CN211923592U - Steel construction wall body positioner - Google Patents

Steel construction wall body positioner Download PDF

Info

Publication number
CN211923592U
CN211923592U CN202020536861.2U CN202020536861U CN211923592U CN 211923592 U CN211923592 U CN 211923592U CN 202020536861 U CN202020536861 U CN 202020536861U CN 211923592 U CN211923592 U CN 211923592U
Authority
CN
China
Prior art keywords
positioning device
connecting rod
steel structure
rod
structure wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020536861.2U
Other languages
Chinese (zh)
Inventor
陈斌
蒋国辉
王青峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuchang Hengda Hangxiao Construction Technology Co Ltd
Original Assignee
Xuchang Hengda Hangxiao Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuchang Hengda Hangxiao Construction Technology Co Ltd filed Critical Xuchang Hengda Hangxiao Construction Technology Co Ltd
Priority to CN202020536861.2U priority Critical patent/CN211923592U/en
Application granted granted Critical
Publication of CN211923592U publication Critical patent/CN211923592U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a steel construction wall body positioner has solved the problem that current wall body straightness measurement of hanging down is inefficient. The utility model discloses a hold the horizon bar, the lower extreme of holding the horizon bar be equipped with the handle, the middle part of holding the horizon bar is equipped with the scale, the upper end of holding the horizon bar is connected with the connecting rod is perpendicular, the connecting rod is connected with the otic placode, be fixed with the screw rod on the otic placode, the cover is equipped with the sleeve on the screw rod, the sleeve is connected with the upper end of the board that hangs down, the middle part of the board that hangs down is equipped with the laser pen, the laser pen is perpendicular with the looks of the board that hangs down, the sub. The utility model has the advantages that: the leveling rod is directly pressed on the wall body, then the scale aligned with the laser pen is observed, the verticality of the wall body is judged, the device is simpler and more flexible in structure, and the operation is simpler and more convenient.

Description

Steel construction wall body positioner
Technical Field
The utility model relates to a construction especially indicates a steel construction wall body positioner.
Background
In the building construction process, the control of the vertical (verticality) of the construction process, namely the control of the axis projection measurement, is very important. The accuracy of the axis projection measurement is directly related to the construction quality and safety of the building structure. And is particularly important for super high-rise buildings.
At present, a wall perpendicularity detection method commonly used in construction sites is a plumb bob method. When carrying out the straightness measurement that hangs down, operating personnel climbs the support frame, places the sash weight from the top down, measures the distance of plumb bob line apart from the wall on it alone, measures the distance of plumb bob line apart from the wall below alone, and through 2 data contrast, reachs the straightness deviation that hangs down, this operation process is complicated, and data error is big, and is inefficient.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem that the current wall body straightness measurement of hanging down that exists is inefficient among the background art, the utility model provides a steel construction wall body positioner.
The technical scheme of the utility model is that: the utility model provides a steel construction wall body positioner, is including holding the flat bar, the lower extreme of holding the flat bar be equipped with the handle, the middle part of holding the flat bar is equipped with the scale, the upper end of holding the flat bar is connected with the connecting rod is perpendicular, the connecting rod is connected with the otic placode, be fixed with the screw rod on the otic placode, the cover is equipped with the sleeve on the screw rod, the sleeve is connected with the upper end of board that hangs down, the middle part of board that hangs down is equipped with the laser pen, the laser pen is perpendicular with the looks of board that hangs down, the.
The leveling rod and the connecting rod are square tubes.
The holding rod is connected with the handle in a welding mode.
The holding rod is connected with the connecting rod in a welding mode.
The connecting rod be connected with two otic placodes, wear to be equipped with the screw rod between two otic placodes, the both ends of screw rod are equipped with the nut.
The connecting rod is connected with the ear plate in a welding mode.
The sleeve is connected with the vertical plate in a welding mode.
The vertical plate and the pressing plate are provided with semicircular grooves for clamping the laser pen, and two ends of the pressing plate are connected with the vertical plate through screws.
The counterweight is a steel ball.
The hanging plate is connected with the balance weight in a welding mode.
The utility model has the advantages that: the leveling rod is directly pressed on the wall body, then the scale aligned with the laser pen is observed, the verticality of the wall body is judged, the device is simpler and more flexible in structure, and the operation is simpler and more convenient.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of the present invention.
In the figure: 1-holding flat rod, 2-handle, 3-connecting rod, 4-ear plate, 5-screw, 6-sleeve, 7-vertical plate, 8-laser pen, 9-pressing plate and 10-counterweight.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
Example 1:
as shown in figure 1, the steel structure wall positioning device comprises a leveling rod 1, a handle 2, a connecting rod 3, an ear plate 4, a screw rod 5, a sleeve 6, a hanging plate 7, a laser pen 8, a pressing plate 9 and a balance weight 10.
The leveling rod 1 is a square tube and is used for being attached to a wall body, and the same perpendicularity as the wall body is guaranteed. The handle 2 is welded at the lower end of the leveling rod 1 and used for operating the leveling rod, and the leveling rod is conveniently pressed and attached to a wall body. The middle part of the leveling rod 1 is provided with scales which are matched with a laser pen and used for judging the verticality of the wall body.
The upper end of the leveling rod 1 is vertically welded and connected with the connecting rod 3, the connecting rod 3 is also a square tube, and the connecting rod is used for extending outwards for a certain distance to ensure that the structures such as a vertical plate are proper in distance with the leveling rod. Connecting rod 3 and otic placode 4 welded connection, the otic placode is used for the installation screw rod. The lug plates 3 are two in total, the screw rods 5 penetrate between the two symmetrical lug plates 4, nuts are arranged at two ends of each screw rod 5, and the nuts are screwed up to fix the screw rods on the lug plates.
The screw 5 is sleeved with a sleeve 6 which can rotate freely relative to the screw. The sleeve 6 is connected with the upper end of the hanging plate 7 in a welding mode, and the hanging plate 7 can freely swing relative to the screw rod. The middle part of board 7 that hangs down is equipped with laser pen 8, and is concrete, hangs down and is equipped with the semicircular groove of cliping laser pen 8 on the board 7 and the clamp plate 9, and the both ends of clamp plate 9 are passed through the screw and are connected with board 7 that hangs down, utilize the clamp plate to press the laser pen to establish and fix the middle part at the board that hangs down. And ensures that the laser pen 8 is perpendicular to the plumbing plate 7.
Under the action of gravity, the vertical plate keeps vertical, the laser pen keeps horizontal, if the wall body is vertical, the laser pen irradiates the middle of the scale, and if the wall body is inclined, the laser pen irradiates the upper side or the lower side of the scale. The lower part welded connection of board 7 that hangs down has counter weight 10, and counter weight 10 is the steel ball, and the counter weight is used for improving the gravity of the board that hangs down for it is stable to hang down the board more, is difficult to rock.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (10)

1. The utility model provides a steel construction wall body positioner, is including holding flat bar (1), its characterized in that: the lower extreme of holding flat bar (1) be equipped with handle (2), the middle part of holding flat bar (1) is equipped with the scale, the upper end of holding flat bar (1) is connected with connecting rod (3) is perpendicular, connecting rod (3) are connected with otic placode (4), be fixed with screw rod (5) on otic placode (4), the cover is equipped with sleeve (6) on screw rod (5), sleeve (6) are connected with the upper end of hanging down board (7), the middle part of hanging down board (7) is equipped with laser pen (8), laser pen (8) and the looks of hanging down board (7) are perpendicular, the sub-unit connection of hanging down board (7) has counter weight (10).
2. The steel structure wall positioning device of claim 1, wherein: the leveling rod (1) and the connecting rod (3) are square tubes.
3. The steel structure wall positioning device as claimed in claim 1 or 2, wherein: the flat holding rod (1) is connected with the handle (2) in a welding mode.
4. The steel structure wall positioning device as claimed in claim 1 or 2, wherein: the leveling rod (1) is connected with the connecting rod (3) in a welding mode.
5. The steel structure wall positioning device of claim 1, wherein: the connecting rod (3) is connected with the two lug plates (4), a screw rod (5) penetrates between the two lug plates (4), and nuts are arranged at two ends of the screw rod (5).
6. The steel structure wall positioning device as claimed in claim 1 or 5, wherein: the connecting rod (3) is connected with the ear plate (4) in a welding way.
7. The steel structure wall positioning device of claim 1, wherein: the sleeve (6) is connected with the vertical plate in a welding way.
8. The steel structure wall positioning device as claimed in claim 1 or 7, wherein: the vertical plate (7) and the pressing plate (9) are provided with semicircular grooves for clamping the laser pen (8), and two ends of the pressing plate (9) are connected with the vertical plate (7) through screws.
9. The steel structure wall positioning device of claim 1, wherein: the counterweight (10) is a steel ball.
10. The steel structure wall positioning device as claimed in claim 1 or 9, wherein: the vertical plate (7) is connected with the counterweight (10) in a welding way.
CN202020536861.2U 2020-04-13 2020-04-13 Steel construction wall body positioner Active CN211923592U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020536861.2U CN211923592U (en) 2020-04-13 2020-04-13 Steel construction wall body positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020536861.2U CN211923592U (en) 2020-04-13 2020-04-13 Steel construction wall body positioner

Publications (1)

Publication Number Publication Date
CN211923592U true CN211923592U (en) 2020-11-13

Family

ID=73375526

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020536861.2U Active CN211923592U (en) 2020-04-13 2020-04-13 Steel construction wall body positioner

Country Status (1)

Country Link
CN (1) CN211923592U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235952A (en) * 2021-04-26 2021-08-10 广东天立方建设集团有限公司 Novel positioning device for constructional engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235952A (en) * 2021-04-26 2021-08-10 广东天立方建设集团有限公司 Novel positioning device for constructional engineering

Similar Documents

Publication Publication Date Title
CN205561851U (en) Detect hang down straightness's instrument of form setting
CN211923592U (en) Steel construction wall body positioner
CN210741327U (en) Building engineering quality detection device
CN210141865U (en) Bridge pier stud template straightness detection device that hangs down
CN218628355U (en) Verticality detection equipment
CN205861059U (en) Infrared ray verticality measurer
CN213208886U (en) Hang portable prefabricated component straightness detection chi that hangs
CN211651598U (en) Novel plumb bob measuring tool
CN210464268U (en) Dipperstick for civil engineering convenient to carry
CN210603288U (en) Wall monitoring device is used in construction of worker's civil engineering
CN210598198U (en) Support arrangement for adjust wall post straightness that hangs down
CN101586955A (en) Column gradient measuring device and measuring method thereof
CN218545722U (en) Construction site verticality detection equipment
CN218002529U (en) Wall body straightness detection device that hangs down for building engineering
CN213331071U (en) Simple tool for measuring pore-forming of cast-in-situ bored pile
CN210242675U (en) Construction equipment of composite wall column and verticality measuring tool thereof
CN214426710U (en) Automatic balancing device for leveling prism
CN111678418A (en) Verticality measuring device is built in room
CN206113928U (en) Special detection instrument of template
CN215952590U (en) Measure wall post template straightness instrument that hangs down
CN218349506U (en) Drainage pipe surveys auxiliary rod
CN111044016A (en) Vertical detection equipment for building engineering construction
CN210070955U (en) Telescopic bolt and rope rod for mine surveying
CN212747674U (en) Equipment for detecting size and squareness of door and window opening
CN211668496U (en) Special perpendicular detection ruler of building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant