CN211816815U - Drainage structures for building - Google Patents

Drainage structures for building Download PDF

Info

Publication number
CN211816815U
CN211816815U CN202020049299.0U CN202020049299U CN211816815U CN 211816815 U CN211816815 U CN 211816815U CN 202020049299 U CN202020049299 U CN 202020049299U CN 211816815 U CN211816815 U CN 211816815U
Authority
CN
China
Prior art keywords
block
pipe
funnel
elbow
connecting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020049299.0U
Other languages
Chinese (zh)
Inventor
张强
姜良
庞光伟
姜大卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjia Jiansheng Construction Engineering Group Co ltd
Zhongqing Jianan Construction Group Co Ltd
Original Assignee
Zhongqing Jianan Construction Group Co Ltd
Qingdao Zhongjia Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongqing Jianan Construction Group Co Ltd, Qingdao Zhongjia Construction Group Co Ltd filed Critical Zhongqing Jianan Construction Group Co Ltd
Priority to CN202020049299.0U priority Critical patent/CN211816815U/en
Application granted granted Critical
Publication of CN211816815U publication Critical patent/CN211816815U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model discloses a drainage structures for building, including funnel, top cap, fixed block and movable block, the side is provided with the connecting block on the funnel, and has seted up the connecting hole on the connecting block, and the side is provided with the joint liner pipe on the connecting block simultaneously, the top cap sets up the side on the joint liner pipe, and the side has seted up the seepage hole on the top cap, the funnel downside is provided with first connecting pipe, and first connecting pipe rear side is provided with the fixed plate, is provided with first connecting screw on the fixed plate simultaneously, the fixed block sets up at the fixed plate leading flank, and the fixed block leading flank has seted up first spacing groove. This drainage structures for building is provided with top cap and weeping hole, when using this drainage structures in the installation on the building, through side-mounting top cap on connecting the bushing pipe, when carrying out the drainage, inside the rainwater entered into this drainage structures through top cap upside weeping hole, and through the filter effect of top cap to debris for this drainage structures is inside to be difficult to block up, and the staff regularly clears up can.

Description

Drainage structures for building
Technical Field
The utility model particularly relates to a building drainage technical field specifically is a drainage structures for building.
Background
The building is a general name of buildings and structures, is an artificial environment created by using the grasped material technical means and applying certain scientific laws, geomantic omen concepts and aesthetic rules in order to meet the needs of social life of people, and drainage of the building is to drain water stains on the surface of the building or nearby the building.
When the existing drainage structure for the building is used for drainage, sundries or other materials easily enter the interior of the drainage pipeline, so that the interior of the drainage pipeline is easy to block, and when the existing drainage structure for the building is installed, a funnel at the upper end of the pipeline is fixed by using a screw, so that the funnel is easy to fall off due to long-time impact force.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a drainage structures for building to current drainage structures for building who proposes in solving above-mentioned background art is when carrying out the drainage, inside debris or other materials enter into drainage pipe easily, and present drainage structures for building when the installation, use the screw to carry out the problem of fixing to pipeline upper end funnel.
In order to achieve the above object, the utility model provides a following technical scheme: a drainage structure for buildings comprises a funnel, a top cover, a fixed block and a movable block, wherein the upper side surface of the funnel is provided with a connecting block, the connecting block is provided with a connecting hole, meanwhile, the upper side surface of the connecting block is provided with a connecting liner tube, the top cover is arranged on the upper side surface of the connecting liner tube, and the upper side surface of the top cover is provided with a leakage hole, the lower side surface of the funnel is provided with a first connecting pipe, the rear side of the first connecting pipe is provided with a fixed plate, meanwhile, a first connecting screw is arranged on the fixing plate, the fixing block is arranged on the front side surface of the fixing plate, a first limiting groove is arranged on the front side surface of the fixing block, meanwhile, the first limit groove is arranged at the rear side of the first connecting pipe, the movable block is arranged at the front side surface of the fixed block, the rear side surface of the movable block is provided with a second limit groove, meanwhile, the second limiting groove is formed in the front side of the first connecting pipe, and the movable block is connected with the fixed block through a second connecting screw.
Preferably, first connecting pipe downside is provided with the elbow, and the elbow upper end is connected with first connecting pipe through first connector, the elbow downside is provided with the clearance pipe, and is provided with the connection lid on the clearance pipe, the elbow lower extreme is provided with the second connecting pipe, and the second connecting pipe is connected with the elbow lower extreme through the second connector.
Preferably, the diameter of the top cover is the same as that of the connecting liner pipe, and the leakage holes are distributed on the top cover at equal intervals.
Preferably, the length and the width of the fixed block are both smaller than those of the fixed plate, and the size and the shape of the fixed block are both the same as those of the movable block.
Preferably, the inner diameter of the second limiting groove is equal to the inner diameter of the first limiting groove, and the sum of the inner diameter of the second limiting groove and the inner diameter of the first limiting groove is equal to the diameter of the first connecting pipe.
Preferably, the second connecting screws are symmetrically arranged about the central axis of the movable block.
Preferably, the inner diameter of the first connector and the inner diameter of the second connector are respectively equal to the diameter of the first connecting pipe, the diameter of the elbow and the diameter of the second connecting pipe.
Compared with the prior art, the beneficial effects of the utility model are that: the drainage structure for the building is characterized in that,
(1) the drainage structure is provided with the top cover and the leakage holes, when the drainage structure is installed and used on a building, the top cover is installed on the upper side of the connecting liner pipe, rainwater enters the inside of the drainage structure through the leakage holes on the upper side of the top cover during drainage, and the top cover can filter sundries, so that the inside of the drainage structure is not easily blocked, and workers can clean the drainage structure at regular time;
(2) the funnel is fixedly installed by allowing the connecting liner tube to enter the water leakage hole and then reinforcing and fixing the connecting liner tube by using cement paste when the drainage structure is installed on a building, and the connecting screw penetrates through the connecting hole in the connecting block to be connected with a wall body, so that the funnel is more firmly installed and is not easy to fall off due to long-term impact force;
(3) be provided with fixed block and movable block, when installing between first connecting pipe and funnel, through letting first connecting pipe enter into the first spacing inslot portion of fixed block front side, reuse second connecting screw fixes the movable block on the fixed block for movable block rear side second spacing groove is connected with first connecting pipe, makes first connecting pipe installation fastness better like this.
Drawings
FIG. 1 is a schematic front view of the present invention;
fig. 2 is a schematic top view of the fixing plate of the present invention;
fig. 3 is a schematic view of the top cover of the present invention.
In the figure: 1. the funnel, 2, the connecting block, 3, the connecting hole, 4, the connection bushing pipe, 5, the top cap, 6, the seepage hole, 7, first connecting pipe, 8, the fixed plate, 9, first connecting screw, 10, the fixed block, 11, first spacing groove, 12, the movable block, 13, the spacing groove of second, 14, second connecting screw, 15, the elbow, 16, first connecting head, 17, the clearance pipe, 18, the connection lid, 19, the second connecting pipe, 20, the second connector.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a drainage structures for building, as shown in fig. 1, the side is provided with connecting block 2 on funnel 1, and has seted up connecting hole 3 on connecting block 2, and the side is provided with connecting liner pipe 4 on connecting block 2 simultaneously, and when installation funnel 1, through letting connecting liner pipe 4 enter into the connecting hole on the building inside, the rethread uses cement concrete to consolidate it fixedly, makes funnel 1's installation fastness better like this.
As shown in fig. 1 and 3, the top cover 5 is arranged on the upper side of the connecting liner tube 4, the upper side of the top cover 5 is provided with the leakage holes 6, the diameter of the top cover 5 is the same as that of the connecting liner tube 4, the leakage holes 6 are distributed on the top cover 5 at equal intervals, so that the top cover 5 can be conveniently installed on the upper side of the connecting liner tube 4, meanwhile, the top cover 5 can play a filtering role in all directions of the connecting liner tube 4, and sundries are not easy to enter the connecting liner tube 4 through the leakage holes 6.
As shown in fig. 2, a first connecting pipe 7 is provided on the lower side surface of the funnel 1, a fixed plate 8 is provided on the rear side of the first connecting pipe 7, a first connecting screw 9 is provided on the fixed plate 8, a fixed block 10 is provided on the front side surface of the fixed plate 8, a first limiting groove 11 is provided on the front side surface of the fixed block 10, the length and width of the fixed block 10 are both smaller than those of the fixed plate 8, and the size and shape of the fixed block 10 are the same as those of a movable block 12, so that the fixed block 10 and the movable block 12 can conveniently reinforce the first connecting pipe 7, so that the first connecting pipe 7 can be more firmly installed, the first limiting groove 11 is provided on the rear side of the first connecting pipe 7, the movable block 12 is provided on the front side surface of the fixed block 10, and a second limiting groove 13 is provided on the rear side surface of the movable block 12, and the second limiting groove 13 is, the internal diameter of second spacing groove 13 equals the internal diameter of first spacing groove 11, and the internal diameter sum of the internal diameter of second spacing groove 13 and the internal diameter of first spacing groove 11 equals the diameter of first connecting pipe 7, make first connecting pipe 7 can enter into second spacing groove 13 and first spacing inslot 11 inside comprehensively like this, it is better to cause first connecting pipe 7 installation fastness, movable block 12 is connected with fixed block 10 through second connecting screw 14, second connecting screw 14 sets up about the axis symmetry of movable block 12, make movable block 12 conveniently be connected with fixed block 10 through second connecting screw 14.
As shown in fig. 1, an elbow 15 is disposed at the lower side of the first connection pipe 7, the upper end of the elbow 15 is connected to the first connection pipe 7 through a first connector 16, a cleaning pipe 17 is disposed at the lower side of the elbow 15, a connection cover 18 is disposed on the cleaning pipe 17, a second connection pipe 19 is disposed at the lower end of the elbow 15, the second connection pipe 19 is connected to the lower end of the elbow 15 through a second connector 20, the inner diameter of the first connector 16 and the inner diameter of the second connector 20 are respectively equal to the diameter of the first connection pipe 7, the diameter of the elbow 15 and the diameter of the second connection pipe 19, the first connection pipe 7 is conveniently connected to the elbow 15 through the first connector 16, and the second connection pipe 19 is conveniently connected to the elbow 15 through the second connector 20.
The working principle is as follows: when the drainage structure for the building is used, the connecting liner pipe 4 enters into the connecting hole on the building, and then the connecting hole 3 on the connecting block 2 is connected with the wall by using the fixing screw to penetrate through the connecting hole, so that the funnel 1 is fixedly installed, at the moment, the outer side surface of the connecting liner pipe 4 is poured by using cement concrete, so that the connecting liner pipe 4 is connected with the connecting hole, so that the connecting liner pipe 4 is fixed, the funnel 1 is better in installation firmness, at the moment, the top cover 5 is installed on the upper side surface of the connecting liner pipe 4, so that the drainage structure can be used, sundries are easily filtered by the action of the leakage hole 6 on the top cover 5, and rainwater can enter into the interior to be discharged, so that the drainage structure is not easy to be blocked, and the first connecting pipe 7 is reinforced by the movable block 12 and the fixed block 10, so that the use of the first connecting pipe 7 is not easily affected while the worker is required to clean the filtered impurities of the top cover 5 at regular intervals, so that the use of the top cover 5 is not easily affected, and what is not described in detail in this specification belongs to the prior art well known to those skilled in the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (7)

1. The utility model provides a drainage structures for building, includes funnel (1), top cap (5), fixed block (10) and movable block (12), its characterized in that: the funnel is characterized in that a connecting block (2) is arranged on the upper side of the funnel (1), a connecting hole (3) is formed in the connecting block (2), a connecting liner tube (4) is arranged on the upper side of the connecting liner tube (4), a top cover (5) is arranged on the upper side of the top cover (5), a leakage hole (6) is formed in the upper side of the top cover (5), a first connecting tube (7) is arranged on the lower side of the funnel (1), a fixing plate (8) is arranged on the rear side of the first connecting tube (7), a first connecting screw (9) is arranged on the fixing plate (8), a fixing block (10) is arranged on the front side of the fixing plate (8), a first limiting groove (11) is formed in the front side of the fixing block (10), a first limiting groove (11) is formed in the rear side of the first connecting tube (7), a movable block (12) is arranged on the front side of the fixing block (10), and a second limiting, meanwhile, a second limiting groove (13) is formed in the front side of the first connecting pipe (7), and the movable block (12) is connected with the fixed block (10) through a second connecting screw (14).
2. A drainage structure for construction according to claim 1, wherein: first connecting pipe (7) downside is provided with elbow (15), and elbow (15) upper end is connected with first connecting pipe (7) through first connector (16), elbow (15) downside is provided with clearance pipe (17), and is provided with on clearance pipe (17) and connects lid (18), elbow (15) lower extreme is provided with second connecting pipe (19), and second connecting pipe (19) are connected with elbow (15) lower extreme through second connector (20).
3. A drainage structure for construction according to claim 1, wherein: the diameter of the top cover (5) is the same as that of the connecting liner tube (4), and the leakage holes (6) are distributed on the top cover (5) at equal intervals.
4. A drainage structure for construction according to claim 1, wherein: the length and the width of the fixed block (10) are both smaller than those of the fixed plate (8), and the size and the shape of the fixed block (10) are the same as those of the movable block (12).
5. A drainage structure for construction according to claim 1, wherein: the inner diameter of the second limiting groove (13) is equal to the inner diameter of the first limiting groove (11), and the sum of the inner diameter of the second limiting groove (13) and the inner diameter of the first limiting groove (11) is equal to the diameter of the first connecting pipe (7).
6. A drainage structure for construction according to claim 1, wherein: the second connecting screws (14) are symmetrically arranged relative to the central axis of the movable block (12).
7. A drainage structure for construction according to claim 2, wherein: the inner diameter of the first connector (16) and the inner diameter of the second connector (20) are respectively equal to the diameter of the first connecting pipe (7), the diameter of the elbow (15) and the diameter of the second connecting pipe (19).
CN202020049299.0U 2020-01-10 2020-01-10 Drainage structures for building Active CN211816815U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020049299.0U CN211816815U (en) 2020-01-10 2020-01-10 Drainage structures for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020049299.0U CN211816815U (en) 2020-01-10 2020-01-10 Drainage structures for building

Publications (1)

Publication Number Publication Date
CN211816815U true CN211816815U (en) 2020-10-30

Family

ID=73048592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020049299.0U Active CN211816815U (en) 2020-01-10 2020-01-10 Drainage structures for building

Country Status (1)

Country Link
CN (1) CN211816815U (en)

Similar Documents

Publication Publication Date Title
CN211816815U (en) Drainage structures for building
CN213358881U (en) Secondary drainage device for ground of sinking type toilet
CN207277511U (en) A kind of mouth of a river double-edged fine-toothed comb
CN202936809U (en) Drainage channel for cleaning post-cast strip
CN211547908U (en) Secondary drainage water draining and draining device for kitchen and bathroom
CN210659205U (en) U-shaped water intercepting tank for climbing frame and intercepting water of outer wall of high-rise main body
CN212820618U (en) Glazed agent spraying equipment for water permeable bricks
CN203603495U (en) Pre-wetting system special for lightweight aggregate
CN212715966U (en) Civil engineering watering device
CN205296105U (en) Field irrigation is with " U " shape concrete water conservation channel
CN210947199U (en) Simple and easy bolt hole plugging device
CN210459806U (en) Building integrated building wall structure of photovoltaic
CN208235959U (en) A kind of building construction temporary drainage structure
CN208268566U (en) A kind of drain structure preventing tube wall indent
CN205934633U (en) Road surface is with brick that permeates water
CN214738879U (en) Assembled building outer wall waterproof construction
CN204983129U (en) Pipeline cleaner
CN201015344Y (en) Hogpen water conservation type faeces cleaning groove
CN216109416U (en) Building design roof eaves mouth watertight fittings
CN210049194U (en) Soil and water conservation net that hydraulic engineering used
CN205296349U (en) Can assemble dismountable escape canal of having enough to meet need use
CN216689666U (en) Drainage device for green building
CN212452889U (en) Water saving fixtures is used in public road bridge roof beam construction
CN216948147U (en) Water conservancy and hydropower engineering constructs water conservancy diversion drainage structures in hole
CN220203292U (en) Engineering flue with waterproof anti-blocking function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 266000 Room 302, Building 29, 171 Jinshui Road, Licang District, Qingdao City, Shandong Province

Patentee after: Zhongjia Jiansheng Construction Engineering Group Co.,Ltd.

Patentee after: Zhongqing Jian'an Construction Group Co., Ltd

Address before: 266000 Room 302, Building 29, 171 Jinshui Road, Licang District, Qingdao City, Shandong Province

Patentee before: QINGDAO ZHONGJIA CONSTRUCTION GROUP Co.,Ltd.

Patentee before: Zhongqing Jian'an Construction Group Co., Ltd