CN211818526U - Assembled maintenance railing for ground disaster construction - Google Patents

Assembled maintenance railing for ground disaster construction Download PDF

Info

Publication number
CN211818526U
CN211818526U CN202020194158.8U CN202020194158U CN211818526U CN 211818526 U CN211818526 U CN 211818526U CN 202020194158 U CN202020194158 U CN 202020194158U CN 211818526 U CN211818526 U CN 211818526U
Authority
CN
China
Prior art keywords
fixed
rope
ground disaster
fixing
assembled maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020194158.8U
Other languages
Chinese (zh)
Inventor
李庆喜
罗会军
秦轶
张业昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Xingye Geological Engineering Co ltd
Original Assignee
Hubei Xingye Geological Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Xingye Geological Engineering Co ltd filed Critical Hubei Xingye Geological Engineering Co ltd
Priority to CN202020194158.8U priority Critical patent/CN211818526U/en
Application granted granted Critical
Publication of CN211818526U publication Critical patent/CN211818526U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a ground disaster construction is with assembled maintenance railing, including unable adjustment base, pole setting and serving wheel, unable adjustment base's top welding has the screw thread post, the surperficial threaded connection of screw thread post has the pole setting, one side of pole setting is seted up flutedly, the inside swing joint of recess has the gim peg, the fixed slot has been seted up to one side of gim peg, the serving wheel has been cup jointed on the surface of pole setting, the breach has been seted up to one side of serving wheel, one side of breach has decides the rope piece through pivot swing joint. This ground disaster construction is with assembled maintenance railing, through the setting of unable adjustment base and fixed awl, make things convenient for operating personnel to fix the device, strengthen the fixing capacity of the device simultaneously, through the setting of serving wheel and interception rope, can make things convenient for operating personnel to install, can also make the device adapt to different environment, through the setting of screw thread post, make things convenient for operating personnel to install, shorten installation time, improve work efficiency.

Description

Assembled maintenance railing for ground disaster construction
Technical Field
The utility model relates to a maintain railing technical field, specifically be a ground disaster construction is with assembled maintenance railing.
Background
The geological disaster refers to a disaster related to geological action, such as mountain collapse, landslide, debris flow, ground collapse, ground crack, ground subsidence and the like which are caused by natural factors or artificial activities and harm life and property safety of people, and is called as a geological disaster for short, the natural disaster mainly causes geological dynamic activities or geological environment abnormal changes, and under the action of internal power, external power or artificial geological power, the earth generates abnormal energy release, material movement, rock-soil body deformation displacement, environmental abnormal changes and the like, so that phenomena or processes which harm human lives and properties, lives and economic activities or destroy resources and environments on which human lives and develops are generally called as geological disasters.
At present, no special maintenance handrail for construction in a ground disaster exists in the market, the traditional maintenance handrail is generally suitable for the condition that the ground is relatively flat and is not suitable for the rugged ground after the ground disaster, meanwhile, the construction time after the ground disaster is relatively short, the traditional maintenance handrail is relatively long in installation time and relatively poor in working efficiency, and the construction requirement after the ground disaster cannot be met.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a ground disaster construction is with assembled maintenance railing has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a ground disaster construction is with assembled maintenance railing, includes unable adjustment base, pole setting and serving as go-between, unable adjustment base's top welding has the screw thread post, the surperficial threaded connection of screw thread post has the pole setting, one side of pole setting is seted up flutedly, the inside swing joint of recess has the gim peg, the fixed slot has been seted up to one side of gim peg, the serving as go-between has been cup jointed on the surface of pole setting, the breach is seted up to one side of serving as go-between, one side of breach has the fixed rope piece through pivot swing joint, the fixed surface of serving as go-between is connected with the interception rope, one side fixedly connected with fixed hook of interception rope, the top welding of pole setting has the spliced pole, unable adjustment.
Optionally, the size of the groove is matched with the size of the fixing bolt.
Optionally, the two sides of the rope winding wheel are both provided with fixing holes, and the inner diameter of each fixing hole is matched with the diameter of the corresponding fixing bolt.
Optionally, the size of the fixing groove is matched with that of the fixing hook.
Optionally, the surface of the vertical rod is provided with a fluorescent paint, and the surface of the fixing bolt is fixedly connected with an operation block.
Optionally, the fixed cone is made of steel, and anti-skid grains are arranged on the surface of the fixed cone.
(III) advantageous effects
The utility model provides a ground disaster construction is with assembled maintenance railing possesses following beneficial effect:
1. this ground disaster construction is with assembled maintenance railing, through the setting of unable adjustment base and fixed awl, make things convenient for operating personnel to fix the device, strengthen the fixing capacity of the device simultaneously, through the setting of serving up the rope sheave and interception rope, can make things convenient for operating personnel to install, can also make the device adapt to different environment, through the setting of screw thread post, make things convenient for operating personnel to install, shorten installation time, improve work efficiency, through the setting of gim peg and fixed orifices, play the effect of fixed serving up the rope sheave position.
2. This ground disaster construction is with assembled maintenance railing through the setting of fixed slot and fixed hook, can make things convenient for the interception rope between the pole setting to connect, through the breach with decide the setting of rope piece, played the effect of fixed interception rope length, prevent that the interception rope is too long or too short to influence the use, through the setting of connecting post, can make the device improve the device's height according to the on-the-spot condition.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A of FIG. 1 according to the present invention;
FIG. 3 is an enlarged schematic view of the structure of FIG. 1 at B according to the present invention;
fig. 4 is a schematic view of the rope winding wheel structure of the present invention.
In the figure: 1. a fixed base; 2. erecting a rod; 3. a rope winding wheel; 4. a threaded post; 5. a groove; 6. a fixing bolt; 7. fixing grooves; 8. a notch; 9. a rope fixing block; 10. intercepting a rope; 11. a fixed hook; 12. connecting columns; 13. a fixed cone; 14. and (7) fixing holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 4, the present invention provides a technical solution: an assembled maintenance railing for ground disaster construction comprises a fixed base 1, upright posts 2 and a rope winding wheel 3, wherein the top of the fixed base 1 is welded with a threaded post 4, the surface of the threaded post 4 is in threaded connection with the upright posts 2, one side of the upright posts 2 is provided with a groove 5, the inside of the groove 5 is movably connected with a fixed bolt 6, one side of the fixed bolt 6 is provided with a fixed groove 7, the connection of intercepting ropes 10 between the upright posts 2 can be facilitated through the arrangement of the fixed groove 7 and a fixed hook 11, the surface of the upright posts 2 is sleeved with the rope winding wheel 3, one side of the rope winding wheel 3 is provided with a notch 8, one side of the notch 8 is movably connected with a fixed rope block 9 through a rotating shaft, the effect of fixing the length of the intercepting ropes 10 is achieved through the arrangement of the notch 8 and the fixed rope block 9, the use of the intercepting ropes 10 is prevented from being too long or too short, the surface of the rope winding, the top of the upright stanchion 2 is welded with a connecting column 12, the height of the device can be improved according to the field situation by arranging the connecting column 12, and the bottom of the fixed base 1 is fixedly connected with a fixed cone 13;
in order to facilitate the fixing of the device by an operator, the fixing capability of the device is enhanced through the arrangement of the fixing base 1 and the fixing cone 13, in order to enable the device to adapt to different environments, the device is realized through the arrangement of the rope winding wheel 3 and the intercepting rope 10, the installation of the operator can be facilitated, in order to shorten the installation time and improve the working efficiency, the installation of the operator is facilitated through the arrangement of the threaded column 4, and in order to facilitate the installation of the rope winding wheel 3, the fixing of the position of the rope winding wheel 3 is realized through the arrangement of the fixing bolt 6 and the fixing hole 14;
the size of recess 5 and the size looks adaptation of gim peg 6, fixed orifices 14 have all been seted up to the both sides of serving wheel 3, the internal diameter of fixed orifices 14 and the diameter looks adaptation of gim peg 6, the size of fixed slot 7 and the size looks adaptation of fixed hook 11, the surface of pole setting 2 is provided with fluorescent paint, the fixed surface of gim peg 6 is connected with the operation piece, the material of fixed cone 13 is the steel material, the surface of fixed cone 13 is provided with anti-skidding line.
In conclusion, when the assembled maintenance railing for ground disaster construction is used, the fixed base 1 is fixed on the ground through the fixed cone 13, the vertical rod 2 is connected with the fixed base 1 through the threaded column 4, the rope winding wheel 3 is sleeved on the vertical rod 2, the fixed bolt 6 on the vertical rod is inserted into the fixed hole 14 of the rope winding wheel 3 to fix the position, the fixed hook 11 at one end of the intercepting rope 10 is fixed with the fixed groove 7, each vertical rod is connected in sequence to form a maintenance railing, the intercepting rope 10 passes through the notch 8 on the rope winding wheel 3 to enable the fixed rope block 9 to be meshed with the intercepting rope 10 to fix the length of the intercepting rope 10, the rope winding wheel 3 and the intercepting rope 10 are arranged to facilitate installation of operators, the assembled maintenance railing can adapt to different environments, installation of the assembled maintenance railing for the operators is facilitated through the arrangement of the threaded column 4, installation of the operators is facilitated, installation time is shortened, and working efficiency is, through the setting of breach 8 and fixed rope piece 9, played the effect of fixed interception rope 10 length, prevented that interception rope 10 is too long or too short influence use, through the setting of spliced pole 12, can make the device improve the height of device according to the on-the-spot condition.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a ground disaster construction is with assembled maintenance railing, includes unable adjustment base (1), pole setting (2) and rope sheave (3), its characterized in that: the top of the fixed base (1) is welded with a threaded column (4), the surface of the threaded column (4) is connected with an upright rod (2) in a threaded manner, one side of the upright stanchion (2) is provided with a groove (5), the inner part of the groove (5) is movably connected with a fixed bolt (6), a fixing groove (7) is arranged on one side of the fixing bolt (6), a rope winding wheel (3) is sleeved on the surface of the upright stanchion (2), a notch (8) is arranged on one side of the rope winding wheel (3), a fixed rope block (9) is movably connected with one side of the notch (8) through a rotating shaft, the surface of the rope winding wheel (3) is fixedly connected with an intercepting rope (10), one side of the intercepting rope (10) is fixedly connected with a fixed hook (11), the top welding of pole setting (2) has spliced pole (12), the fixed cone (13) of bottom fixedly connected with of unable adjustment base (1).
2. The assembled maintenance railing for ground disaster construction according to claim 1, characterized in that: the size of the groove (5) is matched with that of the fixing bolt (6).
3. The assembled maintenance railing for ground disaster construction according to claim 1, characterized in that: fixing holes (14) are formed in the two sides of the rope winding wheel (3), and the inner diameter of each fixing hole (14) is matched with the diameter of the corresponding fixing bolt (6).
4. The assembled maintenance railing for ground disaster construction according to claim 1, characterized in that: the size of the fixing groove (7) is matched with that of the fixing hook (11).
5. The assembled maintenance railing for ground disaster construction according to claim 1, characterized in that: the surface of the upright stanchion (2) is provided with fluorescent paint, and the surface of the fixed bolt (6) is fixedly connected with an operation block.
6. The assembled maintenance railing for ground disaster construction according to claim 1, characterized in that: the fixed cone (13) is made of steel, and anti-skid grains are arranged on the surface of the fixed cone (13).
CN202020194158.8U 2020-02-21 2020-02-21 Assembled maintenance railing for ground disaster construction Expired - Fee Related CN211818526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020194158.8U CN211818526U (en) 2020-02-21 2020-02-21 Assembled maintenance railing for ground disaster construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020194158.8U CN211818526U (en) 2020-02-21 2020-02-21 Assembled maintenance railing for ground disaster construction

Publications (1)

Publication Number Publication Date
CN211818526U true CN211818526U (en) 2020-10-30

Family

ID=72999119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020194158.8U Expired - Fee Related CN211818526U (en) 2020-02-21 2020-02-21 Assembled maintenance railing for ground disaster construction

Country Status (1)

Country Link
CN (1) CN211818526U (en)

Similar Documents

Publication Publication Date Title
CN102383588A (en) Lifting platform for protecting safety of high-level construction
CN205027219U (en) Hole stake blasting construction safety device is dug in manual work
CN107893665B (en) A kind of prefabricated assembled composite supporting construction mounting process based on fashioned iron
CN203795942U (en) Tower reinforcing support structure
CN110029600B (en) A side slope stone rolling fast row structure for mountain area highway protection
CN108487340A (en) The anchor connection method anti-pulling device of unit for single-pile vertical anti-pulling static test
CN211006424U (en) Highway construction safety warning device
CN211818526U (en) Assembled maintenance railing for ground disaster construction
CN106229700B (en) A kind of firm protective device of grounding rod installation
CN203213001U (en) Antique landscape footway
CN209838448U (en) Supporting device for coal mine tunneling
CN218148309U (en) Pre-buried stake of concatenation formula of being convenient for
CN203800449U (en) Overhaul platform of equipment on transformer station pillar
CN213653839U (en) Anti-seismic device for civil engineering
CN209038950U (en) A kind of highway bridge jack
CN206091551U (en) Assemblage device of electric network line iron tower
CN208981499U (en) A kind of Anti-seismic building structure temporarily built
CN206916747U (en) A kind of prefabricated pile cover
CN212027345U (en) Smart power grids strutting arrangement
CN205653141U (en) Steel -pipe pile high altitude pile extension hanging flower basket
CN216076441U (en) Tower crane foundation protection device
CN210828628U (en) Safety net for fence operation
CN215439394U (en) Embrace pole subassembly with dynamometry monitored control system
CN203977834U (en) A kind of construction of lift well protective platform
CN221030256U (en) Landslide protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030