CN211880792U - Water supply measurement PLC control cabinet for assembly of water works - Google Patents

Water supply measurement PLC control cabinet for assembly of water works Download PDF

Info

Publication number
CN211880792U
CN211880792U CN202020879840.0U CN202020879840U CN211880792U CN 211880792 U CN211880792 U CN 211880792U CN 202020879840 U CN202020879840 U CN 202020879840U CN 211880792 U CN211880792 U CN 211880792U
Authority
CN
China
Prior art keywords
rotating
fixedly connected
rods
cabinet
cabinet body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020879840.0U
Other languages
Chinese (zh)
Inventor
张培新
张开拓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Intelligent Control Automation Equipment Co ltd
Original Assignee
Zhengzhou Intelligent Control Automation Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Intelligent Control Automation Equipment Co ltd filed Critical Zhengzhou Intelligent Control Automation Equipment Co ltd
Priority to CN202020879840.0U priority Critical patent/CN211880792U/en
Application granted granted Critical
Publication of CN211880792U publication Critical patent/CN211880792U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of control cabinets, in particular to a water supply measurement PLC control cabinet for assembly of a water plant, aiming at the problems that the prior control cabinet is labor-consuming in circuit and electric power element installation due to compact structure and is inconvenient for daily maintenance or overhaul through a tool, and brings difficulty to workers, the utility model provides a proposal which comprises a cabinet body, two installation grooves are arranged on the cabinet body, first rotary rods are respectively and rotatably arranged in the two installation grooves, two fixing elements are respectively and fixedly sleeved outside the two first rotary rods, four fixing elements are divided into two groups, each group of fixing elements comprises two fixing elements, each group of fixing elements is fixedly connected with a cabinet door, the circuit and the electric power element in the control cabinet are convenient and labor-saving in installation through arranging a transmission rod and a connecting rod in the utility model, and the daily maintenance or overhaul can be conveniently carried out through the tool, bringing convenience to the working personnel.

Description

Water supply measurement PLC control cabinet for assembly of water works
Technical Field
The utility model relates to a switch board technical field especially relates to a water supply measurement PLC switch board that is used for water works assembly to use.
Background
The PLC control cabinet is a programmable control cabinet, the control cabinet is a complete set of control cabinet, an electric cabinet capable of realizing control of a motor and a switch has protection functions of overload, short circuit, open-phase protection and the like. It has compact structure, stable operation and complete functions. The intelligent control system can be combined according to the size of an actual control specification, not only can realize single-cabinet automatic control, but also can realize that a plurality of cabinets form a Distributed Control System (DCS) through an industrial Ethernet or an industrial field bus network. The PLC control cabinet can adapt to industrial automation control occasions of various sizes. The method is widely applied to industries such as electric power, metallurgy, chemical industry, papermaking, environmental protection sewage treatment and the like;
however, the existing control cabinet is difficult to install circuits and power elements due to the compact structure, and is inconvenient to carry out daily maintenance or overhaul through tools, so that difficulty is brought to workers;
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving current switch board because its compact structure leads to circuit and power component to install comparatively hard, and be not convenient for carry out routine maintenance or overhaul through the instrument, bring the shortcoming of difficulty for the staff, and the water supply that is used for water works assembly usefulness that proposes measures the PLC switch board.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a water supply measurement PLC control cabinet for assembly of a water plant comprises a cabinet body, wherein two mounting grooves are formed in the cabinet body, first rotary rods are rotatably mounted in the two mounting grooves respectively, two fixing elements are fixedly sleeved on the outer sides of the two first rotary rods respectively, the four fixing elements are divided into two groups, each group of fixing elements comprises two fixing elements, each group of fixing elements is fixedly connected with a cabinet door, one side of each cabinet door is fixedly connected with a handle, two connecting columns are fixedly connected to the inner wall of one side of the cabinet body, first sliding grooves are formed in one ends of the two connecting columns respectively, connecting rods are slidably mounted in the two first sliding grooves respectively, one end of each connecting rod is fixedly connected with the same circuit mounting plate, two second sliding grooves are formed in the inner wall of one side of the cabinet body, sliding blocks are slidably mounted in the two second sliding grooves respectively, the sliding blocks are matched with the cabinet, the first rotating element is matched with the connecting rod.
Preferably, one side of each of the two connecting rods is fixedly connected with a second rotating element, one end of each of the two second rotating elements is rotatably connected with one end of each of the transmission rods, the other ends of the two transmission rods are rotatably connected with the two first rotating elements respectively, and the transmission rods can drive the connecting rods to move through the second rotating elements.
Preferably, set up two rotatory holes of putting through mutually with two mounting grooves on the cabinet body respectively, all rotate in two rotatory holes and install the second rotary rod, the one end of two second rotary rods extends to respectively in two mounting grooves and the first bevel gear of fixedly connected with, the outside of two first rotary rods is all fixed the cover and is equipped with the second bevel gear, two second bevel gears mesh with two first bevel gears respectively, the second bevel gear can drive first bevel gear and rotate.
Preferably, all rotate in two second spouts and install the threaded rod, all seted up threaded hole on two sliders, two threaded rod difference threaded mounting are in two threaded hole, and the threaded rod can drive the slider through the threaded hole and remove.
Preferably, two gear cavities communicated with the two rotating holes are formed in the cabinet body respectively, the other ends of the two second rotating rods extend into the two gear cavities respectively and are fixedly connected with bevel gear discs, one ends of the two threaded rods extend into the two gear cavities respectively and are fixedly connected with two third bevel gears, the two third bevel gears are meshed with the two bevel gear discs respectively, and the bevel gear discs can drive the third bevel gears to rotate.
Compared with the prior art, the utility model has the advantages of:
(1) according to the scheme, the second bevel gear is matched with the first bevel gear, and the bevel gear disc is matched with the third bevel gear, so that the first rotating rod can indirectly drive the third bevel gear to rotate and the rotating stroke is improved;
(2) in the scheme, the slide block is matched with the transmission rod, the transmission rod is matched with the connecting rod, and the threaded rod is matched with the slide block through the threaded hole, so that the circuit mounting plate can move in the cabinet body;
the utility model discloses in through setting up transfer line and connecting rod for circuit and power component in the switch board install comparatively convenient laborsavingly, and be convenient for carry out routine maintenance or overhaul through the instrument, it is convenient to bring for the staff.
Drawings
Fig. 1 is a schematic view of a top-view cross-sectional structure of a water supply measurement PLC control cabinet for use in assembly of a water plant according to the present invention;
fig. 2 is an enlarged schematic structural diagram of a position a in fig. 1 of the water supply measurement PLC control cabinet for assembling in a water works according to the present invention;
fig. 3 is an enlarged schematic structural diagram of B in fig. 1 of the PLC control cabinet for measuring water supply for assembling in a water works of the present invention.
In the figure: the cabinet comprises a cabinet body 1, a mounting groove 2, a first rotating rod 3, a fixing element 4, a cabinet door 5, a handle 6, a connecting column 7, a connecting rod 8, a circuit mounting plate 9, a sliding block 10, a first rotating element 11, a second rotating element 12, a transmission rod 13, a second rotating rod 14, a first bevel gear 15, a second bevel gear 16, a threaded rod 17, a gear cavity 18, a bevel gear disc 19 and a third bevel gear 20.
Detailed Description
The technical solutions in the embodiments will be described clearly and completely with reference to the drawings in the embodiments, and it is obvious that the described embodiments are only a part of the embodiments, but not all embodiments.
Example one
Referring to fig. 1-3, a water supply measurement PLC control cabinet for assembly of a water works includes a cabinet body 1, the cabinet body 1 is provided with two mounting grooves 2, first rotating rods 3 are respectively rotatably mounted in the two mounting grooves 2, two fixing elements 4 are respectively fixedly sleeved on the outer sides of the two first rotating rods 3, the four fixing elements 4 are divided into two groups, each group of fixing elements 4 includes two fixing elements 4, each group of fixing elements 4 is fixedly connected with a cabinet door 5, one side of each cabinet door 5 is fixedly connected with a handle 6, one side of the cabinet body 1 is fixedly connected with two connecting posts 7, one end of each connecting post 7 is provided with a first chute, two connecting rods 8 are respectively slidably mounted in the two first chutes, one end of each connecting rod 8 is fixedly connected with a same circuit mounting plate 9, one side of the cabinet body 1 is provided with two second chutes, all slidable mounting has slider 10 in two second spouts, and slider 10 cooperatees with cabinet door 5, the equal fixedly connected with first rotating element 11 in one side of two sliders 10, and first rotating element 11 cooperatees with connecting rod 8.
In this embodiment, one side of the two connecting rods 8 is fixedly connected with the second rotating element 12, the two second rotating elements 12 are respectively connected with one end of the transmission rod 13 in a rotating manner, the other ends of the two transmission rods 13 are respectively connected with the two first rotating elements 11 in a rotating manner, and the transmission rod 13 can drive the connecting rods 8 to move through the second rotating elements 12.
In this embodiment, set up two rotatory holes that communicate with two mounting grooves 2 respectively on the cabinet body 1, two rotatory downthehole second rotary rod 14 of all rotating to install, the one end of two second rotary rods 14 extends to respectively in two mounting grooves 2 and the first bevel gear 15 of fixedly connected with, the outside of two first rotary rods 3 is all fixed to be equipped with second bevel gear 16, two second bevel gears 16 mesh with two first bevel gears 15 respectively, second bevel gear 16 can drive first bevel gear 15 and rotate.
In this embodiment, all rotate in two second spouts and install threaded rod 17, all seted up threaded hole on two sliders 10, two threaded rod 17 threaded mounting is in two threaded hole respectively, and threaded rod 17 can drive slider 10 through the screw hole and remove.
In this embodiment, the cabinet body 1 is provided with two gear cavities 18 communicated with the two rotating holes, the other ends of the two second rotating rods 14 extend into the two gear cavities 18 respectively and are fixedly connected with bevel gear discs 19, one ends of the two threaded rods 17 extend into the two gear cavities 18 respectively and are fixedly connected with two third bevel gears 20, the two third bevel gears 20 are engaged with the two bevel gear discs 19 respectively, and the bevel gear discs 19 can drive the third bevel gears 20 to rotate.
Example two
Referring to fig. 1-3, a water supply measurement PLC control cabinet for assembly of a water works includes a cabinet body 1, two mounting grooves 2 are formed on the cabinet body 1, first rotating rods 3 are rotatably mounted in the two mounting grooves 2, two fixing elements 4 are respectively sleeved on the outer sides of the two first rotating rods 3 through welding, the four fixing elements 4 are divided into two groups, each group of fixing elements 4 includes two fixing elements 4, each group of fixing elements 4 is fixedly connected with a cabinet door 5 through welding, one side of each cabinet door 5 is fixedly connected with a handle 6 through welding, two connecting posts 7 are fixedly connected on the inner wall of one side of the cabinet body 1 through welding, one end of each connecting post 7 is provided with a first chute, connecting rods 8 are slidably mounted in the two first chutes, one end of each connecting rod 8 is fixedly connected with the same circuit mounting plate 9 through bolts, two second spouts have been seted up on one side inner wall of the cabinet body 1, and equal slidable mounting has slider 10 in two second spouts, and slider 10 cooperatees with cabinet door 5, and one side of two sliders 10 all is through the first rotating element 11 of welded connection, and first rotating element 11 cooperatees with connecting rod 8.
In this embodiment, one side of two connecting rods 8 all is connected with second rotating element 12 through welded fastening, all rotates the one end that is connected with transfer line 13 on two second rotating element 12, and the other end of two transfer lines 13 rotates with two first rotating element 11 respectively and is connected, and transfer line 13 can drive connecting rod 8 through second rotating element 12 and remove.
In this embodiment, set up two rotatory holes that communicate with two mounting grooves 2 respectively on the cabinet body 1, two rotatory downthehole second rotary rod 14 of all rotating installed, the one end of two second rotary rods 14 extends to respectively in two mounting grooves 2 and through the first bevel gear 15 of welded fastening connection, the outside of two first rotary rods 3 all is equipped with second bevel gear 16 through the fixed cover of welding, two second bevel gear 16 mesh with two first bevel gears 15 respectively, second bevel gear 16 can drive first bevel gear 15 and rotate.
In this embodiment, all rotate in two second spouts and install threaded rod 17, all seted up threaded hole on two sliders 10, two threaded rod 17 threaded mounting is in two threaded hole respectively, and threaded rod 17 can drive slider 10 through the screw hole and remove.
In this embodiment, two gear cavities 18 communicated with the two rotating holes are respectively formed in the cabinet body 1, the other ends of the two second rotating rods 14 respectively extend into the two gear cavities 18 and are fixedly connected with a bevel gear disc 19 by welding, one ends of the two threaded rods 17 respectively extend into the two gear cavities 18 and are fixedly connected with two third bevel gears 20 by welding, the two third bevel gears 20 are respectively engaged with the two bevel gear discs 19, and the bevel gear disc 19 can drive the third bevel gears 20 to rotate.
In this embodiment, when using, a worker can rotate the handle 6 to open the cabinet door 5, and then perform maintenance, etc., at this time, the cabinet door 5 drives the first rotating rod 3 to rotate through the fixing element 4, the first rotating rod 3 drives the second bevel gear 16 to rotate, the second bevel gear 16 drives the first bevel gear 15 to rotate, the first bevel gear 15 drives the second rotating rod 14 to rotate, the second rotating rod 14 drives the bevel gear disc 19 to rotate, the bevel gear disc 19 drives the third bevel gear 20 to rotate, the third bevel gear 20 drives the threaded rod 17 to rotate, the threaded rod 17 drives the sliding block 10 to move in the second sliding slot through the threaded hole, the sliding block 10 drives one end of the transmission rod 13 to move through the first rotating element 11, the other end of the transmission rod 13 drives the connecting rod 8 to move in the first sliding slot through the second rotating element 12, so that the connecting rod 8 drives the circuit mounting plate 9, the operation of staff is convenient.
The above descriptions are only preferred embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the scope of the present invention, and the technical solutions and the utility model concepts of the present invention are equivalent to, replaced or changed.

Claims (5)

1. A water supply measurement PLC switch board for water works assembly usefulness, including the cabinet body (1), its characterized in that, two mounting grooves (2) have been seted up on the cabinet body (1), all rotate in two mounting grooves (2) and install first rotary rod (3), the outside of two first rotary rods (3) is all fixed the cover and is equipped with two fixed component (4), four fixed component (4) divide into two sets ofly, every group fixed component (4) includes two fixed component (4), every group fixed component (4) fixedly connected with a cabinet door (5), one side of two cabinet doors (5) is all fixedly connected with handle (6), fixedly connected with two spliced poles (7) on one side inner wall of cabinet body (1), the first spout has all been seted up to the one end of two spliced poles (7), all slidable mounting has connecting rod (8) in the two first spouts, the one end fixedly connected with same circuit mounting panel (9) of two connecting rods (8), two second chutes are formed in the inner wall of one side of the cabinet body (1), sliding blocks (10) are arranged in the two second chutes in a sliding mode, the sliding blocks (10) are matched with the cabinet door (5), first rotating elements (11) are fixedly connected to one sides of the two sliding blocks (10), and the first rotating elements (11) are matched with the connecting rod (8).
2. The supply water measuring PLC control cabinet for assembly of a water works according to claim 1, wherein one side of each of the two connecting rods (8) is fixedly connected with a second rotating member (12), one end of each of the two second rotating members (12) is rotatably connected with one end of a transmission rod (13), and the other ends of the two transmission rods (13) are rotatably connected with the two first rotating members (11), respectively.
3. The water supply measurement PLC control cabinet for assembling of a water works as defined in claim 1, wherein the cabinet body (1) is respectively provided with two rotating holes communicated with the two mounting grooves (2), the two rotating holes are respectively and rotatably provided with the second rotating rods (14), one ends of the two second rotating rods (14) respectively extend into the two mounting grooves (2) and are fixedly connected with the first bevel gears (15), the outer sides of the two first rotating rods (3) are respectively and fixedly provided with the second bevel gears (16), and the two second bevel gears (16) are respectively engaged with the two first bevel gears (15).
4. The water supply measurement PLC control cabinet for assembling of a water works as claimed in claim 1, wherein a threaded rod (17) is rotatably installed in each of the two second sliding grooves, threaded holes are respectively formed in the two sliding blocks (10), and the two threaded rods (17) are respectively installed in the two threaded holes in a threaded manner.
5. The water supply measurement PLC control cabinet for assembling of a water works as claimed in claim 1, wherein the cabinet body (1) is respectively provided with two gear cavities (18) communicated with the two rotating holes, the other ends of the two second rotating rods (14) respectively extend into the two gear cavities (18) and are fixedly connected with a bevel gear disc (19), one ends of the two threaded rods (17) respectively extend into the two gear cavities (18) and are fixedly connected with two third bevel gears (20), and the two third bevel gears (20) are respectively engaged with the two bevel gear discs (19).
CN202020879840.0U 2020-05-23 2020-05-23 Water supply measurement PLC control cabinet for assembly of water works Expired - Fee Related CN211880792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020879840.0U CN211880792U (en) 2020-05-23 2020-05-23 Water supply measurement PLC control cabinet for assembly of water works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020879840.0U CN211880792U (en) 2020-05-23 2020-05-23 Water supply measurement PLC control cabinet for assembly of water works

Publications (1)

Publication Number Publication Date
CN211880792U true CN211880792U (en) 2020-11-06

Family

ID=73234585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020879840.0U Expired - Fee Related CN211880792U (en) 2020-05-23 2020-05-23 Water supply measurement PLC control cabinet for assembly of water works

Country Status (1)

Country Link
CN (1) CN211880792U (en)

Similar Documents

Publication Publication Date Title
CN202527954U (en) Automatic centering fixture for boring of drive axle housing
CN111276906A (en) Safety wiring clamp for power supply laying
CN211580434U (en) PLC cabinet with classified installation
CN211415209U (en) Gear feeding and discharging tool clamp for robot
CN211880792U (en) Water supply measurement PLC control cabinet for assembly of water works
CN210053030U (en) Power equipment installation mechanism
CN211179036U (en) A multi-functional sampling device for soil is learned
CN211614373U (en) Energy-concerving and environment-protective type drilling equipment for machine-building
CN212286784U (en) General zero point positioning clamping device of digit control machine tool
CN210475600U (en) Punching device for steel structure
CN210240484U (en) Quick detachable gear
CN212110228U (en) Water level monitoring station
CN211370288U (en) Highway engineering construction equipment
CN210360052U (en) Automobile cover plate welding clamp
CN210806424U (en) A interim block terminal for convenient to detach is built in room
CN211859285U (en) Power control box convenient to installation
CN219747257U (en) Four-axis linkage type steel plate protective cover of numerical control machine tool
CN213635759U (en) Sealed switch for power distribution control equipment
CN112517957A (en) Bearing machining and drilling device
CN220240653U (en) Tapping and stamping integrated device
CN204564646U (en) A kind of bolt cleaning equipment
CN219152310U (en) Machine tool safety door structure
CN220510461U (en) Automatic pop-up type switch cabinet for circuit breaker
CN213916246U (en) Clamping mechanism of internal spline housing tool
CN210023886U (en) Valve rod keyway processing equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201106

Termination date: 20210523