CN211817327U - Hang installation component of piece and light gauge steel - Google Patents

Hang installation component of piece and light gauge steel Download PDF

Info

Publication number
CN211817327U
CN211817327U CN202020324906.XU CN202020324906U CN211817327U CN 211817327 U CN211817327 U CN 211817327U CN 202020324906 U CN202020324906 U CN 202020324906U CN 211817327 U CN211817327 U CN 211817327U
Authority
CN
China
Prior art keywords
keel
connecting hole
piece
steel
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020324906.XU
Other languages
Chinese (zh)
Inventor
汪成
汪晓娟
王玉江
闫含洋
王广为
牛峰
崔杰
朱晓宇
高磊
冯源
武少鹏
王小丽
林志强
李明辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jingnuo Construction Engineering Co Ltd
Beijing Jingnuosheng Metal Structure Engineering Co Ltd
China Railway Construction Group Co Ltd
Original Assignee
Beijing Jingnuo Construction Engineering Co Ltd
Beijing Jingnuosheng Metal Structure Engineering Co Ltd
China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jingnuo Construction Engineering Co Ltd, Beijing Jingnuosheng Metal Structure Engineering Co Ltd, China Railway Construction Group Co Ltd filed Critical Beijing Jingnuo Construction Engineering Co Ltd
Priority to CN202020324906.XU priority Critical patent/CN211817327U/en
Application granted granted Critical
Publication of CN211817327U publication Critical patent/CN211817327U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a hang installation component of piece and light gauge steel, hang piece, first connecting hole, second connecting hole, third connecting hole, jib, nut, first bolt, second bolt and strengthen the scute including light gauge steel, first fixed orifices, channel-section steel, second fixed orifices, fossil fragments. The utility model has the advantages that: the nut is provided with two, and fossil fragments hang the piece and twist about through the nut and be connected fixedly with the jib, be convenient for adjust fossil fragments and hang the height of piece, the second connecting hole is provided with two, and control two second connecting holes and be the one-to-one setting, the running through of the first bolt of being convenient for is twisted soon, light gauge steel passes through the second bolt and twists first fixed orifices, the second fixed orifices, first connecting hole and fossil fragments and hang piece and twist the locking and be connected, make light gauge steel and fossil fragments hang the swift and safe of being connected of piece, the width of channel-section steel is less than light gauge steel's inside recess, prevent that light gauge steel from taking place deformation.

Description

Hang installation component of piece and light gauge steel
Technical Field
The utility model relates to an installation component specifically is an installation component who hangs piece and light gauge steel, belongs to installation component technical field.
Background
Along with the rapid development of the building industry, designers pay more attention to diversification and individualized development trends for indoor decoration, the modeling and color of an indoor suspended ceiling and the indoor lighting illumination setting provide more rigorous requirements for suspended ceiling design, traditional materials such as gypsum boards and fiber boards cannot meet the trend of decoration development, the application of metal aluminum plates and soft film suspended ceiling materials in suspended ceilings starts in Europe, and the materials become the first choice of modern suspended ceiling materials increasingly after being introduced from the nineties in China.
When the ceiling is installed, the light steel keel needs to be fixedly connected with the light steel keel, so that the requirement on the current market is met by an installation assembly of a hanging piece and the light steel keel, although various installation assemblies are produced on the current market, in general, a lot of common problems still exist, firstly, the installation steps of the existing installation assembly are too complex, time and labor are wasted during installation, and secondly, the stability of the existing installation assembly is insufficient, and certain potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a hang piece and light gauge steel's installation component in order to solve above-mentioned problem.
The utility model discloses a following technical scheme realizes above-mentioned purpose: a mounting assembly of a hanging piece and a light steel keel comprises the light steel keel, a first fixing hole, a channel steel, a second fixing hole, a keel hanging piece, a first connecting hole, a second connecting hole, a third connecting hole, a hanging rod, a nut, a first bolt, a second bolt and a reinforcing angle plate; the utility model discloses a light gauge steel installation component, including light gauge steel, keel, first fixed orifices, keel, first connecting hole, second connecting hole, third connecting hole, jib, first bolt horizontal rotation and twist on the second connecting hole, the bottom that the keel hung a piece is connected, first fixed orifices sets up at the light gauge steel top, the horizontal joint of channel-section steel is in the inside recess of light gauge steel, the second fixed orifices sets up at the channel-section steel top, the vertical top of connecting at light gauge steel is hung to the keel, just the keel hangs a major structure that constitutes this installation component, first connecting hole sets up on the bottom diaphragm that the keel hung a piece, the second connecting hole sets up on the left and right sides riser that the keel hung a piece, the third connecting hole is located keel and hangs a top diaphragm, the jib is vertical to be connected in the third connecting hole, the bottom at the jib is twisted soon to the nut, first bolt horizontal rotation is twisted.
Preferably, in order to ensure the service life of the suspension rod, the suspension rod is an M8 full-thread suspension rod, and the bottom of the suspension rod is provided with a screwing thread column.
Preferably, in order to facilitate the height that the piece was hung to the adjustment fossil fragments, the nut is provided with two, and fossil fragments hang the piece and revolve to revolve from top to bottom through the nut and be connected fixedly with the jib.
Preferably, in order to facilitate the penetration and screwing of the first bolt, the two second connecting holes are arranged, and the left second connecting hole and the right second connecting hole are arranged in a one-to-one correspondence manner.
Preferably, in order to make the connection between the light gauge steel and the keel hanging piece quick and safe, the light gauge steel is screwed and locked with the keel hanging piece through the second bolt passing through the first fixing hole, the second fixing hole and the first connecting hole.
Preferably, in order to prevent the light gauge steel from deforming, the width of the channel steel is smaller than the inner groove of the light gauge steel.
The utility model has the advantages that: this installation component reasonable in design, the jib is M8 full thread jib, and its bottom is provided with revolves soon the screw thread post, guarantee the life of this jib, the nut is provided with two, and fossil fragments hang the piece and revolve about the nut and revolve to be connected fixedly with the jib, be convenient for adjust the height that fossil fragments hung the piece, the second connecting hole is provided with two, and control two second connecting holes and be the one-to-one setting, the running through of the first bolt of being convenient for is revolved soon, light gauge steel passes first fixed orifices through the second bolt, the second fixed orifices, first connecting hole revolves soon with fossil fragments and locks the connection, make light gauge steel and fossil fragments hang being connected swiftly and safety, the width of channel-section steel is less than light gauge steel's inside recess, prevent that light gauge steel.
Drawings
FIG. 1 is a schematic side view of the whole body of the present invention;
fig. 2 is a three-dimensional schematic view of the split of the present invention.
In the figure: 1. light gauge steel, 2, first fixed orifices, 3, channel-section steel, 4, second fixed orifices, 5, fossil fragments hang piece, 6, first connecting hole, 7, second connecting hole, 8, third connecting hole, 9, jib, 10, nut, 11, first bolt, 12, second screw and 13, reinforcing angle board.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, an assembly for mounting a hanging piece and a light gauge steel comprises a light gauge steel 1, a first fixing hole 2, a channel steel 3, a second fixing hole 4, a keel hanging piece 5, a first connecting hole 6, a second connecting hole 7, a third connecting hole 8, a hanging rod 9, a nut 10, a first bolt 11, a second bolt 12 and a reinforcing angle plate 13; the light steel keel 1 is connected to the bottom of the keel hanging piece 5, the first fixing hole 2 is arranged at the top of the light steel keel 1, the channel steel 3 is horizontally clamped in a groove in the light steel keel 1, the second fixing hole 4 is arranged at the top of the channel steel 3, the keel hanging piece 5 is vertically connected to the top of the light steel keel 1, the keel hanging piece 5 forms a main body structure of the mounting assembly, the first connecting hole 6 is arranged on a bottom transverse plate of the keel hanging piece 5, the second connecting holes 7 are arranged on left and right side vertical plates of the keel hanging piece 5, the third connecting holes 8 are arranged on a top transverse plate of the keel hanging piece 5, the hanging rod 9 is vertically connected into the third connecting holes 8, the screw cap 10 is screwed at the bottom of the hanging rod 9, the first bolt 11 is horizontally screwed on the second connecting hole 7, the second bolt 12 is vertically screwed on the first connecting hole 6, the reinforcing angle plate 13 is fixed at the top angular point of the keel hanger 5.
The jib 9 is M8 full thread jib, and its bottom is provided with to revolve and revolves the screw thread post, guarantees this jib 9 life, nut 10 is provided with two, and fossil fragments hang 5 and revolve about through nut 10 and revolve to be connected fixedly with jib 9, the height that the piece 5 was hung to the adjustment fossil fragments of being convenient for, second connecting hole 7 is provided with two, and controls two second connecting holes 7 and be the one-to-one setting, and the running through of first bolt 11 of being convenient for is revolved soon, light gauge steel 1 passes first fixed orifices 2, second fixed orifices 4, first connecting hole 6 and fossil fragments and hangs 5 to revolve to twist the locking and be connected through second bolt 12, makes light gauge steel 1 and fossil fragments hang being connected swiftly and safety of 5, the width of channel-section steel 3 is less than light gauge steel 1's inside recess, prevents that light gauge steel 1 from taking place deformation.
The working principle is as follows: when using this installation component, revolve about earlier fossil fragments and twist about fossil fragments hang piece 5 through nut 10 and be connected fixedly with jib 9, the adjustment fossil fragments of being convenient for hang the height of piece 5, then arrange channel-section steel 3 in light gauge steel 1 inside recess, then pass first fixed orifices 2, second fixed orifices 4, first connecting hole 6 and fossil fragments through second bolt 12 with light gauge steel 1 and hang 5 and revolve to twist the locking and be connected, make light gauge steel 1 with fossil fragments hang that 5 be connected swiftly and safety can.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a hang piece and light gauge steel's installation component which characterized in that: the steel keel structure comprises a light steel keel (1), a first fixing hole (2), a channel steel (3), a second fixing hole (4), a keel hanging piece (5), a first connecting hole (6), a second connecting hole (7), a third connecting hole (8), a hanging rod (9), a nut (10), a first bolt (11), a second bolt (12) and a reinforcing angle plate (13); the light steel keel (1) is connected to the bottom of the keel hanging piece (5), the first fixing hole (2) is formed in the top of the light steel keel (1), the channel steel (3) is horizontally clamped in a groove in the light steel keel (1), the second fixing hole (4) is formed in the top of the channel steel (3), the keel hanging piece (5) is vertically connected to the top of the light steel keel (1), the keel hanging piece (5) forms a main body structure of the mounting assembly, the first connecting hole (6) is formed in a bottom transverse plate of the keel hanging piece (5), the second connecting holes (7) are formed in vertical plates on the left side and the right side of the keel hanging piece (5), the third connecting hole (8) is located in a transverse plate on the top of the keel hanging piece (5), the suspender (9) is vertically connected into the third connecting hole (8), and the nut (10) is screwed to the bottom of the suspender (9), the first bolt (11) is horizontally screwed on the second connecting hole (7), the second bolt (12) is vertically screwed on the first connecting hole (6), and the reinforcing angle plate (13) is fixed at the top angular point of the keel hanging piece (5).
2. The assembly of claim 1, wherein: the suspension rod (9) is an M8 full-thread suspension rod, and the bottom of the suspension rod is provided with a screwing thread column.
3. The assembly of claim 1, wherein: the two screw caps (10) are arranged, and the keel hanging piece (5) is vertically screwed and connected and fixed with the hanging rod (9) through the screw caps (10).
4. The assembly of claim 1, wherein: the number of the second connecting holes (7) is two, and the left second connecting hole and the right second connecting hole (7) are arranged in a one-to-one correspondence manner.
5. The assembly of claim 1, wherein: the light steel keel (1) passes through the first fixing hole (2), the second fixing hole (4) and the first connecting hole (6) through the second bolt (12) and is connected with the keel hanger (5) in a screwing and locking manner.
6. The assembly of claim 1, wherein: the width of the channel steel (3) is smaller than the inner groove of the light steel keel (1).
CN202020324906.XU 2020-03-16 2020-03-16 Hang installation component of piece and light gauge steel Active CN211817327U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020324906.XU CN211817327U (en) 2020-03-16 2020-03-16 Hang installation component of piece and light gauge steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020324906.XU CN211817327U (en) 2020-03-16 2020-03-16 Hang installation component of piece and light gauge steel

Publications (1)

Publication Number Publication Date
CN211817327U true CN211817327U (en) 2020-10-30

Family

ID=73012617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020324906.XU Active CN211817327U (en) 2020-03-16 2020-03-16 Hang installation component of piece and light gauge steel

Country Status (1)

Country Link
CN (1) CN211817327U (en)

Similar Documents

Publication Publication Date Title
CN105178479B (en) The construction method of the intelligent glass curtain wall of Super High element type
CN202370147U (en) Ceiling lamp groove structure of lightgage steel joist framework
CN204876268U (en) Light steel suspended ceiling keel that excels in
CN205804726U (en) Single-beam back-bolt type stone curtain wall
CN210288842U (en) Penetrating grid furred ceiling structure
CN211817327U (en) Hang installation component of piece and light gauge steel
CN211974027U (en) Adaptor convenient to GRG jib is adjusted location
CN206655376U (en) A kind of lamp diaphragm plate hanging structure
CN216713553U (en) Fireproof environment-friendly curtain box
CN206234782U (en) A kind of LED lamp high-altitude fixing device
CN213868520U (en) Light steel keel frame with stable structure for indoor suspended ceiling
CN205840109U (en) A kind of flexible hanging piece suspended ceiling of tubulose
CN203654575U (en) Ceiling installation structure
CN209723360U (en) A kind of suspension and support fixed structure for steel construction flange plate
CN110821012B (en) Three-dimensional adjustable curtain wall support
CN204609087U (en) A kind of furred ceiling mounts keel
CN207177007U (en) A kind of bright frame decorative strip installing structure of building curtain wall
CN206625434U (en) Keel bracket connects system
CN208952035U (en) A kind of mounting structure of wall-mounted lamps and lanterns
CN213233958U (en) Decorate furred ceiling and wall reentrant corner crack resistance structure
CN205077802U (en) Enameled pressed steel hangs dress structure
CN218881266U (en) Ceramic curtain wall plate structure
CN212802362U (en) Glass attachment device for building decoration
CN217439316U (en) Suspended ceiling structure
CN218264798U (en) A aluminium honeycomb panel fast-assembling device for wall fast-assembling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant