CN211818124U - Stone material curtain installation hoist device - Google Patents
Stone material curtain installation hoist device Download PDFInfo
- Publication number
- CN211818124U CN211818124U CN202020274385.1U CN202020274385U CN211818124U CN 211818124 U CN211818124 U CN 211818124U CN 202020274385 U CN202020274385 U CN 202020274385U CN 211818124 U CN211818124 U CN 211818124U
- Authority
- CN
- China
- Prior art keywords
- hanging
- hanging basket
- matched
- positioning
- stone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004575 stone Substances 0.000 title claims abstract description 35
- 239000000463 material Substances 0.000 title claims abstract description 10
- 238000009434 installation Methods 0.000 title claims description 12
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 33
- 239000010959 steel Substances 0.000 claims abstract description 33
- 238000003780 insertion Methods 0.000 claims abstract description 17
- 230000037431 insertion Effects 0.000 claims abstract description 17
- 230000000149 penetrating effect Effects 0.000 claims description 7
- 230000007704 transition Effects 0.000 claims description 2
- 230000000694 effects Effects 0.000 description 6
- 239000002184 metal Substances 0.000 description 4
- 238000004804 winding Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000003139 buffering effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000013467 fragmentation Methods 0.000 description 1
- 238000006062 fragmentation reaction Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a stone curtain wall mounting and hoisting device, which comprises a hanging basket, wherein hanging rods are respectively mounted at the left side and the right side of the hanging basket, bolts are matched between the hanging rods and the hanging basket, the side of each hanging rod transversely runs through a hanging hole matched with a hanging hook, two insertion pipes are symmetrically arranged at the bottom of the hanging basket in the left-right direction, positioning ropes are assembled in the insertion pipes, and screws for fixing the positioning ropes are screwed in the outer parts of the insertion pipes; a steel plate is arranged on the outer side of the operation platform, and a first screw is matched between the steel plate and the operation platform; this product can realize the hoist and mount of stone material, and move from top to bottom stably.
Description
Technical Field
The utility model relates to a stone material curtain installs hoist device.
Background
The curtain wall is the outer wall enclosure of the building, does not bear the weight, hangs like a curtain, so is also called as a curtain wall, and is a light wall with decorative effect commonly used by modern large-scale and high-rise buildings. The building outer protective structure or decorative structure consists of a panel and a support structure system, can have certain displacement capacity or certain deformation capacity relative to the main structure, and does not bear the function of the main structure.
The stone curtain wall is a common curtain wall form, adopts the curtain wall that natural stone ground and form, and its holistic sight effect is very good.
However, when a building with a building height of 10 m or more is constructed, the stone plate can be transported downward from the roof only by a winding device in cooperation with a hanging basket and is provided for workers to install.
Because the steel frame is built outside the building, when the hanging basket is arranged below, the hanging basket often impacts the steel frame. Resulting in the damage of steel frame deformation and stone fragmentation in the hanging basket.
Based on the problems, the stone curtain wall installation and hoisting device capable of realizing stone hoisting and stable in vertical operation is designed.
Disclosure of Invention
The to-be-solved technical problem of the utility model is to provide a can realize the hoist and mount of stone material, and stable stone material curtain installation hoist device when the up-down operation.
In order to solve the above problem, the utility model adopts the following technical scheme:
a stone curtain wall mounting and hoisting device comprises a hanging basket, hanging rods are mounted on the left side and the right side of the hanging basket respectively, bolts are matched between the hanging rods and the hanging basket, hanging holes matched with a hanging hook are transversely arranged on the side of each hanging rod in a penetrating mode, two insertion pipes are symmetrically arranged on the bottom of the hanging basket in the left-right direction, positioning ropes are assembled in the insertion pipes, and screws used for fixing the positioning ropes are screwed into the outer portions of the insertion pipes; the positioning device comprises a steel plate, a base, a right-angle connecting piece, a second screw, a positioning rope and a positioning rope, wherein the steel plate is arranged on the outer side of the operation platform, the first screw is matched between the steel plate and the operation platform, the base is arranged on the side, away from the operation platform, of the steel plate, the right-angle connecting piece is welded to the outer wall of the base, the second screw is matched between the right-angle connecting piece and the steel plate, a stepped hole is vertically arranged in the top of the base in a penetrating mode, and the positioning rope penetrates through; when the position is below the hanging basket to the extreme position, the insertion pipe is limited in the stepped hole; a balancing weight is assembled on the positioning rope, and a third screw is matched between the balancing weight and the positioning rope.
Preferably, a buffer gasket made of rubber is embedded in the step surface of the step hole; when the hanging basket passes through the hanging basket below the winding equipment, the hanging basket enters the stepped hole through the insertion pipe to form limiting on the hanging basket, and at the moment, the hanging basket can be in soft contact with the insertion pipe through the buffer gasket, so that high noise is prevented from being generated; by reducing the impact on the stone material carried in the basket.
Preferably, two clamping steel plates are clamped at the position, close to the tail end, of the positioning rope, a first bolt is matched between the two clamping steel plates, and the two clamping steel plates are clamped and fixed with the positioning rope after being tightened under the action of the first bolt; above-mentioned structure mainly plays safe spacing effect, and when the fixed inefficacy of balancing weight, the balancing weight can drop fast, and we can play safety protection's effect through the centre gripping steel sheet this moment.
Preferably, a plurality of convex strips for positioning the stone are arranged in parallel in the hanging basket; the sand grip can separate the stone, and when the stone in the hanging flower basket progressively reduces, can avoid the bottom of stone to slide, avoids the stone cracked.
Preferably, step surfaces are arranged on the inner left side surface and the inner right side surface of the hanging basket, and an accessory box is assembled between the step surfaces on the two sides and can slide along the transverse direction of the step surfaces; the dry-hanging stone curtain wall needs to use a very metal connecting piece, and the metal connecting piece can be stored better through the accessory box.
The utility model has the advantages that: this product is when the installation, connects the work platform through the steel sheet, and we can realize the position location of hanging flower basket through the location rope when pulling the hanging flower basket from top to bottom, and the steel sheet is installed in that one side that the building was kept away from to the work platform, therefore the assistance-localization real-time of location rope, can effectually avoid hanging flower basket contact steelframe. The structure of this product is comparatively simple, and the cost is comparatively cheap, and the operation is comparatively stable, is fit for using widely.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a front view of the present invention;
FIG. 2 is a cross-sectional view taken along line A-A;
FIG. 3 is a cross-sectional view of the base;
fig. 4 is a top view of the accessory caddy.
Detailed Description
All of the features disclosed in this specification, or all of the steps in any method or process so disclosed, may be combined in any combination, except combinations of features and/or steps that are mutually exclusive.
Any feature disclosed in this specification (including any accompanying claims, abstract and drawings), may be replaced by alternative features serving equivalent or similar purposes, unless expressly stated otherwise. That is, unless expressly stated otherwise, each feature is only an example of a generic series of equivalent or similar features.
In the description of the present invention, it is to be understood that the terms "one end", "the other end", "the outside", "upper", "inside", "horizontal", "coaxial", "central", "end", "length", "outer end", etc. indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Furthermore, in the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise explicitly specified or limited, the terms "set", "coupled", "connected", "penetrating", "plugging", and the like are to be understood in a broad sense, and may be, for example, fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Referring to fig. 1, 2, 3 and 4, the stone curtain wall installation and hoisting device comprises a hanging basket 1, suspenders 2 are installed on the left side and the right side of the hanging basket 1, bolts 211 are matched between the suspenders 2 and the hanging basket 1, hanging holes 201 matched with a hanging hook are transversely arranged on the side of the suspenders 2 in a penetrating manner, two insertion pipes 101 are symmetrically arranged on the bottom of the hanging basket 1 in the left-right direction, positioning cables 3 are arranged in the insertion pipes 101, and screws 111 used for fixing the positioning cables 3 are screwed into the outer parts of the insertion pipes 101; a steel plate 4 is installed on the outer side of the operation platform, a first screw 411 is matched between the steel plate 4 and the operation platform, a base 5 is arranged on one side, away from the operation platform, of the steel plate 4, a right-angle connecting piece 501 is welded on the outer wall of the base 5, a second screw 511 is matched between the right-angle connecting piece 501 and the steel plate 4, a stepped hole 502 is vertically arranged at the top of the base 5 in a penetrating mode, and the positioning rope 3 penetrates through the stepped hole 502 and is in transition fit with a small hole part of the stepped hole; when the basket 1 is located at a limiting position, the insertion pipe 101 is limited in the stepped hole 502; a weight block 6 is assembled on the positioning rope 3, and a third screw 611 is fitted between the weight block 6 and the positioning rope 3.
In a preferred embodiment of the present invention, a rubber cushion ring 522 is embedded in the step surface of the step hole 502; when the hanging basket 1 passes through the lower part of the winding device, the inserting pipe 101 enters the stepped hole 502 to limit the hanging basket 1, and at the moment, the buffering gasket 522 can be in soft contact with the inserting pipe 101 to avoid generating larger noise; by reducing the impact on the stone material carried in the basket 1.
In a preferred embodiment of the present invention, two clamping steel plates 331 are clamped at a position close to the end of the positioning cable 3, a first bolt 332 is fitted between the two clamping steel plates 331, and the two clamping steel plates 331 are clamped and fixed with the positioning cable 3 after being tightened under the action of the first bolt 332; above-mentioned structure mainly plays safe spacing effect, and when balancing weight 6's fixed inefficacy, balancing weight 6 can drop fast, and we can play safety protection's effect through centre gripping steel sheet 331 this moment.
In a preferred embodiment of the present invention, a plurality of raised strips 121 for positioning the stone material are arranged in parallel inside the hanging basket 1; the raised strips 121 can separate the stones, and when the stones in the hanging basket 1 are gradually reduced, the bottom of the stones can be prevented from sliding, and the stones are prevented from being broken.
In a preferred embodiment of the present invention, step surfaces 131 are disposed on the inner left and right sides of the hanging basket 1, an accessory box 141 is assembled between the step surfaces 131 on both sides, and the accessory box 141 can slide along the transverse direction of the step surfaces 131; the dry-hanging stone curtain wall needs to use a very metal connecting piece, and the metal connecting piece can be stored better through the accessory box.
The utility model has the advantages that: this product is when the installation, connects the work platform through the steel sheet, and we can realize the position location of hanging flower basket through the location rope when pulling the hanging flower basket from top to bottom, and the steel sheet is installed in that one side that the building was kept away from to the work platform, therefore the assistance-localization real-time of location rope, can effectually avoid hanging flower basket contact steelframe. The structure of this product is comparatively simple, and the cost is comparatively cheap, and the operation is comparatively stable, is fit for using widely.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (5)
1. The utility model provides a stone material curtain installation hoist device which characterized in that: the hanging basket comprises a hanging basket body (1), hanging rods (2) are installed on the left side face and the right side face of the hanging basket body (1), bolts (211) are matched between the hanging rods (2) and the hanging basket body (1), hanging holes (201) matched with a hanging hook are transversely arranged on the side faces of the hanging rods (2) in a penetrating mode, two insertion pipes (101) are symmetrically arranged on the bottom of the hanging basket body (1) in the left-right mode, positioning ropes (3) are assembled in the insertion pipes (101), and screws (111) used for fixing the positioning ropes (3) are screwed into the outer portions of the insertion pipes (101); a steel plate (4) is installed on the outer side of the operation platform, a first screw (411) is matched between the steel plate (4) and the operation platform, a base (5) is arranged on one side, far away from the operation platform, of the steel plate (4), a right-angle connecting piece (501) is welded on the outer wall of the base (5), a second screw (511) is matched between the right-angle connecting piece (501) and the steel plate (4), a stepped hole (502) is vertically arranged at the top of the base (5) in a penetrating mode, and the positioning rope (3) penetrates through the stepped hole (502) and is in transition fit with a small hole part of the stepped hole; when the basket (1) is moved to the limit position, the insertion pipe (101) is limited in the stepped hole (502); a balancing weight (6) is assembled on the positioning rope (3), and a third screw (611) is matched between the balancing weight (6) and the positioning rope (3).
2. The stone curtain wall installation and hoisting device of claim 1, characterized in that: a rubber cushion washer (522) is embedded in the step surface of the step hole (502).
3. The stone curtain wall installation and hoisting device of claim 1, characterized in that: two clamping steel plates (331) are clamped at the position, close to the tail end, of the positioning rope (3), a first bolt (332) is matched between the two clamping steel plates (331), and the two clamping steel plates (331) are tightened under the action of the first bolt (332) and then are clamped and fixed with the positioning rope (3).
4. The stone curtain wall installation and hoisting device of claim 1, characterized in that: a plurality of convex strips (121) for positioning the stone are arranged in the hanging basket (1) in parallel.
5. The stone curtain wall installation and hoisting device of claim 1, characterized in that: step surfaces (131) are arranged on the inner left side surface and the inner right side surface of the hanging basket (1), an accessory box (141) is assembled between the step surfaces (131) on the two sides, and the accessory box (141) can slide along the transverse direction of the step surfaces (131).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020274385.1U CN211818124U (en) | 2020-03-09 | 2020-03-09 | Stone material curtain installation hoist device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020274385.1U CN211818124U (en) | 2020-03-09 | 2020-03-09 | Stone material curtain installation hoist device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211818124U true CN211818124U (en) | 2020-10-30 |
Family
ID=73008398
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020274385.1U Active CN211818124U (en) | 2020-03-09 | 2020-03-09 | Stone material curtain installation hoist device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211818124U (en) |
-
2020
- 2020-03-09 CN CN202020274385.1U patent/CN211818124U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110528863B (en) | Hanging basket device for outer inclined plane construction and construction method | |
CN101177959A (en) | Curtain wall unit hanging equipment and construction method thereof | |
CN202080836U (en) | Material lifting equipment for aerial operation | |
CN209050366U (en) | The connecting rod bearing shell mounting tool of marine diesel | |
CN210032533U (en) | Construction equipment scaffold | |
CN201215876Y (en) | Assistant hanging rack for mounting top rack of electric pole | |
CN211818124U (en) | Stone material curtain installation hoist device | |
CN202767547U (en) | Nuclear plant construction safety rope fixing clamping rod | |
CN109098425B (en) | Steel beam operation table connection structure | |
CN209799408U (en) | rail-mounted vertical transportation mechanism for unit plate | |
KR101472980B1 (en) | Weight clamping type Gondola Hanger for Building facade maintenance | |
CN207483168U (en) | A kind of car floor frame tool special for hoisting | |
CN207109614U (en) | A kind of Hanging Basket for building | |
CN215666580U (en) | Transfer device is used in construction of compound incubation exterior sheathing | |
JP5673134B2 (en) | Lifting device, shaking prevention jig and suspension jig | |
CN202644958U (en) | Adjustable parapet wall supporting and suspending device | |
CN217555570U (en) | Protector for crane balancer | |
JP5235464B2 (en) | Elevator droop protector and elevator system | |
CN221216935U (en) | Assembled curtain wall unit body lifting device for super high-rise building reconstruction | |
CN213265386U (en) | Plate conveying device | |
CN220247462U (en) | Stone dry hanging anti-falling structure | |
CN212740403U (en) | Mechanical equipment hoisting frame | |
CN214780478U (en) | Lifting type auxiliary lifting device | |
CN213016417U (en) | Hydraulic support side guard plate mounting equipment | |
CN220033826U (en) | Hoisting equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |