CN211850552U - Assembled operating room electrolytic steel plate connection structure - Google Patents

Assembled operating room electrolytic steel plate connection structure Download PDF

Info

Publication number
CN211850552U
CN211850552U CN202020106373.8U CN202020106373U CN211850552U CN 211850552 U CN211850552 U CN 211850552U CN 202020106373 U CN202020106373 U CN 202020106373U CN 211850552 U CN211850552 U CN 211850552U
Authority
CN
China
Prior art keywords
keel
ground
steel plate
electrolytic steel
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020106373.8U
Other languages
Chinese (zh)
Inventor
蓝建勋
林静标
徐燕云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Construction & Decoration Engineering Co ltd
Original Assignee
Guangdong Construction & Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Construction & Decoration Engineering Co ltd filed Critical Guangdong Construction & Decoration Engineering Co ltd
Priority to CN202020106373.8U priority Critical patent/CN211850552U/en
Application granted granted Critical
Publication of CN211850552U publication Critical patent/CN211850552U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an assembled operating room electrolytic steel plate connecting structure, which comprises a wall surface vertical plate, an electrolytic steel plate and keels, wherein each keel comprises a first keel and a plurality of second keels and third keels which are mutually perpendicular and are in through connection with the first keel; the first keel is vertical to the ground, the second keel and the third keel are parallel to the ground, the surface of the second keel, which is connected with the side wall body, is fixedly connected with an angle iron piece, one side of the second keel, which is connected with the wall ceiling, is fixedly connected with a screw rod, and a reinforcing keel is connected between the second keel and the first keel; the structure that second fossil fragments, first fossil fragments and ground formed is fixed mounting electrolytic steel board, circular arc board, riser, ground roll board in proper order. The utility model has the advantages that the electrolytic steel plate is arranged in the assembled keel frame, the welding construction for the keel frame is not needed, the welding operation is reduced, and the comfort of the operation environment is improved; meanwhile, the electrolytic steel plate is more firmly installed and is convenient to detach and install.

Description

Assembled operating room electrolytic steel plate connection structure
Technical Field
The utility model relates to an operating room wallboard construction technical field especially relates to an assembled operating room electrolytic steel plate joint construction.
Background
The clean operating room is an important mark of the modern medical level and reflects the facility level, the medical level and the management level of the modern hospital. At present, the assembled decoration of domestic medical buildings is lagged compared with that of foreign buildings, and the traditional construction method is adopted more.
In the traditional operating room, a frame of the whole operating room is manufactured and welded on site in the decoration process, so that the steel consumption in the construction process is large, the material is not favorable for saving, the number of professionals and personnel involved is large, the process is complex, the manual requirement on constructors is high, the construction period is long, the time and the labor are wasted, the construction period is not favorable for saving, and the cost is not favorable for saving; secondly, the field assembly welding, the electric welding operation and the spraying operation are large, and the welding operation has large fire hazard.
SUMMERY OF THE UTILITY MODEL
To the above problem, the utility model provides an assembled operating room electrolysis steel sheet joint construction mainly solves installation, fossil fragments and the concatenation of electrolysis steel sheet, the fossil fragments and the technical problem such as being connected of wall body of fossil fragments frame when current operating room assembles.
The utility model provides an assembled operating room electrolytic steel plate connecting structure, which comprises a wall surface vertical plate, an electrolytic steel plate and keels, wherein each keel comprises a first keel and a plurality of second keels and third keels which are mutually perpendicular and are in through connection with the first keel; the first keel is vertical to the ground, the second keel and the third keel are parallel to the ground, the surface of the second keel, which is connected with the side wall body, is fixedly connected with an angle iron piece, one side of the second keel, which is connected with the wall ceiling, is fixedly connected with a screw rod, and a reinforcing keel is connected between the second keel and the first keel; the structure that second fossil fragments, first fossil fragments and ground formed is fixed mounting electrolytic steel board, circular arc board, riser, ground roll board in proper order.
Further, a backing plate is arranged between the second keel and the electrolytic steel plate.
Further, the wallboard reinforcing member is fixedly installed on the position, corresponding to the vertical plate, of the first keel.
Furthermore, a skirting line lining plate is installed on the side edge of the ground rolling plate, and a cement arc pier is connected between the skirting line lining plate and the ground.
Further, the length of the second keel connected with the side wall body is equal, and the second keel is distributed on the first keel according to a preset interval.
Furthermore, a ground aluminum groove is arranged between the third keel close to the ground and the ground rolling plate.
The utility model has the advantages that:
1. the electrolytic steel plate is arranged in the constructed keel frame, so that welding construction of the keel frame is not needed, welding operation is reduced, and the comfort of the operation environment is improved; meanwhile, the electrolytic steel plate is more firmly installed, and is convenient to disassemble and install;
2. the second keel is connected with the side wall body through the angle iron piece, the first keel is connected with the ceiling of the wall body through the lead screw, the distance from the keel to the ceiling can be finely adjusted through rotation of the lead screw, installation and operation of workers are facilitated, the application range of the lead screw is wider, and connecting pieces with different sizes do not need to be manufactured;
3. set up between first fossil fragments and the second fossil fragments and consolidate the fossil fragments, first fossil fragments, second fossil fragments and third fossil fragments mutually perpendicular build, have strengthened assembled electrolytic steel plate middle keel frame's stability.
Drawings
FIG. 1 is a schematic view of the connection structure of the electrolytic steel plate in the assembled operating room according to the embodiment of the present invention;
wherein: 10. a first keel; 11. a second keel; 12. a third keel; 13. reinforcing the keel; 2. a vertical plate; 20. a circular arc plate; 21. electrolytic steel plate; 22. a backing plate; 23. rolling a plate on the ground; 24. a vertical plate reinforcing member; 3. a ground aluminum trough; 4. a corner iron piece; 40. a bolt; 41. a screw rod; 5. a skirting line lining plate; 50. and (4) arc piers.
Detailed Description
In order to deepen the understanding of the present invention, the following embodiments will be combined to make the present invention do further details, and the present embodiment is only used for explaining the present invention, and does not constitute the limitation of the protection scope of the present invention.
According to the figure 1, the embodiment provides an assembled type operating room electrolytic steel plate connecting structure, which comprises a wall face vertical plate 2, an electrolytic steel plate 21 and keels, wherein each keel comprises a first keel 10, and a plurality of second keels 11 and third keels 12 which are perpendicular to and in penetrating connection with the first keel 10; a stable three-dimensional structure is formed between the keels; the first keel 10 is vertical to the ground and serves as a stand column of the frame, the second keel 11 and the third keel 12 are parallel to the ground and serve as cross bars of the frame, and the keels play a role in reinforcing and stabilizing the structure; the surface of the second keel 11 connected with the side wall body is fixedly connected with an angle iron piece 4, the angle iron piece 4 is fixedly connected with the side wall body through an expansion bolt 40, and the position of the keel is fixed;
one side fixed connection lead screw 41 that second fossil fragments 11 and wall body smallpox are connected, lead screw 41 is connected with the wall body smallpox, and the rotation of lead screw 41 can finely tune fossil fragments to the distance in smallpox, makes things convenient for staff's installation operation, and lead screw 41's accommodation is wider, need not to make not unidimensional connecting piece, and the commonality is better.
A reinforcing keel 13 is connected between the second keel 11 and the first keel 10; the reinforcing keel 13 draws the second keel 11, so that the influence of the deflection of the second keel 11 on the whole frame is reduced; the structure that second fossil fragments 11, first fossil fragments 10 and ground formed fixedly installs electrolytic steel 21, circular arc board 20, riser 2, ground roll board 23 in proper order, uses circular arc board 20 to carry out transitional coupling between the mutually perpendicular plate, reduces the acute angle of operating room.
Preferably, a backing plate 22 is further disposed between the second keel 11 and the electrolytic steel plate 21 for shielding the keel, the connector and the like, so as to improve the overall aesthetic feeling of the operating room.
Preferably, fixed mounting wallboard reinforcement in the position of first fossil fragments 10 corresponding riser 2, the position of the firm riser 2 of wallboard reinforcement, when the area of contact of first fossil fragments 10 and riser 2 is less, the area of contact of first fossil fragments 10 of wallboard reinforcement increase and riser 2 makes massive riser 2 can fix on the first fossil fragments 10 of unified specification and dimension.
Preferably, the skirting line lining plate 5 is installed on the side edge of the ground rolling plate 23, a cement arc pier 50 is connected between the skirting line lining plate 5 and the ground, and the cement arc pier 50 further reinforces the relative position of the skirting line lining plate 5 and the ground to reduce the sharp surface.
Specifically, the lengths of the second keels 11 connected with the side wall body are equal, the second keels 11 are distributed on the first keels 10 according to a preset interval, and the second keels 11 are fixedly connected with the side wall body through angle iron pieces 4 arranged on the second keels.
Specifically, a ground aluminum groove 3 is arranged between a third keel 12 close to the ground and the ground rolling plate 23, and the ground aluminum groove 3 is arranged on the third keel 12, so that the damage to a main structural frame of the first keel 10 in the installation process is reduced.
The utility model discloses a theory of operation: a frame consisting of a first keel 10, a second keel 11 and a third keel 12 is built, an angle iron piece 4 is installed on one side, connected with a side wall body, of the second keel 11, and a screw rod 41 is installed on the surface of the first keel 10; an electrolytic steel plate 21, an arc plate 20, a vertical plate 2 and a ground rolling plate 23 are arranged between the second keel 11 and the ground; the first keel 10 is provided with a wall body reinforcing member corresponding to the position of the vertical plate 2, a skirting line lining plate 5 is arranged on the side edge of the ground rolling plate 23, and a cement arc pier 50 is connected between the skirting line lining plate 5 and the ground.
The above-described embodiments are merely illustrative of the embodiments of the present invention, and do not limit the spirit and scope of the present invention. Under the prerequisite that does not deviate from the design concept of the utility model, the ordinary person in the art should fall into the protection scope of the utility model to the various changes and improvements that the technical scheme of the utility model made.

Claims (6)

1. An assembled operating room electrolytic steel plate connecting structure comprises a wall vertical plate, an electrolytic steel plate and keels, and is characterized in that each keel comprises a first keel, and a plurality of second keels and third keels which are perpendicular to and in penetrating connection with the first keel; the first keel is vertical to the ground, the second keel and the third keel are parallel to the ground, the surface of the second keel, which is connected with the side wall body, is fixedly connected with an angle iron piece, one side of the second keel, which is connected with the wall ceiling, is fixedly connected with a screw rod, and a reinforcing keel is connected between the second keel and the first keel; the structure that second fossil fragments, first fossil fragments and ground formed is fixed mounting electrolytic steel board, circular arc board, riser, ground roll board in proper order.
2. The fabricated operating room electrolytic steel plate connection structure of claim 1, wherein a backing plate is further disposed between the second keel and the electrolytic steel plate.
3. The fabricated operating room electrolytic steel plate connecting structure as recited in claim 1, wherein a wall plate reinforcing member is fixedly installed at a position of the first keel corresponding to the vertical plate.
4. The fabricated operating room electrolytic steel plate connection structure as claimed in claim 1, wherein a skirting line lining plate is installed on a side edge of the ground rolling plate, and a cement circular arc pier is connected between the skirting line lining plate and the ground.
5. The fabricated operating room electrolysis steel plate connection structure of claim 1, wherein the second keel connected with the side wall body has the same length and is distributed on the first keel at a predetermined interval.
6. The fabricated operating room electrolytic steel plate connection structure of claim 1, wherein a ground aluminum groove is installed between the third keel near the ground and the ground rolling plate.
CN202020106373.8U 2020-01-17 2020-01-17 Assembled operating room electrolytic steel plate connection structure Active CN211850552U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020106373.8U CN211850552U (en) 2020-01-17 2020-01-17 Assembled operating room electrolytic steel plate connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020106373.8U CN211850552U (en) 2020-01-17 2020-01-17 Assembled operating room electrolytic steel plate connection structure

Publications (1)

Publication Number Publication Date
CN211850552U true CN211850552U (en) 2020-11-03

Family

ID=73232148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020106373.8U Active CN211850552U (en) 2020-01-17 2020-01-17 Assembled operating room electrolytic steel plate connection structure

Country Status (1)

Country Link
CN (1) CN211850552U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112376956A (en) * 2020-11-18 2021-02-19 武汉海镜医疗净化工程有限公司 Design and installation structure of sterile operating room and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112376956A (en) * 2020-11-18 2021-02-19 武汉海镜医疗净化工程有限公司 Design and installation structure of sterile operating room and construction method thereof

Similar Documents

Publication Publication Date Title
CN211257823U (en) Building engineering construction template fastener
CN111395598A (en) High-rise building scale unitized curtain wall system
CN211850552U (en) Assembled operating room electrolytic steel plate connection structure
CN211735781U (en) Modular assembly type steel structure house body
CN212562058U (en) Special-shaped curved surface curtain wall with supporting seat
CN215406895U (en) Modular wallboard unit for steel structure house
CN211548254U (en) Corner curtain wall upright post-free connecting structure
CN203729480U (en) Keelless aluminum veneer structure for decorating ceiling
CN207892016U (en) A kind of H profile steel combination pedestal in house
CN206607792U (en) A kind of bright frame plate fastening frame
CN112112364A (en) Partition wall slat
CN107268803B (en) Connecting method for external wall board with out-of-plane constraint on wall board only at bottom end
CN218668078U (en) Concrete slab connecting system for unitized curtain wall
CN211691037U (en) Combined assembly type ceiling gypsum line mounting device
CN219753509U (en) Column foot structure of curtain wall
CN214696810U (en) Strengthening rib structure for building engineering construction
CN212001865U (en) A rigid keel structure for villa construction usefulness
CN219710610U (en) Skirting line auxiliary construction device
CN219528276U (en) Side beautifying and decorating structure of vertical curved surface modeling
CN217811794U (en) Metal pendant for assembled external wall panel
CN216766414U (en) Grid assembly for curtain wall decoration
CN219909582U (en) ALC wallboard structure
CN215519270U (en) External-pasting type water stop steel plate for constructional engineering
CN218843571U (en) Self-leveling interior facing thermal mortar structure
CN212376026U (en) Reinforced steel at joint of steel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant