CN211873056U - Temporary steel pipe pile with arc-shaped partition plate - Google Patents
Temporary steel pipe pile with arc-shaped partition plate Download PDFInfo
- Publication number
- CN211873056U CN211873056U CN202020361804.5U CN202020361804U CN211873056U CN 211873056 U CN211873056 U CN 211873056U CN 202020361804 U CN202020361804 U CN 202020361804U CN 211873056 U CN211873056 U CN 211873056U
- Authority
- CN
- China
- Prior art keywords
- steel
- arc
- steel pipe
- pipe pile
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model provides a take ARC baffle's interim steel-pipe pile, it includes main steel pipe, be fixed with C type hasp on the lateral wall of main steel pipe, install T type fore shaft on the main steel pipe of C type hasp symmetric position, the bilateral symmetry of T type fore shaft is fixed with the assistance-localization real-time support, install between the assistance-localization real-time support and draw the hole steel and protect a section of thick bamboo, draw the hole steel and protect a bottom of section of thick bamboo and be located the assistance-localization real-time and support and install the arc steel sheet. Through using fore shaft steel-pipe pile cofferdam as the interim construction equipment when building large-scale bridge deep water basis, specially to fore shaft steel-pipe pile cofferdam during the pilot hole operation, the thick cobble layer leads to circumstances and complicated geological conditions such as pilot hole collapse, buried drill, and the drilling off normal, the drilling straightness is relatively poor, the interim construction equipment under the circumstances such as pore-forming quality is poor.
Description
Technical Field
The utility model belongs to the steel-pipe pile field especially relates to take interim steel-pipe pile of ARC baffle.
Background
At present, the fore shaft steel pipe pile cofferdam has the characteristics of simple processing and manufacturing, short construction period, large integral rigidity, good sealing performance, high material recycling rate, strong planar arrangement adaptability and the like, and is widely applied to the construction of high pile cap and low pile cap under the stratum conditions that the water depth is within 20m, the water flow velocity is less than 3m/s, the riverbed is sandy soil, cohesive soil, crushed (pebble) soil, weathered rock and the like. However, during the hole leading operation of the cofferdam, the cofferdam is influenced by a thick pebble layer, hole collapse, buried drilling and the like are easy to occur in the hole leading process, meanwhile, the cofferdam is influenced by geological conditions and clay backfilled in the front drill hole, the deviation of the drill hole and the verticality of the drill hole are poor, the hole forming quality is poor, and the construction efficiency and the overall progress are seriously influenced.
SUMMERY OF THE UTILITY MODEL
For solving above technical problem, the utility model provides a take ARC baffle's interim steel-pipe pile through using fore shaft steel-pipe pile cofferdam as the interim construction equipment when building large-scale bridge deep water basis, is directed against fore shaft steel-pipe pile cofferdam specially during the pilot hole operation, and thick cobble layer leads to circumstances and complicated geological conditions such as pilot hole collapse, buried drill, and drilling off normal position, drilling hang down straightness relatively poor, the interim construction equipment under the circumstances such as pore-forming quality is poor.
In order to realize the technical characteristics, the purpose of the utility model is realized as follows: take interim steel-pipe pile of arc baffle, it includes main steel pipe, be fixed with C type hasp on the lateral wall of main steel pipe, install T type fore shaft on the main steel pipe of C type hasp symmetric position, the bilateral symmetry of T type fore shaft is fixed with the assistance-localization real-time support, install between the assistance-localization real-time support and draw a hole steel and protect a section of thick bamboo, draw the bottom of a hole steel and protect and be located the assistance-localization real-time support and install the arc steel sheet.
The auxiliary positioning support is made of an I-shaped steel material.
The guide hole steel protective cylinder and the arc-shaped steel plate are concentrically arranged, and the inner diameter and the outer diameter of the guide hole steel protective cylinder are equal to those of the arc-shaped steel plate.
The auxiliary positioning support is arranged along the whole length of the main steel pipe.
The arc-shaped steel plate is arranged at the bottom of the guide hole steel casing and is arranged along the whole length of the bottom of the main steel pipe.
The hole guiding steel protective cylinder is arranged at a position with a certain height away from the top end of the main steel pipe, and the bottom end of the hole guiding steel protective cylinder is flush with the bottom end of the T-shaped locking port.
The length of the T-shaped lock opening is smaller than that of the C-shaped lock catch.
The utility model discloses there is following beneficial effect:
1. the utility model discloses a construction of fore shaft steel-pipe pile cofferdam that interim steel-pipe pile can adapt to multiple complicated geological conditions.
2. The utility model discloses an auxiliary positioning who sets up on interim steel-pipe pile supports, plane position and the straightness that hangs down that can effectual control fore shaft steel-pipe pile cofferdam drilled under complicated geological conditions.
3. The utility model discloses an arc steel sheet that sets up on interim steel-pipe pile can reduce a steel and protect a hole depth degree to effectively prevent to appear collapsing hole, buried drill scheduling problem when receiving thick cobble layer to influence.
4. The utility model discloses an in drilling process, dig soon and bore on the drill bit collides the arc steel sheet, play buffering and separate a grade supporting role, directly strike the steel-pipe pile when avoiding the drill bit rotatory, lead to the steel-pipe pile off normal.
5. The utility model discloses an interim steel-pipe pile's use can effectively improve pore-forming quality and construction efficiency.
Drawings
The present invention will be further explained with reference to the drawings and examples.
Fig. 1 is a front view of the present invention.
FIG. 2 is a view of a section B in FIG. 1 according to the present inventionOn the upper part-BOn the upper partAnd (6) view.
FIG. 3 is a view of a section B in FIG. 1 according to the present inventionLower part-BLower partAnd (6) view.
Fig. 4 is a view from C-C in fig. 1 according to the present invention.
Fig. 5 is a view from D-D of fig. 1 according to the present invention.
In the figure: the steel pipe comprises a main steel pipe 1, a C-shaped lock catch 2, a T-shaped lock opening 3, an auxiliary positioning support 4, an arc-shaped steel plate 5 and a guide hole steel casing 6.
Detailed Description
The following describes embodiments of the present invention with reference to the accompanying drawings.
Referring to fig. 1-5, the temporary steel pipe pile with the arc-shaped partition plate comprises a main steel pipe 1, wherein a C-shaped lock catch 2 is fixed on the side wall of the main steel pipe 1, a T-shaped locking notch 3 is installed on the main steel pipe 1 at the symmetrical position of the C-shaped lock catch 2, auxiliary positioning supports 4 are symmetrically fixed on two sides of the T-shaped locking notch 3, a hole guiding steel casing 6 is installed between the auxiliary positioning supports 4, and an arc-shaped steel plate 5 is installed at the bottom of the hole guiding steel casing 6 and between the auxiliary positioning supports 4. Through adopting the interim steel-pipe pile of above-mentioned structure, the cofferdam is leading during the hole, through T type fore shaft and the 2 worker steels of being symmetrical in that T type fore shaft set up respectively along main steel pipe wall through-length in both sides, has formed the steel and has protected a supplementary positioning support when installing, treats that leading hole steel protects a section of thick bamboo 6 and transfers the back of targetting in place, leads hole steel and protects a section of thick bamboo 6 and supplementary positioning support temporary welding, has effectively controlled the plane position straightness that hangs down of drilling under the complicated geological conditions, has improved the pore-forming quality. Then, an arc-shaped steel plate welded on the outer side of the positioning tool steel through the lower part of the main steel pipe is used as a separation support, so that the hole guiding depth of the hole guiding steel protective cylinder 6 is reduced, and collapse and buried drilling of backfilled clay in the early-stage drilling in the drilling process are prevented; the rotary drilling drill bit collides with the arc-shaped steel plate to play roles in buffering and separating and supporting, and the drill bit is prevented from directly impacting the steel pipe pile when rotating.
Furthermore, the auxiliary positioning support 4 is made of an I-shaped steel material. Through its simple to operate of foretell auxiliary positioning support 4, can protect a section of thick bamboo 6 to the lead hole steel and install temporarily moreover.
Furthermore, the guide hole steel casing 6 and the arc-shaped steel plate 5 are concentrically arranged, and the inner diameter and the outer diameter of the guide hole steel casing are equal to each other.
Further, the auxiliary positioning support 4 is arranged along the whole length of the main steel pipe 1. The auxiliary positioning support 4 can be used for auxiliary positioning support of the whole main steel pipe 1.
Further, the arc-shaped steel plate 5 is arranged at the bottom of the guide hole steel casing 6 and along the whole length of the bottom of the main steel pipe 1. Through foretell arc steel sheet as separating the shelves and supporting, reduced the 6 leading hole degree of depth of leading hole steel casing, prevented among the drilling process in the drilling earlier stage backfill clay and appear collapsing, buried drill.
Further, the hole guiding steel protecting cylinder 6 is arranged at a certain height from the top end of the main steel pipe 1, and the bottom end of the hole guiding steel protecting cylinder 6 is flush with the bottom end of the T-shaped locking notch 3. By adopting the length arrangement, the pore-forming quality can be ensured.
Further, the length of the T-shaped locking notch 3 is smaller than that of the C-shaped lock catch 2. By adopting the length matching relationship, the connection strength and the reliability between two adjacent main steel pipes 1 are ensured.
Example 2:
in the construction process of the cofferdam fore shaft steel pipe pile pilot hole pile inserting, through a drilling mode of 1 hole site in advance, by utilizing a T-shaped fore shaft 3 and two auxiliary positioning supports 4 which are symmetrical to the T-shaped fore shaft 3 and are respectively arranged on two sides along the through length of the pipe wall of a main steel pipe 1, the auxiliary positioning supports when the pilot hole steel casing 6 is installed are formed, after the pilot hole steel casing 6 is put down in place, the pilot hole steel casing 6 is temporarily welded with the auxiliary positioning supports, the drilling plane position and the verticality under the complex geological condition are effectively controlled, and the hole forming quality is improved;
an arc-shaped steel plate 5 is welded on the outer side of the auxiliary positioning support 4 through the lower portion of the main steel pipe 1 to serve as a barrier support, so that the hole guiding depth of the steel casing is reduced, and collapse and buried drilling of backfilled clay in the early-stage drilled hole in the drilling process are prevented;
in the drilling process, the rotary drilling bit collides with the arc-shaped steel plate 5 to play a role in buffering and separating and supporting, so that the drill bit is prevented from directly impacting the main steel pipe 1 during rotation.
Claims (7)
1. Take interim steel-pipe pile of arc baffle, its characterized in that: it includes main steel pipe (1), be fixed with C type hasp (2) on the lateral wall of main steel pipe (1), install T type fore shaft (3) on main steel pipe (1) of C type hasp (2) symmetric position, the bilateral symmetry of T type fore shaft (3) is fixed with auxiliary positioning support (4), it protects a section of thick bamboo (6) to install the lead hole steel between auxiliary positioning support (4), the bottom that the lead hole steel protected a section of thick bamboo (6) is located and installs arc steel sheet (5) between auxiliary positioning support (4).
2. The temporary steel pipe pile with the arc-shaped partition plate according to claim 1, wherein: the auxiliary positioning support (4) is made of an I-shaped steel material.
3. The temporary steel pipe pile with the arc-shaped partition plate according to claim 1, wherein: the guide hole steel protective cylinder (6) and the arc-shaped steel plate (5) are concentrically arranged, and the inner diameter and the outer diameter of the guide hole steel protective cylinder are equal.
4. The temporary steel pipe pile with the arc-shaped partition plate according to claim 1, wherein: the auxiliary positioning support (4) is arranged along the whole length of the main steel pipe (1).
5. The temporary steel pipe pile with the arc-shaped partition plate according to claim 1, wherein: the arc-shaped steel plate (5) is arranged at the bottom of the guide hole steel casing (6) and is arranged along the whole length of the bottom of the main steel pipe (1).
6. The temporary steel pipe pile with the arc-shaped partition plate according to claim 1, wherein: the hole guiding steel protecting cylinder (6) is arranged at a certain height away from the top end of the main steel pipe (1), and the bottom end of the hole guiding steel protecting cylinder (6) is flush with the bottom end of the T-shaped locking notch (3).
7. The temporary steel pipe pile with the arc-shaped partition plate according to claim 1, wherein: the length of the T-shaped locking notch (3) is smaller than that of the C-shaped lock catch (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020361804.5U CN211873056U (en) | 2020-03-20 | 2020-03-20 | Temporary steel pipe pile with arc-shaped partition plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020361804.5U CN211873056U (en) | 2020-03-20 | 2020-03-20 | Temporary steel pipe pile with arc-shaped partition plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211873056U true CN211873056U (en) | 2020-11-06 |
Family
ID=73259619
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020361804.5U Active CN211873056U (en) | 2020-03-20 | 2020-03-20 | Temporary steel pipe pile with arc-shaped partition plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211873056U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023093632A1 (en) * | 2021-11-24 | 2023-06-01 | 中铁上海工程局集团有限公司 | Lock-type steel pipe pile cofferdam for cemented pebble geology |
-
2020
- 2020-03-20 CN CN202020361804.5U patent/CN211873056U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023093632A1 (en) * | 2021-11-24 | 2023-06-01 | 中铁上海工程局集团有限公司 | Lock-type steel pipe pile cofferdam for cemented pebble geology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111270694A (en) | Temporary steel pipe pile with arc-shaped partition plate and construction method | |
CN103469817B (en) | Existing subway station main structure broadening construction method | |
CN106988302B (en) | A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method | |
CN104947690B (en) | Grooving construction method for embedding underground continuous wall into rock | |
CN108166483A (en) | Bored pile construction method | |
WO2021088349A1 (en) | Method for excavating tunnel shaft | |
CN102518470A (en) | Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel | |
CN104863183B (en) | Damping pilework and construction method is isolated in large cross-section tunnel proximity architecture construction | |
CN211873056U (en) | Temporary steel pipe pile with arc-shaped partition plate | |
CN110700293B (en) | Rotary excavating leading hole steel sheet pile cofferdam construction method under deep water sloping rock environment | |
CN107653878A (en) | Cast-in-situ bored pile is reusable to be longitudinally separated formula steel pile casting construction | |
CN209538258U (en) | A kind of construction equipment for replacing bored concrete pile | |
CN113216148B (en) | Construction method for pile foundation of pressure-bearing underground air-raid shelter collapse section | |
CN102434718B (en) | Method for reinforcing originating end of push bench | |
CN106930274A (en) | The a full set of cylinder rotatory boring castinplace pile construction method that a kind of reinforcing bar cage location is fixed | |
CN109594994A (en) | Tunneling method under existing building | |
CN210857242U (en) | Side slope anti-skidding supporting construction | |
CN111236310B (en) | Construction method of connecting channel of existing underground structure in weak water-rich stratum | |
CN110219678A (en) | Pass through the Large Diameter Pipeline steel tube lock leg structure and construction technology in Debris Flow Deposition body tunnel | |
CN201433395Y (en) | Tri-circular safe pile casing for environment-friendly manual-excavated piles | |
CN217399628U (en) | Steel protects a section of thick bamboo suitable for overlength pile foundation | |
CN114991819B (en) | Three-super control technology for water damage tunnel | |
CN110306533A (en) | The construction method of steel reinforced concrete column type connector and the joint continuous concrete wall | |
CN220469840U (en) | Auxiliary fixture for installing and detaching underwater blasting drilling rod | |
CN219932158U (en) | Shield cutter changing reinforcing structure for water-rich sandy pebble stratum |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |