CN211899817U - New formwork support device for construction engineering - Google Patents

New formwork support device for construction engineering Download PDF

Info

Publication number
CN211899817U
CN211899817U CN202020315671.8U CN202020315671U CN211899817U CN 211899817 U CN211899817 U CN 211899817U CN 202020315671 U CN202020315671 U CN 202020315671U CN 211899817 U CN211899817 U CN 211899817U
Authority
CN
China
Prior art keywords
supporting plate
plate
support plate
face
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020315671.8U
Other languages
Chinese (zh)
Inventor
王彦明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Yatai Building Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020315671.8U priority Critical patent/CN211899817U/en
Application granted granted Critical
Publication of CN211899817U publication Critical patent/CN211899817U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本实用新型公开了建筑工程技术领域的新型建筑工程模板支撑装置,括工程模板、第一支撑板、第二支撑板和第三支撑板,所述工程模板左侧端面均匀设有定位凸起槽,所述第一支撑板、第二支撑板和第三支撑板右端面均设有凸起,所述凸起与定位凸起槽相匹配,所述第一支撑板、第二支撑板和第三支撑板依次从上到下排列,所述第一支撑板下端面右侧设有第一斜撑板,所述第一斜撑板下面固定连接第二支撑板上端面左侧,所述第二支撑板下端面左侧设有第二斜撑板,所述第二斜撑板下端固定连接第三支撑板上端面右侧,所述第一斜撑板与第二斜撑板左端面设有L形支撑板,该装置结构简单,操作方便,能够固定模板不会松动,加快施工进度。

Figure 202020315671

The utility model discloses a novel construction engineering formwork support device in the technical field of construction engineering, comprising an engineering formwork, a first support plate, a second support plate and a third support plate. The left end face of the engineering formwork is evenly provided with positioning protrusion grooves , the right end surfaces of the first support plate, the second support plate and the third support plate are all provided with protrusions, the protrusions are matched with the positioning protrusion grooves, and the first support plate, the second support plate and the third support plate are The three supporting plates are arranged in sequence from top to bottom. A first diagonal bracing plate is arranged on the right side of the lower end surface of the first supporting plate. The bottom of the first diagonal bracing plate is fixedly connected to the left side of the upper end surface of the second supporting plate. A second diagonal bracing plate is arranged on the left side of the lower end surface of the second supporting plate, the lower end of the second diagonal bracing plate is fixedly connected to the right side of the upper end surface of the third supporting plate, and the left end surface of the first diagonal bracing plate and the second diagonal bracing plate is provided There is an L-shaped support plate, the device has a simple structure, is easy to operate, can fix the formwork without loosening, and speed up the construction progress.

Figure 202020315671

Description

新型建筑工程模板支撑装置New formwork support device for construction engineering

技术领域technical field

本实用新型涉及建筑工程技术领域,具体为一种新型建筑工程模板支撑装置。The utility model relates to the technical field of construction engineering, in particular to a novel formwork support device for construction engineering.

背景技术Background technique

建筑模板是一种临时性支护结构,按设计要求制作,使混凝土结构、构件按规定的位置、几何尺寸成形,保持其正确位置,并承受建筑模板自重及作用在其上的外部荷载。进行模板工程的目的,是保证混凝土工程质量与施工安全、加快施工进度和降低工程成本,目前现有建筑工程模板支撑系统采用架手架支撑系统,支撑方式杂乱,没有固定形式,使用可靠性低,易形成模板支撑系统的薄弱点,由于模板支撑架整体结构不合理,在使用时模板支撑架常会出现松动,在工程模板进行混凝土浇灌时,由于混凝土向外的作用力,造成工程模板松散,给使用者带来不便,为此,我们提出新型建筑工程模板支撑装置。The building formwork is a temporary support structure, which is made according to the design requirements, so that the concrete structure and components are formed according to the specified position and geometric size, maintain their correct position, and bear the self-weight of the building formwork and the external load acting on it. The purpose of the formwork project is to ensure the quality and construction safety of the concrete project, speed up the construction progress and reduce the project cost. At present, the existing construction project formwork support system adopts the frame and hand frame support system, the support method is messy, there is no fixed form, and the use reliability is low. , It is easy to form the weak point of the formwork support system. Due to the unreasonable overall structure of the formwork support frame, the formwork support frame often becomes loose during use. When the engineering formwork is poured concrete, the engineering formwork is loose due to the outward force of the concrete. To bring inconvenience to users, for this reason, we propose a new type of formwork support device for construction projects.

实用新型内容Utility model content

本实用新型的目的在于提供新型建筑工程模板支撑装置,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide a novel formwork support device for construction projects to solve the problems raised in the above background technology.

为实现上述目的,本实用新型提供如下技术方案:新型建筑工程模板支撑装置,包括工程模板、第一支撑板、第二支撑板和第三支撑板,所述工程模板左侧端面均匀设有定位凸起槽,所述第一支撑板、第二支撑板和第三支撑板右端面均设有凸起,所述凸起与定位凸起槽相匹配,所述第一支撑板、第二支撑板和第三支撑板依次从上到下排列,所述第一支撑板下端面右侧设有第一斜撑板,所述第一斜撑板下面固定连接第二支撑板上端面左侧,所述第二支撑板下端面左侧设有第二斜撑板,所述第二斜撑板下端固定连接第三支撑板上端面右侧,所述第一斜撑板与第二斜撑板左端面设有L形支撑板,所述L形支撑板下端位于第三支撑板上端面,所述第三支撑板左端设有固定板,所述固定板下端设有固定轴,所述固定板在固定轴转动,所述固定板上端面设有第三螺栓,所述第三螺栓从上到下依次固定连接固定板、L形支撑板和第三支撑板,所述L形支撑板右侧设有第一螺栓和第二螺栓,所述第一螺栓和第二螺栓分别固定连接第一支撑板和第二支撑板左端面,所述第三支撑板下端面中部设有第一安装座,所述第一安装座上端面设有第一安装钉与地面固定连接,所述第三支撑板左端设有第二安装座,所述第二安装座上端面设有第二安装钉固定连接地面。In order to achieve the above purpose, the present utility model provides the following technical solutions: a novel construction engineering formwork support device, including an engineering template, a first support plate, a second support plate and a third support plate, and the left end face of the engineering template is evenly provided with positioning Protruding grooves, the first support plate, the second support plate and the third support plate are all provided with protrusions on the right end surfaces, the protrusions are matched with the positioning protrusion grooves, the first support plate, the second support plate The plate and the third supporting plate are arranged in sequence from top to bottom, a first diagonal bracing plate is arranged on the right side of the lower end surface of the first supporting plate, and the bottom of the first diagonal bracing plate is fixedly connected to the left side of the upper end surface of the second supporting plate, The left side of the lower end surface of the second support plate is provided with a second diagonal support plate, the lower end of the second diagonal support plate is fixedly connected to the right side of the upper end surface of the third support plate, and the first diagonal support plate and the second diagonal support plate are The left end surface is provided with an L-shaped support plate, the lower end of the L-shaped support plate is located on the upper surface of the third support plate, the left end of the third support plate is provided with a fixed plate, the lower end of the fixed plate is provided with a fixed shaft, and the fixed plate When the fixed shaft rotates, the upper end of the fixed plate is provided with a third bolt, and the third bolt is fixedly connected to the fixed plate, the L-shaped support plate and the third support plate in order from top to bottom. The right side of the L-shaped support plate A first bolt and a second bolt are provided, and the first bolt and the second bolt are respectively fixedly connected to the left end face of the first support plate and the second support plate, and the middle part of the lower end face of the third support plate is provided with a first mounting seat, The upper end surface of the first mounting seat is provided with a first mounting nail to be fixedly connected to the ground, the left end of the third support plate is provided with a second mounting seat, and the upper end surface of the second mounting seat is provided with a second mounting nail to be fixedly connected to the ground .

优选的,所述第一斜撑板与第二斜撑板上下两端均设有螺丝钉,所述螺丝钉固定连接第一支撑板、第二支撑板和第三支撑板。Preferably, the upper and lower ends of the first diagonal bracing plate and the second diagonal bracing plate are provided with screws, and the screws are fixedly connected to the first supporting plate, the second supporting plate and the third supporting plate.

优选的,所述定位凸起槽设有三组,依次从上到下排列,且支撑板凸起依次插接于定位凸起槽内腔。Preferably, the positioning protrusion grooves are provided with three groups, which are arranged in sequence from top to bottom, and the support plate protrusions are inserted into the inner cavity of the positioning protrusion grooves in sequence.

优选的,所述第三支撑板内腔均设有与第一安装座和第二安装座相匹配的安装槽,且第一安装槽与第二安装槽均为横向凹槽。Preferably, the inner cavity of the third support plate is provided with installation grooves matching the first installation seat and the second installation seat, and the first installation groove and the second installation groove are both transverse grooves.

优选的,所述固定板上部下端面与第三支撑板上端面平行,且距离为L形支撑板的横向厚度。Preferably, the upper and lower end surfaces of the fixing plate are parallel to the upper end surface of the third supporting plate, and the distance is the lateral thickness of the L-shaped supporting plate.

优选的,所述第一安装钉与第二安装钉下端地面对应设有安装孔,且安装孔内腔设有木塞。Preferably, a mounting hole is provided on the ground corresponding to the lower end of the first mounting nail and the second mounting nail, and a wooden plug is provided in the inner cavity of the mounting hole.

与现有技术相比,本实用新型的有益效果是:采用第一支撑板、第二支撑板和第三支撑板,利用L形支撑板固定第一支撑板和第二支撑板,且利用斜撑板固定第一支撑板、第二支撑板与第三支撑板,保证工程模板上部和中部紧固,不会出现松动。Compared with the prior art, the beneficial effects of the present utility model are: adopt the first support plate, the second support plate and the third support plate, use the L-shaped support plate to fix the first support plate and the second support plate, and use the inclined The support plate fixes the first support plate, the second support plate and the third support plate, so as to ensure that the upper part and the middle part of the engineering formwork are fastened without loosening.

采用固定板、固定轴、第一安装座、第二安装座、第一安装钉和第二安安装钉,保证第三支撑板固定安装在地面上,不会出现松动,固定板可以阻挡L形支撑板横向部分,同时有保证第一支撑板和第二支撑板受到混凝土浇筑是不会产生松动。The fixed plate, the fixed shaft, the first installation seat, the second installation seat, the first installation nail and the second installation nail are used to ensure that the third support plate is fixedly installed on the ground without loosening, and the fixed plate can block the L-shaped The transverse part of the support plate also ensures that the first support plate and the second support plate will not be loosened when the concrete is poured.

附图说明Description of drawings

图1为:本实用新型建筑工程模板支撑装置结构示意图。Fig. 1 is: the structural schematic diagram of the formwork support device for the construction project of the present invention.

图中:1、工程模板;2、定位凸起槽;3、第二支撑板;4、凸起;5、第一支撑板;6、L形支撑板;7、第一斜撑板;8、第一螺栓;9、第二斜撑板;10、第二螺栓;11、固定板;12、固定轴;13、第二安装钉;14、第二安装座;15、第一安装钉;16、第一安装座;17、第三支撑板;18、第三螺栓。In the figure: 1. Engineering template; 2. Positioning protrusion groove; 3. Second support plate; 4. Protrusion; 5. First support plate; 6. L-shaped support plate; , the first bolt; 9, the second diagonal brace; 10, the second bolt; 11, the fixed plate; 12, the fixed shaft; 13, the second installation nail; 14, the second installation seat; 15, the first installation nail; 16. The first mounting seat; 17. The third support plate; 18. The third bolt.

附图仅用于示例性说明,不能理解为对本专利的限制;为了更好说明本实施例,附图某些部件会有省略、放大或缩小,并不代表实际产品的尺寸;对于本领域技术人员来说,附图中某些公知结构及其说明可能省略是可以理解的。The accompanying drawings are for illustrative purposes only, and should not be construed as limitations on this patent; in order to better illustrate the present embodiment, some parts of the accompanying drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art It is understandable to the artisan that certain well-known structures and their descriptions may be omitted from the drawings.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

请参阅图1,本实用新型提供一种技术方案:新型建筑工程模板支撑装置,包括工程模板1、第一支撑板5、第二支撑板3和第三支撑板17,工程模板1左侧端面均匀设有定位凸起槽2,第一支撑板5、第二支撑板3和第三支撑板17右端面均设有凸起4,凸起4与定位凸起槽2匹配,第一支撑板5、第二支撑板3和第三支撑板17依次从上到下排列,第一支撑板5与第二支撑板3长度、厚度均相等,第三支撑板17长度大于第一支撑板5和第二支撑板3,保证L形支撑板6能够固定在第三支撑板17上端面。Please refer to FIG. 1, the present utility model provides a technical solution: a novel construction engineering formwork support device, including an engineering template 1, a first support plate 5, a second support plate 3 and a third support plate 17, the left end face of the engineering template 1 The positioning protrusion grooves 2 are evenly arranged, and the right end surfaces of the first support plate 5, the second support plate 3 and the third support plate 17 are all provided with protrusions 4. The protrusions 4 are matched with the positioning protrusion grooves 2. The first support plate 5. The second support plate 3 and the third support plate 17 are arranged in sequence from top to bottom, the length and thickness of the first support plate 5 and the second support plate 3 are equal, and the length of the third support plate 17 is greater than that of the first support plate 5 and the second support plate 3. The second support plate 3 ensures that the L-shaped support plate 6 can be fixed on the upper end surface of the third support plate 17 .

请查阅图1,第一支撑板5下端面右侧设有第一斜撑板7,第一斜撑板7下面固定连接第二支撑板3上端面左侧,第二支撑板3下端面左侧设有第二斜撑板9,第二斜撑板9下端固定连接第三支撑板17上端面右侧,保证第一支撑板5、第二支撑板3和第三支撑板17之间首尾相连,并且保证第一支撑板5、第二支撑板3和第三支撑板17为一体,保证支撑板的稳定性。Please refer to FIG. 1 , a first diagonal bracing plate 7 is provided on the right side of the lower end surface of the first supporting plate 5 , and the bottom of the first diagonal bracing plate 7 is fixedly connected to the left side of the upper end surface of the second supporting plate 3 , and the lower end surface of the second supporting plate 3 is left on the left side. A second diagonal bracing plate 9 is provided on the side, and the lower end of the second diagonal bracing plate 9 is fixedly connected to the right side of the upper end surface of the third supporting plate 17 to ensure that the first supporting plate 5, the second supporting plate 3 and the third supporting plate 17 are head and tail. are connected, and ensure that the first support plate 5, the second support plate 3 and the third support plate 17 are integrated to ensure the stability of the support plate.

请参阅图1,第一斜撑板7与第二斜撑板9左端面设有L形支撑板6,L形支撑板6下部位于第三支撑板17上端面,第三支撑板17左端设有固定板11,固定板11下端设有固定轴12,固定板11在固定轴12转动,固定板11上端面设有第三螺栓18,第三螺栓18从上到下依次固定连接固定板11、L形支撑板6和第三支撑板17,L形支撑板右侧设有第一螺栓8和第二螺栓10,第一螺栓8和第二螺栓10分别固定连接第一支撑板5和第二支撑板3左端面,L形支撑板6为反向L形,保证固定板11可以固定L形支撑板6下部横向支撑板左端,保证混凝土浇筑时,工程模板1不会松动或倾斜。Please refer to FIG. 1 , an L-shaped supporting plate 6 is provided on the left end surfaces of the first diagonal bracing plate 7 and the second diagonal supporting plate 9 , the lower part of the L-shaped supporting plate 6 is located on the upper end surface of the third supporting plate 17 , and the left end of the third supporting plate 17 is provided with an L-shaped supporting plate 6 . There is a fixing plate 11, the lower end of the fixing plate 11 is provided with a fixing shaft 12, the fixing plate 11 rotates on the fixing shaft 12, the upper end surface of the fixing plate 11 is provided with a third bolt 18, and the third bolt 18 is fixed and connected to the fixing plate 11 sequentially from top to bottom , L-shaped support plate 6 and third support plate 17, the right side of the L-shaped support plate is provided with a first bolt 8 and a second bolt 10, the first bolt 8 and the second bolt 10 are fixedly connected to the first support plate 5 and the first bolt 10 respectively. On the left end face of the second support plate 3, the L-shaped support plate 6 is in the reverse L shape, which ensures that the fixing plate 11 can fix the left end of the lateral support plate at the lower part of the L-shaped support plate 6, and ensures that the engineering formwork 1 will not loosen or tilt when the concrete is poured.

请参阅图1,第一斜撑板7与第二斜撑板9上下两端均设有螺丝钉,螺丝钉固定连接第一支撑板5、第二支撑板3和第三支撑板17,斜撑板上下两端左侧与右侧均设有垂直于支撑板的螺栓孔,使第一支撑板5、第二支撑板3和第三支撑板17为一体结构,第一支撑板5与第二支撑板3不会因为重力而倾斜或者松动。Please refer to FIG. 1, the upper and lower ends of the first diagonal bracing plate 7 and the second diagonal bracing plate 9 are provided with screws, and the screws are fixedly connected to the first supporting plate 5, the second supporting plate 3 and the third supporting plate 17. The diagonal bracing plate The left and right sides of the upper and lower ends are provided with bolt holes that are perpendicular to the support plate, so that the first support plate 5, the second support plate 3 and the third support plate 17 are integrated into one structure. The first support plate 5 and the second support plate Plate 3 will not tilt or loosen due to gravity.

请参阅图1,定位凸起槽2设有三组,依次从上到下排列,且支撑板凸起4依次插接于定位凸起槽2内腔,保证工程模板1上部、中部和下部均受力,工程模板1在混凝土浇筑时,不会倾斜,导致塌方。Referring to Figure 1, there are three sets of positioning protrusion grooves 2, which are arranged from top to bottom in sequence, and the support plate protrusions 4 are inserted into the inner cavity of the positioning protrusion groove 2 in turn, so as to ensure that the upper, middle and lower parts of the engineering template 1 are When the concrete is poured, the engineering formwork 1 will not incline, resulting in collapse.

请参阅图1,第三支撑板17内腔均设有与第一安装座16和第二安装座14相匹配的安装槽,且第一安装槽与第二安装槽均为横向凹槽,当混泥土浇筑时,工程模板1会有向左的作用力,横折形安装座可以抵挡第三支撑板17向左的作用力,第三支撑板17不会移动,导致工程模板1松动。Please refer to FIG. 1 , the inner cavity of the third support plate 17 is provided with mounting grooves matching the first mounting seat 16 and the second mounting seat 14 , and the first mounting groove and the second mounting groove are both transverse grooves. When concrete is poured, the engineering formwork 1 will have a leftward force, and the transversely folded mounting seat can resist the leftward force of the third support plate 17, and the third support plate 17 will not move, causing the engineering formwork 1 to loosen.

请参阅图1,固定板11上部下端面与第三支撑板17上端面平行,且距离为L形支撑板6的横向厚度,保证L形支撑板6横向支撑板能够支撑固定板11,第三螺栓18不会支撑板厚度过高或者过低无法安装,L形支撑板6无法承受工程模板1、第一支撑板5和第二支撑板3的作用力。Referring to FIG. 1, the upper and lower end surfaces of the fixing plate 11 are parallel to the upper end surface of the third supporting plate 17, and the distance is the lateral thickness of the L-shaped supporting plate 6 to ensure that the lateral supporting plate of the L-shaped supporting plate 6 can support the fixing plate 11, and the third The bolts 18 cannot be installed because the thickness of the support plate is too high or too low, and the L-shaped support plate 6 cannot withstand the force of the engineering template 1 , the first support plate 5 and the second support plate 3 .

请参阅图1,第一安装钉15与第二安装钉13,下端地面对应设有安装孔,且安装孔内腔设有木塞,木塞充满整个安装孔,保证第一安装钉15与第二安装钉13能够进入木塞内部,保证第一安装座16与第二安装座14能够固定,从而保证第三支撑板17不会向左移动,保证工程模板1的稳定性。Please refer to FIG. 1 , the first installation nail 15 and the second installation nail 13 have corresponding installation holes on the ground at the lower ends, and the inner cavity of the installation hole is provided with a wooden plug, which fills the entire installation hole to ensure that the first installation nail 15 and the first installation nail 15 The two mounting nails 13 can enter the interior of the cork to ensure that the first mounting seat 16 and the second mounting seat 14 can be fixed, so as to ensure that the third support plate 17 will not move to the left and ensure the stability of the engineering template 1 .

工作原理:使用时,将工程模板1安装于需要浇筑面的左端面,将第一支撑板5、第二支撑板3和第三支撑板17右侧的凸起4均插接于工程模板1左侧面的定位凸起槽2内腔,再利用第一螺栓8和第二螺栓10将L形支撑板6固定在第一支撑板5与第二支撑板3的左端面,然后利用第一斜撑板7固定连接第一支撑板5与第二支撑板3,利用第二斜撑板9固定第二支撑板3与第三支撑板17,保证第一支撑板5、第二支撑板3和第三支撑板17之间由斜撑板固定为一体结构,再将固定板11利用固定轴12旋转到L形支撑板6横向支撑板上端面,利用第三螺栓18固定L形支撑板6,保证L形支撑板6不会松动,插接第三支撑板17的同时,第三支撑板17内腔均插接第一安装座16与第二安装座14,保证第三支撑板17不会移动,支撑装置稳定。Working principle: When in use, install the engineering template 1 on the left end face of the surface to be poured, and insert the first support plate 5, the second support plate 3 and the protrusion 4 on the right side of the third support plate 17 into the engineering template 1. The inner cavity of the positioning protrusion groove 2 on the left side, and then use the first bolt 8 and the second bolt 10 to fix the L-shaped support plate 6 on the left end face of the first support plate 5 and the second support plate 3, and then use the first The diagonal bracing plate 7 is fixedly connected to the first supporting plate 5 and the second supporting plate 3 , and the second supporting plate 3 and the third supporting plate 17 are fixed by the second diagonal bracing plate 9 to ensure the first supporting plate 5 and the second supporting plate 3 And the third support plate 17 is fixed as an integral structure by the diagonal support plate, and then the fixed plate 11 is rotated to the upper end surface of the L-shaped support plate 6 horizontally by the fixed shaft 12, and the L-shaped support plate 6 is fixed by the third bolt 18. , to ensure that the L-shaped support plate 6 will not be loose, and at the same time when the third support plate 17 is inserted, the inner cavity of the third support plate 17 is inserted into the first mounting seat 16 and the second mounting seat 14 to ensure that the third support plate 17 does not will move and the support device is stable.

本实用新型使用到的标准零件均可以从市场上购买,异形件根据说明书的和附图的记载均可以进行订制,各个零件的具体连接方式均采用现有技术中成熟的螺栓、铆钉、焊接等常规手段,机械、零件和设备均采用现有技术中,常规的型号,加上电路连接采用现有技术中常规的连接方式,在此不再详述。The standard parts used in the utility model can be purchased from the market, the special-shaped parts can be customized according to the description in the specification and the drawings, and the specific connection method of each part adopts the mature bolts, rivets, welding in the prior art. and other conventional means, the machinery, parts and equipment all adopt the conventional models in the prior art, and the circuit connection adopts the conventional connection manner in the prior art, which will not be described in detail here.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1. Novel building engineering template supports device, including engineering template (1), first backup pad (5), second backup pad (3) and third backup pad (17), its characterized in that: the engineering template (1) is characterized in that the left end face of the engineering template (1) is uniformly provided with positioning protruding grooves (2), the right end faces of the first supporting plate (5), the second supporting plate (3) and the third supporting plate (17) are respectively provided with a protrusion (4), the protrusions (4) are matched with the positioning protruding grooves (2), the first supporting plate (5), the second supporting plate (3) and the third supporting plate (17) are sequentially arranged from top to bottom, the right side of the lower end face of the first supporting plate (5) is provided with a first inclined supporting plate (7), the lower face of the first inclined supporting plate (7) is fixedly connected with the left side of the upper end face of the second supporting plate (3), the left side of the lower end face of the second supporting plate (3) is provided with a second inclined supporting plate (9), the lower end of the second inclined supporting plate (9) is fixedly connected with the right side of the upper end face of the third supporting plate (17), the first inclined supporting plate (7) and the left end, the lower end of the L-shaped supporting plate (6) is located on the upper end face of a third supporting plate (17), a fixing plate (11) is arranged at the left end of the third supporting plate (17), a fixing shaft (12) is arranged at the lower end of the fixing plate (11), the fixing plate (11) rotates on the fixing shaft (12), a third bolt (18) is arranged on the upper end face of the fixing plate (11), the L-shaped supporting plate (6) and the third supporting plate (17) are fixedly connected with the third bolt (18) from top to bottom in sequence, a first bolt (8) and a second bolt (10) are arranged on the right side of the L-shaped supporting plate, the first bolt (8) and the second bolt (10) are fixedly connected with the left end faces of the first supporting plate (5) and the second supporting plate (3) respectively, a first mounting seat (16) is arranged in the middle of the lower end face of the third supporting plate (17), and a first mounting nail (15) and a ground are fixedly, the left end of the third supporting plate (17) is provided with a second mounting seat (14), and the upper end face of the second mounting seat (14) is provided with a second mounting nail (13) fixedly connected with the ground.
2. The new form support assembly for construction projects as set forth in claim 1, wherein: screws are arranged at the upper end and the lower end of the first inclined supporting plate (7) and the second inclined supporting plate (9) and fixedly connected with the first supporting plate (5), the second supporting plate (3) and the third supporting plate (17).
3. The new form support assembly for construction projects as set forth in claim 1, wherein: the positioning convex grooves (2) are provided with three groups which are arranged from top to bottom in sequence, and the supporting plate bulges (4) are sequentially inserted into the inner cavity of the positioning convex grooves (2).
4. The new form support assembly for construction projects as set forth in claim 1, wherein: the inner cavity of the third supporting plate (17) is provided with mounting grooves matched with the first mounting seat (16) and the second mounting seat (14), and the first mounting groove and the second mounting groove are horizontal grooves.
5. The new form support assembly for construction projects as set forth in claim 1, wherein: the lower end face of the upper part of the fixing plate (11) is parallel to the upper end face of the third supporting plate (17), and the distance is the transverse thickness of the L-shaped supporting plate (6).
6. The new form support assembly for construction projects as set forth in claim 1, wherein: the first mounting nail (15) and the second mounting nail (13) are correspondingly provided with mounting holes on the lower end ground, and wood plugs are arranged in the inner cavities of the mounting holes.
CN202020315671.8U 2020-03-14 2020-03-14 New formwork support device for construction engineering Expired - Fee Related CN211899817U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020315671.8U CN211899817U (en) 2020-03-14 2020-03-14 New formwork support device for construction engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020315671.8U CN211899817U (en) 2020-03-14 2020-03-14 New formwork support device for construction engineering

Publications (1)

Publication Number Publication Date
CN211899817U true CN211899817U (en) 2020-11-10

Family

ID=73321624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020315671.8U Expired - Fee Related CN211899817U (en) 2020-03-14 2020-03-14 New formwork support device for construction engineering

Country Status (1)

Country Link
CN (1) CN211899817U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114934671A (en) * 2022-06-09 2022-08-23 安徽康新建设工程有限公司 Fixed wallboard device for house construction pouring and mounting method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114934671A (en) * 2022-06-09 2022-08-23 安徽康新建设工程有限公司 Fixed wallboard device for house construction pouring and mounting method thereof
CN114934671B (en) * 2022-06-09 2023-09-12 安徽康新建设工程有限公司 Fixing wallboard device for building construction pouring and mounting method thereof

Similar Documents

Publication Publication Date Title
CN103967268B (en) Plate construction formwork moulded by a kind of aluminium frame wood
CN211899817U (en) New formwork support device for construction engineering
CN207974007U (en) A kind of municipal administration bridge construction supporting rack
CN105239495A (en) Concrete side mold and mold support method thereof
CN211396067U (en) Vertical splicing mechanism of steel plate concrete shear wall for super high-rise building
CN210369924U (en) Template for building
CN216840639U (en) Fixing support for building engineering template
CN218563004U (en) Bridging reinforced structure for scaffold support
CN210002877U (en) Back ridge external corner active diagonal pulling device in aluminum alloy template system
CN210918206U (en) Repeatedly usable's building templates
CN218715128U (en) Template structure for building construction
CN223781158U (en) Template supporting component for building construction
CN223119297U (en) A fast-assembly assembled building wall panel structure
CN221742033U (en) Assembled building templates
CN221665774U (en) Well word frame is used in construction of multilayer factory building side fascia
CN215717137U (en) Novel install firm exterior angle template
CN215055239U (en) A combined support formwork for construction engineering
CN220433973U (en) A prefabricated shear wall
CN217268167U (en) Stable device of regional dimension of steel house room wall dog-ear
CN217150343U (en) Precast panel retaining wall
CN216893450U (en) Assembly template for building
CN217759972U (en) Aluminum formwork structure for building
CN217151236U (en) Tool type scaffolding side beam formwork system
CN224016757U (en) An easy-to-install steel structure formwork for buildings
CN221741597U (en) An ultra-long cantilevered steel frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220628

Address after: No. 1801, Jilin Road, Changchun City, Jilin Province, 130000

Patentee after: JILIN YATAI BUILDING ENGINEERING Co.,Ltd.

Address before: 130000 Jilin Yatai Construction Engineering Co., Ltd., building 9, Songyuan Mingdi, Hefei Road, Erdao District, Changchun City, Jilin Province

Patentee before: Wang Yanming

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201110