CN211930120U - Hydraulic and hydroelectric engineering is with device of sunkening cord - Google Patents

Hydraulic and hydroelectric engineering is with device of sunkening cord Download PDF

Info

Publication number
CN211930120U
CN211930120U CN202020813613.8U CN202020813613U CN211930120U CN 211930120 U CN211930120 U CN 211930120U CN 202020813613 U CN202020813613 U CN 202020813613U CN 211930120 U CN211930120 U CN 211930120U
Authority
CN
China
Prior art keywords
fixedly connected
device body
bevel gear
wire
thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020813613.8U
Other languages
Chinese (zh)
Inventor
刘川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Jianze Construction Engineering Co ltd
Original Assignee
Sichuan Jianze Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Jianze Construction Engineering Co ltd filed Critical Sichuan Jianze Construction Engineering Co ltd
Priority to CN202020813613.8U priority Critical patent/CN211930120U/en
Application granted granted Critical
Publication of CN211930120U publication Critical patent/CN211930120U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Hydraulic Turbines (AREA)

Abstract

The utility model discloses a hydraulic and hydroelectric engineering is with device of sunkening cord relates to hydraulic and hydroelectric engineering technical field, including the device body of sunkening cord, the last fixed surface of the device body of sunkening cord is connected with the supporting shoe, and the last fixed surface of supporting shoe is connected with the backup pad, and the middle part of backup pad is rotated and is connected with the rotary rod, the one end fixedly connected with bevel gear of rotary rod one, the last fixed surface of the device body of sunkening cord is connected with the support riser. This water conservancy water and electricity engineering is with device of sunkening cord is through setting up the supporting shoe, backup pad and rotary rod, can receive and release the coil, through setting up bevel gear one, motor and bevel gear two, when the motor rotates, can drive bevel gear two and rotate, bevel gear two can drive bevel gear one and rotate, thereby can drive the rotary rod and rotate, thereby can receive and release the spool, through setting up the threading piece and crossing the line hole, can make the spool pass through the inside of threading piece, thereby can make the spool equal interval discharge.

Description

Hydraulic and hydroelectric engineering is with device of sunkening cord
Technical Field
The utility model relates to a hydraulic and hydroelectric engineering technical field specifically is a hydraulic and hydroelectric engineering is with device of sunkening cord.
Background
Water is a basic element that human beings rely on for survival, electric power is a main energy source for social development, the water conservancy and hydropower engineering subject is an engineering science that regulates and controls and utilizes water energy resources by engineering or non-engineering measures on the basis of research on natural characteristics of water, the water conservancy and hydropower engineering equipment gradually expands the demand of maintenance and extension as time goes on, and circuits for water conservancy engineering construction also need to be extended and connected in multiple directions.
In the hydraulic engineering construction, need bury the pipeline underground in the pipeline, and present current device of burying the line, there is certain use defect, for example, constructor buries the line during operation, grip current device of burying the line through the manual work and carry out parallel translation and lay, still need a plurality of staff cooperations to correct, intensity of labour is too high, this type of method excessively occupies staff's quantity, and current device is inconvenient to many electric wires bury the line and lay, be more difficult to keep the interval between the accuse electric wire, supplementary effect is not good enough, consequently, a hydraulic and hydroelectric engineering is with burying the line device now provides.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a water conservancy and hydropower engineering is with device of sunkening cord, including the device body of sunkening cord, the last fixed surface of the device body of sunkening cord is connected with the supporting shoe, the last fixed surface of supporting shoe is connected with the backup pad, the middle part of backup pad is rotated and is connected with the rotary rod, the one end fixedly connected with conical gear of rotary rod one, the last fixed surface of the device body of sunkening cord is connected with the support riser, a lateral wall fixedly connected with motor of support riser, the output fixedly connected with conical gear of motor two, conical gear two and a conical gear looks adaptation, the last fixed surface of the device body of sunkening cord is connected with the threading piece, the line hole has been seted up at the middle part of threading.
Optionally, the inner wall fixedly connected with spring of crossing the line hole, the equal fixedly connected with rubber circle of one end that the line hole was kept away from to the spring can protect the spool through spring and rubber circle, prevents that the spool from causing the damage to the spool because frictional force is great when passing through the inside of threading piece.
Optionally, a wire outlet hole is formed in the wire embedding device body, the wire outlet hole penetrates through the upper surface of the wire embedding device body and one side surface of the wire embedding device body, and the wire pipes can be discharged through the wire outlet hole, so that the same distance between the wire pipes can be ensured.
Optionally, the inner wall of the wire outlet hole is rotatably connected with a pulley, and the pulley facilitates the wire pipe to be discharged out of the wire outlet hole, so that the phenomenon that the wire pipe is bent inside the wire outlet hole to cause blockage can be avoided.
Optionally, the upper surface of the supporting vertical plate is fixedly connected with a handrail, a hole is formed in the middle of the handrail, and the handrail and the hole facilitate construction of constructors and movement of the buried line device body.
Optionally, the bottom surface of the wire burying device body is fixedly connected with a connecting block, and the bottom surface of the connecting block is rotatably connected with a moving wheel, so that the wire burying device body is convenient to move.
Compared with the prior art, this water conservancy and hydropower engineering is with device of sunkening cord possesses following beneficial effect:
1. the utility model discloses a set up supporting shoe, backup pad and rotary rod, can receive and release the coil, through setting up bevel gear one, motor and bevel gear two, when the motor rotates, can drive bevel gear two and rotate, bevel gear two can drive bevel gear one and rotate, thereby can drive the rotary rod and rotate, thereby can receive and release the spool, through setting up the threading piece and crossing the line hole, can make the spool through the inside of threading piece, thereby can make the spool equal interval discharge.
2. The utility model discloses an inner wall fixedly connected with spring of crossing the line hole, the equal fixedly connected with rubber circle of one end of line hole is kept away from to the spring, can protect the spool through spring and rubber circle, because frictional force causes the damage to the spool greatly when preventing the inside of spool through the threading piece, the wire hole has been seted up to the inside of the device body of sunkening cord, the wire hole runs through the upper surface of the device body of sunkening cord and a side of the device body of sunkening cord, can emit the spool through the inside of wire hole to can guarantee the same interval between the spool.
3. The inner wall of wire hole rotates and is connected with the pulley, the pulley makes things convenient for spool discharge wire hole, thereby can avoid the spool to buckle in the inside of wire hole, cause the phenomenon of jam, the last fixed surface who supports the riser is connected with the handrail, the trompil has been seted up at the middle part of handrail, handrail and trompil make things convenient for constructor to be under construction, be convenient for remove the device body that buries, the bottom surface fixedly connected with connecting block of the device body that buries, the bottom surface of connecting block rotates and is connected with the removal wheel, thereby the convenience removes the device body that buries.
Drawings
FIG. 1 is a perspective view of the present invention;
fig. 2 is a sectional view of the inside of the threading block of the present invention;
FIG. 3 is a side sectional view of the thread burying device body of the present invention;
fig. 4 is a connection diagram of the first conical gear and the second conical gear of the present invention.
In the figure: the thread burying device comprises a thread burying device body 1, a supporting block 2, a supporting plate 3, a rotating rod 4, a conical gear I5, a supporting vertical plate 6, a motor 7, a conical gear II 8, a threading block 9, a thread passing hole 10, a spring 11, a rubber ring 12, a thread outlet hole 13, a pulley 14, a connecting block 15, a moving wheel 16, a handrail 17 and a hole 18.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a thread burying device for water conservancy and hydropower engineering comprises a thread burying device body 1, wherein a connecting block 15 is fixedly connected to the bottom surface of the thread burying device body 1, a moving wheel 16 is rotatably connected to the bottom surface of the connecting block 15, so that the thread burying device body 1 can be moved conveniently, a thread outlet hole 13 is formed in the thread burying device body 1, the thread outlet hole 13 penetrates through the upper surface of the thread burying device body 1 and one side surface of the thread burying device body 1, a thread pipe can be discharged through the inside of the thread outlet hole 13, so that the same distance between the thread pipes can be ensured, a pulley 14 is rotatably connected to the inner wall of the thread outlet hole 13, the pulley 14 facilitates the thread pipe to be discharged out of the thread outlet hole 13, so that the phenomenon of blockage caused by bending of the thread pipe in the thread outlet hole 13 can be avoided, a supporting block 2 is fixedly connected to the upper surface of the thread burying device body 1, a supporting plate 3 is, one end of the rotating rod 4 is fixedly connected with a first bevel gear 5, and the upper surface of the thread burying device body 1 is fixedly connected with a supporting vertical plate 6.
Support riser 6's last fixed surface and be connected with handrail 17, trompil 18 has been seted up at handrail 17's middle part, and handrail 17 and trompil 18 make things convenient for constructor to be under construction, are convenient for remove buried line device body 1, support riser 6's a lateral wall fixedly connected with motor 7, and motor 7's model is: Y132S2-2, two 8 of motor 7' S output fixedly connected with conical gear, two 8 of conical gear and conical gear 5 looks adaptations, the last fixed surface of thread embedding device body 1 is connected with threading piece 9, threading hole 10 has been seted up at the middle part of threading piece 9, the inner wall fixedly connected with spring 11 of threading hole 10, the equal fixedly connected with rubber circle 12 of one end of threading hole 10 is kept away from to spring 11, can protect the spool through spring 11 and rubber circle 12, because the great damage to the spool of frictional force causes when preventing the spool from passing through the inside of threading piece 9.
During the use, twine the spool at the surface of rotary rod 4, starter motor 7, motor 7 drives two 8 rotations of bevel gear, two 8 rotations of bevel gear drive bevel gear rotate 5, thereby can drive rotary rod 4 and rotate, emit the line, when the line is through the inside of threading piece 9, spring 11 can play the shock attenuation effect to the line, rubber ring 12 can play the guard action to the line, prevent that the line from because the surface damage of excessive messenger's line of frictional force, and can make the interval between line and the line roughly equal during the wiring, when the line passes through the inside of wire hole 13, can avoid the line to cause the jam in the inside of wire hole 13 through pulley 14.

Claims (6)

1. The utility model provides a hydraulic and hydroelectric engineering is with device of sunkening cord, includes sunkening cord device body (1), its characterized in that: the upper surface of the thread burying device body (1) is fixedly connected with a supporting block (2), the upper surface of the supporting block (2) is fixedly connected with a supporting plate (3), the middle of the supporting plate (3) is rotatably connected with a rotating rod (4), one end of the rotating rod (4) is fixedly connected with a first bevel gear (5), the upper surface of the thread burying device body (1) is fixedly connected with a supporting vertical plate (6), one side wall of the supporting vertical plate (6) is fixedly connected with a motor (7), the output end of the motor (7) is fixedly connected with a second bevel gear (8), the second bevel gear (8) is matched with the first bevel gear (5), the upper surface of the thread burying device body (1) is fixedly connected with a threading block (9), and the middle of the threading block (9) is provided with a thread passing hole (10).
2. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the inner wall of the wire passing hole (10) is fixedly connected with a spring (11), and one end, far away from the wire passing hole (10), of the spring (11) is fixedly connected with a rubber ring (12).
3. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the wire outlet hole (13) is formed in the wire embedding device body (1), and the wire outlet hole (13) penetrates through the upper surface of the wire embedding device body (1) and one side face of the wire embedding device body (1).
4. The thread burying device for the water conservancy and hydropower engineering according to claim 3, characterized in that: the inner wall of the wire outlet hole (13) is rotatably connected with a pulley (14).
5. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the upper surface of the supporting vertical plate (6) is fixedly connected with a handrail (17), and the middle part of the handrail (17) is provided with an opening (18).
6. The thread burying device for the water conservancy and hydropower engineering according to claim 1, characterized in that: the bottom surface of the wire burying device body (1) is fixedly connected with a connecting block (15), and the bottom surface of the connecting block (15) is rotatably connected with a moving wheel (16).
CN202020813613.8U 2020-05-15 2020-05-15 Hydraulic and hydroelectric engineering is with device of sunkening cord Active CN211930120U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020813613.8U CN211930120U (en) 2020-05-15 2020-05-15 Hydraulic and hydroelectric engineering is with device of sunkening cord

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020813613.8U CN211930120U (en) 2020-05-15 2020-05-15 Hydraulic and hydroelectric engineering is with device of sunkening cord

Publications (1)

Publication Number Publication Date
CN211930120U true CN211930120U (en) 2020-11-13

Family

ID=73320110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020813613.8U Active CN211930120U (en) 2020-05-15 2020-05-15 Hydraulic and hydroelectric engineering is with device of sunkening cord

Country Status (1)

Country Link
CN (1) CN211930120U (en)

Similar Documents

Publication Publication Date Title
CN211930120U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN209948538U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN108408499A (en) A kind of electric power cable winding device
CN210126986U (en) Pipe laying and paying-off device for hydraulic engineering
CN212784540U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN215119886U (en) Hydraulic engineering that prevents line and bend is with device of sunkening cord
CN213212935U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN211790454U (en) Thread burying device for water conservancy and hydropower engineering
CN212518195U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN209217586U (en) A kind of power line construction cable safety hitch
CN213402251U (en) Thread burying device for water conservancy and hydropower engineering
CN215009316U (en) Hydraulic and hydroelectric engineering construction is with device of sunkening cord
CN218514068U (en) Water conservancy construction is with device of sunkening cord
CN211720139U (en) Hydraulic and hydroelectric engineering is with mechanism of burying line
CN111549840A (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN107069541B (en) A kind of overhead transmission line maintenance unit
CN216335776U (en) Water conservancy and hydropower construction pipe laying pay-off
CN206017043U (en) The attending device of tidal power generating system
CN203977483U (en) Combine bagger under water
CN206210426U (en) A kind of deep well submerged pump private cable
CN209329579U (en) A kind of interior decoration threading device
CN219018313U (en) Threading construction device for building electrical engineering
CN221614521U (en) Water conservancy and hydropower engineering is with burying line device
CN220049301U (en) Underground power pipeline channel dredging device
CN208363039U (en) A kind of checkdam for hydraulic and hydroelectric engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant