screw 4, it connects to advance water cover 1, connect through a plurality of connection pipe fittings 2 between a plurality of connecting pipe 7 and outlet pipe 8, a plurality of expansion screw 4 of rethread are vertical to be installed on the wall.
The inner wall of the water inlet cover 1 is provided with a placing opening 13, a blockage removing mechanism is arranged in the placing opening 13, the blockage removing mechanism comprises a blockage removing ball 12 placed in the placing opening 13, the outer wall of the blockage removing ball 12 is wrapped with an elastic sponge 14, the elastic sponge 14 can be contacted with the pipe wall, the blockage removing effect is improved, the upper end of the blockage removing ball 12 is provided with a thread groove, the upper end of the water inlet cover 1 is provided with a first bolt 11 in threaded connection with the thread groove in a penetrating manner, the side wall of the water outlet pipe 8 is provided with a pulling mechanism connected with the blockage removing mechanism, the pulling mechanism comprises two connecting rods 9 fixed on the side wall of the water outlet pipe 8, a rotating shaft is rotatably connected between the two connecting rods 9, a pull rope 10 is fastened on the rotating shaft, one end of the pull rope 10 extends into the water inlet cover 1 along a plurality of connecting pipes 7, one end of the pull rope 10 positioned in the water inlet cover 1 is connected with the bottom of the blockage removing ball 12, get out clear stifled ball 12 in placing mouth 13, stand in outlet pipe 8 department, rotate rotatory handle and drive the pivot and rotate to pulling stay cord 10, stay cord 10 drives clear stifled ball 12 and moves down, finally supports out from outlet pipe 8 with the plug in the connecting pipe 7, and clear stifled effect is obvious, convenient to use.
The lateral wall of connecting pipe 7 is connected with through latch mechanism and plants platform 15, latch mechanism is including setting up joint groove 6 on the lateral wall of connecting pipe 7, two clamps 3 in the joint groove 6, lock through two second bolts 5 between two clamps 3, the end of two clamps 3 and the lateral wall fixed connection who plants platform 15, the rotatory handle of one end fixedly connected with of pivot, can be as required the selectivity with 3 joints of clamps in the joint groove 6 of connecting pipe 7, lock through second bolt 5, plant platform 15 promptly, plant platform 15 after a plurality of connecting pipes 7 have all been installed, plant different plants in the platform 15, on the one hand, the holistic aesthetic property is improved, on the other hand, the environmental protection is improved.
In the utility model, the water inlet cover 1, the connecting pipes 7 and the water outlet pipe 8 are connected through the connecting pipes 2, and then vertically installed on the wall surface through the expansion screws 4, the clamp 3 can be selectively clamped in the clamping groove 6 of the connecting pipe 7 as required, and locked through the second bolt 5, namely, the planting table 15 is installed, after the planting table 15 is installed on the connecting pipes 7, different plants can be planted in the planting table 15, on one hand, the integral aesthetic property is improved, and on the other hand, the environmental protection is improved; when blockking up in connecting pipe 7, can twist off first bolt 11 at the roof, from placing mouthful 13 interior taking out clear stifled ball 12, stand in outlet pipe 8 department, rotate rotatory handle and drive the pivot and rotate to pulling stay cord 10, stay cord 10 drives clear stifled ball 12 and moves down, finally supports out from outlet pipe 8 with the plug in the connecting pipe 7, clear stifled effect is obvious, convenient to use can open stay cord 10 after the use, and put down stay cord 10 from the eminence and tie again and connect, use for clear stifled the next time.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a building water supply and drainage pipeline, includes many interconnect's connecting pipe (7), its characterized in that, the top the upper end of connecting pipe (7) is connected with into water cover (1), the below the lower extreme of connecting pipe (7) is connected with outlet pipe (8), many the junction cover of connecting pipe (7) is equipped with connects pipe fitting (2), the lateral wall of connecting pipe fitting (2) runs through and is equipped with a plurality of inflation screws (4), the inner wall of intaking cover (1) is equipped with places mouth (13), it is equipped with clear stifled mechanism in mouth (13) to place, the lateral wall of outlet pipe (8) is equipped with and gets the mechanism with the pulling that clear stifled mechanism is connected, the lateral wall of connecting pipe (7) is connected with through joint mechanism and plants platform (15).
2. The building water supply and drainage pipeline according to claim 1, wherein the blockage removing mechanism comprises a blockage removing ball (12) placed in the placing opening (13), a thread groove is formed in the upper end of the blockage removing ball (12), and a first bolt (11) in threaded connection with the thread groove penetrates through the upper end of the water inlet cover (1).
3. The building water supply and drainage pipeline according to claim 2, wherein the outer wall of the blockage removing ball (12) is wrapped with an elastic sponge (14).
4. The building water supply and drainage pipeline as claimed in claim 2, wherein the pulling mechanism comprises two connecting rods (9) fixed on the side wall of the water outlet pipe (8), a rotating shaft is rotatably connected between the two connecting rods (9), a pull rope (10) is fastened to the rotating shaft, one end of the pull rope (10) extends into the water inlet cover (1) along the plurality of connecting pipes (7), and one end of the pull rope (10) located in the water inlet cover (1) is fastened to the bottom of the blockage removing ball (12).
5. The building water supply and drainage pipeline according to claim 1, wherein the clamping mechanism comprises a clamping groove (6) formed in the side wall of the connecting pipe (7), two clamping hoops (3) are arranged in the clamping groove (6), the two clamping hoops (3) are locked through two second bolts (5), and the tail ends of the two clamping hoops (3) are fixedly connected with the side wall of the planting table (15).
6. The building water supply and drainage pipeline of claim 4, wherein one end of the rotating shaft is fixedly connected with a rotating handle.
CN201920907555.2U 2019-06-17 2019-06-17 Building water supply and drainage pipeline Active CN210421679U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920907555.2U CN210421679U (en) 2019-06-17 2019-06-17 Building water supply and drainage pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920907555.2U CN210421679U (en) 2019-06-17 2019-06-17 Building water supply and drainage pipeline

Publications (1)

Publication Number Publication Date
CN210421679U true CN210421679U (en) 2020-04-28

Family

ID=70375499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920907555.2U Active CN210421679U (en) 2019-06-17 2019-06-17 Building water supply and drainage pipeline

Country Status (1)

Country Link
CN (1) CN210421679U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424893A (en) * 2020-03-25 2020-07-17 马鞍山宏合建筑工程有限公司 High-rise building outer wall drainage pipe connects erection equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424893A (en) * 2020-03-25 2020-07-17 马鞍山宏合建筑工程有限公司 High-rise building outer wall drainage pipe connects erection equipment
CN111424893B (en) * 2020-03-25 2021-04-09 马鞍山宏合建筑工程有限公司 High-rise building outer wall drainage pipe connects erection equipment

Similar Documents

Publication Publication Date Title
CN105008633B (en) The railing waterproof and drainage arrangement of building roof
CN210421679U (en) Building water supply and drainage pipeline
CN206428956U (en) Driven hanging basket and its fixing device
CN206706924U (en) A kind of architectural engineering drainage arrangement
CN215858669U (en) Prevent blockking up drain pipe for housing construction
CN202767391U (en) Rain water pipe fixing piece
CN205456714U (en) Portable removal law enforcement equipment box
CN209082961U (en) Novel hanging basket device for pitched roof transformation
CN206800824U (en) A kind of anti-clogging roof drain
CN114718298A (en) Installation structure and installation method of simple construction reserved hole plugging template
CN206418466U (en) The full-automatic drain grating in power station
CN207881897U (en) A kind of sprinkling equipment of tent detection
CN207041991U (en) A kind of larger impurity treatment equipment of wastewater disposal basin
CN201901913U (en) Water draining and collecting device
CN207314913U (en) A kind of environment-friendly type lavatory of separating dry space from moist space
CN221702656U (en) Anti-blocking drainage device
CN206071106U (en) Dismounting Combined multifunctional energy-conservation tea booth
CN205411055U (en) Urinate just disconnect -type drought lavatory excrement and urine access arrangement
CN201232571Y (en) Big lane water drenching drainage shed frame
CN215106127U (en) Building engineering wall waterproof construction
CN213201997U (en) Fireproof device for elevator shaft of building
CN214834169U (en) Architectural design roof eaves mouth watertight fittings
CN216016152U (en) Building engineering is with safe type block terminal
CN213077868U (en) High-efficient dust device of construction is built in room
CN215368309U (en) Architectural design roof eaves mouth waterproof construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210910

Address after: No. 75-1, Jinfeng street, Shenfu New District, Shenyang City, Liaoning Province

Patentee after: Liaoning Zhongyuan Construction Development Co.,Ltd.

Address before: No. 141, Zhenshan Industrial Road, Nan'an City, Quanzhou City, Fujian Province, 362000

Patentee before: QUANZHOU DEWANG MACHINERY TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right