CN212201302U - Multifunctional construction engineering construction support assembly - Google Patents
Multifunctional construction engineering construction support assembly Download PDFInfo
- Publication number
- CN212201302U CN212201302U CN202020760801.9U CN202020760801U CN212201302U CN 212201302 U CN212201302 U CN 212201302U CN 202020760801 U CN202020760801 U CN 202020760801U CN 212201302 U CN212201302 U CN 212201302U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- support
- pipeline
- backup pad
- main part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a multi-functional building engineering construction support subassembly relates to the building engineering field. This multifunctional building engineering construction support subassembly includes support subject and backup pad, and the screw has been seted up in the front of support subject, and the back fixedly connected with and the corresponding second screw rod of screw of backup pad, the front of backup pad are equipped with pipeline clamping mechanism, the back both ends fixedly connected with clamp splice of support subject, and the top threaded connection of clamp splice has first screw rod, and the bottom fixedly connected with of first screw rod supports tight piece. This multifunctional construction engineering construction support subassembly has realized when using the support main part to fix the mould, still can install the backup pad in the support main part simultaneously, fixes interim pipeline and circuit in the front of support main part through pipeline latch mechanism to make interim pipeline and circuit on the building site keep neatly orderly, pipeline latch mechanism's easy operation is convenient, and the user is labour saving and time saving when fixing interim pipeline and circuit.
Description
Technical Field
The utility model relates to a building engineering technical field specifically is a multi-use architecture engineering construction support subassembly.
Background
The building engineering refers to an engineering entity formed by the construction of various building buildings and their auxiliary facilities and the installation of lines, pipes and equipment matched with them, wherein the building buildings refer to the engineering which has top covers, beams, columns, walls, foundations and can form internal spaces and meet the requirements of people for production, living, study and public activities.
In the building engineering construction, need use the construction bracket subassembly convenience to support and fix the template, and current construction bracket subassembly simple structure, the function is single, when the construction, often can arrange a lot of interim pipelines and circuits, interim pipeline is convenient for water, interim circuit is convenient for constructor to carry out some electrical equipment operations, and often chaotic of these interim pipelines and circuits, the construction bracket subassembly is not convenient for arrange in order these interim pipelines and circuits, can not satisfy the demand.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model discloses a multifunctional construction engineering construction bracket component to solve the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a multi-functional building engineering construction support subassembly, includes support subject and backup pad, the screw has been seted up in the front of support subject, the back fixedly connected with and the corresponding second screw rod of screw of backup pad, the front of backup pad is equipped with pipeline latch mechanism, the back both ends fixedly connected with clamp splice of support subject, the shape of clamp splice is horizontal "U" shape, the top threaded connection of clamp splice has first screw rod, the top fixedly connected with of first screw rod changes the handle, the bottom fixedly connected with of first screw rod supports tight piece, pipeline latch mechanism includes fixed strip and lower fixed strip, go up the fixed strip and down the activity joint between the fixed strip have the check lock lever.
Preferably, the top of the locking rod is fixedly connected with a swivel, a pin shaft is inserted in the axis of the swivel, a swivel groove corresponding to the locking rod and the swivel is formed in the top of the upper fixing strip, and two ends of the pin shaft penetrate through the side wall of the swivel groove.
Preferably, the bottom fixedly connected with end cap of check lock pole, clamping sleeve and spring have been cup jointed on the check lock pole, the middle part fixedly connected with stopper of check lock pole, clamping sleeve and spring are located between stopper and the end cap, the fluting corresponding with the check lock pole has been seted up to the fixed strip down, the draw-in groove that corresponds with the clamping sleeve has been seted up to the diapire of fixed strip down.
Preferably, the top of the spring is abutted to the clamping sleeve, the bottom of the spring is abutted to the end cap, the spring is in a compression state, and the top of the clamping sleeve is abutted to the limiting block.
Preferably, the number of the support plates is two, and the two support plates are symmetrically distributed around the middle halving part of the bracket main body.
Preferably, a handle is fixedly connected to the side wall of the clamping sleeve.
Preferably, the length of the locking rod is greater than the gap between the upper fixing strip and the lower fixing strip.
The utility model discloses a multifunctional construction engineering construction bracket component, its beneficial effect who possesses as follows:
1. this multifunctional building engineering construction support subassembly, through setting up the support main part, the clamp splice, backup pad and pipeline latch mechanism, realized when using the support main part to fix the mould, the while still can be at the last erection support board of support main part, fix the front in the support main part with interim pipeline and circuit through pipeline latch mechanism, thereby make interim pipeline and circuit on the building site keep neat orderly, pipeline latch mechanism's easy operation is convenient, the user is labour saving and time saving when fixing interim pipeline and circuit, satisfy the user demand.
2. This multifunctional building engineering construction bracket component can carry on spacingly to the chucking cover through setting up the stopper, prevents that chucking cover position from too high influence operation, through setting up the handle person of facilitating the use slip chucking cover, when the user removes the fixed of locking lever, otherwise with the operation of installation locking lever can.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of a portion A of FIG. 1 according to the present invention;
FIG. 3 is a structural view of the main body of the bracket of the present invention;
fig. 4 is a connection diagram of the support plate and the locking rod of the present invention.
In the figure: 1. a stent body; 101. a screw hole; 2. a clamping block; 3. a first screw; 301. turning a handle; 302. a propping block; 4. a support plate; 401. a second screw; 402. an upper fixing strip; 403. a lower fixing strip; 4031. a card slot; 5. a locking lever; 501. rotating the ring; 502. a pin shaft; 503. a limiting block; 504. an end cap; 6. a clamping sleeve; 601. a handle; 7. a spring.
Detailed Description
The embodiment of the utility model provides a multifunctional construction bracket component, as shown in fig. 1-4, comprising a bracket main body 1 and a supporting plate 4, wherein the front of the bracket main body 1 is provided with a screw hole 101, the back of the supporting plate 4 is fixedly connected with a second screw 401 corresponding to the screw hole 101, the front of the supporting plate 4 is provided with a pipeline clamping mechanism, both ends of the back of the bracket main body 1 are fixedly connected with clamping blocks 2, the clamping blocks 2 are in a horizontal U shape, the top of the clamping blocks 2 is in threaded connection with a first screw 3, the top of the first screw 3 is fixedly connected with a rotating handle 301, the bottom of the first screw 3 is fixedly connected with a resisting block 302, the pipeline clamping mechanism comprises an upper fixing strip 402 and a lower fixing strip 403, a locking rod 5 is movably clamped between the upper fixing strip 402 and the lower fixing strip 403, and through the arrangement of the bracket main body 1, the clamping blocks 2, the supporting plate 4, realized when using support subject 1 to fix the mould, still can install backup pad 4 on support subject 1 simultaneously, fix interim pipeline and circuit in support subject 1's front through pipeline latch mechanism to make interim pipeline and circuit on the building site keep neat orderly, pipeline latch mechanism's easy operation is convenient, and the user is laborsaving in the time-saving of fixing interim pipeline and circuit, satisfies the user demand.
The top fixedly connected with swivel 501 of check lock lever 5, the axle center department of swivel 501 pegs graft there is round pin axle 502, go up the top of fixed strip 402 and offer the turn trough corresponding with check lock lever 5 and swivel 501, the lateral wall in turn trough is passed at the both ends of round pin axle 502, is convenient for check lock lever 5 to rotate on last fixed strip 402 through setting up swivel 501 and round pin axle 502.
Bottom fixedly connected with end cap 504 of check lock lever 5, clamp sleeve 6 and spring 7 have been cup jointed on the check lock lever 5, the middle part fixedly connected with stopper 503 of check lock lever 5, clamp sleeve 6 and spring 7 are located between stopper 503 and the end cap 504, lower fixed strip 403 has seted up the fluting corresponding with check lock lever 5, draw-in groove 4031 corresponding with clamp sleeve 6 has been seted up to the diapire of lower fixed strip 403, be convenient for fix check lock lever 5 on lower fixed strip 403 through setting up clamp sleeve 6 and spring 7.
The top of spring 7 offsets with chucking cover 6, and the bottom of spring 7 offsets with end cap 504, and spring 7 is in compression state, and the top of chucking cover 6 offsets with stopper 503, can carry on spacingly to chucking cover 6 through setting up stopper 503, prevents that chucking cover 6 from putting too high influence operation.
The quantity of backup pad 4 is two sets of, and two sets of backup pads 4 are about the middle halving department symmetric distribution of support main part 1, and the lateral wall fixedly connected with handle 601 of chucking cover 6 through setting up handle 601 person of facilitating the use slip chucking cover 6, when the user removes the fixed of locking lever 5, can vice versa with the operation of installation locking lever 5.
The length of the locking bar 5 is greater than the gap between the upper and lower fixing strips 402 and 403.
The working principle is as follows: when the user used, can use support main part 1 to press from both sides tightly the mould, specifically advance the mould card in "U" shape bayonet socket of clamp splice 2, rotate this moment and change 301, change 301 and drive first screw rod 3 and rotate, first screw rod 3 along screw 101 spiral shell screwing down and promote to support tight piece 302 and press from both sides tightly the mould, use a set of support main part 1 can make both ends fix two sets of moulds.
After fixing the mould, can be at the positive erection bracing board 4 of support main part 1, and then be convenient for fix interim pipeline and interim circuit, concrete operation does, can advance interim pipeline and circuit card between fixed strip 402 and lower fixed strip 403, at this moment, pulling handle 601 drives the motion of chucking cover 6, make chucking cover 6 slide on check lock lever 5 and compression spring 7, and drive check lock lever 5 and rotate, check lock lever 5 drives swivel 501 and rotates along round pin axle 502, make check lock lever 5 card advance in the fluting of fixed strip 403 down, the handle 601 of loosing this moment, spring 7 resets and upwards pushes up chucking cover 6 and moves, chucking cover 6 card advances draw-in groove 4031, realize the fixed to check lock lever 5, and then make interim pipeline and interim circuit card between last fixed strip 402 and lower fixed strip 403.
This device is through setting up support main part 1, clamp splice 2, backup pad 4 and pipeline latch mechanism, realized when using support main part 1 to fix the mould, simultaneously still can install backup pad 4 on support main part 1, fix interim pipeline and circuit in support main part 1's front through pipeline latch mechanism, thereby make interim pipeline and circuit on the building site keep neatly orderly, pipeline latch mechanism's easy operation is convenient, the user is laborsaving in fixed interim pipeline and circuit time saving, satisfy the user demand.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (7)
1. The utility model provides a multi-functional building engineering construction support subassembly, includes support main part (1) and backup pad (4), its characterized in that: screw (101) have been seted up in the front of support main part (1), the back fixedly connected with and the corresponding second screw rod (401) of screw (101) of backup pad (4), the front of backup pad (4) is equipped with pipeline clamping mechanism, the back both ends fixedly connected with clamp splice (2) of support main part (1), the shape of clamp splice (2) is horizontal "U" shape, the top threaded connection of clamp splice (2) has first screw rod (3), the top fixedly connected with of first screw rod (3) changes (301), the bottom fixedly connected with of first screw rod (3) supports tight piece (302), pipeline clamping mechanism includes fixed strip (402) and lower fixed strip (403), it has check lock lever (5) to go up the activity joint between fixed strip (402) and lower fixed strip (403).
2. The multifunctional construction work support assembly according to claim 1, wherein: the top of the locking rod (5) is fixedly connected with a rotating ring (501), a pin shaft (502) is inserted in the axis of the rotating ring (501), a rotating groove corresponding to the locking rod (5) and the rotating ring (501) is formed in the top of the upper fixing strip (402), and two ends of the pin shaft (502) penetrate through the side wall of the rotating groove.
3. The multifunctional construction work support assembly according to claim 1, wherein: the bottom fixedly connected with end cap (504) of check lock lever (5), clamp sleeve (6) and spring (7) have been cup jointed on check lock lever (5), middle part fixedly connected with stopper (503) of check lock lever (5), clamp sleeve (6) and spring (7) are located between stopper (503) and end cap (504), the corresponding fluting with check lock lever (5) has been seted up down in fixed strip (403), draw-in groove (4031) corresponding with clamp sleeve (6) has been seted up to the diapire of fixed strip (403) down.
4. The multifunctional construction work support assembly according to claim 3, wherein: the top of the spring (7) is abutted to the clamping sleeve (6), the bottom of the spring (7) is abutted to the end cap (504), the spring (7) is in a compressed state, and the top of the clamping sleeve (6) is abutted to the limiting block (503).
5. The multifunctional construction work support assembly according to claim 1, wherein: the number of the support plates (4) is two, and the two support plates (4) are symmetrically distributed at the middle bisector of the support main body (1).
6. The multifunctional construction work support assembly according to claim 3, wherein: the side wall of the clamping sleeve (6) is fixedly connected with a handle (601).
7. The multifunctional construction work support assembly according to claim 1, wherein: the length of the locking rod (5) is larger than the gap between the upper fixing strip (402) and the lower fixing strip (403).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020760801.9U CN212201302U (en) | 2020-05-11 | 2020-05-11 | Multifunctional construction engineering construction support assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020760801.9U CN212201302U (en) | 2020-05-11 | 2020-05-11 | Multifunctional construction engineering construction support assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212201302U true CN212201302U (en) | 2020-12-22 |
Family
ID=73813949
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020760801.9U Expired - Fee Related CN212201302U (en) | 2020-05-11 | 2020-05-11 | Multifunctional construction engineering construction support assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212201302U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114808681A (en) * | 2022-05-17 | 2022-07-29 | 中铁三局集团第二工程有限公司 | Construction method of bridge buried drain pipe |
-
2020
- 2020-05-11 CN CN202020760801.9U patent/CN212201302U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114808681A (en) * | 2022-05-17 | 2022-07-29 | 中铁三局集团第二工程有限公司 | Construction method of bridge buried drain pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211114845U (en) | Steel structure support frame for building engineering | |
CN212201302U (en) | Multifunctional construction engineering construction support assembly | |
CN111043401A (en) | Improved water conservancy pipeline supporting and connecting structure for water conservancy project | |
CN108756073A (en) | A kind of reinforcing bar Quick connection sleeve cylinder of angle adjustable | |
CN212053755U (en) | Template anchor clamps of building engineering construction usefulness | |
CN108756070A (en) | A method of it improving building and builds efficiency | |
CN212802644U (en) | Building construction wall strutting arrangement | |
CN217631741U (en) | Protection enclosure that construction used | |
CN213268934U (en) | Be used for interior support of pre-buried electronic box of shear force wall | |
CN212689400U (en) | Roof daylighting panel based on architectural design | |
CN209942217U (en) | Reinforced template for constructional engineering | |
CN210121829U (en) | Novel wall face inslot automatic installation pipe card equipment of building decoration construction | |
CN210896851U (en) | Single-phase transformer with square connecting frame | |
CN210968536U (en) | Fixed clamping structure for municipal building | |
CN217232745U (en) | Connecting and locking device for building template | |
CN208363603U (en) | A kind of column mould clamping device | |
CN220080113U (en) | Waterproof device | |
CN218242798U (en) | Cable erecting device for building construction | |
CN214739940U (en) | Building engineering template fixing device | |
CN215907427U (en) | Connecting and locking device for building template | |
CN216312659U (en) | Porous metal waterproof joint | |
CN217054349U (en) | Concrete forming template convenient to build | |
CN216921326U (en) | Building engineering template fixing device | |
CN218103049U (en) | Light photovoltaic support that stability is strong | |
CN219138375U (en) | Novel K board reinforcement bearing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201222 Termination date: 20210511 |
|
CF01 | Termination of patent right due to non-payment of annual fee |