CN211948217U - Water conservancy construction is with preventing unrestrained unit device - Google Patents

Water conservancy construction is with preventing unrestrained unit device Download PDF

Info

Publication number
CN211948217U
CN211948217U CN201921688429.9U CN201921688429U CN211948217U CN 211948217 U CN211948217 U CN 211948217U CN 201921688429 U CN201921688429 U CN 201921688429U CN 211948217 U CN211948217 U CN 211948217U
Authority
CN
China
Prior art keywords
baffle
rod
welded
fixed block
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921688429.9U
Other languages
Chinese (zh)
Inventor
司鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Dingshun Construction Engineering Co ltd
Original Assignee
Anhui Dingshun Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Dingshun Construction Engineering Co ltd filed Critical Anhui Dingshun Construction Engineering Co ltd
Priority to CN201921688429.9U priority Critical patent/CN211948217U/en
Application granted granted Critical
Publication of CN211948217U publication Critical patent/CN211948217U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a wave-proof unit device for water conservancy construction, which comprises a first baffle plate, a first round hole is arranged below the first baffle plate, a first rod is connected with the first round hole in a sliding way, a ring is connected with the first rod in a sliding way, one end of the first rod is welded with a first abutting block, the ring is connected with one end of a first spring, the other end of the first spring is connected with the first rod, two sides of a second baffle plate are welded with the first rod, the bottom end of the first baffle plate is provided with a water outlet, a groove is arranged above the water outlet, the bottom end of the fourth rod is welded with the groove of the first baffle plate, one end of a third spring is connected with the bottom end of the groove of the first baffle plate, the other end of the third spring is connected with a fourth fixed block, the fourth fixed block is connected with the third rod in a sliding way, the third rod is connected with the third fixed block in a sliding way, the third fixed block is welded with the second baffle, the second fixed block is connected with the second rod in a sliding mode. The utility model discloses there is the flood discharge electricity generation, strong function shocks resistance.

Description

Water conservancy construction is with preventing unrestrained unit device
Technical Field
The utility model relates to a water conservancy construction technical field particularly, relates to a water conservancy construction is with preventing unrestrained unit device.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in nature to achieve the purposes of removing harmful substances and benefiting. Also known as water engineering. Water is a valuable resource essential for human production and life, but its naturally occurring state does not completely meet the needs of human beings. Only when hydraulic engineering is built, water flow can be controlled, flood disasters are prevented, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production. Hydraulic engineering needs to build various types of hydraulic buildings such as dams, dikes, spillways, water gates, water inlets, channels, transition troughs, rafts, fishways and the like so as to achieve the aims.
In the hydraulic engineering construction process, the bank dyke is often protected by the wave-resisting device, and the conventional wave-resisting device is simple in structure and single in function.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water conservancy construction is with preventing unrestrained unit device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a wave-proof unit device for water conservancy construction is characterized by comprising a first baffle plate, wherein a first round hole is arranged below the first baffle plate, a first rod is connected with the first round hole in a sliding manner, a ring is connected with the first rod in a sliding manner, one end of the first rod is welded with a first abutting block, the ring is connected with one end of a first spring, the other end of the first spring is connected with the first rod, two sides of a second baffle plate are welded with the first rod, a water outlet is arranged at the bottom end of the first baffle plate, a groove is arranged above the water outlet, the bottom end of a fourth rod is welded with the groove of the first baffle plate, one end of a third spring is connected with the bottom end of the groove of the first baffle plate, the other end of the third spring is connected with a fourth fixed block, the fourth fixed block is connected with a third rod in a sliding manner, the third rod is connected with a third fixed block in a sliding manner, and the third fixed block is welded with the second baffle plate, the middle part of the second baffle is welded with a second fixed block, the second fixed block is connected with a second rod in a sliding manner, the bottom end of the second rod is welded with a second abutting block, the second abutting block is connected with one end of a second spring, the top end of the second rod is connected with a first fixed block in a sliding manner, the first fixed block is welded with a third baffle, a second round hole is arranged at the same distance of the third baffle, the second round hole is connected with a blocking block through a first shaft in a sliding manner, the bottom end of the third baffle is connected with a second shaft in a sliding manner, the second shaft is welded with a fourth baffle, the fourth baffle is arranged in cement, the cement is arranged on gravels, a generator is arranged at the lower side of the second baffle and is welded with a support frame, the support frame is arranged in the cement, fan blades are connected with the generator in a buckling manner, one side of the bottom end of the first baffle is welded with, the other end of the supporting rod is connected with the cement.
Further, a gasket is arranged on the surface of the block.
Furthermore, the third baffle is made of corrosion-resistant aluminum alloy.
Furthermore, the second baffle above the generator is provided with corresponding holes.
Further, the cement is changed from high to low in gradient from the fourth baffle to the first baffle.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses increased the impact that the spring shrink pole buffered the flood wave at equipment is excessive, prolonged the life of unrestrained equipment on the one hand, on the other hand has reduced the intensity of the flood wave. And the holes of the third baffle plate have the function of discharging some flood, so that redundant water flows downwards from top to bottom to supply water to the generator set for generating electricity, and the sustainable strategy of discharging the flood and generating the electricity is achieved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic perspective view of a wave-proof unit device for water conservancy construction;
fig. 2 is a schematic plan view of a wave-proof unit device for water conservancy construction.
Reference numerals:
1. a first baffle plate; 2. a second baffle; 3. a first lever; 4. a circular ring; 5. a first resisting block; 6. a first circular hole; 7. a first spring; 8. a support bar; 9. cement; 10. sand and stone; 11. a third baffle plate; 12. a first fixed block; 13. a first shaft; 14. a second circular hole; 15. blocking; 16. a second lever; 17. a second resisting block; 18. a second spring; 19. a second shaft; 20. a generator; 21. a fan blade; 22. a fourth baffle; 23. A support frame; 24. a second fixed block; 25. a third fixed block; 26. a third lever; 27. a fourth fixed block; 28. a fourth bar; 29. a third spring; 30. and (7) a water outlet.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it should be noted that the terms "top", "bottom", "one side", "the other side", "front", "back", "middle part", "inside", "top", "bottom", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of description and simplification of the description, but does not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance; furthermore, unless expressly stated or limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, as they may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-2, a wave-proof unit device for water conservancy construction according to an embodiment of the present invention includes a first baffle 1, a first circular hole 6 is disposed below the first baffle 1, a first rod 3 is slidably connected to the first circular hole 6, a ring 4 is slidably connected to the first rod 3, one end of the first rod 3 is welded to a first abutting block 5, the ring 4 is connected to one end of a first spring 7, the other end of the first spring 7 is connected to the first rod 3 to play a role of a contracting rod, two sides of a second baffle 2 are welded to the first rod 3, a water outlet 30 is disposed at the bottom end of the first baffle 1 to allow water waves to flow out, a groove is disposed above the water outlet 30, the bottom end of a fourth rod 28 is welded to the groove of the first baffle 1, one end of a third spring 29 is connected to the groove bottom end of the first baffle 1, the other end of the third spring 29 is connected to a fourth fixing block 27, the fourth fixing block 27 is connected with the third rod 26 in a sliding manner, the third rod 26 is connected with the third fixing block 25 in a sliding manner, so that the impact buffering effect is achieved, the third fixing block 25 is welded with the second baffle plate 2, the middle part of the second baffle plate 2 is welded with the second fixing block 24, the second fixing block 24 is connected with the second rod 16 in a sliding manner, the bottom end of the second rod 16 is welded with the second abutting block 17, the second abutting block 17 is connected with one end of the second spring 18, the top end of the second rod 16 is connected with the first fixing block 12 in a sliding manner, the first fixing block 12 is welded with the third baffle plate 11, the third baffle plate 11 is provided with second round holes 14 at equal intervals, the second round holes 14 are connected with the blocking block 15 in a sliding manner through the first shaft 13, the bottom end of the third baffle plate 11 is connected with the second shaft 19 in a sliding manner, the second shaft 19 is welded with the fourth baffle plate 22, and the fourth baffle plate 22 is placed in cement 9, fixed fourth baffle 22, on grit 10 was arranged in to cement 9, generator 20 arranged in the downside of second baffle 2, generator 20 and support frame 23 welding stabilize generator 20, support frame 23 is arranged in the cement 9, flabellum 21 with generator 20 buckle is connected, one side and the bracing piece 8 welding of 1 bottom of first baffle, the bracing piece 8 the other end with cement 9 is connected, forms the triangle-shaped structure with first baffle 1, and the steadiness increases.
Through the above technical scheme of the utility model, 15 surface mounting of block have the gasket, and the gas tightness reinforcing, third baffle 11 adopt corrosion-resistant aluminum alloy material, and plasticity and intensity are good, the generator 20 top second baffle 2 is equipped with the hole that corresponds, and cement 9 is followed fourth baffle 22 to 1 slope of first baffle are by the step-down, and the guide lets the unrestrained outflow of water.
The working principle is as follows:
when the flood wave comes, the water wave impacts the third baffle 11, the second rod 16, the first rod 3 and the third rod 26 are extruded and retracted by the force, the excess water wave enters from the second hole 14, the block 15 has the function of preventing the water wave from flowing back, the water wave flows down from the top to drive the fan blades 21, the generator 20 generates electricity, and the water wave flows out from the water outlet 30. The utility model discloses the principle is simple, has the flood discharge electricity generation, shock-resistant advantage.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The wave-proof unit device for water conservancy construction is characterized by comprising a first baffle (1), wherein a first round hole (6) is arranged below the first baffle (1), a first rod (3) is in sliding connection with the first round hole (6), a ring (4) is in sliding connection with the first rod (3), one end of the first rod (3) is welded with a first abutting block (5), the ring (4) is connected with one end of a first spring (7), the other end of the first spring (7) is connected with the first rod (3), two sides of a second baffle (2) are welded with the first rod (3), a water outlet (30) is arranged at the bottom end of the first baffle (1), a groove is arranged above the water outlet (30), the bottom end of a fourth rod (28) is welded with the groove of the first baffle (1), and one end of a third spring (29) is connected with the groove bottom end of the first baffle (1), the other end of the third spring (29) is connected with a fourth fixed block (27), the fourth fixed block (27) is connected with a third rod (26) in a sliding manner, the third rod (26) is connected with a third fixed block (25) in a sliding manner, the third fixed block (25) is welded with the second baffle (2), the middle part of the second baffle (2) is welded with the second fixed block (24), the second fixed block (24) is connected with the second rod (16) in a sliding manner, the bottom end of the second rod (16) is welded with the second abutting block (17), the second abutting block (17) is connected with one end of the second spring (18), the top end of the second rod (16) is connected with the first fixed block (12) in a sliding manner, the first fixed block (12) is welded with the third baffle (11), second round holes (14) are equidistantly arranged on the third baffle (11), and the second round holes (14) are connected with the first blocking block (15) in a sliding manner through a first shaft (13), the bottom and second axle (19) sliding connection of third baffle (11), second axle (19) and fourth baffle (22) welding, cement (9) are arranged in fourth baffle (22), on grit (10) were arranged in cement (9), generator (20) were arranged in the downside of second baffle (2), generator (20) and support frame (23) welding, support frame (23) were arranged in cement (9), flabellum (21) with generator (20) buckle is connected, one side and bracing piece (8) welding of first baffle (1) bottom, the other end of bracing piece (8) with cement (9) are connected.
2. The wave protection unit device for water conservancy construction according to claim 1, characterized in that the stop block (15) is surface-mounted with a gasket.
3. The wave protection unit device for water conservancy construction according to claim 1, wherein the third baffle (11) is made of corrosion-resistant aluminum alloy.
4. The wave protection unit device for water conservancy construction according to claim 1, characterized in that the second baffle (2) above the generator (20) is provided with corresponding holes.
5. The wave protection unit device for water conservancy construction according to claim 1, characterized in that the cement (9) slopes from the fourth baffle (22) to the first baffle (1) from high to low.
CN201921688429.9U 2019-10-10 2019-10-10 Water conservancy construction is with preventing unrestrained unit device Expired - Fee Related CN211948217U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921688429.9U CN211948217U (en) 2019-10-10 2019-10-10 Water conservancy construction is with preventing unrestrained unit device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921688429.9U CN211948217U (en) 2019-10-10 2019-10-10 Water conservancy construction is with preventing unrestrained unit device

Publications (1)

Publication Number Publication Date
CN211948217U true CN211948217U (en) 2020-11-17

Family

ID=73166700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921688429.9U Expired - Fee Related CN211948217U (en) 2019-10-10 2019-10-10 Water conservancy construction is with preventing unrestrained unit device

Country Status (1)

Country Link
CN (1) CN211948217U (en)

Similar Documents

Publication Publication Date Title
CN106759082A (en) A kind of wave absorption buoyancy tank, bank slope erosion control safeguard structure and method
CN211948217U (en) Water conservancy construction is with preventing unrestrained unit device
CN213805199U (en) Hydraulic engineering is with high-efficient durable flood bank
CN212896234U (en) Connection structure of bank spillway slow-leveling section and steep groove section
CN210597218U (en) Dam reinforcing structure for hydraulic engineering
CN210013189U (en) Scour protection water conservancy dykes and dams
CN107044111A (en) The three-dimensional cell structure and energy dissipating method of a kind of sluicing gravity dam energy dissipating
CN211340711U (en) Water conservancy construction is with disappearing unrestrained and hindering unrestrained device
CN211421170U (en) Retaining wall for hydraulic engineering
CN211948206U (en) Safety device for water conservancy construction
CN101469547A (en) Apparatus for preventing foundation from being tunneled
CN216999592U (en) Grid energy dissipation device
CN210685844U (en) Hydraulic engineering overhauls cat ladder
CN209760185U (en) Water drop vertical shaft of reservoir spillway
CN204690672U (en) Be provided with the dykes and dams shore protection device of propeller blade
CN204662348U (en) Dykes and dams shore protection device
CN216787018U (en) Protective device for protecting bank slope of navigation channel renovation project
CN215518591U (en) Water conservancy protection high strength dyke
CN217104959U (en) Concrete gravity dam structure
CN219951822U (en) Flood control device for municipal works
CN216428158U (en) Slope body bearing structure for hydraulic engineering
CN214532332U (en) Adjustable water conservancy construction fence device
CN202416273U (en) Energy dissipation pore plate for flood discharge tunnel
CN217399656U (en) Offshore wind power pile driving underwater grouting connection structure
CN221000838U (en) Floating beach repair structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201117

Termination date: 20211010