- Prior art keywords
- fixedly connected
- workstation
- screw rod
- base
- cup jointed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model relates to the technical field of mechanical equipment, and a vertical automatic tiling device for construction is disclosed, including the base, the sleeve pipe has been cup jointed in base inner chamber's middle part activity, and the sheathed tube external fixation has cup jointed from the driving wheel, and the inside activity of sheathed tube has cup jointed the screw rod, and the one end of screw rod extends to the top and the fixedly connected with workstation of base, and base inner chamber's bottom surface fixedly connected with is located the left first motor of sleeve pipe. The utility model discloses a mode that risees is carried out to the position of puting up the wall brick, utilize the interact between sleeve pipe and the screw rod, it rises to drive the screw rod, it rises to highly adjusting of puting up the wall brick to drive the workstation through the screw rod that rises, it is usually higher to have avoided the wall, it carries out the wall brick operation to need the workman to scramble the eminence, the dangerous degree of workman's operation increases, cause the unable guarantee of workman's safety, the poor problem of security has improved the security when guaranteeing workman's safety.
Description
Technical Field
The utility model relates to the technical field of mechanical equipment, specifically be a vertical automatic tiling device for construction.
Background
The wall tiles are suitable for facade decoration of washrooms, kitchens and outdoor balconies, the wall tiles are effective ways for protecting wall surfaces from water splashing, are not only used for wall surfaces and used for edge decoration of doors and windows, but also are interesting decorative elements, are used for decorating wall tiles at skirting lines, are attractive, protect wall bases from being stained by shoes or table, chair and stool feet, and are also important processes essential for building construction.
In-process of modern building construction, often adopt artificial mode to carry out posting of wall brick, because the wall is usually higher, need the workman to climb the eminence and carry out the operation of wall brick, the dangerous degree of workman's operation increases, cause the unable guarantee of workman's safety, the poor problem of security, after posting the completion simultaneously, owing to do not flatten the processing to the wall brick, cause the wall brick of posting to drop and break, lead to the inefficiency of posting, the extravagant problem of cost, a vertical automatic wall brick device for construction is released at present.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a vertical automatic tiling device for construction possesses the advantage of guaranteeing workman's safety, security height, puting up efficient, saving the cost, has solved the problem of proposing among the above-mentioned background art.
The utility model provides a following technical scheme: the utility model provides a vertical automatic tiling device for construction, includes the base, the sleeve pipe has been cup jointed in base inner chamber's middle part activity, the sheathed tube external fixation has been cup jointed from the driving wheel, and the sheathed tube inside activity has cup jointed the screw rod, the one end of screw rod extends to the top and the fixedly connected with workstation of base, base inner chamber's bottom surface fixedly connected with is located the left first motor of sleeve pipe, and fixedly on the output shaft of first motor has cup jointed the action wheel, and the activity has cup jointed the belt on the action wheel, the action wheel passes through the belt and is connected from the driving wheel transmission.
Choice, the bottom surface fixedly connected with second motor of workstation inner chamber, and the fixed cover of having connect the elliptical plate on the output shaft of second motor, the right side fixedly connected with elastic component of workstation inner chamber, and the one end fixedly connected with connector of elastic component, swing joint has the pulley on the connector, the side fixedly connected with telescopic link of connector, the one end of telescopic link extends to the right side and the fixedly connected with rubber head of workstation.
Carefully, the right side fixedly connected with hydraulic means of workstation top surface, and fixedly connected with fixed plate on hydraulic means's the output shaft, the side fixedly connected with sucking disc of fixed plate, the left side fixedly connected with controller of workstation top surface, and controller and hydraulic means electric connection, the right side fixedly connected with machine case of base inner chamber bottom surface, the left side fixedly connected with control panel of base, and control panel and machine case are electric connection.
And carefully selecting, wherein the inner part of the sleeve is provided with a thread matched with the screw rod, and the sleeve is spirally sleeved with the screw rod.
Carefully selecting, the surface of pulley is seted up anti-skidding line, pulley and elliptical plate sliding connection.
Carefully selecting, the elastic component activity cup joints in the outside of telescopic link, the length value of elastic component equals with the connector to the distance value on workstation inner chamber right side.
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. the utility model discloses a mode that risees is carried out to the position of puting up the wall brick, utilize the interact between sleeve pipe and the screw rod, it rises to drive the screw rod, it rises to highly adjusting of puting up the wall brick to drive the workstation through the screw rod that rises, it is usually higher to have avoided the wall, it carries out the wall brick operation to need the workman to scramble the eminence, the dangerous degree of workman's operation increases, cause the unable guarantee of workman's safety, the poor problem of security has improved the security when guaranteeing workman's safety.
2. The utility model discloses a mode of flattening is carried out to the wall brick of puting up, utilize the interact between elliptical plate and the pulley, drive the pulley and remove, the pulley through flexible removal drives the flexible removal of rubber head and strikes the wall brick for the wall brick is hugged closely the wall, has avoided after puting up the completion, because not flattening the processing to the wall brick, causes the wall brick of puting up to drop and breaks, leads to the inefficiency of puting up, the cost is practiced thrift in the time of efficiency has been improved to the extravagant problem of cost.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic sectional view of the structure workbench of the present invention;
fig. 3 is a schematic side view of the structure fixing plate of the present invention.
In the figure: 1. a base; 2. a first motor; 3. a control panel; 4. a driving wheel; 5. a belt; 6. a work table; 7. a controller; 8. a hydraulic device; 9. a fixing plate; 10. a suction cup; 11. a telescopic rod; 12. a rubber head; 13. a screw; 14. a chassis; 15. a driven wheel; 16. a sleeve; 17. a second motor; 18. an elliptical plate; 19. a pulley; 20. a connector; 21. an elastic member.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a vertical automatic wall tile sticking device for building construction comprises a base 1, a sleeve 16 is movably sleeved in the middle of an inner cavity of the base 1, a thread matched with a screw 13 is formed in the sleeve 16, the sleeve 16 is spirally sleeved with the screw 13, the screw 13 is driven to ascend by utilizing the interaction between the sleeve 16 and the screw 13, a worktable 6 is driven by the ascending screw 13 to ascend to adjust the height of a wall tile, the problem that the wall surface is generally high, a worker needs to climb to a high place to perform wall tile sticking operation, the danger degree of the operation of the worker is increased, the safety of the worker cannot be guaranteed, the safety is poor is solved, the safety of the worker is improved while the safety of the worker is ensured, a driven wheel 15 is fixedly sleeved on the outer part of the sleeve 16, the screw 13 is movably sleeved in the sleeve 16, one end of the screw 13 extends to the upper part of the base 1 and is fixedly connected with the, the bottom surface of the inner cavity of the base 1 is fixedly connected with a first motor 2 positioned on the left side of a sleeve 16, an output shaft of the first motor 2 is fixedly sleeved with a driving wheel 4, grooves matched with a belt 5 are formed in the driving wheel 4 and a driven wheel 15, and anti-skid grains are arranged in the grooves, so that the driving wheel 4 can drive the driven wheel 15 to rotate through the belt 5, the sleeve 16 is driven to rotate, the problem of structural skidding is reduced, the belt 5 is movably sleeved on the driving wheel 4, the driving wheel 4 is in transmission connection with the driven wheel 15 through the belt 5, the bottom surface of the inner cavity of the workbench 6 is fixedly connected with a second motor 17, an output shaft of the second motor 17 is fixedly sleeved with an elliptical plate 18, the right side of the inner cavity of the workbench 6 is fixedly connected with an elastic part 21, the elastic part 21 is movably sleeved outside the telescopic rod 11, and the length value of, the elastic part 21 is limited through the telescopic rod 11, the deflection of the elastic part 21 is reduced, meanwhile, the elastic part 21 is in a normal state initially, the pulley 19 is driven to be continuously contacted with the elliptical plate 18 through the elastic expansion and contraction of the elastic part 21, the connector 20 is fixedly connected with one end of the elastic part 21, the pulley 19 is movably connected onto the connector 20, the surface of the pulley 19 is provided with anti-skid grains, the pulley 19 is in sliding connection with the elliptical plate 18, the pulley 19 is driven to move by utilizing the interaction between the elliptical plate 18 and the pulley 19, the rubber head 12 is driven to move in an expansion and contraction mode through the pulley 19 which moves in an expansion and contraction mode to knock the wall brick, so that the wall brick is tightly attached to the wall surface, the problem that after the pasting is completed, the pasting of the wall brick is not flattened, the pasted wall brick falls and is damaged, the pasting efficiency is low, the cost is wasted is, connector 20's side fixedly connected with telescopic link 11, the one end of telescopic link 11 extends to workstation 6's right side and fixedly connected with rubber head 12, the right side fixedly connected with hydraulic means 8 of workstation 6 top surface, and fixedly connected with fixed plate 9 on hydraulic means 8's the output shaft, the side fixedly connected with sucking disc 10 of fixed plate 9, the quantity of sucking disc 10 is three, adsorb the wall brick through three sucking disc 10, improve the stability that the wall brick is adsorbed, avoid because the adsorption affinity is not enough, cause the problem that the wall brick drops badly, embody the stability of structure, the left side fixedly connected with controller 7 of workstation 6 top surface, and controller 7 and 8 electric connection of hydraulic means, the right side fixedly connected with machine case 14 of base 1 inner chamber bottom surface, base 1's left side fixedly connected with control panel 3, and control panel 3 is electric connection with machine case 14.
The working principle is as follows: when the wall brick sticking machine is used, firstly, a wall brick is adsorbed on the sucking disc 10, then equipment is started by using the control panel 3, the controller 7 controls the hydraulic device 8 to stretch, the hydraulic device 8 drives the fixing plate 9 to move, the fixing plate 9 drives the sucking disc 10 to move to stick the wall brick on a wall surface coated with concrete, meanwhile, the second motor 17 drives the elliptical plate 18 to rotate, when the long axis of the elliptical plate 18 is in contact with the pulley 19, the pulley 19 is pushed to move rightwards, the pulley 19 drives the telescopic rod 11 to move rightwards and simultaneously compresses the elastic part 21 to generate elastic force, the telescopic rod 11 drives the rubber head 12 to move rightwards to knock the pasted wall brick, when the elliptical plate 18 rotates to the short axis, the elastic part 21 recovers the elastic force to drive the telescopic rod 11 to move leftwards through the connector 20, the telescopic rod 11 drives the pulley 19 to move leftwards to be in continuous contact with the elliptical plate 18, drive rubber head 12 through telescopic link 11 is strikeed the wall brick of posting up the completion, when the position was posted in needs rising, first motor 2 drove action wheel 4 and rotates, and action wheel 4 drives from driving wheel 15 through belt 5 and rotates, drives sleeve pipe 16 from driving wheel 15 and rotates, and sleeve pipe 16 drives screw 13 with screw 13's spiral effect and rises, and screw 13 drives workstation 6 and rises to the realization is to the regulation of posting up the height.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Simultaneously in the utility model discloses an in the drawing, fill the pattern and just do not do any other injecions for distinguishing the picture layer.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a construction is with vertical automatic tiling device, includes base (1), its characterized in that: sleeve pipe (16) have been cup jointed in the middle part activity of base (1) inner chamber, the external fixation of sleeve pipe (16) has been cup jointed from driving wheel (15), and the inside activity of sleeve pipe (16) has been cup jointed screw rod (13), the one end of screw rod (13) extends to top and fixedly connected with workstation (6) of base (1), the bottom surface fixedly connected with of base (1) inner chamber is located the left first motor (2) of sleeve pipe (16), and fixed cover has been cup jointed on the output shaft of first motor (2) action wheel (4), and the activity has been cup jointed belt (5) on action wheel (4), action wheel (4) are connected with from driving wheel (15) transmission through belt (5).
2. The vertical automatic wall tile sticking device for building construction according to claim 1, wherein: bottom surface fixedly connected with second motor (17) of workstation (6) inner chamber, and fixed cover on the output shaft of second motor (17) have connect elliptical plate (18), the right side fixedly connected with elastic component (21) of workstation (6) inner chamber, and the one end fixedly connected with connector (20) of elastic component (21), swing joint has pulley (19) on connector (20), the side fixedly connected with telescopic link (11) of connector (20), the one end of telescopic link (11) extends to the right side and the fixedly connected with rubber head (12) of workstation (6).
3. The vertical automatic wall tile sticking device for building construction according to claim 1, wherein: the utility model discloses a hydraulic control system, including workstation (6), fixed connection has hydraulic means (8) on the right side fixedly connected with of workstation (6) top surface, and fixedly connected with fixed plate (9) on the output shaft of hydraulic means (8), side fixedly connected with sucking disc (10) of fixed plate (9), left side fixedly connected with controller (7) of workstation (6) top surface, and controller (7) and hydraulic means (8) electric connection, the right side fixedly connected with machine case (14) of base (1) inner chamber bottom surface, the left side fixedly connected with control panel (3) of base (1), and control panel (3) and machine case (14) are electric connection.
4. The vertical automatic wall tile sticking device for building construction according to claim 1, wherein: the screw thread matched with the screw rod (13) is formed in the sleeve (16), and the sleeve (16) is in spiral sleeve connection with the screw rod (13).
5. The vertical automatic wall tile sticking device for building construction according to claim 2, wherein: the surface of the pulley (19) is provided with anti-skid grains, and the pulley (19) is connected with the elliptical plate (18) in a sliding manner.
6. The vertical automatic wall tile sticking device for building construction according to claim 2, wherein: the elastic piece (21) is movably sleeved outside the telescopic rod (11), and the length value of the elastic piece (21) is equal to the distance value from the connector (20) to the right side of the inner cavity of the workbench (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922342229.4U CN211923418U (en) | 2019-12-24 | 2019-12-24 | Vertical automatic wall tile sticking device for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922342229.4U CN211923418U (en) | 2019-12-24 | 2019-12-24 | Vertical automatic wall tile sticking device for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211923418U true CN211923418U (en) | 2020-11-13 |
Family
ID=73324409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922342229.4U Expired - Fee Related CN211923418U (en) | 2019-12-24 | 2019-12-24 | Vertical automatic wall tile sticking device for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211923418U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112267654A (en) * | 2020-11-18 | 2021-01-26 | 南通通明集团有限公司 | Mechanical device for automatically pasting wall tiles and using method thereof |
CN112482708A (en) * | 2020-12-01 | 2021-03-12 | 乾日安全科技(北京)有限公司 | Vertical wall tile sticking device for building construction |
CN114704057A (en) * | 2022-04-14 | 2022-07-05 | 江苏利铭建设工程有限公司 | Assembly type construction external wall insulation board construction equipment |
CN115324314A (en) * | 2022-08-23 | 2022-11-11 | 北京城建集团有限责任公司 | Wall tile pasting equipment for building construction |
-
2019
- 2019-12-24 CN CN201922342229.4U patent/CN211923418U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112267654A (en) * | 2020-11-18 | 2021-01-26 | 南通通明集团有限公司 | Mechanical device for automatically pasting wall tiles and using method thereof |
CN112482708A (en) * | 2020-12-01 | 2021-03-12 | 乾日安全科技(北京)有限公司 | Vertical wall tile sticking device for building construction |
CN112482708B (en) * | 2020-12-01 | 2021-06-15 | 乾日安全科技(北京)有限公司 | Vertical wall tile sticking device for building construction |
CN114704057A (en) * | 2022-04-14 | 2022-07-05 | 江苏利铭建设工程有限公司 | Assembly type construction external wall insulation board construction equipment |
CN115324314A (en) * | 2022-08-23 | 2022-11-11 | 北京城建集团有限责任公司 | Wall tile pasting equipment for building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211923418U (en) | Vertical automatic wall tile sticking device for building construction | |
CN205433586U (en) | Robot for cleaning glass | |
CN111677252B (en) | Green's ceramic tile laying auxiliary device for interior decoration | |
CN110331843B (en) | Automatic wall tile sticking machine with seam beautifying function | |
CN113070757B (en) | Decorate engineering with dustless wall polisher of over-and-under type | |
CN212105179U (en) | Adjustable installation device for building glass curtain wall | |
CN206598905U (en) | Four-footed sucked type automatic travelling device | |
CN110952759A (en) | Semi-automatic vertical wall tile sticking device and construction method thereof | |
CN111364735B (en) | Building exterior wall decoration construction process | |
CN101416851A (en) | A kind of wall cleaning machine | |
CN113802819B (en) | Automatic tile sticking device for building construction | |
CN106214082A (en) | A kind of wallboard cleaning device | |
CN211867330U (en) | Wall grinding device for building engineering | |
CN103982035B (en) | Automatic plastering machine | |
CN210342599U (en) | Horizontal ground ceramic tile laying device for house construction | |
CN215254346U (en) | Vertical automatic wall tile sticking device for building construction | |
CN212773327U (en) | Vertical automatic wall tile sticking device for building construction | |
CN213858440U (en) | Energy-saving stone material machine tool | |
CN105064667A (en) | Controllable sucking-disc type floor laying machine | |
CN211677559U (en) | Cleaning equipment of putty powder mixer | |
CN210659163U (en) | Special ceramic tile of fitment construction equipment is spread and is pasted anchor clamps | |
CN207345969U (en) | A kind of absorption running gear for being suitable for moist high-altitude curtain wall | |
CN211760349U (en) | Building materials burr grinding device | |
CN212140341U (en) | Glass curtain wall belt cleaning device for building | |
CN110629986B (en) | Creeping device filled with crack beautifying agent for gaps between wall tiles and operation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201113 Termination date: 20211224 |
|
CF01 | Termination of patent right due to non-payment of annual fee |