CN211898361U - Point distribution device for pile foundation construction - Google Patents
Point distribution device for pile foundation construction Download PDFInfo
- Publication number
- CN211898361U CN211898361U CN202020195295.3U CN202020195295U CN211898361U CN 211898361 U CN211898361 U CN 211898361U CN 202020195295 U CN202020195295 U CN 202020195295U CN 211898361 U CN211898361 U CN 211898361U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- foundation construction
- steel
- pile foundation
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 24
- 239000010959 steel Substances 0.000 claims abstract description 24
- 239000000463 material Substances 0.000 claims abstract description 8
- 241001391944 Commicarpus scandens Species 0.000 abstract description 3
- 230000007547 defect Effects 0.000 abstract description 3
- 239000002023 wood Substances 0.000 abstract description 2
- 238000005259 measurement Methods 0.000 description 3
- 230000004075 alteration Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Abstract
The invention provides a point distribution device for pile foundation construction, which comprises a rotating plate made of steel materials and a sleeve made of steel materials, wherein a positioning plate is arranged at the bottom end of the sleeve. The utility model solves the defect that the traditional wood pole is easy to break, and ensures the efficiency and the strength of point distribution; the sleeve and the pile driving rod are detachably designed, so that the pile driving device is convenient to detach after the pile driving is performed on the distribution points; the bottom end of the positioning plate is provided with the fixing rod, so that the fixing on the ground is facilitated, the position of a piling and distributing point is marked, and the follow-up construction is facilitated.
Description
Technical Field
The utility model relates to a construction technical field specifically is a point distribution device is used in pile foundation construction.
Background
In the construction process of pile group foundation, the measurement and the placement of the pile positions are particularly important, in order to not influence the construction progress, the measurement and the placement of the pile positions should be carried out in advance, and the point positions after the measurement and the placement should be marked obviously. Generally speaking, the wooden rod is inserted into the ground for marking, but is influenced by the material, is easy to break, and loses the marking function when an accident occurs, so that a device which is convenient for punching and can play a marking function is needed.
SUMMERY OF THE UTILITY MODEL
In order to solve the defects of the prior art, the utility model provides a point distribution device for pile foundation construction, the problem of proposing in the background art has been solved.
In order to achieve the above object, the utility model discloses a technical scheme be:
point distribution device is used in pile foundation construction, including rotor plate and the sleeve of steel material, the sleeve bottom is equipped with the locating plate, its characterized in that, the rotor plate with the sleeve is not fixed to be connected, just the rotor plate bottom is equipped with the connecting rod, the connecting rod bottom is equipped with the steel pole of piling, the steel pole of piling passes extend to outside behind sleeve, the locating plate, and extend to outside part is equipped with the drill bit, the steel pole of piling with the connection can be dismantled to the sleeve, the locating plate bottom still is equipped with the dead lever that is used for fixed ground.
It is right to the utility model discloses further description, be equipped with logical groove in the sleeve, steel pile pole inserts logical groove, just it is equipped with screw thread portion to lead to the groove outside, steel pile pole be equipped with the screw thread portion cooperation is used, the screw thread with screw thread portion threaded connection.
It is right to the utility model discloses further description, the steel pole of piling still be equipped with the lower screw thread that screw thread portion corresponds, the lower screw thread is located the drill bit top.
Right the utility model discloses further description, lead to the groove with the fretwork intercommunication at locating plate center.
For a further description of the present invention, the sleeve is-cm in length.
For a further description of the present invention, the sleeve diameter is-cm and the positioning plate diameter is-cm.
Compared with the prior art, the utility model has the advantages that:
the defect that the traditional wood rod is easy to break is overcome, and the point distribution efficiency and strength are ensured; the sleeve and the pile driving rod are detachably designed, so that the pile driving device is convenient to detach after the pile driving is performed on the distribution points; the bottom end of the positioning plate is provided with the fixing rod, so that the fixing on the ground is facilitated, the position of a piling and distributing point is marked, and the follow-up construction is facilitated.
Drawings
FIG. 1 is an external structural view;
FIG. 2 is an internal structural view;
FIG. 3 is a top view of the positioning plate;
fig. 4 is a schematic view of the sleeve and the positioning plate.
Reference numerals: 1-rotating plate, 2-sleeve, 3-positioning plate, 4-fixing rod, 5-drill bit, 6-connecting rod, 7-steel piling rod, 8-thread part, 9-thread, 10-through groove and 501-lower thread.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings, and it is to be understood that the described embodiments are only some embodiments, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Example 1, as shown in fig. 1 to 4:
point distribution device for pile foundation construction, including rotor plate 1 and the sleeve 2 of steel material, 2 bottoms of sleeve are equipped with locating plate 3, rotor plate 1 is not fixed connection with sleeve 2, and 1 bottom of rotor plate is equipped with connecting rod 6, 6 bottoms of connecting rod are equipped with steel pole 7 of piling, steel pole 7 of piling passes sleeve 2, extend to the outside behind the locating plate 3, and extend to outside part and be equipped with drill bit 5, steel pole 7 of piling can dismantle with sleeve 2 and be connected, 3 bottoms of locating plate still are equipped with dead lever 4 that is used for fixed ground.
According to a preferable technical scheme of the embodiment, a through groove 10 is formed in the sleeve 2, the steel piling bar 7 is inserted into the through groove 10, a threaded portion 8 is arranged outside the through groove 10, a thread 9 matched with the threaded portion 8 is arranged on the steel piling bar 7, and the thread 9 is in threaded connection with the threaded portion 8.
In a preferred embodiment of the present invention, the steel piling bar 7 is further provided with a lower thread 501 corresponding to the thread portion 8, and the lower thread 501 is located above the drill bit 5.
According to the preferable technical scheme, the through groove 10 is communicated with the center of the positioning plate 3 in a hollow manner.
In a preferred embodiment of the present invention, the length of the sleeve 2 is 50-70 cm.
According to a preferable technical scheme of the embodiment, the diameter of the sleeve 2 is 10-15cm, and the diameter of the positioning plate 3 is 60-80 cm.
In the present embodiment, all the components are general standard components or components known to those skilled in the art, and the structure and principle thereof can be known to those skilled in the art through technical manuals or through routine experiments.
The drill bit at the bottom end of the large pile hole 7 is inserted into the ground to be marked, the fixing rod 4 at the lower end of the rotating plate 3 is fixed on the ground, at the moment, the rotating plate 1 can be rotated, the connecting rod 6 drives the pile driving rod 7 to rotate, the threads 9 on the connecting rod rotate along the thread part 8 of the through groove 10, the pile driving rod 7 is detached from the sleeve 2 and the ground, and the positioning plate 3 and the sleeve 2 are left in place, so that the marking effect is guaranteed.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise contact between the first and second features not directly. Also, a first feature "above," "over," and "on" a second feature includes that the first feature is directly above and obliquely above the second feature, or merely means that the first feature is at a higher level than the second feature, and a first feature "below," "under," and "under" the second feature includes that the first feature is directly above and obliquely above the second feature, or merely means that the first feature is at a lower level than the first feature.
In the description of the present specification, reference to the description of the terms "one embodiment," "some embodiments," "an example," "a specific example" or "some examples" or the like means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention, and schematic representations of the terms in the specification do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
Although embodiments of the present invention have been shown and described, it is to be understood that the above embodiments are exemplary and should not be construed as limiting the present invention, and that those skilled in the art can make changes, modifications, substitutions and alterations to the above embodiments without departing from the spirit and scope of the present invention.
Claims (6)
1. Point distribution device for pile foundation construction, including rotor plate (1) and sleeve (2) of steel material, sleeve (2) bottom is equipped with locating plate (3), its characterized in that, rotor plate (1) with sleeve (2) unfixed connection, just rotor plate (1) bottom is equipped with connecting rod (6), connecting rod (6) bottom is equipped with the steel and beats stake pole (7), the steel is beaten stake pole (7) and is passed extend to outside behind sleeve (2), locating plate (3), and the part that extends to outside is equipped with drill bit (5), the steel beat stake pole (7) with sleeve (2) can dismantle the connection, locating plate (3) bottom still is equipped with dead lever (4) that are used for fixed ground.
2. The pile foundation construction stationing device according to claim 1, wherein a through groove (10) is provided in the sleeve (2), the steel pile driving rod (7) is inserted into the through groove (10), a threaded portion (8) is provided outside the through groove (10), the steel pile driving rod (7) is provided with a thread (9) used in cooperation with the threaded portion (8), and the thread (9) is in threaded connection with the threaded portion (8).
3. The pile foundation construction stationing device of claim 2, wherein the steel pile driving rod (7) is further provided with a lower thread (501) corresponding to the threaded portion (8), the lower thread (501) being located above the drill bit (5).
4. The pile foundation construction stationing device according to claim 2, wherein the through groove (10) is communicated with a hollow in the center of the positioning plate (3).
5. The pile foundation construction stationing device of claim 1, wherein the sleeve (2) has a length of 50-70 cm.
6. The pile foundation construction stationing device of claim 1, wherein the sleeve (2) has a diameter of 10-15cm, and the positioning plate (3) has a diameter of 60-80 cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020195295.3U CN211898361U (en) | 2020-02-22 | 2020-02-22 | Point distribution device for pile foundation construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020195295.3U CN211898361U (en) | 2020-02-22 | 2020-02-22 | Point distribution device for pile foundation construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211898361U true CN211898361U (en) | 2020-11-10 |
Family
ID=73292238
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020195295.3U Expired - Fee Related CN211898361U (en) | 2020-02-22 | 2020-02-22 | Point distribution device for pile foundation construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211898361U (en) |
-
2020
- 2020-02-22 CN CN202020195295.3U patent/CN211898361U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211898361U (en) | Point distribution device for pile foundation construction | |
CN105133609A (en) | Cone penetration test reaction device comprising variable-diameter spiral ground anchors and force exerting disc | |
CN109972746A (en) | A kind of half tenon node of dowel and preparation method thereof that self-tapping screw is reinforced | |
CN205804330U (en) | A kind of concrete-pile | |
CN212130102U (en) | Signal tower with stable structure | |
CN108660947A (en) | A kind of reinforcing device and method of concrete hollow slab girder bridge longitudinal crack | |
CN213867961U (en) | Building engineering detects and detects with engineering foundation pile detection fixing device | |
CN205576920U (en) | Detachable wind -powered electricity generation basis piling bar pile follower device | |
CN204959749U (en) | Static sounding counter -force device that contains reducing spiral line earth anchor and afterburning dish | |
CN210715422U (en) | Anti-rotation connecting structure for plate connection and combined plate | |
CN211646983U (en) | Steel bar connecting device for building construction | |
CN208949465U (en) | A kind of spinning frame lift spindle fixed frame | |
CN220319247U (en) | Threaded flagpole for building construction | |
CN211773577U (en) | Pile head structure of prefabricated tubular pile | |
CN206309051U (en) | A kind of tension bar planting structure | |
CN201610560U (en) | Device for adjusting perpendicularity of sunk tubular pile with tubular pile hammering method | |
CN212482965U (en) | Geotechnical layering sampling device in geotechnical engineering | |
CN216618170U (en) | Drill rod anchor | |
CN205961688U (en) | Hoe | |
CN216403602U (en) | Shipbuilding gantry crane windproof ground anchor structure | |
CN110921524B (en) | Tower crane supporting structure of detachable supporting rod | |
CN205342985U (en) | High -speed wire rod baling press clamping cylinder bearing puller | |
CN214152263U (en) | Novel forestry identification pile | |
CN220013647U (en) | Pre-buried sleeve convenient to location | |
CN220868179U (en) | Thin-wall tubular pile structure for highway foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210203 Address after: No.70 Youyi East Road, Beilin District, Xi'an City, Shaanxi Province, 710054 Patentee after: CHINA ELECTRONIC Research Institute OF ENGINEERING INVESTIGATIONS AND DESIGN Address before: 710054 backyard, No.11 Xinyi lane, Jianguo Liuxiang, Beilin District, Xi'an City, Shaanxi Province Patentee before: Shao Yuanwei |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201110 |
|
CF01 | Termination of patent right due to non-payment of annual fee |