CN211941427U CN201922282408.3U CN201922282408U CN211941427U CN 211941427 U CN211941427 U CN 211941427U CN 201922282408 U CN201922282408 U CN 201922282408U CN 211941427 U CN211941427 U CN 211941427U
Authority
CN
China
Prior art keywords
mould
rod
groove
reinforced concrete
chain connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922282408.3U
Other languages
Chinese (zh)
Inventor
桑庆荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Xingfo Pipe Industry Co ltd
Original Assignee
Nanjing Xingfo Pipe Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Xingfo Pipe Industry Co ltd filed Critical Nanjing Xingfo Pipe Industry Co ltd
Priority to CN201922282408.3U priority Critical patent/CN211941427U/en
Application granted granted Critical
Publication of CN211941427U publication Critical patent/CN211941427U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a reinforced concrete pipeline fast demoulding mould, including mould, sealing mechanism, concatenation piece, installation mechanism and enhancement mechanism, sealing mechanism is all installed with the bottom in the mould top, the both sides of mould all are provided with the concatenation piece, the equidistant installation mechanism that is provided with in surface of concatenation piece in mould one side, the inside of installation mechanism has set gradually the body of rod, first spring, first chain link pole, second chain link pole, chain link, dead lever, second spring, fixture block and draw-in groove, the both sides of body of rod one end all articulate there is first chain link pole, and the one end of first chain link pole articulates there is the second chain link pole, the one end of second chain link pole is provided with the chain link, the equidistant through-hole that is provided with in inside of mould opposite side concatenation piece, the inside of mould is provided with enhancement mechanism. The utility model discloses not only realized the device convenient to detach effect, realized reinforcing the device's hardness, realized reinforcing the device's leakproofness.

Description

Quick demoulding mould for reinforced concrete pipeline
Technical Field
The utility model relates to a reinforced concrete technical field specifically is reinforced concrete pipeline fast demoulding mould.
Background
Along with the continuous development of society, the mould trade has obtained flourishing development, and during the process of reinforced concrete pipeline preparation, often need apply corresponding mould, this type of reinforced concrete pipeline fast demoulding mould on the market is various now, can satisfy people's user demand basically, but still has certain problem, and the concrete problem has following several:
(1) when the traditional reinforced concrete pipeline quick demoulding mould is used, the finished reinforced concrete pipeline is inconvenient to take out, so that the reinforced concrete pipeline is inconvenient to disassemble;
(2) when the traditional reinforced concrete pipeline rapid demoulding mould is used, due to insufficient hardness, cracks and pipeline deformation phenomena can occur when the mould is put into concrete;
(3) when the traditional quick demoulding mould for the reinforced concrete pipeline is used, due to low sealing performance, the concrete material flows out when entering a steam curing pool.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a reinforced concrete pipeline fast demoulding mould to solve the inconvenient problem of dismantling, hardness is low and the leakproofness is low of the device of proposing in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the quick demoulding mould for the reinforced concrete pipeline comprises a mould, a sealing mechanism, splicing blocks, an installing mechanism and a reinforcing mechanism, wherein the sealing mechanism is installed at the top end and the bottom end of the mould, the splicing blocks are arranged on the two sides of the mould, the installing mechanism is arranged on the surface of the splicing blocks on one side of the mould at equal intervals, a rod body, a first spring, a first chain connecting rod, a second chain connecting rod, a chain connecting block, a fixed rod, a second spring, a clamping block and a clamping groove are sequentially arranged in the installing mechanism, the first chain connecting rod is hinged to the two sides of one end of the rod body, the second chain connecting rod is hinged to one end of the first chain connecting rod, the chain connecting block is arranged at one end of the second chain connecting rod, through holes are formed in the splicing blocks on the other side of the mould.
Preferably, the inside of sealing mechanism has set gradually sealed lid, first lug, first recess, second lug and second recess, one side of sealed lid is fixed with first lug, the top and the bottom of sealed lid one side mould all are provided with first recess, and first recess and first lug cooperate.
Preferably, a second convex block is fixed on one side of the splicing block on one side of the mold on one side of the sealing cover, a second groove is formed in one side of the other splicing block on one side of the second convex block, and the second groove is matched with the second convex block.
Preferably, a fixed rod is fixed at the center of one side of the link block, the fixed rod extends into the rod body, and a second spring is arranged inside one end of the fixed rod.
Preferably, the two ends of the second spring are provided with clamping blocks, the inner wall of the rod body at one end of the fixing rod is provided with clamping grooves at equal intervals, the clamping grooves are matched with the clamping blocks, and the first spring is arranged outside one end of the rod body.
Preferably, the inside of strengthening mechanism has set gradually standing groove, first strengthening rib and second strengthening rib, the inside vertical equidistant second strengthening rib that is provided with of standing groove, the inside horizontal equidistant first strengthening rib that is provided with of standing groove, and first strengthening rib and second strengthening rib are crisscross to be arranged mutually.
Compared with the prior art, the beneficial effects of the utility model are that: the reinforced concrete pipeline rapid demoulding mould not only realizes the effect of convenient disassembly of the device, but also realizes the enhancement of the hardness of the device and the enhancement of the sealing performance of the device;
(1) the rod body is pressed to enable the rod body to splice the molds through the through holes, then the linking blocks are pressed to enable the fixed rods to slide in the rod body, and meanwhile, the clamping blocks are clamped with the clamping grooves under the action of the second springs, so that the reinforced concrete pipeline rapid demoulding mold is convenient to disassemble;
(2) under the combined action of the second reinforcing ribs and the first reinforcing ribs, the reinforced concrete pipeline rapid demoulding mould has certain hardness, the phenomenon that the device deforms when cement soil is put into the reinforced concrete pipeline rapid demoulding mould is avoided, the hardness of the reinforced concrete pipeline rapid demoulding mould is enhanced, and the service life of the reinforced concrete pipeline rapid demoulding mould is prolonged;
(3) through splicing between the mould, and can make during the concatenation cooperate between second recess and the second lug, later install through installation mechanism, will seal the block of lid through first lug and first recess and install in the top and the bottom of mould, merge with reason rethread installation mechanism, realized reinforcing this reinforced concrete pipeline fast demoulding mould's leakproofness to concrete outflow has been avoided.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic side view of a cross-sectional structure of the mounting mechanism of the present invention;
fig. 3 is an enlarged schematic structural view of a point a in fig. 2 according to the present invention;
FIG. 4 is a schematic view of the cross-section of the present invention;
fig. 5 is a schematic view of a rear view partial section structure of the present invention.
In the figure: 1. a mold; 2. a sealing mechanism; 201. a sealing cover; 202. a first bump; 203. a first groove; 204. a second bump; 205. a second groove; 3. splicing blocks; 4. an installation mechanism; 401. a rod body; 402. a first spring; 403. a first link rod; 404. a second link rod; 405. a linking block; 406. fixing the rod; 407. a second spring; 408. a clamping block; 409. a card slot; 5. a through hole; 6. a reinforcing mechanism; 601. a placement groove; 602. a first reinforcing rib; 603. and a second reinforcing rib.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment: the reinforced concrete pipeline rapid demoulding mould comprises a mould 1, a sealing mechanism 2, splicing blocks 3, an installation mechanism 4 and a reinforcing mechanism 6, wherein the sealing mechanism 2 is installed at the top end and the bottom end of the mould 1, a sealing cover 201, a first lug 202, a first groove 203, a second lug 204 and a second groove 205 are sequentially arranged in the sealing mechanism 2, the first lug 202 is fixed on one side of the sealing cover 201, the first groove 203 is arranged at the top end and the bottom end of the mould 1 on one side of the sealing cover 201, the first groove 203 is matched with the first lug 202, the second lug 204 is fixed on one side of the splicing blocks 3 on one side of the mould 1 on one side of the sealing cover 201, the second groove 205 is arranged on one side of the other splicing block 3 on one side of the second lug 204, and the second groove 205 is matched with the second lug 204;
specifically, as shown in fig. 5, when the mechanism is used, first, when the molds 1 are spliced, the second protrusion 204 and the second groove 205 are engaged with each other, so as to promote the molds 1 to be tightly attached to each other, and then the sealing cover 201 is engaged with the first groove 203 through the first protrusion 202, so as to tightly attach the sealing cover 201 to the molds 1, so that the sealing performance of the device is enhanced;
the two sides of the mold 1 are respectively provided with the splicing blocks 3, the surface of the splicing block 3 at one side of the mold 1 is provided with the installation mechanism 4 at equal intervals, the interior of the installation mechanism 4 is sequentially provided with a rod body 401, a first spring 402, a first chain connecting rod 403, a second chain connecting rod 404, a chain connecting block 405, a fixed rod 406, a second spring 407, a clamping block 408 and a clamping groove 409, the two sides of one end of the rod body 401 are respectively hinged with the first chain connecting rod 403, one end of the first chain connecting rod 403 is hinged with the second chain connecting rod 404, one end of the second chain connecting rod 404 is provided with the chain connecting block 405, the central position at one side of the chain connecting block 405 is fixed with the fixed rod 406, the fixed rod 406 extends to the interior of the rod body 401, the interior at one end of the fixed rod 406 is provided with the second spring 407, the two ends of the second spring 407 are respectively provided with the clamping, a first spring 402 is arranged outside one end of the rod body 401;
specifically, as shown in fig. 2 and 3, when the mechanism is used, firstly, the rod 401 is pressed to compress the first spring 402, the rod 401 extends to one side of the other mold 1 through the through hole 5, the link block 405 is pressed to slide the fixing rod 406 in the rod 401, and the latch block 408 is engaged with the latch slot 409 under the action of the second spring 407, so that the first link rod 403 and the rod 401 are perpendicular to each other, and the device is convenient to detach;
through holes 5 are arranged in the splicing blocks 3 on the other side of the die 1 at equal intervals, a reinforcing mechanism 6 is arranged in the die 1, a placing groove 601, a first reinforcing rib 602 and a second reinforcing rib 603 are sequentially arranged in the reinforcing mechanism 6, the second reinforcing rib 603 is longitudinally arranged in the placing groove 601 at equal intervals, the first reinforcing rib 602 is transversely arranged in the placing groove 601 at equal intervals, and the first reinforcing rib 602 and the second reinforcing rib 603 are staggered;
specifically, as shown in fig. 4, when the mechanism is used, firstly, the rigidity of the device can be increased by the cooperation of the first reinforcing rib 602 and the second reinforcing rib 603, so that the device is prevented from being deformed and broken when concrete is placed, and the rigidity of the device is enhanced.
The working principle is as follows: when the device is used, firstly, when the mold 1 is spliced, the second protrusion 204 is clamped with the second groove 205, then the sealing cover 201 is clamped with the first groove 203 through the first protrusion 202, so that the sealing cover 201 is tightly attached to the mold 1, then, the rod body 401 is pressed to compress the first spring 402, the rod body 401 extends to one side of the other mold 1 through the through hole 5, the link block 405 is pressed to enable the fixing rod 406 to slide in the rod body 401, the fixture block 408 is clamped with the clamping groove 409 under the action of the second spring 407, so that the first link rod 403 is perpendicular to the rod body 401, and the first link rod 403 is tightly attached to the mold 1, finally, the reinforcing steel bar and the concrete can be sequentially placed in the mold 1, and the hardness of the device can be increased due to the combined action of the first reinforcing rib 602 and the second reinforcing rib 603, thereby deformation and breakage appear when avoiding placing the concrete in the device, fix between sealed lid 201 and mould 1 again in the same way, finally accomplish the work of reinforced concrete pipeline quick demoulding mould.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. Reinforced concrete pipeline fast demoulding mould, including mould (1), sealing mechanism (2), splice (3), installation mechanism (4) and reinforcing means (6), its characterized in that: sealing mechanisms (2) are respectively installed at the top end and the bottom end of the mold (1), splicing blocks (3) are respectively arranged on two sides of the mold (1), installation mechanisms (4) are arranged on the surfaces of the splicing blocks (3) on one side of the mold (1) at equal intervals, a rod body (401), a first spring (402), a first chain connecting rod (403), a second chain connecting rod (404), a chain connecting block (405), a fixing rod (406), a second spring (407), a clamping block (408) and a clamping groove (409) are sequentially arranged in the installation mechanisms (4), a first chain connecting rod (403) is hinged to two sides of one end of the rod body (401), a second chain connecting rod (404) is hinged to one end of the first chain connecting rod (403), a chain connecting block (405) is arranged at one end of the second chain connecting rod (404), through holes (5) are arranged in the splicing blocks (3) on the other side of the mold (1) at, and a reinforcing mechanism (6) is arranged in the die (1).
2. The reinforced concrete pipeline rapid demoulding mould as claimed in claim 1, wherein: the sealing mechanism is characterized in that a sealing cover (201), a first bump (202), a first groove (203), a second bump (204) and a second groove (205) are sequentially arranged inside the sealing mechanism (2), the first bump (202) is fixed on one side of the sealing cover (201), the first groove (203) is formed in the top end and the bottom end of the mold (1) on one side of the sealing cover (201), and the first groove (203) is matched with the first bump (202).
3. The reinforced concrete pipeline rapid demoulding mould as claimed in claim 2, wherein: a second convex block (204) is fixed on one side of the splicing block (3) on one side of the mold (1) on one side of the sealing cover (201), a second groove (205) is formed in one side of the other splicing block (3) on one side of the second convex block (204), and the second groove (205) is matched with the second convex block (204).
4. The reinforced concrete pipeline rapid demoulding mould as claimed in claim 1, wherein: a fixed rod (406) is fixed at the center of one side of the link block (405), the fixed rod (406) extends into the rod body (401), and a second spring (407) is arranged inside one end of the fixed rod (406).
5. The reinforced concrete pipeline rapid demoulding mould as claimed in claim 1, wherein: clamping blocks (408) are arranged at two ends of the second spring (407), clamping grooves (409) are arranged on the inner wall of the rod body (401) at one end of the fixing rod (406) at equal intervals, the clamping grooves (409) are matched with the clamping blocks (408), and a first spring (402) is arranged outside one end of the rod body (401).
6. The reinforced concrete pipeline rapid demoulding mould as claimed in claim 1, wherein: the reinforced structure is characterized in that a placing groove (601), a first reinforcing rib (602) and a second reinforcing rib (603) are sequentially arranged in the reinforced structure (6), the second reinforcing rib (603) is longitudinally arranged in the placing groove (601) at equal intervals, the first reinforcing rib (602) is transversely arranged in the placing groove (601) at equal intervals, and the first reinforcing rib (602) and the second reinforcing rib (603) are staggered and arranged.
CN201922282408.3U 2019-12-18 2019-12-18 Quick demoulding mould for reinforced concrete pipeline Expired - Fee Related CN211941427U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922282408.3U CN211941427U (en) 2019-12-18 2019-12-18 Quick demoulding mould for reinforced concrete pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922282408.3U CN211941427U (en) 2019-12-18 2019-12-18 Quick demoulding mould for reinforced concrete pipeline

Publications (1)

Publication Number Publication Date
CN211941427U true CN211941427U (en) 2020-11-17

Family

ID=73176713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922282408.3U Expired - Fee Related CN211941427U (en) 2019-12-18 2019-12-18 Quick demoulding mould for reinforced concrete pipeline

Country Status (1)

Country Link
CN (1) CN211941427U (en)

Similar Documents

Publication Publication Date Title
CN110509411B (en) Detachable concrete placement mould for assembly type structure
CN205580844U (en) But reuse's reinforced concrete beam type test piece pouring mold
CN211566301U (en) Prefabricated wallboard mould with adjustable
CN211941427U (en) Quick demoulding mould for reinforced concrete pipeline
CN201462204U (en) Assembled cable bridge
CN208197114U (en) Assembled-type house prefabricated outer wall panel goes out muscle quick blocking structure
CN216810948U (en) Can realize structure post template structure of demolising fast
CN207682620U (en) A kind of prefabricated window mold that floats of separate type
CN211842459U (en) Combined type plastic mold for prefabricated truss laminated plate
CN210732757U (en) Interior gliding style high leakproofness prefabricated staircase mould
CN210100269U (en) Side die and template for producing rib prefabricated part
CN210190103U (en) Assembled underground garage channel-shaped plate mould
CN211622575U (en) Building construction aluminum formwork
CN110284705B (en) Sectional type formwork system for reinforcing concrete cylinder
CN209381018U (en) A kind of wallboard mould
CN209699412U (en) A kind of PC shear wall mold of segmented
CN209817410U (en) Waterproof wear-resisting building plastic-aluminum pressure frid
CN110714609A (en) High-strength composite material template
CN211499759U (en) Reinforced plastic building template
CN110409709B (en) Connecting box assembled concrete beam
CN218622650U (en) Reinforced concrete structure connecting component
CN115405001B (en) Construction method of concrete outer wall heat insulation layer and concrete outer wall body
CN218838124U (en) A forming die for stair
CN215760481U (en) Assembled straight-section vertical splicing light and thin template
CN211447785U (en) Hole reservation device for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201117

Termination date: 20211218