CN211949484U - But height-adjusting's stable form engineering construction scaffold - Google Patents

But height-adjusting's stable form engineering construction scaffold Download PDF

Info

Publication number
CN211949484U
CN211949484U CN202020387946.9U CN202020387946U CN211949484U CN 211949484 U CN211949484 U CN 211949484U CN 202020387946 U CN202020387946 U CN 202020387946U CN 211949484 U CN211949484 U CN 211949484U
Authority
CN
China
Prior art keywords
scaffold
bolt
telescopic
rod
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202020387946.9U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Wuyi Bamin Construction Development Co ltd
Original Assignee
Fujian Wuyi Bamin Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Wuyi Bamin Construction Development Co ltd filed Critical Fujian Wuyi Bamin Construction Development Co ltd
Priority to CN202020387946.9U priority Critical patent/CN211949484U/en
Application granted granted Critical
Publication of CN211949484U publication Critical patent/CN211949484U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a but height-adjusting's stable form engineering construction scaffold relates to engineering construction scaffold technical field. The utility model discloses well construction adds base one surface and is provided with bolt and bolt hole, bolt and bolt hole mutually support, the construction adds base another surface and is provided with electric putter, flexible dead lever and action bars, be provided with a plurality of perforating holes on the flexible dead lever, the inside first spout that is provided with of scaffold base, the bolt can slide wantonly in first spout, a lift platform surface is provided with the second spout, the railing can slide wantonly in the second spout, flexible dead lever surface has the telescopic link cover, telescopic link cover one surface is provided with a plurality of perforating holes, telescopic link cover and flexible dead lever are through lining up the column connection. The utility model discloses a set up electric putter, backup pad and flexible dead lever, can adjust the engineering construction scaffold to different heights, can fix the engineering construction scaffold in the position of wanting through setting up stopper, bolt and bolt hole.

Description

But height-adjusting's stable form engineering construction scaffold
Technical Field
The utility model belongs to the technical field of, especially, relate to a stable form engineering construction scaffold of adjustable height.
Background
The engineering construction is a special subject for accounting of the integrated accounting engineering cost of a building installation enterprise, and is characterized in that the engineering construction is carried out by carrying out new construction, extension and reconstruction activities on a construction project according to the requirements of a construction project design file, and four particulars such as labor cost, material cost, mechanical cost and other direct cost are set under the engineering construction. The engineering construction scaffold is a common working platform which is set up for ensuring each construction process to be smoothly carried out in engineering construction, and the traditional engineering construction scaffold is simple in design, is unadjustable in height and unstable and cannot be fixed at a position needing to work.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a but height-adjusting's stable form engineering construction scaffold through setting up electric putter, backup pad and flexible dead lever, can adjust engineering construction scaffold to different heights, can fix engineering construction scaffold in wanted position through setting up stopper, bolt and bolt hole.
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model relates to a stable form engineering construction scaffold of adjustable height, including scaffold foundation, lift platform, flexible dead lever, telescopic link cover, through-column, flexible stair, railing, electric putter, action bars, pulley and stopper, its characterized in that, scaffold foundation one surface is provided with bolt and bolt hole, bolt and bolt hole mutually support, another surface of scaffold foundation is provided with first spout, the bolt can slide wantonly in first spout; the scaffold base is characterized in that an electric push rod, a telescopic fixed rod and an operating rod are arranged on one surface of the scaffold base, a supporting plate is arranged on one surface of the electric push rod, a plurality of through holes are formed in one surface of the telescopic fixed rod, and the electric push rod, the telescopic fixed rod and the operating rod are fixedly connected with the scaffold base; lifting platform surface is provided with the second spout, the railing can slide wantonly in the second spout, flexible dead lever surface has the telescopic link cover, telescopic link cover surface is provided with a plurality of perforating holes, flexible dead lever and telescopic link cover are through lining up the post connection, telescopic link cover and lifting platform fixed connection.
Furthermore, a plurality of pulleys are arranged on one surface of the scaffold base, and the number of the pulleys is 4-8.
Furthermore, a telescopic stair is arranged on one surface of the scaffold base and fixedly connected with the scaffold base.
Further, scaffold base internal surface is provided with the recess, the stopper passes through bolt, bolt hole and first spout and mutually supports to be fixed in the recess.
Furthermore, a handle is arranged on one surface of the plug pin, and an anti-skid sleeve is arranged on the outer surface of the handle.
The utility model discloses following beneficial effect has: through setting up electric putter, backup pad and flexible dead lever, can adjust the engineering construction scaffold to different heights, can fix the engineering construction scaffold in the position of wanting through setting up stopper, bolt and bolt hole.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a stable type engineering construction scaffold with adjustable height;
fig. 2 is a bottom view of an adjustable height stable type construction scaffold;
FIG. 3 is an enlarged view of a portion of FIG. 2 at A;
FIG. 4 is an enlarged view of a portion of FIG. 2 at B;
FIG. 5 is a rear view of a stable type of engineering construction scaffold with adjustable height
Fig. 6 is a partially enlarged view of C in fig. 5.
In the drawings, the components represented by the respective reference numerals are listed below:
1-a scaffold base, 2-a lifting platform, 3-a telescopic fixed rod, 4-a telescopic rod sleeve, 5-a through column, 6-a telescopic stair, 7-a railing, 8-an electric push rod, 9-an operating rod, 10-a pulley, 11-a limiting block, 101-a bolt, 102-a bolt hole, 103-a groove, 104 a first sliding groove, 201-a second sliding groove, 301-a through hole, 801-a supporting plate and 1011-a handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "upper", "middle", "outer", "inner", and the like, indicate positional or positional relationships, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the referenced components or elements must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Referring to fig. 1-6, the utility model relates to a stable type engineering construction scaffold with adjustable height, which comprises a scaffold base 1, a lifting platform 2, a telescopic fixed rod 3, a telescopic rod sleeve 4, a through column 5, a telescopic stair 6, a railing 7, an electric push rod 8, an operating rod 9, a pulley 10 and a limited block 11, wherein a bolt 101 and a bolt hole 102 are arranged on one surface of the scaffold base 1, the bolt 101 and the bolt hole 102 are matched with each other, the limited block 11 is fixed in a groove 103, a first sliding groove 104 is arranged on the other surface of the scaffold base 1, and the bolt 101 can slide in the first sliding groove 104 at will;
an electric push rod 8, a telescopic fixed rod 3 and an operating rod 9 are arranged on one surface of the scaffold base 1, a supporting plate 801 is arranged on one surface of the electric push rod 8, a plurality of through holes 301 are formed in one surface of the telescopic fixed rod 3, the electric push rod 8, the telescopic fixed rod 3 and the operating rod 9 are fixedly connected with the scaffold base 1, and the supporting plate 801 and the telescopic fixed rod can more stably fix the lifting platform 2 at a desired height;
the second sliding groove 201 is formed in one surface of the lifting platform 2, the handrail 7 can slide in the second sliding groove 201 at will, the handrail 7 can protect workers in construction operation, meanwhile, the handrail can play a role in lifting, the handrail can be pushed to one side when not in use, the outer surface of the telescopic fixing rod 3 is provided with a telescopic rod sleeve 4, one surface of the telescopic rod sleeve 4 is provided with a plurality of through holes 301, the telescopic fixing rod 3 and the telescopic rod sleeve 4 are connected through the through column 5, the telescopic rod sleeve 4 is fixedly connected with the lifting platform 2, the stress area of the telescopic rod sleeve 4 can be increased, and the lifting platform 2 can be supported more stably;
wherein, a plurality of pulleys 10 are arranged on one surface of the scaffold base 1, so that the engineering construction scaffold can be conveniently pushed to different positions, and the number of the pulleys 10 is 4-8.
Wherein, a telescopic stair 6 is arranged on one surface of the scaffold base 1, and the telescopic stair 6 is fixedly connected with the scaffold base 1.
Wherein, the inner surface of the scaffold base 1 is provided with a groove 103, the limiting block 11 is mutually matched and fixed in the groove 103 through the bolt 101, the bolt hole 102 and the first sliding groove 104, the limiting block 11 can fix the engineering construction scaffold at a desired position, and the phenomenon that the pulley 10 rolls to deviate from a working position or even cause an accident is prevented.
Wherein, bolt 101 one surface is provided with handle 1011, and handle 1011 external surface has the antiskid cover.
The first embodiment is as follows:
the embodiment is a use method of a stable type engineering construction scaffold with adjustable height, which comprises the following steps: when engineering construction scaffold needs to be used, firstly, the engineering construction scaffold is pushed to an expected position through the pulley 10, the bolt 101 is pulled out from the bolt hole 102, the scaffold base 1 is limited at a position needing to work through the limiting block 11, the lifting platform 2 is adjusted to a required height through the electric push rod 8, the operating rod 9 and the telescopic fixing rod 3, the through column 5 is inserted into the telescopic fixing rod 3 and the telescopic rod sleeve 4, a worker climbs the lifting platform 2 through the telescopic stairs 6, the railing 7 is adjusted to a position needing to work through mutual matching of the railing 7 and the second sliding groove 201, and normal work can be achieved.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (5)

1. A stable type engineering construction scaffold with adjustable height comprises a scaffold base (1), a lifting platform (2), a telescopic fixing rod (3), a telescopic rod sleeve (4), a through column (5), a telescopic stair (6), a railing (7), an electric push rod (8), an operating rod (9), pulleys (10) and a limiting block (11), and is characterized in that a bolt (101) and a bolt hole (102) are arranged on one surface of the scaffold base (1), the bolt (101) and the bolt hole (102) are matched with each other, a first sliding groove (104) is arranged on the other surface of the scaffold base (1), and the bolt (101) can slide in the first sliding groove (104) at will; an electric push rod (8), a telescopic fixed rod (3) and an operating rod (9) are arranged on one surface of the scaffold base (1), a supporting plate (801) is arranged on one surface of the electric push rod (8), a plurality of through holes (301) are formed in one surface of the telescopic fixed rod (3), and the electric push rod (8), the telescopic fixed rod (3) and the operating rod (9) are all fixedly connected with the scaffold base (1); lifting platform (2) a surface is provided with second spout (201), railing (7) can slide wantonly in second spout (201), flexible dead lever (3) surface has telescopic link cover (4), telescopic link cover (4) a surface is provided with a plurality of perforating holes (301), flexible dead lever (3) and telescopic link cover (4) are connected through penetrating through post (5), telescopic link cover (4) and lifting platform (2) fixed connection.
2. The stable type engineering and construction scaffold with adjustable height as claimed in claim 1, wherein, a plurality of pulleys (10) are arranged on one surface of the scaffold base (1), and the number of the pulleys (10) is 4-8.
3. The stable type engineering and construction scaffold with adjustable height as claimed in claim 1, wherein the scaffold base (1) has a telescopic stair (6) on one surface, the telescopic stair (6) is fixedly connected with the scaffold base (1).
4. The stable type engineering and construction scaffold with adjustable height as claimed in claim 1, wherein the inner surface of the scaffold base (1) is provided with a groove (103), and the limited block (11) is fixed in the groove (103) by the mutual fit of the bolt (101), the bolt hole (102) and the first sliding groove (104).
5. The stable type engineering and construction scaffold with adjustable height as claimed in claim 1, wherein a surface of the bolt (101) is provided with a handle (1011), and an outer surface of the handle (1011) is provided with a non-slip sleeve.
CN202020387946.9U 2020-03-24 2020-03-24 But height-adjusting's stable form engineering construction scaffold Withdrawn - After Issue CN211949484U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020387946.9U CN211949484U (en) 2020-03-24 2020-03-24 But height-adjusting's stable form engineering construction scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020387946.9U CN211949484U (en) 2020-03-24 2020-03-24 But height-adjusting's stable form engineering construction scaffold

Publications (1)

Publication Number Publication Date
CN211949484U true CN211949484U (en) 2020-11-17

Family

ID=73185477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020387946.9U Withdrawn - After Issue CN211949484U (en) 2020-03-24 2020-03-24 But height-adjusting's stable form engineering construction scaffold

Country Status (1)

Country Link
CN (1) CN211949484U (en)

Similar Documents

Publication Publication Date Title
EP0995860A1 (en) New process for mounting handrails in scaffolds
CN202055497U (en) Movable combination scaffold for construction works
US20170211283A1 (en) Trestle ladder systems and method
CN211949484U (en) But height-adjusting's stable form engineering construction scaffold
CN210032734U (en) Construction is with interim flexible stair
US4807719A (en) Scaffolding ascent apparatus
KR20060071595A (en) A moving work-stand adjustable in height and inclination
CN209831613U (en) Building decoration moving platform
CN214034710U (en) Spring layer support
CN207795041U (en) A kind of folding climbing ladder
CN210500860U (en) Secondary structure constructional column top bar planting assistor
CN220768773U (en) Building construction frame
CN207420429U (en) A kind of adjustable for height step ladder
KR20110002720U (en) Ladder for high place works
CN110565931A (en) Assembled scaffold for road construction
CN211623288U (en) Solid preparation clean workshop working ladder
KR100583775B1 (en) Scaffolding structure for architecture
CN217518109U (en) Multipurpose operation platform that encorbelments
CN217840791U (en) Construction rack for building factory building
CN218522604U (en) Customized staircase
CN218714902U (en) Civil engineering scaffold
CN215978350U (en) Scaffold frame of high security
CN219603082U (en) Crane safety passage
RU2793699C1 (en) Step-ladder
CN216765594U (en) Steel trestle height-adjustable festival formula guardrail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20201117

Effective date of abandoning: 20221108

AV01 Patent right actively abandoned

Granted publication date: 20201117

Effective date of abandoning: 20221108