CN211923504U - Concrete form for hydraulic engineering - Google Patents

Concrete form for hydraulic engineering Download PDF

Info

Publication number
CN211923504U
CN211923504U CN202020295039.1U CN202020295039U CN211923504U CN 211923504 U CN211923504 U CN 211923504U CN 202020295039 U CN202020295039 U CN 202020295039U CN 211923504 U CN211923504 U CN 211923504U
Authority
CN
China
Prior art keywords
template
fixedly connected
groove
hole
hydraulic engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202020295039.1U
Other languages
Chinese (zh)
Inventor
韩国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Zhuotai Water Conservancy And Hydropower Engineering Co ltd
Original Assignee
Inner Mongolia Zhuotai Water Conservancy And Hydropower Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Zhuotai Water Conservancy And Hydropower Engineering Co ltd filed Critical Inner Mongolia Zhuotai Water Conservancy And Hydropower Engineering Co ltd
Priority to CN202020295039.1U priority Critical patent/CN211923504U/en
Application granted granted Critical
Publication of CN211923504U publication Critical patent/CN211923504U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model belongs to the technical field of concrete templates, especially, a concrete template for hydraulic engineering, including first template, the second template has all been lapped at the both ends about the first template, first recess has been seted up in the first template, be provided with the slide bar in the first recess, the surface sliding connection of slide bar has the sliding sleeve, the fixed block is all fixedly connected with to the both sides about the sliding sleeve, two one end of fixed block is all fixedly connected in first recess, the top fixedly connected with connecting plate of slide bar, the top fixedly connected with pull rod of connecting plate, first through-hole has been seted up in the first template, the bottom and the first recess of first through-hole are linked together; the utility model discloses, through setting up first fixture block joint can be with second template fixed connection in first draw-in groove on first template, through promoting the pull ring, drive the pull rod and move down to it can be with slide bar sliding connection in the spout to drive the slide bar and slide in the sliding sleeve.

Description

Concrete form for hydraulic engineering
Technical Field
The utility model belongs to the technical field of the concrete form, concretely relates to concrete form for hydraulic engineering.
Background
The water conservancy project is used for controlling and allocating surface water and underground water in the nature, the project built to achieve the purpose of removing harm and benefiting, also called water project, water is a valuable resource essential for human production and life, but the naturally existing state of the water conservancy project does not completely meet the requirement of human, only the water conservancy project is built, the water flow can be controlled, flood disasters are prevented, the regulation and distribution of water quantity are carried out, the requirement of people for water resources in life and production is met, the building template is a temporary supporting structure, the temporary supporting structure is manufactured according to the design requirement, a concrete structure and a member are formed according to the specified position and geometric dimension, the correct position of the concrete structure and the member is kept, the self weight of the building template and an external load acting on the concrete structure are borne, the aim of template project is fulfilled, the quality and the construction safety of the concrete project are guaranteed, the construction progress is accelerated, and the project cost is reduced.
And the inconvenient installation and the dismantlement of current template anchor clamps lead to the practicality relatively poor, influence the normal clear of construction, increase construction cost, lead to work efficiency low.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a concrete form for hydraulic engineering has reduction construction cost, convenient dismantlement and installation, characteristics such as the practicality is stronger.
In order to achieve the above object, the utility model provides a following technical scheme: a concrete formwork for hydraulic engineering comprises a first formwork, wherein second formworks are lapped at the left end and the right end of the first formwork, a first groove is formed in the first formwork, a sliding rod is arranged in the first groove, the surface of the sliding rod is connected with a sliding sleeve in a sliding manner, fixed blocks are fixedly connected at the left side and the right side of the sliding sleeve, one ends of the two fixed blocks are fixedly connected in the first groove, a connecting plate is fixedly connected at the top end of the sliding rod, a pull rod is fixedly connected at the top end of the connecting plate, a first through hole is formed in the first formwork, the bottom end of the first through hole is communicated with the first groove, a baffle is fixedly connected at the top end of the pull rod through the first through hole, a first clamping groove is formed in the first formwork, a first clamping block is clamped in the first clamping groove, and one end of the first clamping block is fixedly connected to, a second through hole is formed in the first template, the top end of the second through hole is communicated with the first groove, a sliding groove is formed in the first clamping block, and the bottom end of the sliding rod penetrates through the second through hole and is connected in the sliding groove in a sliding mode.
Preferably, a second groove is formed in the first clamping block, an electric push rod is fixedly connected in the second groove, a second clamping groove is formed in the slide rod, a second clamping block is clamped in the second clamping groove, and one end of the second clamping block is fixedly connected to the electric push rod.
Preferably, the top end of the connecting plate is fixedly connected with two springs, and the top ends of the two springs are fixedly connected in the first groove.
Preferably, the top end of the baffle is fixedly connected with a pull ring.
Preferably, the top end of the second template is fixedly connected with a control button, and the control button is electrically connected with the electric push rod through a lead.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses, through setting up first fixture block joint can be with second template fixed connection in first draw-in groove on first template, through promoting the pull ring, drive the pull rod downstream, thereby it can be with slide bar sliding connection in the spout to drive the slide bar to slide in the sliding sleeve, extension through electric putter drives second fixture block joint and can fix the slide bar in the spout in the second draw-in groove, the convenience is to the installation and the dismantlement of first template and second template, work efficiency has been improved, staff's intensity of labour has been reduced, make things convenient for staff's use, the practicality is stronger, the normal clear of construction has been guaranteed, construction cost is reduced, the utility model discloses compact structure, reasonable in design, the practicality is strong.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a front view of the present invention;
fig. 2 is a schematic sectional view of the top view of the present invention;
FIG. 3 is an enlarged schematic view of the structure at A in FIG. 2;
in the figure: 1. a first template; 2. a second template; 3. a first groove; 4. a slide bar; 5. a sliding sleeve; 6. a fixed block; 7. a connecting plate; 8. a spring; 9. a pull rod; 10. a first through hole; 11. a baffle plate; 12. a pull ring; 13. a second through hole; 14. a first card slot; 15. a first clamping block; 16. a chute; 17. a second groove; 18. an electric push rod; 19. a second fixture block; 20. a second card slot; 21. and a control button.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: a concrete formwork for hydraulic engineering comprises a first formwork 1, wherein the left end and the right end of the first formwork 1 are respectively provided with a second formwork 2 in a lap joint manner, a first groove 3 is formed in the first formwork 1, a slide rod 4 is arranged in the first groove 3, the surface of the slide rod 4 is connected with a slide sleeve 5 in a sliding manner, the left side and the right side of the slide sleeve 5 are respectively fixedly connected with a fixed block 6, one end of each of the two fixed blocks 6 is fixedly connected in the first groove 3, the top end of the slide rod 4 is fixedly connected with a connecting plate 7, the top end of the connecting plate 7 is fixedly connected with a pull rod 9, a first through hole 10 is formed in the first formwork 1, the bottom end of the first through hole 10 is communicated with the first groove 3, the top end of the pull rod 9 penetrates through the first through hole 10 and is fixedly connected with a baffle plate 11, a first clamping groove 14 is formed in the first formwork 1, and a, on the one end fixedly connected with second template 2 of first fixture block 15, can be with second template 2 fixed connection on first template 1 in first draw-in groove 14 through first fixture block 15 joint, second through-hole 13 has been seted up in the first template 1, the top and the first recess 3 of second through-hole 13 are linked together, spout 16 has been seted up in the first fixture block 15, the bottom of slide bar 4 passes second through-hole 13 sliding connection in spout 16, through promoting pull ring 12, drives pull rod 9 and moves down to it can be with slide bar 4 sliding connection in spout 16 to drive slide bar 4 and slide in sliding sleeve 5, conveniently to the installation and the dismantlement of first template 1 and second template 2, has improved work efficiency, has reduced staff's intensity of labour, makes things convenient for staff's use.
Specifically, second recess 17 has been seted up in first fixture block 15, fixedly connected with electric putter 18 in the second recess 17, second draw-in groove 20 has been seted up in the slide bar 4, the joint has second fixture block 19 in the second draw-in groove 20, the one end fixed connection of second fixture block 19 is on electric putter 18, and extension through electric putter 18 drives second fixture block 19 joint and can fix slide bar 4 in second draw-in groove 20 in spout 16, and the practicality is stronger, has guaranteed the normal clear of construction, reduces construction cost.
Specifically, the top end of the connecting plate 7 is fixedly connected with two springs 8, and the top ends of the two springs 8 are fixedly connected in the first groove 3.
Specifically, the top end of the baffle 11 is fixedly connected with a pull ring 12.
Specifically, the top end of the second template 2 is fixedly connected with a control button 21, and the control button 21 is electrically connected with the electric push rod 18 through a wire.
The utility model discloses a theory of operation and use flow: the utility model discloses during the use, remove second template 2, with 15 joints of first fixture block in first draw-in groove 14, then promote pull ring 12, drive pull rod 9 downstream, thereby drive slide bar 4 and slide in sliding sleeve 5, then drive slide bar 4 sliding connection in spout 16, then click control button 21, two electric putter 18 begin work, two electric putter 18 extension drive two second fixture block 19 relative movement, thereby make 19 joints of second fixture block in second draw-in groove 20, then fix second template 2 on first template 1, realize the installation to first template 1 and second template 2, then pour into the concrete into in first template 1 and second template 2.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a concrete form for hydraulic engineering, includes first template (1), its characterized in that: the first template is characterized in that second templates (2) are respectively lapped at the left end and the right end of the first template (1), a first groove (3) is formed in the first template (1), a sliding rod (4) is arranged in the first groove (3), a sliding sleeve (5) is connected on the surface of the sliding rod (4) in a sliding manner, fixed blocks (6) are respectively fixedly connected at the left side and the right side of the sliding sleeve (5), one ends of the two fixed blocks (6) are respectively and fixedly connected in the first groove (3), a connecting plate (7) is fixedly connected at the top end of the sliding rod (4), a pull rod (9) is fixedly connected at the top end of the connecting plate (7), a first through hole (10) is formed in the first template (1), the bottom end of the first through hole (10) is communicated with the first groove (3), and a baffle (11) is fixedly connected at the top end of the pull rod (9) through, first draw-in groove (14) have been seted up in first template (1), first draw-in groove (14) joint has first fixture block (15), on one end fixedly connected with second template (2) of first fixture block (15), second through-hole (13) have been seted up in first template (1), the top and first recess (3) of second through-hole (13) are linked together, spout (16) have been seted up in first fixture block (15), second through-hole (13) sliding connection is passed in spout (16) to the bottom of slide bar (4).
2. The concrete form for hydraulic engineering according to claim 1, characterized in that: a second groove (17) is formed in the first clamping block (15), an electric push rod (18) is fixedly connected in the second groove (17), a second clamping groove (20) is formed in the sliding rod (4), a second clamping block (19) is clamped in the second clamping groove (20), and one end of the second clamping block (19) is fixedly connected to the electric push rod (18).
3. The concrete form for hydraulic engineering according to claim 1, characterized in that: the top end of the connecting plate (7) is fixedly connected with two springs (8), and the top ends of the two springs (8) are fixedly connected in the first groove (3).
4. The concrete form for hydraulic engineering according to claim 1, characterized in that: the top end of the baffle (11) is fixedly connected with a pull ring (12).
5. The concrete form for hydraulic engineering according to claim 1, characterized in that: the top end of the second template (2) is fixedly connected with a control button (21), and the control button (21) is electrically connected with the electric push rod (18) through a lead.
CN202020295039.1U 2020-03-11 2020-03-11 Concrete form for hydraulic engineering Withdrawn - After Issue CN211923504U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020295039.1U CN211923504U (en) 2020-03-11 2020-03-11 Concrete form for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020295039.1U CN211923504U (en) 2020-03-11 2020-03-11 Concrete form for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN211923504U true CN211923504U (en) 2020-11-13

Family

ID=73346606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020295039.1U Withdrawn - After Issue CN211923504U (en) 2020-03-11 2020-03-11 Concrete form for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN211923504U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232788A (en) * 2021-12-22 2022-03-25 江西省萍乡市联友建材有限公司 Ultra-long structure concrete seamless construction structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232788A (en) * 2021-12-22 2022-03-25 江西省萍乡市联友建材有限公司 Ultra-long structure concrete seamless construction structure and construction method

Similar Documents

Publication Publication Date Title
CN211923504U (en) Concrete form for hydraulic engineering
CN210887687U (en) Building curtain wall with splicing fulcrum
CN215829628U (en) Double-concrete-beam and concrete frame column connecting structure for building design
CN214994580U (en) Assembled steel construction building
CN212201302U (en) Multifunctional construction engineering construction support assembly
CN214091008U (en) Template piece small tool
CN213681772U (en) Novel template fastening device is used in road bridge construction
CN212478552U (en) Building templates connection structure that civil engineering used
CN209812714U (en) Stable form sliding support link
CN208495498U (en) A kind of hardware cladding lever stamping equipment
CN209812735U (en) Stable calibration connecting piece of concrete processing equipment
CN212809597U (en) Warning sign is used in water conservancy construction
CN216587182U (en) Assembled building combined steel concrete
CN211690279U (en) Stable structure of soft foundation construction support
CN218265016U (en) Connecting device for PC (polycarbonate) member and cast-in-place reinforced concrete member
CN209874462U (en) Environment-friendly high-strength building template
CN211949604U (en) Novel structural connection fastening device for civil engineering
CN217054303U (en) A building templates for building engineering's be convenient for aggregate erection
CN207812758U (en) A kind of shearing outer wall template for building
CN218148883U (en) Steel structure building construction member
CN210366491U (en) Novel wall device that attaches of construction elevator
CN217419634U (en) Concrete pouring device for concrete composite foundation
CN215927034U (en) Safety device for hydraulic engineering maintenance
CN211971483U (en) Hoisting device for adjusting prefabricated part
CN209907201U (en) Prestressed steel strand anchoring device for bridge construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20201113

Effective date of abandoning: 20211227

AV01 Patent right actively abandoned

Granted publication date: 20201113

Effective date of abandoning: 20211227

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned