CN211817923U - Scaffold for building construction - Google Patents

Scaffold for building construction Download PDF

Info

Publication number
CN211817923U
CN211817923U CN202020358973.3U CN202020358973U CN211817923U CN 211817923 U CN211817923 U CN 211817923U CN 202020358973 U CN202020358973 U CN 202020358973U CN 211817923 U CN211817923 U CN 211817923U
Authority
CN
China
Prior art keywords
disc
scaffold
standpipe
utility
vertical pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020358973.3U
Other languages
Chinese (zh)
Inventor
孙晓丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Jiaheng Construction Technology Co ltd
Original Assignee
Hangzhou Jiaheng Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiaheng Construction Technology Co ltd filed Critical Hangzhou Jiaheng Construction Technology Co ltd
Priority to CN202020358973.3U priority Critical patent/CN211817923U/en
Application granted granted Critical
Publication of CN211817923U publication Critical patent/CN211817923U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a scaffold technical field just discloses construction scaffold, including the standpipe, the quantity of standpipe can increase according to actual need, the standpipe is columniform steel pipe, every be provided with disc one and disc two on the standpipe, disc one and disc two are the circular shape piece, this construction scaffold, because the utility model discloses a four half slots have all been seted up on disc one and the disc two, so all can install on every half slot and violently manage, compare the joint spare that current scaffold adopted, because current scaffold connecting piece, only can connect a horizontal steel pipe alone, but the utility model discloses utilized disc one and disc two to make it once to connect four violently pipes, reduced the use of connecting piece, do not waste the resource for it is whole more succinct.

Description

Scaffold for building construction
Technical Field
The utility model relates to a scaffold technical field specifically is construction scaffold.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form.
The existing scaffold generally adopts four vertical pipes and then adopts connecting pieces to connect a cross rod on the vertical pipes, but the connecting pieces arranged in the way can only be connected with one transverse steel pipe, so that resources are wasted.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a construction scaffold.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the building construction scaffold comprises vertical pipes, the number of the vertical pipes can be increased according to actual needs, the vertical pipes are cylindrical steel pipes, a first disc and a second disc are arranged on each vertical pipe, the first disc and the second disc are circular blocks, the second disc is positioned above the first disc, the first disc is fixedly arranged on the vertical pipes, circular holes are formed in the second disc, the second disc is movably arranged on the vertical pipes through the circular holes, the second disc can slide on the vertical pipes up and down, four semicircular grooves are respectively formed in one side wall surface, close to the first disc, of the second disc and one side wall surface, the semicircular grooves are semi-cylindrical grooves, the semicircular grooves penetrate through one side wall surface, far away from the vertical pipes, of the first disc and the second disc, and rectangular openings are formed in the inner walls of the semicircular grooves in the first disc and the second disc, the rectangular opening is a rectangular opening.
Preferably, the rectangular opening penetrates through a side wall surface of the first disc and a side wall surface of the second disc which are far away from each other up and down, four threaded holes are formed in the first disc and the second disc, and each threaded hole is located between every two semicircular grooves.
Preferably, the threaded hole in the first disc corresponds to the threaded hole in the second disc up and down, the threaded hole in the second disc is connected with a threaded column in a threaded mode, and a transverse pipe is arranged between the first disc and the second disc.
Preferably, the length of the transverse pipe is changed according to actual needs, two clamping blocks are fixedly mounted on the outer walls of the upper side and the lower side of the two ends of the transverse pipe, and the clamping blocks are matched with the rectangular openings.
(III) advantageous effects
Compared with the prior art, the utility model provides a construction scaffold possesses following beneficial effect:
1. this construction scaffold, because the utility model discloses a four half slots have all been seted up on disc one and the disc two, so all can install on every half slot and violently manage, compare the joint spare that current scaffold adopted, because current scaffold connecting piece, can only connect a horizontal steel pipe alone, but the utility model discloses utilized disc one and disc two to make it can once connect four violently pipes, reduced the use of connecting piece, not extravagant resource for it is whole more succinct.
2. This construction scaffold puts into the half slot on the suitable position disc one through will violently managing, then will violently manage and put into the joint piece of the one end downside of half slot inside and put into the rectangle mouth on the disc one, block it, then slide two downstreams of disc, then make the half slot block on the disc two to violently manage, make the rectangle mouth card on the disc two go into to the joint piece on, then rotatory screw thread post, make the screw thread post enter into the screw hole on the disc one, such setting is convenient to assemble.
Drawings
Fig. 1 is the structure stereo-splitting schematic diagram of the utility model.
In the figure: the device comprises a vertical pipe 1, a first disc 2, a second disc 3, a rectangular opening 4, a threaded column 5, a threaded hole 6, a semicircular groove 7, a transverse pipe 8 and a clamping block 9.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, the scaffold for building construction includes vertical pipes 1, the number of the vertical pipes 1 can be increased according to actual needs, the vertical pipes 1 are cylindrical steel pipes, each vertical pipe 1 is provided with a first disc 2 and a second disc 3, the first disc 2 and the second disc 3 are circular blocks, the second disc 3 is located above the first disc 2, the first disc 2 is fixedly installed on the vertical pipe 1, the second disc 3 is provided with a circular hole, the second disc 3 is movably installed on the vertical pipe 1 through the circular hole, the second disc 3 can slide up and down on the vertical pipe 1, one side wall surface of the second disc 3 close to the first disc 2 up and down is respectively provided with four semicircular grooves 7, the semicircular grooves 7 are semi-cylindrical grooves, and the semicircular grooves 7 penetrate through one side wall surface of the first disc 2 and the second disc 3 away from the vertical pipe 1, set up rectangle mouth 4 on the 7 inner walls of half slot on the 2 on the disc of disc and the two 3 on the disc, rectangle mouth 4 is the mouth of rectangle, rectangle mouth 4 has run through a side wall that keeps away from about 2 on the disc and the two 3 on the disc, all set up four screw hole 6 on the 2 on the disc and the two 3 on the disc, every screw hole 6 is located between per two half slot 7 respectively, screw hole 6 on the 2 on the disc corresponds from top to bottom with screw hole 6 on the two 3 on the disc, threaded connection has screw post 5 in the screw hole 6 on the two 3 on the disc, it violently manages 8 to be provided with between the 2 on the disc and the two 3, the length of violently managing 8 changes according to actual need, equal fixed mounting has two joint pieces 9 on the both sides outer wall about violently managing 8 both ends, joint piece 9 and 4 looks adaptations of rectangle.
When in use, the utility model is used,
the first step is as follows: in placing the half slot 7 on the suitable position disc 2 with violently managing 8, then put into the joint piece 9 of the one end downside of half slot 7 inside with violently managing 8 and put into the rectangle mouth 4 on disc 2, block it, then slide two 3 downstreams of disc, then make the half slot 7 block on the two 3 discs violently manage 8, make the rectangle mouth 4 card on two 3 discs go into on the joint piece 9, then rotatory screw thread post 5, make screw thread post 5 enter into the screw hole 6 on the disc 2, such setting makes things convenient for the equipment.
The second step is that: because the utility model discloses a four half slots 7 have all been seted up on disc one 2 and disc two 3, so all can install on every half slot 7 and violently manage 8, compare the joint spare that current scaffold adopted, because current scaffold connecting piece, can only connect a horizontal steel pipe alone, but the utility model discloses utilized disc one 2 and disc two 3 to make it can once connect four and violently manage 8, reduced the use of connecting piece for it is whole more succinct.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. Construction scaffold frame, including standpipe (1), standpipe (1) is columniform steel pipe, its characterized in that: the vertical pipe (1) is provided with a first disc (2) and a second disc (3), four semicircular grooves (7) are respectively formed in one side wall surface of the second disc (3) close to the first disc (2) up and down, rectangular openings (4) are formed in the inner walls of the semicircular grooves (7) in the first disc (2) and the semicircular grooves (7) in the second disc (3), and four threaded holes (6) are formed in the first disc (2) and the second disc (3);
threaded connection has screw thread post (5) in screw hole (6) on two (3) of disc, be provided with between disc (2) and two (3) of disc and violently manage (8), equal fixed mounting has two joint pieces (9) on the both ends upper and lower both sides outer wall of violently managing (8), joint piece (9) and rectangle mouth (4) looks adaptation.
2. The construction scaffold of claim 1, wherein: the disc II (3) is located above the disc I (2), the disc I (2) is fixedly installed on the vertical pipe (1), the disc II (3) is provided with a round hole, and the disc II (3) is movably installed on the vertical pipe (1) through the round hole.
3. The construction scaffold of claim 1, wherein: the semicircular groove (7) is a semi-cylindrical groove, and the semicircular groove (7) penetrates through the side wall surface of the first disc (2) and the second disc (3) far away from the vertical pipe (1).
4. The construction scaffold of claim 1, wherein: the rectangular opening (4) penetrates through one side wall face of the first disk (2) and the second disk (3) which are far away from each other from top to bottom, each threaded hole (6) is located between every two semicircular grooves (7), and the threaded holes (6) in the first disk (2) correspond to the threaded holes (6) in the second disk (3) from top to bottom.
CN202020358973.3U 2020-03-20 2020-03-20 Scaffold for building construction Expired - Fee Related CN211817923U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020358973.3U CN211817923U (en) 2020-03-20 2020-03-20 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020358973.3U CN211817923U (en) 2020-03-20 2020-03-20 Scaffold for building construction

Publications (1)

Publication Number Publication Date
CN211817923U true CN211817923U (en) 2020-10-30

Family

ID=73011005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020358973.3U Expired - Fee Related CN211817923U (en) 2020-03-20 2020-03-20 Scaffold for building construction

Country Status (1)

Country Link
CN (1) CN211817923U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112459438A (en) * 2020-11-30 2021-03-09 四川仟坤建设集团有限责任公司 Scaffold structure and erection method thereof
CN113356559A (en) * 2021-06-13 2021-09-07 湖南金峰金属构件有限公司 Cold extrusion scaffold positioning and filling seat die

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112459438A (en) * 2020-11-30 2021-03-09 四川仟坤建设集团有限责任公司 Scaffold structure and erection method thereof
CN113356559A (en) * 2021-06-13 2021-09-07 湖南金峰金属构件有限公司 Cold extrusion scaffold positioning and filling seat die
CN113356559B (en) * 2021-06-13 2024-05-14 湖南金峰金属构件有限公司 Cold extrusion scaffold positioning filling seat die

Similar Documents

Publication Publication Date Title
CN211817923U (en) Scaffold for building construction
CN209817099U (en) Large-span steel house room bearing structure
CN211341149U (en) Assembled steel construction beam column node connecting device
CN210194906U (en) Concrete formwork for fabricated building
CN206385884U (en) A kind of extra-high performance concrete electric pole
CN214220423U (en) Assembly type leveling installation structure of waterproof wall surface
CN210659196U (en) Prepackage type building outer wall scaffold frame
CN212896816U (en) Assembled steel construction with subassembly is strengthened to junction
CN206428959U (en) A kind of scaffold upright rod base
CN209760799U (en) Be applied to cast-in-place section of assembled and do not have support instrument template system
CN205976473U (en) Aluminum -wood formwork support device
CN206829590U (en) A kind of scaffold upright rod
CN218668406U (en) Scaffold with safety protection net
CN208220198U (en) A kind of building engineering construction is with hanging mold device
CN213297406U (en) A rail guard for hydraulic engineering
CN209413277U (en) A kind of antidetonation scaffold connecting mechanism
CN219825724U (en) Steel frame concrete partition wall and partition wall structure
CN211817785U (en) Scaffold for building construction
CN211555326U (en) Splicing model for highway bridge design
CN214246674U (en) Exempt from building steel construction of screw installation
CN215368843U (en) Guardrail connecting structure is prevented in prefabricated assembly structure construction
CN206859611U (en) Construction scaffold
CN215760474U (en) Outer wall reserved hole plugging device
CN213330216U (en) Distributed power station is with control room of being convenient for build fast
CN217601495U (en) Assembled frame foundation for steel structure tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201030