CN211872971U - Pile foundation construction concrete pouring enclosure device - Google Patents

Pile foundation construction concrete pouring enclosure device Download PDF

Info

Publication number
CN211872971U
CN211872971U CN202020380654.2U CN202020380654U CN211872971U CN 211872971 U CN211872971 U CN 211872971U CN 202020380654 U CN202020380654 U CN 202020380654U CN 211872971 U CN211872971 U CN 211872971U
Authority
CN
China
Prior art keywords
pouring
template
joint
connecting shaft
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020380654.2U
Other languages
Chinese (zh)
Inventor
葛雷
邵丽娟
杨帆
朱俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020380654.2U priority Critical patent/CN211872971U/en
Application granted granted Critical
Publication of CN211872971U publication Critical patent/CN211872971U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a pile foundation construction concrete placement envelope, concretely relates to engineering construction field, including first template of pouring, first quantity of pouring the template sets up to two, and two first fixed mounting have two second between pouring the template respectively, and there are two side double-open joint boards in the both sides of first template of pouring through bolt fixed mounting respectively, and the both sides of template are pour to the second there is the support center shaft board through the equal fixed mounting of bolt, and two side double-open joint boards and the mutual joint of corresponding support center shaft board are put to two sides. The utility model discloses a set up the side and put two joint boards of opening and support the well axostylus axostyle board, two sides are put two mutual joints of opening joint board and corresponding support well axostylus axostyle board, and circular logical groove has been seted up to one side of limit angle joint seat, and circular logical groove is linked together with adjacent dog-ear joint groove, has solved the quick problem of pouring the template of installation of being not convenient for among the prior art.

Description

Pile foundation construction concrete pouring enclosure device
Technical Field
The utility model relates to an engineering construction technical field, more specifically say, the utility model relates to a pile foundation construction concrete placement envelope.
Background
The pile foundation construction refers to the construction process of building foundation, the pile foundation is formed from pile and pile bearing platform, the construction method of pile foundation is divided into two categories of prefabricated pile and cast-in-place pile, the pile driving method is selected according to engineering geological condition, and also considering pile type, section, length, site environment and design requirements, the pile foundation is formed from pile and pile bearing platform, the pile construction method is divided into two categories of prefabricated pile and cast-in-place pile, the pile driving method is selected according to engineering geological condition, also considering pile type, section, length, site environment and design requirements, a flat stone with ropes attached at the sides ramming wooden pile construction has been existed in ancient China, after pile length and pile diameter are increased, stone a flat stone with ropes attached at the sides is gradually replaced by cast iron drop hammer, steam hammer was invented in 17 th century 80 th era, guide rod type diesel hammer has been applied in 19 th century 30 th era, with development of building industry, in order to meet the requirements of large-scale pile foundation engineering, the pile foundation construction technology needs to increase the weight of a hammer, improve the lifting and hoisting operation processes, and reduce vibration noise and pollution to the environment.
Need divide two steps to be under construction in the pile foundation work progress, enclose and build the template and pour concrete respectively, traditional template and rail are all comparatively loaded down with trivial details at the in-process of dismouting, waste time and energy, are unfavorable for building site scale construction to reduce whole work efficiency by a wide margin.
SUMMERY OF THE UTILITY MODEL
In order to overcome prior art's above-mentioned defect, the embodiment of the utility model provides a pile foundation construction concrete pouring enclosure device puts two divisions of joint board and supports well axostylus axostyle through having set up the side, and two sides are put two divisions of joint board and the mutual joint of corresponding support well axostylus axostyle, and circular logical groove has been seted up to one side of limit angle joint seat, and circular logical groove is linked together with adjacent dog-ear joint groove to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pile foundation construction concrete placement envelope, includes first template of pouring, the quantity of first template of pouring sets up to two, two respectively fixed mounting has two second between the first template of pouring, the both sides of first template of pouring have two side double open joint boards through bolt fixed mounting respectively, the both sides of template are pour to the second have the support center shaft board through the equal fixed mounting of bolt, two side double open joint board and the mutual joint of corresponding support center shaft board, the joint has corner joint seat between first template of pouring and the second template, dog-ear joint groove has been seted up to the inside of corner joint seat, dog-ear joint groove joint is in the junction of first template of pouring and second template of pouring.
In a preferred embodiment, a circular through groove is formed in one side of each corner clamping seat, the circular through groove is communicated with the adjacent corner clamping grooves, and a bolt is arranged in an inner cavity of each circular through groove.
In a preferred embodiment, a sleeve joint is fixedly installed at a joint of the first pouring template and the second pouring template, a hollow connecting shaft tube penetrates through a joint of the first pouring template and the second pouring template, and the sleeve joint and the hollow connecting shaft tube are welded to each other.
In a preferred embodiment, the connecting shaft rod penetrates through the inner cavities of the sleeve joint barrel and the hollow connecting shaft tube, and the connecting shaft rod is arranged at the joint of the first pouring template and the second pouring template.
In a preferred embodiment, a first socket base and a second socket base are respectively inserted into two ends of the connecting shaft rod, and the first socket base and the second socket base are respectively attached to corresponding side walls of the first pouring formwork and the second pouring formwork.
In a preferred embodiment, the circumferential side outer wall of the connecting shaft rod is sleeved with a spring support block and an anti-falling sleeve block respectively, the spring support block and the anti-falling sleeve block are welded with each other, and the spring support block and the anti-falling sleeve block are both connected to the circumferential side outer wall of the connecting shaft rod in a sliding manner.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a set up the setting of side double open joint board and support middle shaft plate, first template and the setting of second template of pouring, can build out required template frame of pouring, so that carry out subsequent pouring work, two side double open joint boards and corresponding support middle shaft plate joint each other, the setting of side double open joint board and support middle shaft plate can promote the convenience and the stability of first template of pouring and the installation of second template of pouring, circular logical groove has been seted up to one side of edge corner joint seat, circular logical groove is linked together with adjacent dog-ear joint groove, the inner chamber of each circular logical groove all is equipped with the bolt, compared with prior art, there is the progress of being convenient for quick installation template of pouring, the convenience of template installation has relatively been promoted;
2. the utility model discloses a connecting shaft pole has been set up, cup joint a section of thick bamboo and hollow connecting axle pipe mutual welding, connecting shaft pole setting is at the first junction of pouring template and second pouring template, connecting shaft pole's setting, can let first pouring template and second pour more stable that the template supported, first cup joint base and second cup joint base laminate respectively and pour the template lateral wall at corresponding first pouring template and second, spring support piece and anti-drop nest block mutual welding, and the equal sliding connection of spring support piece and anti-drop nest block is at the circumference side outer wall of connecting the axostylus axostyle, compared with the prior art, there is the fixed progress of pouring the template of being convenient for, the security of whole use has been promoted relatively.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic top structure diagram of the present invention.
Fig. 3 is a schematic bottom structure diagram of the present invention.
The reference signs are: 1 first template of pouring, 2 second template of pouring, 3 side are put two and are opened joint board, 4 and support well axostylus axostyle boards, 5 limit angle joint angle seats, 6 dog-ear joint grooves, 7 circular logical grooves, 8 socket joint sections, 9 hollow connecting shaft pipes, 10 connecting shaft pole, 11 first socket joint bases, 12 second socket joint bases, 13 spring supporting shoes, 14 anti-drop sleeve blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to the attached drawings 1-3 of the specification, the pile foundation construction concrete pouring enclosure device of an embodiment of the invention can comprise two first pouring templates 1, two second pouring templates 2 are respectively fixedly arranged between the two first pouring templates 1, the arrangement of the first pouring templates 1 and the second pouring templates 2 can build a required pouring template frame so as to facilitate subsequent pouring work, two side double-open clamping plates 3 are respectively fixedly arranged at two sides of the first pouring templates 1 through bolts, supporting central shaft plates 4 are respectively fixedly arranged at two sides of the second pouring templates 2 through bolts, the two side double-open clamping plates 3 are mutually clamped with the corresponding supporting central shaft plates 4, the arrangement of the side double-open clamping plates 3 and the supporting central shaft plates 4 can improve the convenience and stability of the installation of the first pouring templates 1 and the second pouring templates 2, first pour between template 1 and the second pour template 2 the joint have an edge card angle seat 5, dog-ear joint groove 6 has been seted up to edge card angle seat 5's inside, dog-ear joint groove 6 joint is in the first junction of pouring template 1 and second pour template 2, circular logical groove 7 has been seted up to one side of edge card angle seat 5, circular logical groove 7 is linked together with adjacent dog-ear joint groove 6, every circular inner chamber that leads to groove 7 all is equipped with the bolt, edge card angle seat 5 and dog-ear joint groove 6's setting, can pour the junction of template 2 to first template 1 of pouring and second and reach final fixed effect.
A sleeve 8 is fixedly arranged at the joint of the first pouring template 1 and the second pouring template 2, a hollow connecting shaft tube 9 is arranged at the joint of the first pouring template 1 and the second pouring template 2 in a penetrating manner, the sleeve 8 and the hollow connecting shaft tube 9 are welded with each other, the arrangement of the sleeve 8 and the hollow connecting shaft tube 9 can achieve the hinging effect on the first pouring template 1 and the second pouring template 2, so that a plurality of first pouring templates 1 and the second pouring templates 2 can be rotatably adjusted and fixed, a connecting shaft rod 10 is arranged in the inner cavity of the sleeve 8 and the hollow connecting shaft tube 9 in a penetrating manner, the connecting shaft rod 10 is arranged at the joint of the first pouring template 1 and the second pouring template 2, the arrangement of the connecting shaft rod 10 can enable the first pouring template 1 and the second pouring template 2 to be supported more stably, a first sleeve base 11 and a second sleeve base 12 are respectively inserted at the two ends of the connecting shaft rod 10, first cup joint base 11 and second cup joint base 12 laminate respectively and pour 2 lateral walls of template 1 and second corresponding first pouring template, the circumference side outer wall of connecting shaft pole 10 has cup jointed spring supporting shoe 13 and anti-drop nest block 14 respectively, spring supporting shoe 13 and anti-drop nest block 14 are mutual welded, and the equal sliding connection of spring supporting shoe 13 and anti-drop nest block 14 is at the circumference side outer wall of connecting shaft pole 10, the setting of spring supporting shoe 13, can promote the first pouring template 1 and pour the cushion nature that template 2 was adjusted with the second, anti-drop nest block 14 can reach anti-drop's effect.
The working principle is as follows: firstly, the parts required by the utility model are taken out for convenient installation and use, the side double-opening clamping plate 3 and the supporting middle shaft plate 4 are clamped with each other, so that the first pouring template 1 and the second pouring template 2 can be installed more quickly, the installed first pouring template 1 and the second pouring template 2 are fixed on a construction site needing pouring for subsequent pouring procedures, the connecting shaft rod 10, the spring supporting block 13 and the anti-falling sleeve block 14 are simultaneously inserted into the inner cavity of the corresponding hollow connecting shaft tube 9, the effect of rotating installation and fixation can be achieved for a plurality of first pouring formworks 1 and second pouring formworks 2, the stability of connection of the first pouring formworks 1 and the second pouring formworks 2 is improved, and then, clamping the corner clamping seat 5 at the junction of the first pouring template 1 and the second pouring template 2, and finally fixing the corner clamping seat from the inner cavity of the circular through groove 7 by using bolts.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the present invention, only the structures related to the disclosed embodiments are referred to, and other structures can refer to the common design, and under the condition of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
and finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a pile foundation construction concrete placement envelope, includes first template (1) of pouring, its characterized in that: the utility model discloses a formwork structure, including first template (1) of pouring, first quantity of pouring sets up to two, two respectively between first template (1) of pouring there are two second template (2) of pouring respectively fixed mounting, the both sides of first template (1) of pouring have two side to put two joint boards (3) through bolt fixed mounting respectively, the both sides of template (2) are poured to the second has support center shaft board (4) through the equal fixed mounting of bolt, two side is put two and is opened joint board (3) and corresponding support center shaft board (4) mutual joint, the joint has corner joint seat (5) between template (2) is pour to first template (1) of pouring and second, dog-ear joint groove (6) have been seted up to the inside of corner joint seat (5), dog-ear joint groove (6) joint is at the junction of first template (1) of pouring and second template (2) of pouring.
2. The pile foundation construction concrete pouring envelope device of claim 1, characterized in that: circular logical groove (7) have been seted up to one side of limit angle joint seat (5), circular logical groove (7) are linked together with adjacent dog-ear joint groove (6), every the inner chamber that circular logical groove (7) all is equipped with the bolt.
3. The pile foundation construction concrete pouring envelope device of claim 1, characterized in that: the first casting formwork (1) and the second casting formwork (2) are fixedly provided with a sleeve joint barrel (8), the joint of the first casting formwork (1) and the second casting formwork (2) is provided with a hollow connecting shaft tube (9) in a penetrating mode, and the sleeve joint barrel (8) and the hollow connecting shaft tube (9) are welded to each other.
4. The pile foundation construction concrete pouring envelope device of claim 3, characterized in that: the inner cavities of the sleeve joint barrel (8) and the hollow connecting shaft tube (9) are all provided with a connecting shaft rod (10) in a penetrating mode, and the connecting shaft rod (10) is arranged at the joint of the first pouring template (1) and the second pouring template (2).
5. The pile foundation construction concrete pouring envelope device of claim 4, characterized in that: the two ends of the connecting shaft rod (10) are respectively inserted with a first sleeving base (11) and a second sleeving base (12), and the first sleeving base (11) and the second sleeving base (12) are respectively attached to the side walls of the corresponding first pouring template (1) and the second pouring template (2).
6. The pile foundation construction concrete pouring envelope device of claim 4, characterized in that: the anti-falling device is characterized in that the outer wall of the circumferential side of the connecting shaft rod (10) is respectively sleeved with a spring supporting block (13) and an anti-falling sleeve block (14), the spring supporting block (13) and the anti-falling sleeve block (14) are welded with each other, and the spring supporting block (13) and the anti-falling sleeve block (14) are connected to the outer wall of the circumferential side of the connecting shaft rod (10) in a sliding mode.
CN202020380654.2U 2020-03-24 2020-03-24 Pile foundation construction concrete pouring enclosure device Expired - Fee Related CN211872971U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020380654.2U CN211872971U (en) 2020-03-24 2020-03-24 Pile foundation construction concrete pouring enclosure device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020380654.2U CN211872971U (en) 2020-03-24 2020-03-24 Pile foundation construction concrete pouring enclosure device

Publications (1)

Publication Number Publication Date
CN211872971U true CN211872971U (en) 2020-11-06

Family

ID=73255910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020380654.2U Expired - Fee Related CN211872971U (en) 2020-03-24 2020-03-24 Pile foundation construction concrete pouring enclosure device

Country Status (1)

Country Link
CN (1) CN211872971U (en)

Similar Documents

Publication Publication Date Title
CN108517883A (en) Opening locked steel tube pilecofferdam and its construction method
CN205976476U (en) Movement joint template is propped up and is established structure and stupefied subassembly of back of body and stencil assembly thereof
CN211872971U (en) Pile foundation construction concrete pouring enclosure device
CN205889488U (en) Steel sleeve box's precast reinforced concrete back cover template and hoist device thereof
CN106836255B (en) The integral prefabricated structure of basement bottom board catch pit steel mesh and method of construction
CN204080844U (en) For the assembling punching block of building engineering foundation platform
CN212200405U (en) Fast pile extension mould shell for cast-in-place pile
CN210141020U (en) A assembled building room roof beam supports steelframe for green building
CN205669210U (en) Steel building concrete cup-shaped foundation inner bore die carrier
CN213173789U (en) Foundation structure in house building construction
CN211447004U (en) Reinforced GRC plate and pipe ditch foundation formwork system combining same
CN210263383U (en) Double-concrete-beam and concrete frame column connecting structure for building design
CN114214949A (en) Hang basket inner chamber template system suitable for variable cross-section bridge
CN110512609B (en) Riprap system jacket and construction process thereof
CN209907898U (en) Internal frame type workbench for erecting elevator shaft shear wall pouring template
CN207331733U (en) A kind of concrete column leg structure
CN110778017A (en) Template for building
CN216238167U (en) Variable cross-section steel box arch tower supporting jig frame for municipal construction
CN212642114U (en) Concrete pouring's upset die carrier
CN217537902U (en) Form removal base for steel form cast-in-situ column
CN216894419U (en) Auxiliary device for reinforced concrete pipeline
CN211057733U (en) Big template legless supporting structure
CN209817407U (en) Novel detachable steel form
CN212078883U (en) Can have enough to meet need formula steel construction flag platform
CN218405395U (en) U-shaped round steel pipe die plate component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201106